3.2.2 Hydro Electric Projects<br />

The Brahmaputra basin has abundant hydropower potential. This region possesses as much as 41<br />

per cent of the country's total hydropower potential. As per the latest assessment the hydropower<br />

potential of the sub-basin is 31,012 MW at 60% load factor. A large chunk of the hydropower<br />

potential of the sub-basin remains to be tapped.<br />

Several hydropower projects of this region like the Kopili (200 MW), Khandong (75 MW), Karbi<br />

Langpi (100 MW) of Assam, Lower Subansiri (2,000 MW), Dibang (3000 MW), Kameng (600 MW),<br />

and Ranganadi (405 MW) of Arunachal Pradesh, Teesta-V (510 MW) of West Bengal, Umiam-Umtru<br />

Power Complex (174 MW) of Meghalaya etc. are presently at various stages of planning and<br />

development.<br />

Salient feature of the important hydropower projects of Brahmaputra basin with their status are<br />

given below-<br />

a) Kopili (Operational): This project consists of Umrong dam on Umrong River, a tributary of<br />

Brahmaputra River. The power house is located at a distance of 70 km from Lanka in Assam.<br />

Kopili power house has 4 units of 50 MW each, with mean annual inflow of 2,860 MCM.<br />

NEEPCO commissioned the project during 1988-97 which has a firm power of 54 MW. For<br />

power generation, the surface power house has Vertical Francis Turbines, which work at net<br />

rated head of 99m. Its annual generation is likely to be 1186.14 MU.<br />

b) Khandong (Operational): This project consists of a dam on Khandong River, a tributary of<br />

Brahmaputra, is located at a distance of 70 km from Lanka in Assam. Khandong power house<br />

has 3 units of 25 MW each, with mean annual inflow of 2,860 MCM and provides firm power of<br />

13 MW. NEEPCO commissioned the project in 1984. Its annual generation is likely to be 277.60<br />

MU. For power generation, the surface power house has Vertical Francis Turbines, which work<br />

at net rated head of 326.5 m. Khandong and Kopili projects have now included under the<br />

Khadong Kopil Complex.<br />

c) Karbi Langpi (Operational): Karbi Langpi dam on Borapani River, a tributary of Brahmaputra<br />

river located near Hamren of Karbi Anglong district, Assam. Karbi Langpi power house has 2<br />

units of 50 MW each, with mean annual inflow of 906 MCM and it’s annual generation is likely<br />

to be 390 MU. For power generation, the surface power house has Vertical Francis Turbines,<br />

which work at net rated head of 240 m. Karbi Langpi project is under control of APGCL.<br />

d) Lower Subansiri (Under Construction): Subansiri lower power houseis under construction in the<br />

Subansiri River in lower Subansiri / Dhemaji Disttrict (Arunachal Pradesh / Assam). The power<br />

house has 8 units of 250 MW of each generation capacity, with mean annual inflow of 44,119<br />

MCM. The expected annual generation is 7,422 MU in 90% dependable year. Lower Subansiri<br />

project is under NHPC Ltd.<br />

e) Ranganadi (Operational): This project has been constructed on Ranganadi River, a tributary of<br />

Brahmaputra River, 50 km from Zir City in Arunachal Pradesh. Ranganadi power house has 3<br />

units of 135 MW each, with maximum and minimum annual inflow of 5,080 and 2,048 MCM<br />

respectively. For power generations, the surface power house has Vertical Francis Turbines<br />

which work at net rated Max. /Mini. Head of 322/290 m. It has a firm power of 65 MW.<br />

NEEPCO commissioned the project in 2002.<br />

f) Kameng (Under Construction): Kameng hydropower house is under construction in the Bichom<br />

& Tenga River in West Kameng district of Arunachal Pradesh. The power house has 4 units of<br />