a) Integrated Kallong <strong>Basin</strong> Lift Irrigation Project: Integrated Kallong <strong>Basin</strong> Lift Irrigation Project<br />
was the first major lift irrigation scheme in Assam taken up during the Vth and completed in<br />
10 th Five Year Plan which irrigate Nagaon district of Assam. GCA, CCA and annual irrigation of<br />
the project are 29.95 Th.ha, 21.45 Th.ha and 21.45 Th.ha respectively.<br />
b) Kaliabor Medium Lift Irrigation Scheme: Kaliabor Lift Irrigation Scheme is a medium lift<br />
irrigation scheme approved by planning commission in 1971 which covers under Tribal Sub<br />
Plan. Annual irrigation under this scheme is 13.58 Th.ha area of Kaliabor region of Nagaon<br />
district.<br />
c) Buridehing Medium Lift Irrigation scheme: This scheme envisages pumping of 4.25 cumec<br />
(Maximum discharge) of water from the Buridehing River at Khowang, for irrigation 5054 Ha<br />
areas on the left bank in Khowang region of Dibrugarh Distirict. The estimated CCA of this<br />
project is 3.05 Th. ha.<br />
d) Hawaipur Medium Lift Irrigation Project: Hawaipur Lift Irrigation Scheme, located in the<br />
Hamren Subdivision of Karbi Anglong District of Assam, envisages lifting of water (design<br />
discharge 2.26 cumecs) from the river Kopili, a tributary of the river Brahmapura, for<br />
providing annual irrigation to an area of 3,887 ha. This project benefited the rain shadow<br />
zone of the district. This scheme completed in 2002.<br />
ERM of 3 earlier completed irrigation projects of Assam falling in the Brahmaputra <strong>Basin</strong> are<br />
accounted up-to 11 th , 5 year plan. ERM schemes of Brahmaputra basin are namely the<br />
Modernization of Jamuna, Improvement of Kulshik and Modernization of Sukla scheme. The salient<br />
features of these schemes are given below:<br />
a) The Modernisation of Jamuna: This scheme was approved by the Planning Commission in<br />
the year 1996-97 for Rs 60.27 crore for rehabilitation and modernization of existing facilities<br />
of the project, thereby, creating an additional Annual Irrigation Potential (AIA ) of 13,758 ha<br />
raising earlier AIA of the project from designed 28,256 ha to 42,014 ha. The modernization<br />
scheme also envisaged restoration of the 5000 ha of AIA lost earlier. This scheme was<br />
included under AIBP in the year 2001-2002 and upto 2009 irrigation increased by additional<br />
12758 ha.<br />
b) Modernization of Sukla: This project was approved by planning commission in 1979 to<br />
modernization and increases the irrigation potential of Sukla Major Irrigation Project of<br />
Kamrup district of Assam. It has created an additional Annual Irrigation Potential of 27.40<br />
Th. ha area in Kamrup district.<br />
c) Improvement of Kulshik: Improvement of Kulshik project was approved by planning<br />
commission in 1966 to increase the irrigation potential of Kulshik project by additional 3<br />
Th.ha in Darrang district of Assam.<br />
The salient features of the Lifts, Power Houses and Extension Renovation and Modernisation (ERM)<br />
projects are listed in the Annexure IV: D, E & F. Spatial location of major water resources structures<br />
and projects are shown in Map 10.<br />
www.india-wris.nrsc.gov.in 35