Integrated Cross-Sectorial Plan of Tirana-Durres Area
The Albanian Government and the National Spatial Plan have identified the Tiranë-Durrës area, as one of the most important economic areas of the country, and of the Balkan region. To ensure a sustainable territorial and urban development of this area, the Ministry of Urban Development in cooperation with the National Territorial Planning Agency has taken the initiative to draft a Cross-sectoral Integrated Plan for the economic area Tiranë – Durrës. The metropolitan region under study includes territories administered by 5 municipalities: Tiranë, Durrës, Vorë, Shijak, Kamëz. The Albanian Government and the National Spatial Plan have identified the Tiranë-Durrës area, as one of the most important economic areas of the country, and of the Balkan region. To ensure a sustainable territorial and urban development of this area, the Ministry of Urban Development in cooperation with the National Territorial Planning Agency has taken the initiative to draft a Cross-sectoral Integrated Plan for the economic area Tiranë – Durrës. The metropolitan region under study includes territories administered by 5 municipalities: Tiranë, Durrës, Vorë, Shijak, Kamëz.
Table 4.30 Areas at risk Table 5.1 Strategic projects: Economic development Table 5.2 Strategic projects: Urban development Table 5.3 Strategic projects: Rural development Table 5.4 Strategic projects: Development of transport and infrastructure Table 5.5 Strategic projects: Environmental protection and development Table 7.1 Strategic themes Table 7.2 Economic welfare Table 7.3 People, urbanization and housing Table 7.4 Infrastructure and environment Figures Figure 1.1 Global Competitiveness Index Figure 1.2 Comparison of the Tirana-Durres metropolitan region with Belgrade Figure 1.3 Comparison of the Tirana-Durres metropolitan region with Pristina and Skopje Figure 1.4 Comparison of the Tirana-Durres metropolitan region with Sarajevo and Zagreb Figure1.5 Comparison of the Tirana-Durres metropolitan region with Ljubljana Figure 1.6 Hierarchy of the territorial plans Figure 1.7 Coordination of the plan Figure 2.1 Scenario 1 Figure 2.2 Scenario 2 Figure 2.3 Scenario 3 Figure 3.1 Vision statement Figure 3.2 Structure of the plan Figure 4.1 Economic development policies Figure 4.2 Innovation and competition in the economy Figure 4.3 Public support components Figure 4.4 What is a development incubator Figure 4.5 Innovation-based incubators Figure 4.6 What is an economic cluster Figure 4.7 Cluster development stages Figure 4.8 “Triple helix” concept Figure 4.9 Different dimensions of a cluster and respective policies and / or programs Figure 4.10 Regional framework of the touristic destination sustainable management Figure 4.11 Organization and cooperation structure of tourism stakeholders Figure 4.12 Conceptual model for public-private partnership for the development of regional tourism Figure 4.13 Urban development policies Figure 4.14 Sustainable communities Figure 4.15 Rural development policies Figure 4.16 Transport and infrastructure development policies Figure 4.17 Environmental development policies Figure 4.18 Green and grey infrastructure 14
Maps Map 1.1 Areas affected by ICSP Tirana-Durres Map 3.1 Vision as per the Integrated Cross-Sectorial Plan Tirana-Durres Map 4.1 Economy Map 4.2 Tourism Map 4.3 Densification of urban centres Map 4.4 Urban centres and the territory comprising ICSP Tirana-Durres Map 4.5 Territorial use in rural areas Map 4.6 Road infrastructure Map 4.7 Energy and industry Map 4.8 Use of natural territories Map 4.9 Urbanization restriction areas Map 4.10 Combining infrastructure, urban centres and natural territories 15
- Page 1: INTEGRATED, COMPETITIVE, DESTINATIO
- Page 4 and 5: This plan was drafted with the inva
- Page 6 and 7: TABLE OF CONTENTS 10 Acronyms 11 Gl
- Page 8 and 9: TABLE OF CONTENTS 81 EP4.2- Develop
- Page 10 and 11: TABLE OF CONTENTS 5 170 Strategic p
- Page 12 and 13: Acronyms B2B Business to Business B
- Page 14 and 15: “Incubation” - is an instrument
- Page 18 and 19: Legal Context The Integrated Cross-
- Page 20 and 21: 1Introduction
- Page 22 and 23: Introduction Albania is an integral
- Page 24 and 25: During 1992-2009 period, Albania ha
- Page 26 and 27: NO Indicators Unit Year Albania Cro
- Page 28 and 29: Rank Score Global Competitiveness I
- Page 30 and 31: County Surface area (km 2 ) Populat
- Page 32 and 33: Agriculture Extracting Processing C
- Page 34 and 35: Regional competitiveness profile: T
- Page 36 and 37: SARAJEVO ACCESSIBILITY AIR ROAD SEA
- Page 38 and 39: 1.2 Combination of the national pla
- Page 40 and 41: 1.3 Coordination of the plan After
- Page 42 and 43: 2SWOT analysis, territorial systems
- Page 44 and 45: 2.1 SWOT analysis The drafting of t
- Page 46 and 47: 2.2 Conclusions In conclusion of th
- Page 48 and 49: Scenario 1- Monocentric (Tirana) Th
- Page 50 and 51: Fushe Kruje Sukth Vore Kamez Durres
- Page 52 and 53: 3Vision and strategic objectives
- Page 54 and 55: Vision of the Integrated Cross-Sect
- Page 56 and 57: KRUJË VORË KAMËZ DURRËS SHIJAK
- Page 58 and 59: on the functions of the urban centr
- Page 60 and 61: Soft factors of regional and local
- Page 62 and 63: SO3. Improve infrastructure, transp
- Page 64 and 65: 4Regional development policies
Maps<br />
Map 1.1 <strong>Area</strong>s affected by ICSP <strong>Tirana</strong>-<strong>Durres</strong><br />
Map 3.1 Vision as per the <strong>Integrated</strong> <strong>Cross</strong>-<strong>Sectorial</strong> <strong>Plan</strong> <strong>Tirana</strong>-<strong>Durres</strong><br />
Map 4.1 Economy<br />
Map 4.2 Tourism<br />
Map 4.3 Densification <strong>of</strong> urban centres<br />
Map 4.4 Urban centres and the territory comprising ICSP <strong>Tirana</strong>-<strong>Durres</strong><br />
Map 4.5 Territorial use in rural areas<br />
Map 4.6 Road infrastructure<br />
Map 4.7 Energy and industry<br />
Map 4.8 Use <strong>of</strong> natural territories<br />
Map 4.9 Urbanization restriction areas<br />
Map 4.10 Combining infrastructure, urban centres and natural territories<br />
15