- Page 1:
INTEGRATED, COMPETITIVE, DESTINATIO
- Page 4 and 5:
This plan was drafted with the inva
- Page 6 and 7:
TABLE OF CONTENTS 10 Acronyms 11 Gl
- Page 8 and 9:
TABLE OF CONTENTS 81 EP4.2- Develop
- Page 10 and 11:
TABLE OF CONTENTS 5 170 Strategic p
- Page 12 and 13:
Acronyms B2B Business to Business B
- Page 14 and 15:
“Incubation” - is an instrument
- Page 16 and 17:
Table 4.30 Areas at risk Table 5.1
- Page 18 and 19:
Legal Context The Integrated Cross-
- Page 20 and 21:
1Introduction
- Page 22 and 23:
Introduction Albania is an integral
- Page 24 and 25:
During 1992-2009 period, Albania ha
- Page 26 and 27:
NO Indicators Unit Year Albania Cro
- Page 28 and 29:
Rank Score Global Competitiveness I
- Page 30 and 31:
County Surface area (km 2 ) Populat
- Page 32 and 33:
Agriculture Extracting Processing C
- Page 34 and 35:
Regional competitiveness profile: T
- Page 36 and 37:
SARAJEVO ACCESSIBILITY AIR ROAD SEA
- Page 38 and 39:
1.2 Combination of the national pla
- Page 40 and 41:
1.3 Coordination of the plan After
- Page 42 and 43:
2SWOT analysis, territorial systems
- Page 44 and 45:
2.1 SWOT analysis The drafting of t
- Page 46 and 47:
2.2 Conclusions In conclusion of th
- Page 48 and 49:
Scenario 1- Monocentric (Tirana) Th
- Page 50 and 51:
Fushe Kruje Sukth Vore Kamez Durres
- Page 52 and 53:
3Vision and strategic objectives
- Page 54 and 55:
Vision of the Integrated Cross-Sect
- Page 56 and 57:
KRUJË VORË KAMËZ DURRËS SHIJAK
- Page 58 and 59:
on the functions of the urban centr
- Page 60 and 61:
Soft factors of regional and local
- Page 62 and 63:
SO3. Improve infrastructure, transp
- Page 64 and 65:
4Regional development policies
- Page 66 and 67:
90 94 94 94 98 108 108 113 113 114
- Page 68 and 69:
138 138 139 141 142 143 143 143 143
- Page 70 and 71:
Regional Development Policies The I
- Page 72 and 73:
competitiveness, focusing on a glob
- Page 74 and 75:
The governing structures should dev
- Page 76 and 77:
EP3- Develop SMEs and innovation Th
- Page 78 and 79:
Fund for Innovation. The board, thr
- Page 80 and 81:
under the ground in order to avoid
- Page 82 and 83:
Various services may be needed for
- Page 84 and 85:
• Creating a climate of trust, co
- Page 86 and 87:
Dimensionet e ndryshme të një kla
- Page 88 and 89:
There are a number of mechanisms wh
- Page 90 and 91:
problems, to run R & D, or to devel
- Page 92 and 93:
EP5- Territorial economic developme
- Page 94 and 95:
For further economic development an
- Page 96 and 97:
EP6- Regional branding and tourism
- Page 98 and 99:
• Establishing areas for fairs, e
- Page 100 and 101:
EP6.3- City and weekend tourism The
- Page 102 and 103:
• Creating food festivals and com
- Page 104 and 105:
Travel agents Tour operators Public
- Page 106 and 107:
Guidelines for the development of u
- Page 108 and 109:
participation of visitors intereste
- Page 110 and 111:
4.2 Urban development policies URBA
- Page 112 and 113:
Metropolis Primary centre Secondary
- Page 114 and 115:
Metropolis Primary centre Secondary
- Page 116 and 117:
The plan promotes the consolidation
- Page 118 and 119: UP2.2- Regeneration of urban poles
- Page 120 and 121: Ishëm Thumanë Cudhi KRUJË Bubq F
- Page 122 and 123: Zonat informale për zhvillim dhe i
- Page 124 and 125: UP5- Comprehensive regional communi
- Page 126 and 127: further affect a better management
- Page 128 and 129: Adriatik Mamurras Ishëm Gramëz Th
- Page 130 and 131: Rural regeneration policies aim at
- Page 132 and 133: c) Marginal rural, agricultural-nat
