16.01.2018 Views

3.Rehabilitation Brochure_Y&K 홈페이지 등재용

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Introduction of High technology in Korea<br />

(Rehabilitation of Power Plant / Other Plant)<br />

Aug. 2017<br />

Local Management<br />

International Trading<br />

E&I (Electrical & Instrument)<br />

MEP (Mechanical/Electrical/Piping)<br />

O&M (Operation & Maintenance)<br />

Solar / Wind Power<br />

Steel Structure Fabrication/Erection<br />

Miscellaneous Steel work


Contents<br />

1. Introduction<br />

2. High Technology for Rehabilitation of Plant in Korea<br />

3. Simulator for Power Plant’s operation<br />

4. Renovation Work for MEP<br />

5. Business Procedure in Bahrain


1. Introduction<br />

We are honored to introduce our offer to clients.<br />

We are well-developed construction companies , especially various MEP Fields.<br />

We have worked for international Plant Projects with Korean EPC companies like<br />

Samsung,GS,Hyundai … for long term’s partnership.<br />

We are composed of 3 companies to cope with various needs .<br />

- DaemMyoung (E&I/MEP/O&M)<br />

- Gaya Steel Works (Steel Fab & Erection)<br />

- You and Kim Consulting (Local Management , Trading)<br />

Under the reliable resource, We are entering to Bahrain and request Clients to<br />

