Business Presentation Den Ouden Groep 03-2018
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2. What do we offer?<br />
References<br />
Construction of 40.000 m 2 concrete<br />
hardenings Lidl - Southamton (UK)<br />
Client:<br />
Bouwbedrijf Van de Ven<br />
Implementation period: 2016<br />
Outside our national borders, in the South-England port<br />
of Southampton, construction company Van de Ven<br />
realised a distribution centre for supermarket chain Lidl.<br />
DEN OUDEN GROEP provided 40,000 m² of concrete road<br />
construction consisting of a ring road, a loading dock,<br />
and parking spaces. It is one of our specialisations. The<br />
challenge with this project was mostly in the lead time,<br />
namely in terms of the production speed of the concrete<br />
mortar. In England, the capacity of concrete plants is lower<br />
than in the Netherlands. In the Netherlands, we are more<br />
focused on efficiency and shorter construction times,<br />
and we have younger plants with larger capacities. In the<br />
Netherlands, we would work with a width of 10 metres at<br />
a time, while in England we were working with a width<br />
of 5 metres at a time. A high-quality outdoor hardening,<br />
resistant to frost and road salt, making it very durable,<br />
requiring very little maintenance!<br />
Application of concrete highway - Couvin (B)<br />
Client:<br />
BAM Contractors<br />
Implementation period: 2016-<strong>2018</strong><br />
The work involved the application of two 8.6 km double<br />
lane concrete highways, including emergency lanes and<br />
ramps east of Couvin in Belgium. The highway is part of<br />
the E420, the main connection between Charleroi and the<br />
French border.<br />
Various structural works, including 190,000 m² of<br />
concrete hardenings, have been realised. The concrete<br />
hardenings consist of double-layer continuous reinforced<br />
concrete. The work of phase 1 was completed in late 2016,<br />
phase 2 in April 2017, and phase 3 will be completed<br />
in <strong>2018</strong>.<br />
23