Vision for Energy Business in Bahrain (1)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Vision</strong> <strong>for</strong> <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />
<strong>in</strong> Bahra<strong>in</strong><br />
2018 year<br />
Local Management<br />
F<strong>in</strong>anc<strong>in</strong>g<br />
Solar <strong>Energy</strong><br />
Steel Structure Fabrication/Erection<br />
Miscellaneous Steel work<br />
FGRS<br />
<strong>Energy</strong> renewal <strong>for</strong> Flare Stack<br />
Rehabilitation of Plant<br />
Rehabilitation of Plant<br />
MEP (Mechanical/Electrical/Pip<strong>in</strong>g)<br />
O&M (Operation & Ma<strong>in</strong>tenance <strong>for</strong> Power Plant)
Contents<br />
1. Introduction<br />
2. Summary of Technology<br />
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />
4. FGRU (Flare Gas Recovery Unit)<br />
5. Rehabilitation of Plant<br />
1
1. Introduction<br />
We are honored to <strong>in</strong>troduce our offer to clients.<br />
We are well-developed Plant construction companies , especially <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong>.<br />
We have worked <strong>for</strong> <strong>in</strong>ternational Plant Projects with Korean EPC companies like<br />
Samsung,GS,Hyundai.<br />
Especially, This Presentation is focused on “<strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong>” with Best benefit of clients.<br />
- Solar <strong>Energy</strong> / High Technology <strong>for</strong> Rehabilitation of Plant / FGRU<br />
We are composed of 4 companies to cope with various needs .<br />
- You and Kim Consult<strong>in</strong>g ( Local Management & F<strong>in</strong>anc<strong>in</strong>g )<br />
- Gaya Steel Works ( Solar <strong>Energy</strong> / Steel Fab & Erection )<br />
- PIELDS ENGINEERING ( FGRS , EPC of MEP Project )<br />
- DaemMyoung ( Plant Rehabilitation / E&I / MEP / O&M )<br />
2
2. Summary of Technology<br />
Busiess Key Value <strong>for</strong> liet’s eefit<br />
SOLAR ENERGY<br />
FGRU<br />
(Flare Gas Recovery Unit)<br />
Rehabilitation<br />
Key Value<br />
1. Best Quality<br />
2. Competitive Price<br />
3. BOT Project<br />
4. Local Ma<strong>in</strong>tenance<br />
Key Value<br />
1. Low Cost (1/3)<br />
2. Payback : 2.3 Year<br />
3. Vent Analysis<br />
(Additional effect)<br />
Key Value<br />
1. Free Analysis<br />
2. Technical offer with<br />
zero ost<br />
3. Plant Renovation<br />
+ Localization<br />
+ Localization + Localization<br />
3
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />
2018 Year<br />
4<br />
Local Management<br />
International Trad<strong>in</strong>g<br />
Solar <strong>Energy</strong><br />
Steel Structure Fabrication/Erection<br />
Miscellaneous Steel work
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />
1. We, GAYA and KNRE (Korea New & Renewable <strong>Energy</strong>) have worked Solar <strong>Bus<strong>in</strong>ess</strong><br />
<strong>in</strong> Korea s<strong>in</strong>ce 2010 year and established Bahra<strong>in</strong> CR to work <strong>in</strong> Bahra<strong>in</strong> from 2017 year.<br />
SOLAR <strong>Bus<strong>in</strong>ess</strong><br />
Key Value<br />
1. Best Quality<br />
2. Competitive Price<br />
3. BOT Project<br />
4. Local Ma<strong>in</strong>tenance<br />
5. F<strong>in</strong>anc<strong>in</strong>g <strong>for</strong> BOT<br />
Execution System<br />
1. Special Market<strong>in</strong>g Offer<br />
- EPC uder 25 year’s warraty ad aiteae<br />
- BOT offer as payment of latest tariff basis<br />