give opportunity to us for below service.<br />

• Service Field<br />

(1) E&I (Electrical & Instrument)<br />

(2) MEP (Mechanical/Electrical/Piping)<br />

(3) O&M (Operation & Maintenance) : Plant / Tanks / Process Line<br />

(4) Solar / Wind Power<br />

(5) Steel Structure Fabrication/Erection<br />

(6) Miscellaneous Steel work<br />

(7) Special Painting Work<br />

1


1. Introduction (DaeMyoung GEC)<br />

Company<br />

Name<br />

DaeMyoung Global Engineering & Construction Co., Ltd.<br />

CEO<br />

JONG-BO, KIM<br />

Found April 10, 1995<br />

Capital USD 1,875,000.00-<br />

2016<br />

Sales Account<br />

Fields<br />

Business<br />

Main Office<br />

USD 105,619,425.66-<br />

M&E Engineering and Construction<br />

Electrical & Mechanical Construction, Commissioning, Operation<br />

& Maintenance, Information & Telecommunication(IT), Energy<br />

Storage System, Storage Tank Fabrication & Erection, Plant<br />

Simulator/Training,<br />

Fire Fighting System, Civil & Building Works,<br />

Wind power generation system<br />

10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

Staff<br />

111 Engineers. 35 Admin./Account, Total 146 qualified staffs<br />

Home Page<br />

www.dmgec.com<br />

Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986<br />

Credit Rating<br />

A+ : by Korea Ratings<br />

A+ : by DNB Korea<br />

Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001 2<br />

1


1. Introduction (DaeMyoung GEC)<br />

3


2. High Technology for Rehabilitation of Plant in Korea<br />

Power Plant<br />

Rehabilitation<br />

2017. 8<br />

4


2. High Technology for Rehabilitation of Plant in Korea<br />

Power Generating & Industrial Facilities<br />

-Routine Maintenance<br />

-Scheduled Outage Maintenance<br />

-Rehabilitation & Modification<br />

-Commissioning<br />

-Technical Service (Supervising)<br />

5


2. High Technology for Rehabilitation of Plant in Korea<br />

Rehabilitation<br />

-. Project : Khartoum North Steam Power Plant<br />

-. Location : Sudan<br />

-. Activity since : 1985<br />

-. Owner : National Electricity Corporation of Sudan(NEC)<br />

-. Power Capacity : 380MW(2x30MW,2x60MW,2x100MW)<br />

-. Fuel : Fuel Oil<br />

-. Work Description : steam turbines rehabilitation, plant partial<br />

modification, thermal mechanical engineering.<br />

-. Work Period : 2009.06 ~ 2010.10<br />

Ongoing & Next Project<br />

Fuel Conversion<br />

-. Project : Cheon-ju Hubis Combined Heat & Power Plant<br />

-. Location : Korea<br />

-. Activity since : 1987<br />

-. Owner : Hubis Cheon-ju Factory<br />

-. Power Capacity : 48MW (Boiler :130ton/hr x1unit, 80ton/hr x 1)<br />

-. Fuel Conversion : Oil to Coal<br />

-. Work Description : boiler rehabilitation, combusition<br />

equipments rehabilitation, coal handling systems erection, steam<br />

turbines rehabilitation, plant partial, thermal mechanical<br />

engineering.<br />

-. Work Period : 1999.1 ~ 2003.3<br />

• KOREA BORYEONG<br />

500MW Fossil Power Plant<br />

• KOREA SHININCHEON<br />

Combined Cycle Power plant<br />

Rehabilitation<br />

-. Project : Seo-Incheon Combined Cycle Power Plant Project<br />

-. Location : Korea<br />

-. Activity since : 1992<br />

-. Owner : Korea Western Power Co.,Ltd<br />

-. Power Capacity : 1800MW(G/T:8x150MW,S/T:8x75MW)<br />

-. Fuel : LNG<br />

-. Work Description : gas turbine repair, economiser tube repair,<br />

gas duct repair, plant partial modification, thermal mechanical<br />

engineering.<br />

-. Work Period : 1996.7 ~ 1997.10<br />

6


2. High Technology for Rehabilitation of Plant in Korea<br />

-. Key benefits<br />

‣ Reduces exposure in remote regions.<br />

‣ Significantly reduces management time input<br />

‣ Allows for a multi-level independent maintenance review, followed by clear<br />

interfaces between DaeMyoung GEC management and the client ;<br />

• Procedures and manuals are written by DaeMyoung and validated by the client.<br />

• The client supplies standard technical specifications<br />

• In turn, DaeMyoung reviews and updates technical documentation before the<br />

contract documents are prepared and signed.<br />

• As DaeMyoung starts the implementation of the scope of work, it is the client<br />

who audits our performance.<br />

• DaeMyoung GEC writes reports on the technical and contractual aspects of the<br />

project, allowing the client to analyze the results of its work.<br />

7


2. High Technology for Rehabilitation of Plant in Korea<br />

-. Key benefits<br />

‣ An integrated project team, comprising both DaeMyoung and client personnel.<br />

‣ An incentive scheme to align the objectives of DaeMyoung and its client,<br />

• HSEQ management.<br />

• reliability and availability.<br />

• plant integrity.<br />

• production objectives.<br />

• cost reduction.<br />

Financial Benefits<br />

• Sustained reduction of OPEX(Operating Expenditure) in a very short period<br />

