Business Presentation Den Ouden Groep 03-2018
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2. What do we offer?<br />
References<br />
Covering landfill Meersteeg - Geldermalsen<br />
Remediation for refurbishment of NRE site -<br />
Eindhoven<br />
Client:<br />
Avri<br />
Implementation period: 2016<br />
Client:<br />
municipality of Eindhoven<br />
Implementation period: 2017<br />
The work involves the installation of an upper seal<br />
structure (in accordance with the Dumping Decree) in the<br />
eastern part of landfill Meersteeg in Geldermalsen.<br />
The work mainly consisted of removing part of the existing<br />
waste gas drainage system, equalising, profiling, and<br />
compacting the existing support layer and delivering and<br />
applying the upper seal structure Trisoplast, HDPE foil,<br />
rainwater drainage mat, and ground layer. A rainwater<br />
drain (wells, gutters, pipes) was also applied and the seal<br />
structure was sown with a grass mixture.<br />
The NRE site, former industrial and port area near the<br />
city centre, is being redeveloped. Eleven special factory<br />
buildings, remnants of the former gas industry, form<br />
the basis for the historic character of the NRE site at<br />
the Nachtegaallaan in the centre of the municipality of<br />
Eindhoven.<br />
The work involved the remediation and preparation<br />
(BRM) of the NRE site phase 2 through 4 in Eindhoven.<br />
The remediation consists of drainage and purifying<br />
contaminated groundwater and excavating and disposal<br />
of contaminated soil. According to experts who studied<br />
the contaminated soil under the former industrial site,<br />
there are no risks to public health during the remediation<br />
of the NRE site.<br />
26