2. Solar Panel Manufacture (Korea)<br />
(1) LG Electronics<br />
- World Best Quality<br />
(2) Hanwha Q cells<br />
- World Best Solar Production<br />
* Other device (Investor etc) – German/ Australia / USA<br />
3. Eng<strong>in</strong>eer<strong>in</strong>g + Supervision<br />
Korea / India / Spa<strong>in</strong> Company licensed<br />
by USA,SPAIN,KOREA)<br />
4. Construction + Ma<strong>in</strong>tenance<br />
GAYA STEELWORKS BAHRAIN WLL<br />
Under the Localization<br />
+ Localization<br />
5. F<strong>in</strong>anc<strong>in</strong>g <strong>for</strong> BOT <strong>Bus<strong>in</strong>ess</strong><br />
Local Partners<br />
5
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />
6
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />
7
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Eng<strong>in</strong>eer<strong>in</strong>g and Supervision)<br />
1. Korean Partner <strong>for</strong> Eng<strong>in</strong>eer<strong>in</strong>g & Supervision<br />
(1) Name:<br />
Dubai Jumaeirah Beach Hotel<br />
LG Electronics<br />
Iran Isfahan / Siria<br />
8
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Eng<strong>in</strong>eer<strong>in</strong>g and Supervision)<br />
2. International Partner <strong>for</strong> Eng<strong>in</strong>eer<strong>in</strong>g & Supervision<br />
(1) Name: Solaire Power<strong>in</strong>g System under AECA License (Spa<strong>in</strong>)<br />
/ Solar apps <strong>in</strong> India (USA Technology)<br />
9
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />
1. Korean Manufacturer -- LG Solar<br />
10
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />
1. Korean Manufacturer -- LG Solar<br />
11
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />
2. Korean Manufacturer – Hanwha Q CELLS<br />
12
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />
2. Korean Manufacturer – Hanwha Q CELLS<br />
13
3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Local Installation & Ma<strong>in</strong>tenance)<br />
1. Korean Partner <strong>for</strong> Local Installation & Ma<strong>in</strong>tenance<br />
* GAYA and KNRE are partner<br />
who have worked <strong>in</strong> Korea<br />
<strong>for</strong> Solar <strong>Bus<strong>in</strong>ess</strong>. And<br />
work <strong>in</strong> Bahra<strong>in</strong> together.<br />
(1) Name:<br />
KNRE<br />
(Korea New & Renewable <strong>Energy</strong>)<br />
(2) Career ( 2010 year ~ at Present) :<br />
- Sunsan Solar Park : 1.9 MW<br />
- Gasan Solar Park : 928 KW<br />
- Yongsung Solar Park : 500 KW<br />
- Dogae Solar Park : 700 KW<br />
14
4. FGRU – Flare Gas Recovery Unit<br />
2018 Year<br />
15<br />
Local Management<br />
F<strong>in</strong>anc<strong>in</strong>g<br />
FGRS<br />
<strong>Energy</strong> renewal <strong>for</strong> Flare Stack<br />
Rehabilitation of Plant
4. FGRU – Flare Gas Recovery Unit<br />
FGRS (Flare Gas Recovery System)<br />
Ref<strong>in</strong>ery and Petrochemical Project<br />
16
4. FGRU – Flare Gas Recovery Unit<br />
17
4. FGRU – Flare Gas Recovery Unit<br />
18
4. FGRU – Flare Gas Recovery Unit<br />
19
5. Rehabilitation of Plant<br />
2018 Year<br />
Local Management<br />
F<strong>in</strong>anc<strong>in</strong>g<br />
Rehabilitation of Plant<br />
MEP (Mechanical/Electrical/Pip<strong>in</strong>g)<br />
O&M (Operation & Ma<strong>in</strong>tenance <strong>for</strong> Power Plant)<br />
20
5. Rehabilitation of Plant<br />
Company<br />
Name<br />
CEO<br />
DaeMyoung Global Eng<strong>in</strong>eer<strong>in</strong>g & Construction Co., Ltd.<br />