of time.<br />

• Spare parts optimization.<br />

• Independent interface between OEM and client will save time and money.<br />

• Reduced expatriate costs.<br />

• Longer asset life, leading to postponed decommissioning costs.<br />

Human Resource Management Benefits<br />

• Flexibility.<br />

• Improved utilization of own client’s own personnel resources.<br />

• Increased safety.<br />

• Fewer human resource issues.<br />

8


3. Simulator for Power Plant’s operation<br />

Simulator<br />

/Training<br />

Center<br />

2017. 8<br />

9


3. Simulator for Power Plant’s operation<br />

Simulator<br />

H/W system<br />

(Boiler, Turbine,<br />

Generator)<br />

Model<br />

(Boiler, Turbine,<br />

Electrical)<br />

H/W DCS<br />

Virtual DCS<br />

EWS<br />

Boiler DCS<br />

Turbine TCS<br />

EWS<br />

Operator Console<br />

Operator Console<br />

HMI<br />

HMI<br />

Operator<br />

Instructor Console<br />

Main Control Room<br />

10


3. Simulator for Power Plant’s operation<br />

Training Centre<br />

KOREA YEOSU<br />

BOTSWANA MORUPULE A<br />

• 340 x 2 MW CFB Power Plant<br />

- 2016.3~2017.4<br />

- Simulator Development &<br />

Instructor Training<br />

• System<br />

- Process Model : GSE<br />

- Unit 1 : YOKOGAWA CENTUM VP<br />

- Unit 2 : ABB P14<br />

• 33x4 MW Power Plant<br />

- 2016.5~2017.7<br />

- Simulator Development &<br />

Operator/Instructor Training<br />

• System<br />

- Process Model : GSE<br />

- Unit 1-4 : SIEMENS T3000<br />

Ongoing & Next Project<br />

• KOREA SHINBORYEONG<br />

1000MW USC Fossil Power<br />

Plant<br />

• KOREA TAEAN 500MW<br />

Fossil Power Plant<br />

• VIETNAM 660MW Power Plant<br />

• SAUDI SWRO Plant<br />

11


3. Simulator for Power Plant’s operation<br />

Combined-Cycle Gas Turbine Simulator<br />

High fidelity modeling of two gas turbine set for a combined<br />

cycle simulator.<br />

Power plant simulator for gas turbine and<br />

CCGT applications<br />

HRSG and Main HMI Control<br />

12


3. Simulator for Power Plant’s operation<br />

Combined-Cycle Gas Turbine Simulator<br />

JTopmeret Engineering Model, Heat Transfer and<br />

Flow Characteristics of Gas Turbine<br />

Gas Turbine Exhaust Temperature and Turning Gear HMI Control<br />

Combined Cycle<br />

• Key features of this combination modeling solution are<br />

• Gas compressor drive motor.<br />

• Calculation of combustion heat and products of combustion.<br />

• Multi-nodes in the combustion zone match the reference plant burner configuration.<br />

• Mass, momentum, and energy balance in each node of the flow path<br />

• Calculation of nodal gas temperatures based on mass and energy conservation.<br />

• Consideration of the combustion heat loss.<br />

• Calculation of gas dynamics of air compressor.<br />

• Calculation of gas turbine megawatt output and turbine efficiency.<br />

13


4. Renovation Work for MEP<br />

▶ Repair, upgrade and maintenance of steam boilers, steam and gas turbines, auxiliary equipment, mechanical and bulk storage systems.<br />

▶ Repair and maintenance of boiler pressure parts and rotating equipment including pumps, fans, flow control equipment.<br />

▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and instrumentation.<br />

LP Rotor Blasting HIP TBN Rotor lifting Disassembly of generator<br />

TBN Main Oil Pump alignment BFP maintenance TBN main stop valve assembly<br />

14


4. Renovation Work for MEP<br />

▶ Repair, upgrade and maintenance of steam boilers, steam and gas turbines, auxiliary equipment, mechanical and bulk storage systems.<br />

▶ Repair and maintenance of boiler pressure parts and rotating equipment including pumps, fans, flow control equipment.<br />

▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and instrumentation.<br />

Sea Waer Lifting Pump motor lifting BLR panel / bundle lifting BLR tube welding<br />

High-pressure pipe welding GGH duct installation BLR tube welding<br />

15


5. Business Procedure in Bahrain<br />

Work Request<br />

Feed back &<br />

Closed<br />

Data Collection<br />

-.Site Survey<br />

-.Fact Finding<br />

-.Maintenance Philosophy<br />

-.Equipment Specification<br />

-.Vendor data<br />

-.Inspection Report<br />

-.Etc.<br />

Preliminary<br />

Proposal<br />

Clarify &<br />

Approval<br />

Perform the<br />

Work<br />

Contract<br />

Agreement<br />

Final Estimate<br />

& Plan<br />

*.All steps will proceed with client’s permission.<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!