Conduril
Conduril presentation Conduril presentation
MAPUTO HEALTH SCIENCE INSTITUTE (MOZAMBIQUE) MAXIXE-MASSINGA NATIONAL ROAD N1 (MOZAMBIQUE) GENERAL SEBASTIÃO MABOTE AVENUE (MOZAMBIQUE) CHICUALACUALA RAILWAY STATION (MOZAMBIQUE) LUCITE BRIDGE (MOZAMBIQUE) MACOMIA-OASSE NATIONAL ROAD N308 (MOZAMBIQUE)
MANAGEMENT OF THE HYDROGRAPHIC BASIN OF N’ZENG-AYONG (GABON) FIGUEIRA GORDA DAM (CAPE VERDE ISLANDS) KAMUDZU DAM UPGRADE (MALAWI) KAMUDZU DAM UPGRADE (MALAWI)
- Page 3 and 4: WHO WE ARE? FRAGMENTS OF OUR HISTOR
- Page 5 and 6: STRATEGY CONDURIL's strategy is to
- Page 7 and 8: COMPANY CULTURE CONDURIL cultivates
- Page 9 and 10: ORGANOGRAM Over many years of exper
- Page 11 and 12: ECONOMIC INDICATORS The equity and
- Page 13 and 14: CONDURIL CORPORATE GROUP ACTIVITY P
- Page 15 and 16: CONDURIL NO MUNDO PORTUGAL SPAIN MO
- Page 17 and 18: RELEVANT WORKS EDP LEIRIA HEAD-OFFI
- Page 19 and 20: MONUMENT TO THE FUNDER OF THE NATIO
- Page 21: NYIMBA - SINDA T4 NATIONAL ROAD (ZA
- Page 25 and 26: SUSTAINABLE DEVELOPMENT AND SOCIAL
- Page 27 and 28: CONDURIL ACADEMY A PROFESSIONAL TRA
- Page 29 and 30: WE RESPECT CULTURES, WE ASSUME COMM
- Page 31: CONTACTS PORTUGAL CONDURIL, Engenha
MANAGEMENT OF THE<br />
HYDROGRAPHIC BASIN OF<br />
N’ZENG-AYONG (GABON)<br />
FIGUEIRA GORDA DAM<br />
(CAPE VERDE ISLANDS)<br />
KAMUDZU DAM UPGRADE<br />
(MALAWI)<br />
KAMUDZU DAM UPGRADE<br />
(MALAWI)