08.03.2018 Views

Cupola Installation Specifications

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cupola</strong> <strong>Installation</strong> <strong>Specifications</strong><br />

Section 8: Clean-Up<br />

8.1 Remove installation debris from roof.<br />

8.2 Wipe down metal components with dry cloth to minimize oil from fingerprints.<br />

8.3 Verify all cupola components are secure and appear ready for long-term use.<br />

8.4 Review final result with customer.<br />

Figure 8.1: Completed <strong>Cupola</strong><br />

Page 10 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!