- Page 134 and 135: • increasing revenues from agricu
- Page 136 and 137: Muncipalities Tirana Durres Kamez D
- Page 138 and 139: • Creating the network and chain
- Page 140 and 141: RP4- Economic development of privat
- Page 142 and 143: • The expansion of the network of
- Page 144 and 145: Type of tourism Natural tourism Agr
- Page 146 and 147: Ishëm Thumanë Cudhi KRUJË Bubq F
- Page 148 and 149: The region will provide fast and se
- Page 150 and 151: Spatial poles and strategic corrido
- Page 152 and 153: Measures to improve road safety Loc
- Page 154 and 155: E762 Ishëm Thumanë Cudhi KRUJË B
- Page 156 and 157: Ishëm Thumanë Cudhi KRUJË Bubq F
- Page 158 and 159: EP1- Conservation of natural landsc
- Page 160 and 161: EP2- Protection and management of s
- Page 162 and 163: GREEN GREEN / GREY GREY Natural res
- Page 164 and 165: EP5- Regional waste management The
- Page 166 and 167: EP6- Climate changes Mitigation and
- Page 170 and 171: 5Strategic projects regulations
- Page 172 and 173: SP1. Economic development Priority
- Page 174 and 175: Priority / Policy Specific project
- Page 176 and 177: Priority / Policy Specific project
- Page 178 and 179: Priority / Policy Specific project
- Page 180 and 181: Priority / Policy Specific project
- Page 182 and 183: Priority / Policy Specific project
- Page 184 and 185: SP 2. Urban development Priority /
- Page 186 and 187: Priority / Policy Specific project
- Page 188 and 189: Priority / Policy Specific project
- Page 190 and 191: SP3. Rural development Priority / P
- Page 192 and 193: Priority / Policy Specific project
- Page 194 and 195: Priority / Policy Specific project
- Page 196 and 197: Priority / Policy Specific project
- Page 198 and 199: Priority / Policy Specific project
- Page 200 and 201: SP4. Transport and infrastructure d
- Page 202 and 203: Priority / Policy Specific project
- Page 204 and 205: Priority / Policy Specific project
- Page 206 and 207: Priority / Policy Specific project
- Page 208 and 209: Priority / Policy Specific project
- Page 210 and 211: SP5. Environmental protection and d
- Page 212 and 213: Priority / Policy Specific project
- Page 214 and 215: 6Territorial land use regulations
- Page 216 and 217: TERRITORIAL LAND USE REGULATIONS TR
- Page 218 and 219:
efficient public transport, with sp
- Page 220 and 221:
5. Limiting land use for specialize
- Page 222 and 223:
dedicated priority lines, while flo
- Page 224 and 225:
floors, horizontal extension size /
- Page 226 and 227:
still active, cleaning of the disch
- Page 228 and 229:
• The promotion of tourist areas
- Page 230 and 231:
local employment. The development o
- Page 232 and 233:
e strengthened through the integrat
- Page 234 and 235:
egional municipalities and line min
- Page 236 and 237:
7Monitoring implementation, evaluat
- Page 238 and 239:
Monitoring implementation, evaluati
- Page 240 and 241:
- identifying new and emerging prob
- Page 242 and 243:
The number and location of incubato
- Page 244 and 245:
The ratio of agricultural land/the
- Page 246 and 247:
Bibliography List of Laws and DCMs
- Page 248 and 249:
Kai Bohmet Philippe Doucet Tomasz K
- Page 250 and 251:
http://www.instat.gov.al/media/3223
- Page 252 and 253:
http://www.siecon.org/online/wp-con
- Page 254 and 255:
COM(2010) 672 final; • DCM No. 70
- Page 256 and 257:
Appendix Representatives of the ins
- Page 258 and 259:
POLIS University Date 09/10/2015 1.
- Page 260 and 261:
Ministry of Energy and Industry 1.
- Page 263:
CIP Katalogimi në botim BK Tiranë