BASU BABU TIWARI, CONSULTING ENGINEER<br />

After doing multiple visits to the project site to assess seismic damage a retrofit plan<br />

was developed. Some key components of the plan were:<br />

• Corner Strengthening with Helifix: From the exterior, 16 mm reinforced bars were<br />

inserted in a 20 mm diameter hole, diagonally created with rotary drill, at 2’ c/ c<br />

spacing. With the bar in place, the hole filled with polymer non-shrink mortar and<br />

both ends plugged with high strength mortar.<br />

• Junction Strengthening: From the interior, a 12 mm diameter bar was inserted at<br />

every 2’ spacing in a L-Shape. To accommodate the bar one course of brick was<br />

removed each side of the wall, bars inserted and gap filled with micro concrete.<br />

• Bands: At three levels - Lintel, around Jambs and at the Sill - bands were run<br />

around the entire perimeter. A 250 mm width MS mesh fabric of 2 mm diameter<br />

and having a mesh size of 25 mm from both faces of wall around opening was run<br />

around sill and lintel level wherever possible. A 40 mm thick application of micro<br />

concrete across the mesh was cured for 7 days.<br />

• Soil Cement Grouts: For existing walls and cracks, a soil cement grout was injected<br />

at low pressure (.1 to .025 MPa). After using an initial injection of water to clean the<br />

insides and improve cohesion, the grouting mix (cement water 1:1) was added. •<br />