JONG-BO, KIM<br />
Found April 10, 1995<br />
Capital USD 1,875,000.00-<br />
2016<br />
Sales<br />
Account<br />
Fields<br />
<strong>Bus<strong>in</strong>ess</strong><br />
Ma<strong>in</strong> Office<br />
Staff<br />
Home Page<br />
USD 105,619,425.66-<br />
M&E Eng<strong>in</strong>eer<strong>in</strong>g and Construction<br />
Electrical & Mechanical Construction, Commission<strong>in</strong>g,<br />
Operation & Ma<strong>in</strong>tenance, In<strong>for</strong>mation &<br />
Telecommunication(IT), <strong>Energy</strong> Storage System, Storage<br />
Tank Fabrication & Erection, Plant Simulator/Tra<strong>in</strong><strong>in</strong>g,<br />
Fire Fight<strong>in</strong>g System, Civil & Build<strong>in</strong>g Works,<br />
W<strong>in</strong>d power generation system<br />
10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />
111 Eng<strong>in</strong>eers. 35 Adm<strong>in</strong>./Account, Total 146 qualified<br />
staffs<br />
www.dmgec.com<br />
Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986<br />
Credit<br />
Rat<strong>in</strong>g<br />
A+ : by Korea Rat<strong>in</strong>gs<br />
A+ : by DNB Korea<br />
1<br />
Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />
22
5. Rehabilitation of Plant<br />
For Rehabilitation Project,<br />
Analysis , Solution Proposal<br />
is proceeded free of charge.<br />
23
5. Rehabilitation of Plant<br />
Rehabilitation<br />
-. Project : Khartoum North Steam Power Plant<br />
-. Location : Sudan<br />
-. Activity s<strong>in</strong>ce : 1985<br />
-. Owner : National Electricity Corporation of Sudan(NEC)<br />
-. Power Capacity : 380MW(2x30MW,2x60MW,2x100MW)<br />
-. Fuel : Fuel Oil<br />
-. Work Description : steam turb<strong>in</strong>es rehabilitation, plant partial<br />
modification with district heat<strong>in</strong>g <strong>in</strong>troduction, thermal mechanical<br />
eng<strong>in</strong>eer<strong>in</strong>g.<br />
-. Work Period : 2009.06 ~ 2010.10<br />
Ongo<strong>in</strong>g & Next Project<br />
Fuel Conversion<br />
-. Project : Cheon-ju Hubis Comb<strong>in</strong>ed Heat & Power Plant<br />
-. Location : Korea<br />
-. Activity s<strong>in</strong>ce : 1987<br />
-. Owner : Hubis Cheon-ju Factory<br />
-. Power Capacity : 48MW (130ton/hr)<br />
-. Fuel Conversion : Oil to Coal<br />
-. Work Description : boiler rehabilitation, combusition<br />
equipments rehabilitation, coal handl<strong>in</strong>g systems erection, steam<br />
turb<strong>in</strong>es rehabilitation, plant partial modification with district<br />
heat<strong>in</strong>g <strong>in</strong>troduction, thermal mechanical eng<strong>in</strong>eer<strong>in</strong>g.<br />
-. Work Period : 1999.1 ~ 2003.3<br />
• KOREA BORYEONG 500MW<br />
Fossil Power Plant<br />
• KOREA SHININCHEON<br />
Comb<strong>in</strong>ed Cycle Power plant<br />
Rehabilitation<br />
-. Project : Seo-Incheon Comb<strong>in</strong>ed Cycle Power Plant Project<br />
-. Location : Korea<br />
-. Activity s<strong>in</strong>ce : 1992<br />
-. Owner : Korea Western Power Co.,Ltd<br />
-. Power Capacity : 1800MW(G/T:8x150MW,S/T:8x75MW)<br />
-. Fuel : LNG<br />
-. Work Description : gas turb<strong>in</strong>e repair, economiser tube repair,<br />
gas duct repair, plant partial modification with district heat<strong>in</strong>g<br />
<strong>in</strong>troduction thermal mechanical eng<strong>in</strong>eer<strong>in</strong>g.<br />
-. Work Period : 1996.7 ~ 1997.10<br />
23
5. Rehabilitation of Plant<br />
