16.02.2018 Views

Curro English 01/2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Group average – 68%<br />

Our sincere appreciation and<br />

gratitude should go to our<br />

teachers and learners for<br />

their hard work in achieving<br />

this.<br />

Our high school opened its<br />

doors but within a few days<br />

fell victim to cable theft, which<br />

left us without electricity for<br />

almost two weeks.<br />

This posed quite a serious<br />

challenge with regard to the<br />

functionality of our server, the<br />

downloading of books and<br />

other computer-related issues.<br />

We are doing our utmost to<br />

catch up on the backlog of<br />

issues created by the power<br />

problems. The cafeteria at the<br />

high school still needs to be<br />

changed/upgraded to adhere<br />

to the original specifications<br />

of a cafeteria; only after this<br />

will we be able to make full<br />

use of this facility. This is a<br />

priority and as such will only<br />

be operational in term 2.<br />

Although the area at the<br />

netball and tennis courts<br />

at the high school has been<br />

allocated for our swimming<br />

pool, there is a delay with the<br />

moving of the water pipeline<br />

and, thus, the pool only forms<br />

part of phase two (2<strong>01</strong>9).<br />

The construction of the<br />

cricket nets (next to the<br />

cafeteria) at the high school<br />

is nearing completion now.<br />

New grass has been planted<br />

in the area next to the fence<br />

on the sports field; therefore,<br />

the lay-out of the athletics<br />

track for our inter-house<br />

was only temporarily done.<br />

The surveyor will be visiting<br />

the school in due course to<br />

determine the final lay-out<br />

of our sports field. Due to<br />

unforeseen circumstances we<br />

had to reschedule our official<br />

opening of the high school<br />

and this will now take place<br />

on 19 April 2<strong>01</strong>8.<br />

I am awaiting the proposed<br />

plans for the roof/cover of<br />

our pavilion at the primary<br />

school in order for me to<br />

determine the costs<br />

involved in erecting<br />

this.<br />

The cover at<br />

our pavilion and<br />

the completion<br />

of the primary<br />

school hockey<br />

field is a priority,<br />

and I hope to have positive<br />

feedback regarding this in<br />

weeks to come.<br />

Ablution facilities at our<br />

primary school sports field<br />

is also an area of great need,<br />

which we can hopefully<br />

address in 2<strong>01</strong>8.<br />

Ferdi Niemand<br />

* Scottish writer<br />

FEB 2<strong>01</strong>8 PROUDLY DESIGNED BY SALES SQUAD 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!