2. What do we offer?<br />
References<br />
Accessing structure core conversion -<br />
Loon op Zand<br />
Sewer replacement Frederiklaan - Eindhoven<br />
Client:<br />
municipality of Loon op Zand<br />
Implementation period: 2015-2017<br />
Client:<br />
municipality of Eindhoven<br />
Implementation period: 2016-2017<br />
The work is located in Loon op Zand and stretches across<br />
a length of approximately 2,600 metres. The objective is<br />
to improve the accessibility of the core of Loon op Zand,<br />
create a better and safer traffic flow, and give the public<br />
space a quality impulse. The core of Loon op Zand is<br />
not sustainable and future-proof. The maximum speed<br />
has been dropped from 50 km/h to 30 km/h. Through<br />
adjustments of the roads, paving stones, and green, the<br />
appearance of the street is also improved. The core of Loon<br />
op Zand is cleaner and safer because there is less traffic<br />
and people drive slower.<br />
The work is located in Frederiklaan, Jonghlaan, and<br />
Essenstraat in the municipality of Eindhoven. The<br />
Frederiklaan Sewer Replacement project has been<br />
implemented in nine phases. Two of these phases were<br />
carried out in Frederiklaan in front of the Philips Stadium.<br />
To minimise the inconvenience for the activities in the<br />
Stadium, the municipality wanted to optimally use the<br />
activity-free period in the summer. This was done by<br />
implementing as much of the first phase as possible in the<br />
period between the concerts of Guus Meeuwis and PSV’s<br />
first football match. This way, the work caused as little<br />
inconvenience to visitors as possible.<br />