PIELDS_Company Profile_2017
High-Tech Biz (1) Flare Solution ENERGY EFFICIENCIES Project Client Scope of Work Period HCP No.2 BTX Flare & PSV Project Hyundai Heavy Industries Co., Ltd. - Process Simulation - Flare Load Analyzing - Network Calculation - Flare System Purchasing 2011.04. ~ 2011.07. Flare System Capacity Assessment Procurement Project Samsung BP Chemicals Co., Ltd. - Flare Load Analyzing - Network Calculation 2011.03. ~ 2011.07. Polymer Pilot Plant Flare Samsung Total Petrochemicals Co., Ltd. - Flare Load Analyzing - Network Calculation - PSV Sizing 2011.03. ~ 2011.04. YERP PSV Load Calculation SK E&C Co., Ltd. - Flare Load Reanalyzing - Network Calculation - PSV Sizing 2011.02. ~ 2011.07. No.2 FCC Flare System Study Project SK E&C Co., Ltd. - PSV Load Evaluation - Flare Load Analyzing - Flare Header Network Calculation 2010.10. ~ 2010.11. Synthetic Rubber Plant Basic Design and Flare Load Analysis Project LG Chem. - Flare Load Analyzing - Flare Header Network Calculation 2009.08. ~ 2010.12. 52
High-Tech Biz (1) Flare Solution ENERGY EFFICIENCIES Project Client Scope of Work Period IGD Flare Gas Project Hyundai Heavy Industries Co., Ltd. - Flare System Basic Design (Network Calculation, etc.) - PSV Sizing 2009.11. ~ 2010.09. LG Chemical Flare LG Chem. - Process Simulation - Flare Load Reanalyzing - Network Calculation - Trouble shooting for existing Flare System 2008.02. ~ 2008.05. 2009.02. ~ 2009.05. (2 times) KTIA Flare (USA) Crown Asphalt Ridge, L.L.C. - Flare Load Analyzing - Network Calculation 2009.07. ~ 2009.12. GS Caltex No.4 CDU Revamping GS E&C - Unit Load recalculation - Network Calculation 2008.01. ~ 2009.05. GS Caltex WCN HDS Revamping GS E&C - Unit Load recalculation - Network Calculation 2007.11. ~ 2008.03. 53
- Page 1 and 2: 1 PIELDS ENGINEERING Co. 2017
- Page 3 and 4: Contents Company Overview Industrie
- Page 5 and 6: Overview INTERNATIONAL EPC CONTRACT
- Page 7 and 8: Organization President / CEO C.H. N
- Page 9 and 10: Available Man-Power 33,000 30,000 2
- Page 11 and 12: Locations- Domestic Head Office Bus
- Page 13 and 14: Document Management System(Security
- Page 15 and 16: Certificates • ISO 9001 - Quality
- Page 17 and 18: 2. Industries & Markets 17
- Page 19 and 20: Major Reference Details • Petroch
- Page 21 and 22: Project Reference Details • Petro
- Page 23 and 24: Project Reference Details • Petro
- Page 25 and 26: Project Reference Details • Petro
- Page 27 and 28: Project Reference Details • Petro
- Page 29 and 30: Project Reference Details • Petro
- Page 31 and 32: Project Reference Details • Refin
- Page 33 and 34: Project Reference Details • Refin
- Page 35 and 36: Project Reference Details • Refin
- Page 37 and 38: Major Reference Details • Offshor
- Page 39 and 40: Major Reference Details • LNG/Gas
- Page 41 and 42: Project Reference Details • LNG/G
- Page 43 and 44: Project Reference Details • Power
- Page 45 and 46: 3. Biz Services 45
- Page 47 and 48: High Tech Biz Provides special solu
- Page 49 and 50: High-Tech Biz (1) Flare Solution EN
- Page 51: High-Tech Biz (1) Flare Solution EN
- Page 55 and 56: High-Tech Biz (2) We are continuall
- Page 57 and 58: High-Tech Biz (3) The LNG (Liquefie
- Page 59 and 60: High-Tech Biz (3) • LNG Storage T
- Page 61 and 62: Contact Information PIELDS Engineer
High-Tech Biz (1)<br />
Flare Solution<br />
ENERGY EFFICIENCIES<br />
Project Client Scope of Work Period<br />
IGD Flare Gas Project<br />
Hyundai Heavy<br />
Industries<br />
Co., Ltd.<br />
- Flare System Basic Design<br />
(Network Calculation, etc.)<br />
- PSV Sizing<br />
2009.11. ~ 2010.09.<br />
LG Chemical Flare<br />
LG Chem.<br />
- Process Simulation<br />
- Flare Load Reanalyzing<br />
- Network Calculation<br />
- Trouble shooting for existing Flare<br />
System<br />
2008.02. ~ 2008.05.<br />
2009.02. ~ 2009.05.<br />
(2 times)<br />
KTIA Flare (USA)<br />
Crown Asphalt Ridge,<br />
L.L.C.<br />
- Flare Load Analyzing<br />
- Network Calculation<br />
2009.07. ~ 2009.12.<br />
GS Caltex No.4 CDU<br />
Revamping<br />
GS E&C<br />
- Unit Load recalculation<br />
- Network Calculation<br />
2008.01. ~ 2009.05.<br />
GS Caltex WCN HDS<br />
Revamping<br />
GS E&C<br />
- Unit Load recalculation<br />
- Network Calculation<br />
2007.11. ~ 2008.03.<br />