09.06.2017 Views

FAIRMONT HOTELS & RESORTS -DESIGN STANDARDS

Hotel Design

Hotel Design

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FAIRMONT</strong> <strong>HOTELS</strong> & <strong>RESORTS</strong> · <strong>DESIGN</strong> <strong>STANDARDS</strong> OUTLINE OF RESPONSIBILITIES<br />

OUTLINE OF RESPONSIBILITIES-WITH RESPECT TO<br />

<strong>FAIRMONT</strong> <strong>HOTELS</strong> STANDARD PROCEDURES<br />

RELATING TO FF&E AND OS&E ITEMS ONLY<br />

Key:<br />

A/E Architect/Engineer<br />

DCC Direct Construction Cost<br />

FC FF&E Contractor<br />

FFE FF&E Cost<br />

PA Purchasing Agent<br />

GC General Contractor<br />

IDC Interior Design Consultant<br />

FHR Fairmont Hotels & Resorts<br />

KDC Kitchen Design Consultant<br />

OSE OS&E Cost<br />

NOTE: Where two or more “key initials” are grouped together, then the first key initial becomes the ultimate responsibility for that item.<br />

Please refer to “Classification or Responsibilities” for a more comprehensive document for the entire project team.<br />

REV. MARCH 2006 22<br />

© 2002, Fairmont Hotels and Resorts. All Rights Reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!