09.06.2017 Views

FAIRMONT HOTELS & RESORTS -DESIGN STANDARDS

Hotel Design

Hotel Design

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fairmont Hotels & Resorts · Design Standards<br />

APPENDICES<br />

Has spot cooling been provided for hot spot areas i.e. laundry area, chef’s<br />

office and valet?<br />

Does the computer room have an independent air conditioning unit?<br />

Is the computer room unit on emergency power?<br />

Has a dedicated/independent air conditioning unit on emergency power<br />

been provided for the PABX room?<br />

Is the garbage room refrigerated?<br />

Is the bakery chocolate room refrigerated?<br />

Has the grease room been provided with a separate exhaust system?<br />

Is a paint booth required?<br />

Hot Water Plant<br />

What is the redundancy factor for the hot water boilers?<br />

When sizing the boilers, has only a partial credit been taken for all air-toair<br />

heat reclaim systems (if applicable)?<br />

Have the internal gains from lighting, power and people used to reduce the<br />

size of the boiler plant? (They should not be).<br />

Is there one hot water pump for each boiler?<br />

Is primary/secondary pumping being utilized?<br />

Have energy-conserving features such as variable speed pumping been<br />

utilized?<br />

Refrigeration Plant<br />

What are the chiller redundancy factors?<br />

Does each chiller have a condenser water pump?<br />

Is the location of the source of condenser water, i.e. cooling tower, dry<br />

coolers etc. located so that the noise generated by this equipment will not<br />

be objectionable to the occupants of the hotel?<br />

Is the refrigerant environmentally friendly, i.e. is R-134a or R-123 being<br />

used?<br />

Has hydronic winter free cooling, utilizing a winterized cooling tower,<br />

been provided to avoid operating the chiller during the winter months?<br />

(Note that this applies to climates with cooler winters).<br />

Have refrigerant leak detectors and a leak evacuation/exhaust system been<br />

provided for in the chiller room?<br />

Have dedicated pumping systems been provided for all hotel suite fan coil<br />

units, air handling units, or any equipment which requires year-round<br />

cooling?<br />

Is chilled water available for year-round cooling?<br />

Has the capacity of the plant been confirmed, i.e. have block load<br />

calculations been performed and reviewed?<br />

Have energy-conserving features such as variable speed pumping been<br />

utilized?<br />

Has chilled or condenser water been provided for the ice machines on the<br />

guest floor?<br />

YES<br />

NO<br />

REV. MARCH 2006 269<br />

©2002 Fairmont Hotels & Resorts. All Rights Reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!