-. Key benefits<br />
‣ Reduces exposure <strong>in</strong> remote regions.<br />
‣ Significantly reduces management time <strong>in</strong>put<br />
‣ Allows <strong>for</strong> a multi-level <strong>in</strong>dependent ma<strong>in</strong>tenance review, followed by clear <strong>in</strong>terfaces between<br />
DaeMyoung GEC management and the client ;<br />
• Procedures and manuals are written by DaeMyoung and validated by the client.<br />
• The client supplies standard technical specifications<br />
• In turn, DaeMyoung reviews and updates technical documentation be<strong>for</strong>e the contract<br />
documents are prepared and signed.<br />
• As DaeMyoung starts the implementation of the scope of work, it is the client who audits<br />
our per<strong>for</strong>mance.<br />
• DaeMyoung GEC writes reports on the technical and contractual aspects of the project,<br />
allow<strong>in</strong>g the client to analyze the results of its work.<br />
24
5. Rehabilitation of Plant<br />
-. Key benefits<br />
‣ An <strong>in</strong>tegrated project team, compris<strong>in</strong>g both DaeMyoung and client personnel.<br />
‣ An <strong>in</strong>centive scheme to align the objectives of DaeMyoung and its client,<br />
• HSEQ management.<br />
• reliability and availability.<br />
• plant <strong>in</strong>tegrity.<br />
• production objectives.<br />
• cost reduction.<br />
F<strong>in</strong>ancial Benefits<br />
• Susta<strong>in</strong>ed reduction of OPEX(Operat<strong>in</strong>g Expenditure) <strong>in</strong> a very short period<br />
of time.<br />
• Spare parts optimization.<br />
• Independent <strong>in</strong>terface between OEM and client will save time and money.<br />
• Reduced expatriate costs.<br />
• Longer asset life, lead<strong>in</strong>g to postponed decommission<strong>in</strong>g costs.<br />
Human Resource Management Benefits<br />
• Flexibility.<br />
• Iproed utilizatio of o cliet’s o persoel resources.<br />
• Increased safety.<br />
• Fewer human resource issues.<br />
25
5. Rehabilitation of Plant<br />
▶ Repair, upgrade and ma<strong>in</strong>tenance of steam boilers, steam and gas turb<strong>in</strong>es, auxiliary equipment, mechanical and bulk storage systems.<br />
▶ Repair and ma<strong>in</strong>tenance of boiler pressure parts and rotat<strong>in</strong>g equipment <strong>in</strong>clud<strong>in</strong>g pumps, fans, flow control equipment.<br />
▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and <strong>in</strong>strumentation.<br />
LP Rotor Blast<strong>in</strong>g HIP TBN Rotor lift<strong>in</strong>g Disassembly of generator<br />
TBN Ma<strong>in</strong> Oil Pump alignment BFP ma<strong>in</strong>tenance TBN ma<strong>in</strong> stop valve assembly<br />
26
5. Rehabilitation of Plant<br />
▶ Repair, upgrade and ma<strong>in</strong>tenance of steam boilers, steam and gas turb<strong>in</strong>es, auxiliary equipment, mechanical and bulk storage systems.<br />
▶ Repair and ma<strong>in</strong>tenance of boiler pressure parts and rotat<strong>in</strong>g equipment <strong>in</strong>clud<strong>in</strong>g pumps, fans, flow control equipment.<br />
▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and <strong>in</strong>strumentation.<br />
SLP motor lift<strong>in</strong>g BLR panel / bundle lift<strong>in</strong>g BLR tube weld<strong>in</strong>g<br />
High-pressure pipe weld<strong>in</strong>g GGH duct <strong>in</strong>stallation BLR tube weld<strong>in</strong>g<br />
27