<strong>FAIRMONT</strong> <strong>HOTELS</strong> & <strong>RESORTS</strong> · <strong>DESIGN</strong> <strong>STANDARDS</strong><br />

CONSTRUCTION REQUIREMENTS<br />

A. CONSTRUCTION REQUIREMENTS<br />

1. CONSTRUCTION REQUIREMENTS<br />

1.1. Model Guestrooms<br />

The contractor shall construct one standard guestroom and one connecting double<br />

double, together with a guestroom corridor the length of both guestrooms, complete<br />

with all finishes and shall alter and adapt them as required at no additional cost to<br />

Fairmont Hotels & Resorts. They will be constructed minimum eighteen month prior to<br />

completion of the construction of the hotel and will be constructed off-site in space<br />

provided by Owner and will remain in their completed state until equivalent rooms are<br />

complete and safely accessible for sales personnel and guests on site<br />

In addition, the contractor shall finish out complete with furniture the first available<br />

standard guestroom and double-double in the hotel. These rooms will be finished as<br />

soon as possible including temporary waterproofing, etc.<br />

1.2. Guarantees<br />

The contractor shall guarantee the building free from defects for a period of not less<br />

than one year with the exception of the items included in these Design Standards for<br />

which a longer guarantee period is specified.<br />

1.3. Substantial Completion Documentation<br />

On substantial completion Fairmont Hotels & Resorts shall be provided with the<br />

following maintenance information either bound or in electronic format:<br />

a) Two sets of architectural, mechanical, electrical and interior<br />

design “as built” drawings. Drawings shall be on CD’s with hard<br />

copies on Mylar and shall be individually bound and clipped in<br />

sets<br />

b) Two bound summaries of all sub contracts awarded on the project<br />

detailing type of sub contract to show the name, address and<br />

telephone number of each contractor<br />

c) Two-framed valve charts listing each valve by number, system<br />

and function.<br />

Three months prior to substantial completion, Fairmont Hotels & Resorts<br />

shall be provided with the following:<br />

REV. MARCH 2006 - 1 -<br />

© 2002, Fairmont Hotels and Resorts. All Rights Reserved.