09.03.2018 Views

Business Presentation Den Ouden Groep 03-2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. What do we offer?<br />

References<br />

Covering landfill Meersteeg - Geldermalsen<br />

Remediation for refurbishment of NRE site -<br />

Eindhoven<br />

Client:<br />

Avri<br />

Implementation period: 2016<br />

Client:<br />

municipality of Eindhoven<br />

Implementation period: 2017<br />

The work involves the installation of an upper seal<br />

structure (in accordance with the Dumping Decree) in the<br />

eastern part of landfill Meersteeg in Geldermalsen.<br />

The work mainly consisted of removing part of the existing<br />

waste gas drainage system, equalising, profiling, and<br />

compacting the existing support layer and delivering and<br />

applying the upper seal structure Trisoplast, HDPE foil,<br />

rainwater drainage mat, and ground layer. A rainwater<br />

drain (wells, gutters, pipes) was also applied and the seal<br />

structure was sown with a grass mixture.<br />

The NRE site, former industrial and port area near the<br />

city centre, is being redeveloped. Eleven special factory<br />

buildings, remnants of the former gas industry, form<br />

the basis for the historic character of the NRE site at<br />

the Nachtegaallaan in the centre of the municipality of<br />

Eindhoven.<br />

The work involved the remediation and preparation<br />

(BRM) of the NRE site phase 2 through 4 in Eindhoven.<br />

The remediation consists of drainage and purifying<br />

contaminated groundwater and excavating and disposal<br />

of contaminated soil. According to experts who studied<br />

the contaminated soil under the former industrial site,<br />

there are no risks to public health during the remediation<br />

of the NRE site.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!