08.01.2018 Views

Vision for Energy Business in Bahrain (1)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Vision</strong> <strong>for</strong> <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />

<strong>in</strong> Bahra<strong>in</strong><br />

2018 year<br />

Local Management<br />

F<strong>in</strong>anc<strong>in</strong>g<br />

Solar <strong>Energy</strong><br />

Steel Structure Fabrication/Erection<br />

Miscellaneous Steel work<br />

FGRS<br />

<strong>Energy</strong> renewal <strong>for</strong> Flare Stack<br />

Rehabilitation of Plant<br />

Rehabilitation of Plant<br />

MEP (Mechanical/Electrical/Pip<strong>in</strong>g)<br />

O&M (Operation & Ma<strong>in</strong>tenance <strong>for</strong> Power Plant)


Contents<br />

1. Introduction<br />

2. Summary of Technology<br />

3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />

4. FGRU (Flare Gas Recovery Unit)<br />

5. Rehabilitation of Plant<br />

1


1. Introduction<br />

We are honored to <strong>in</strong>troduce our offer to clients.<br />

We are well-developed Plant construction companies , especially <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong>.<br />

We have worked <strong>for</strong> <strong>in</strong>ternational Plant Projects with Korean EPC companies like<br />

Samsung,GS,Hyundai.<br />

Especially, This Presentation is focused on “<strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong>” with Best benefit of clients.<br />

- Solar <strong>Energy</strong> / High Technology <strong>for</strong> Rehabilitation of Plant / FGRU<br />

We are composed of 4 companies to cope with various needs .<br />

- You and Kim Consult<strong>in</strong>g ( Local Management & F<strong>in</strong>anc<strong>in</strong>g )<br />

- Gaya Steel Works ( Solar <strong>Energy</strong> / Steel Fab & Erection )<br />

- PIELDS ENGINEERING ( FGRS , EPC of MEP Project )<br />

- DaemMyoung ( Plant Rehabilitation / E&I / MEP / O&M )<br />

2


2. Summary of Technology<br />

Busiess Key Value <strong>for</strong> liet’s eefit<br />

SOLAR ENERGY<br />

FGRU<br />

(Flare Gas Recovery Unit)<br />

Rehabilitation<br />

Key Value<br />

1. Best Quality<br />

2. Competitive Price<br />

3. BOT Project<br />

4. Local Ma<strong>in</strong>tenance<br />

Key Value<br />

1. Low Cost (1/3)<br />

2. Payback : 2.3 Year<br />

3. Vent Analysis<br />

(Additional effect)<br />

Key Value<br />

1. Free Analysis<br />

2. Technical offer with<br />

zero ost<br />

3. Plant Renovation<br />

+ Localization<br />

+ Localization + Localization<br />

3


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong><br />

2018 Year<br />

4<br />

Local Management<br />

International Trad<strong>in</strong>g<br />

Solar <strong>Energy</strong><br />

Steel Structure Fabrication/Erection<br />

Miscellaneous Steel work


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />

1. We, GAYA and KNRE (Korea New & Renewable <strong>Energy</strong>) have worked Solar <strong>Bus<strong>in</strong>ess</strong><br />

<strong>in</strong> Korea s<strong>in</strong>ce 2010 year and established Bahra<strong>in</strong> CR to work <strong>in</strong> Bahra<strong>in</strong> from 2017 year.<br />

