<strong>Case</strong> 5: The SH coil bends had come close to<br />

the casing, that the bends had got eroding. The<br />

shields were not placed properly during a<br />

maintenance & it led to failure of SH.<br />

<strong>Case</strong> 6: The protection shield at bends was not<br />

placed properly during maintenance. This had<br />

led to a stoppage of the plant. There is a gas<br />

baffle to prevent the gas going along the<br />

bends.<br />

<strong>Case</strong> 7: <strong>Erosion</strong> at the top rows of a convection phenomenon depends on the arrangement of<br />

pressure parts layout. A shabby work of shields can lead to poor availability of the boiler. We<br />

can see how the shields are disoriented. The waterwall is seen eroded due to shields. The<br />

distorted shields have led to multiple failures within the bank. Simply all the shields were<br />

removed and all tubes were replaced in a scheduled manner.<br />

Planned replacement of tubes can improve the availability of the boiler than simply resorting to<br />

shields. Shields & baffles are to be engineered depending on various parameters, such as present<br />

velocity & temperature profile, tube to tube clearances.