<strong>Brahamaputra</strong> <strong>Basin</strong><br />
Major and Medium Irrigation Projects of West Bengal:<br />
The development of the irrigation in West Bengal forming part of the Brahmaputra basin is slow.<br />
Only one medium project, namely the Karatowa project was taken up in 1957 to benefit an area of<br />
8.90 Th.ha in the Jalpaiguri district. The project was completed in 1969. Teesta Barrage St - I, St - I Ph<br />
-I is the major Irrigation Project of West Bengal whose command area is falling in both the<br />
Brahmaputra and Ganga. This project is approved by Planning Commission in 1975.<br />
a) Teesta Barrage St-I, Ph-I Subphase I Project (West Bengal): The Teesta barrage project<br />
St-I, Phase-I Subphase I envisages the creation of irrigation potential of 527 Th.ha in six<br />
northern districts namely Darjeeling, Malda, Kochbihar, Jalpaiguri, North Dinajpur and<br />
South Dinajpur. Teesta barrage across river Teesta at Gazoldaba in Jalpaiguri district,<br />
Mahananda barrage at Fulbari in Jalpaiguri district and Dauk barrage across river Dauk at<br />
Chopra in Uttar Dinajpur district are the three barrages associated with this irrigation<br />
scheme. CCA of this project is estimated as 342.30 Th.ha.<br />
Major and Medium Irrigation Projects of Assam:<br />
It was only in the later part of the III th 5 year plan some major and medium Irrigation schemes were<br />
undertaken in Assam.At present, major Irrigation projects completed in Assam are namely - Sukla,<br />
Jamuna and Bordikarai Major Irrigation Project. Other major ongoing projects of Assam falling in<br />
Brahmaputra basin are - Dhanisiri Project, Pagladiya and Champamati Irrigation Project. Medium<br />
irrigation projects of Assam include- Kaldiya, Dikharu, Harguti, Longa, Borolia, Pahumara, Bhumki,<br />
Rupahi, and Dekadong irrigation project.<br />
The salient features of these projects are given below:<br />
b) Jamuna Irrigation Project: The Jamuna Irrigation Scheme, the first major irrigation<br />
project of Assam, was commissioned in the year 1969 for providing irrigation facilities to<br />
the command area spread over Karbi-Anglong and Nagaon districts of Assam. GCA, CCA<br />
and annual irrigation of the project are 33.48, 27.7 and 41.01 Th.ha of area respectively.<br />
c) Sukla Irrigation Project: The scheme envisages construction of a weir on the river Sukla<br />
near Naokota in Kamrup district of Assam. The project was commissioned during 1965<br />
and completed in 1978. GCA, CCA and annual irrigation of the project are 22.842, 16.8<br />
and 27.4 Th.ha respectively.<br />
d) Dhanisiri Major Project: This is mainly an Irrigation Project, but it was subsequently<br />
decided to take advantage of the five canal falls to install five powerhouses of 4 MW<br />
each. The project envisages construction of 160 m long diversion barrage at<br />
Bhairabkunda and the main canal takes off from right bank of the barrage. The total<br />
potential created upto March 2011 is 41258 ha against the ultimate irrigation potential<br />
of 83,366 ha.<br />
e) Pagladiya Major Irrigation Project: The project involves construction of an earthen dam<br />
of 26m height over Pagladiya River, a tributary of Brahmaputra, at Thalkuchi village in<br />
Nalbari District of Assam. Pagladia dam project is essentially a flood control and<br />
irrigation project with incidental hydropower generated from the canal release. The<br />
Pagladiya River has been responsible for recurrent floods in the north bank of the<br />
Brahmaputra. Benefits from Pagladiya dam include flood moderation in 40,000 ha area,<br />
annual irrigation benefits to 54,160 ha and incidental power generation by a plant of 3<br />
MW capacities.<br />