2. What do we offer?<br />

References<br />

Accessing structure core conversion -<br />

Loon op Zand<br />

Sewer replacement Frederiklaan - Eindhoven<br />

Client:<br />

municipality of Loon op Zand<br />

Implementation period: 2015-2017<br />

Client:<br />

municipality of Eindhoven<br />

Implementation period: 2016-2017<br />

The work is located in Loon op Zand and stretches across<br />

a length of approximately 2,600 metres. The objective is<br />

to improve the accessibility of the core of Loon op Zand,<br />

create a better and safer traffic flow, and give the public<br />

space a quality impulse. The core of Loon op Zand is<br />

not sustainable and future-proof. The maximum speed<br />

has been dropped from 50 km/h to 30 km/h. Through<br />

adjustments of the roads, paving stones, and green, the<br />

appearance of the street is also improved. The core of Loon<br />

op Zand is cleaner and safer because there is less traffic<br />

and people drive slower.<br />

The work is located in Frederiklaan, Jonghlaan, and<br />

Essenstraat in the municipality of Eindhoven. The<br />

Frederiklaan Sewer Replacement project has been<br />

implemented in nine phases. Two of these phases were<br />

carried out in Frederiklaan in front of the Philips Stadium.<br />

To minimise the inconvenience for the activities in the<br />

Stadium, the municipality wanted to optimally use the<br />

activity-free period in the summer. This was done by<br />

implementing as much of the first phase as possible in the<br />

period between the concerts of Guus Meeuwis and PSV’s<br />

first football match. This way, the work caused as little<br />

inconvenience to visitors as possible.<br />