Fairmont Hotels & Resorts · Design Standards<br />

APPENDICES<br />

1.16 Installation<br />

A. Hardware shall be units mounted at heights directed by the Architect.<br />

Each hardware item shall be installed in strict compliance with the<br />

manufacturer’s instructions and recommendations level, plumb, and true to line<br />

and location.<br />

1.17 Adjusting, Cleaning, and Demonstrating<br />

A. The Contractor shall adjust and check each operating item of hardware and each<br />

door to ensure proper operation or function of every unit and replace units that<br />

cannot be adjusted to operate freely and smoothly or as intended for the<br />

application made.<br />

1. Where door hardware is installed more than one month prior to<br />

acceptance or occupancy of a space or area, return to the installation<br />

during the week prior to acceptance or occupancy and make final check<br />

and adjustment of all hardware items in such space or area. Clean<br />

operating items as necessary to restore proper function and finish of<br />

hardware and doors. Adjust door control devices to compensate for final<br />

operation of heating and ventilating equipment.<br />

B. Clean and repair adjacent surfaces soiled by hardware installation.<br />

C. Instruct FHR’s personnel in the proper adjustment and maintenance of door<br />

hardware and hardware finishes.<br />

D. Approximately six months after the date of Substantial Completion, the<br />

Contractor, accompanied by representatives of the manufacturers of latchsets<br />

and locksets and of door control devices, and of other major hardware suppliers,<br />

shall return to the Project to perform the following work:<br />

1. Examine and re-adjust each item of door hardware as necessary to<br />

restore function of doors hardware to comply with specified<br />

requirements.<br />

2. Consult with and instruct FHR’s personnel in recommended additions to<br />

the maintenance procedures.<br />

3. Replace hardware items that have deteriorated or failed due to faulty<br />

design, materials, or installation of hardware units.<br />

4. Prepare a written report of current and predictable problems (of<br />

substantial nature) in the performance of the hardware.<br />

REV. MARCH 2006 252<br />

© 2002, Fairmont Hotels and Resorts. All Rights Reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!