SOLAR <strong>Bus<strong>in</strong>ess</strong><br />

Key Value<br />

1. Best Quality<br />

2. Competitive Price<br />

3. BOT Project<br />

4. Local Ma<strong>in</strong>tenance<br />

5. F<strong>in</strong>anc<strong>in</strong>g <strong>for</strong> BOT<br />

Execution System<br />

1. Special Market<strong>in</strong>g Offer<br />

- EPC uder 25 year’s warraty ad aiteae<br />

- BOT offer as payment of latest tariff basis<br />

2. Solar Panel Manufacture (Korea)<br />

(1) LG Electronics<br />

- World Best Quality<br />

(2) Hanwha Q cells<br />

- World Best Solar Production<br />

* Other device (Investor etc) – German/ Australia / USA<br />

3. Eng<strong>in</strong>eer<strong>in</strong>g + Supervision<br />

Korea / India / Spa<strong>in</strong> Company licensed<br />

by USA,SPAIN,KOREA)<br />

4. Construction + Ma<strong>in</strong>tenance<br />

GAYA STEELWORKS BAHRAIN WLL<br />

Under the Localization<br />

+ Localization<br />

5. F<strong>in</strong>anc<strong>in</strong>g <strong>for</strong> BOT <strong>Bus<strong>in</strong>ess</strong><br />

Local Partners<br />

5


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />

6


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Execution System)<br />

7


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Eng<strong>in</strong>eer<strong>in</strong>g and Supervision)<br />

1. Korean Partner <strong>for</strong> Eng<strong>in</strong>eer<strong>in</strong>g & Supervision<br />

(1) Name:<br />

Dubai Jumaeirah Beach Hotel<br />

LG Electronics<br />

Iran Isfahan / Siria<br />

8


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Eng<strong>in</strong>eer<strong>in</strong>g and Supervision)<br />

2. International Partner <strong>for</strong> Eng<strong>in</strong>eer<strong>in</strong>g & Supervision<br />

(1) Name: Solaire Power<strong>in</strong>g System under AECA License (Spa<strong>in</strong>)<br />

/ Solar apps <strong>in</strong> India (USA Technology)<br />

9


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />

1. Korean Manufacturer -- LG Solar<br />

10


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />

1. Korean Manufacturer -- LG Solar<br />

11


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />

2. Korean Manufacturer – Hanwha Q CELLS<br />

12


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Solar Panel Manufacturer)<br />

2. Korean Manufacturer – Hanwha Q CELLS<br />

13


3. Solar <strong>Energy</strong> <strong>Bus<strong>in</strong>ess</strong> (Local Installation & Ma<strong>in</strong>tenance)<br />

1. Korean Partner <strong>for</strong> Local Installation & Ma<strong>in</strong>tenance<br />

* GAYA and KNRE are partner<br />

who have worked <strong>in</strong> Korea<br />

<strong>for</strong> Solar <strong>Bus<strong>in</strong>ess</strong>. And<br />

work <strong>in</strong> Bahra<strong>in</strong> together.<br />

(1) Name:<br />

KNRE<br />

(Korea New & Renewable <strong>Energy</strong>)<br />

(2) Career ( 2010 year ~ at Present) :<br />

- Sunsan Solar Park : 1.9 MW<br />

- Gasan Solar Park : 928 KW<br />

- Yongsung Solar Park : 500 KW<br />

- Dogae Solar Park : 700 KW<br />

14


4. FGRU – Flare Gas Recovery Unit<br />

2018 Year<br />

15<br />

Local Management<br />

F<strong>in</strong>anc<strong>in</strong>g<br />

FGRS<br />

<strong>Energy</strong> renewal <strong>for</strong> Flare Stack<br />

Rehabilitation of Plant


4. FGRU – Flare Gas Recovery Unit<br />

FGRS (Flare Gas Recovery System)<br />

Ref<strong>in</strong>ery and Petrochemical Project<br />

16


4. FGRU – Flare Gas Recovery Unit<br />

17


4. FGRU – Flare Gas Recovery Unit<br />

18


4. FGRU – Flare Gas Recovery Unit<br />

19


5. Rehabilitation of Plant<br />

2018 Year<br />

Local Management<br />

F<strong>in</strong>anc<strong>in</strong>g<br />

Rehabilitation of Plant<br />

MEP (Mechanical/Electrical/Pip<strong>in</strong>g)<br />

O&M (Operation & Ma<strong>in</strong>tenance <strong>for</strong> Power Plant)<br />

20


5. Rehabilitation of Plant<br />

Company<br />

Name<br />

CEO<br />

DaeMyoung Global Eng<strong>in</strong>eer<strong>in</strong>g & Construction Co., Ltd.<br />

JONG-BO, KIM<br />

Found April 10, 1995<br />

Capital USD 1,875,000.00-<br />

2016<br />

Sales<br />

Account<br />

Fields<br />

<strong>Bus<strong>in</strong>ess</strong><br />

Ma<strong>in</strong> Office<br />

Staff<br />

Home Page<br />

USD 105,619,425.66-<br />

M&E Eng<strong>in</strong>eer<strong>in</strong>g and Construction<br />

Electrical & Mechanical Construction, Commission<strong>in</strong>g,<br />

Operation & Ma<strong>in</strong>tenance, In<strong>for</strong>mation &<br />

Telecommunication(IT), <strong>Energy</strong> Storage System, Storage<br />

Tank Fabrication & Erection, Plant Simulator/Tra<strong>in</strong><strong>in</strong>g,<br />

Fire Fight<strong>in</strong>g System, Civil & Build<strong>in</strong>g Works,<br />

W<strong>in</strong>d power generation system<br />

10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

111 Eng<strong>in</strong>eers. 35 Adm<strong>in</strong>./Account, Total 146 qualified<br />

staffs<br />

www.dmgec.com<br />

Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986<br />

Credit<br />

Rat<strong>in</strong>g<br />

A+ : by Korea Rat<strong>in</strong>gs<br />

A+ : by DNB Korea<br />

1<br />

Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />

22


5. Rehabilitation of Plant<br />

For Rehabilitation Project,<br />

Analysis , Solution Proposal<br />

is proceeded free of charge.<br />

23


5. Rehabilitation of Plant<br />

Rehabilitation<br />

-. Project : Khartoum North Steam Power Plant<br />

-. Location : Sudan<br />

-. Activity s<strong>in</strong>ce : 1985<br />

-. Owner : National Electricity Corporation of Sudan(NEC)<br />

-. Power Capacity : 380MW(2x30MW,2x60MW,2x100MW)<br />

-. Fuel : Fuel Oil<br />

-. Work Description : steam turb<strong>in</strong>es rehabilitation, plant partial<br />

modification with district heat<strong>in</strong>g <strong>in</strong>troduction, thermal mechanical<br />

eng<strong>in</strong>eer<strong>in</strong>g.<br />

-. Work Period : 2009.06 ~ 2010.10<br />

Ongo<strong>in</strong>g & Next Project<br />

Fuel Conversion<br />

-. Project : Cheon-ju Hubis Comb<strong>in</strong>ed Heat & Power Plant<br />

-. Location : Korea<br />

-. Activity s<strong>in</strong>ce : 1987<br />

-. Owner : Hubis Cheon-ju Factory<br />

-. Power Capacity : 48MW (130ton/hr)<br />

-. Fuel Conversion : Oil to Coal<br />

-. Work Description : boiler rehabilitation, combusition<br />

equipments rehabilitation, coal handl<strong>in</strong>g systems erection, steam<br />

turb<strong>in</strong>es rehabilitation, plant partial modification with district<br />

heat<strong>in</strong>g <strong>in</strong>troduction, thermal mechanical eng<strong>in</strong>eer<strong>in</strong>g.<br />

-. Work Period : 1999.1 ~ 2003.3<br />

• KOREA BORYEONG 500MW<br />

Fossil Power Plant<br />

• KOREA SHININCHEON<br />

Comb<strong>in</strong>ed Cycle Power plant<br />

Rehabilitation<br />

-. Project : Seo-Incheon Comb<strong>in</strong>ed Cycle Power Plant Project<br />

-. Location : Korea<br />

-. Activity s<strong>in</strong>ce : 1992<br />

-. Owner : Korea Western Power Co.,Ltd<br />

-. Power Capacity : 1800MW(G/T:8x150MW,S/T:8x75MW)<br />

-. Fuel : LNG<br />

-. Work Description : gas turb<strong>in</strong>e repair, economiser tube repair,<br />

gas duct repair, plant partial modification with district heat<strong>in</strong>g<br />

<strong>in</strong>troduction thermal mechanical eng<strong>in</strong>eer<strong>in</strong>g.<br />

-. Work Period : 1996.7 ~ 1997.10<br />

23


5. Rehabilitation of Plant<br />

-. Key benefits<br />

‣ Reduces exposure <strong>in</strong> remote regions.<br />

‣ Significantly reduces management time <strong>in</strong>put<br />

‣ Allows <strong>for</strong> a multi-level <strong>in</strong>dependent ma<strong>in</strong>tenance review, followed by clear <strong>in</strong>terfaces between<br />

DaeMyoung GEC management and the client ;<br />

• Procedures and manuals are written by DaeMyoung and validated by the client.<br />

• The client supplies standard technical specifications<br />

• In turn, DaeMyoung reviews and updates technical documentation be<strong>for</strong>e the contract<br />

documents are prepared and signed.<br />

• As DaeMyoung starts the implementation of the scope of work, it is the client who audits<br />

our per<strong>for</strong>mance.<br />

• DaeMyoung GEC writes reports on the technical and contractual aspects of the project,<br />

allow<strong>in</strong>g the client to analyze the results of its work.<br />

24


5. Rehabilitation of Plant<br />

-. Key benefits<br />

‣ An <strong>in</strong>tegrated project team, compris<strong>in</strong>g both DaeMyoung and client personnel.<br />

‣ An <strong>in</strong>centive scheme to align the objectives of DaeMyoung and its client,<br />

• HSEQ management.<br />

• reliability and availability.<br />

• plant <strong>in</strong>tegrity.<br />

• production objectives.<br />

• cost reduction.<br />

F<strong>in</strong>ancial Benefits<br />

• Susta<strong>in</strong>ed reduction of OPEX(Operat<strong>in</strong>g Expenditure) <strong>in</strong> a very short period<br />

of time.<br />

• Spare parts optimization.<br />

• Independent <strong>in</strong>terface between OEM and client will save time and money.<br />

• Reduced expatriate costs.<br />

• Longer asset life, lead<strong>in</strong>g to postponed decommission<strong>in</strong>g costs.<br />

Human Resource Management Benefits<br />

• Flexibility.<br />

• Iproed utilizatio of o cliet’s o persoel resources.<br />

• Increased safety.<br />

• Fewer human resource issues.<br />

25


5. Rehabilitation of Plant<br />

▶ Repair, upgrade and ma<strong>in</strong>tenance of steam boilers, steam and gas turb<strong>in</strong>es, auxiliary equipment, mechanical and bulk storage systems.<br />

▶ Repair and ma<strong>in</strong>tenance of boiler pressure parts and rotat<strong>in</strong>g equipment <strong>in</strong>clud<strong>in</strong>g pumps, fans, flow control equipment.<br />

▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and <strong>in</strong>strumentation.<br />

LP Rotor Blast<strong>in</strong>g HIP TBN Rotor lift<strong>in</strong>g Disassembly of generator<br />

TBN Ma<strong>in</strong> Oil Pump alignment BFP ma<strong>in</strong>tenance TBN ma<strong>in</strong> stop valve assembly<br />

26


5. Rehabilitation of Plant<br />

▶ Repair, upgrade and ma<strong>in</strong>tenance of steam boilers, steam and gas turb<strong>in</strong>es, auxiliary equipment, mechanical and bulk storage systems.<br />

▶ Repair and ma<strong>in</strong>tenance of boiler pressure parts and rotat<strong>in</strong>g equipment <strong>in</strong>clud<strong>in</strong>g pumps, fans, flow control equipment.<br />

▶ Refurbishment, upgrade and/or replacement of all major components, associated pipework and control and <strong>in</strong>strumentation.<br />

SLP motor lift<strong>in</strong>g BLR panel / bundle lift<strong>in</strong>g BLR tube weld<strong>in</strong>g<br />

High-pressure pipe weld<strong>in</strong>g GGH duct <strong>in</strong>stallation BLR tube weld<strong>in</strong>g<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!