Fairmont Hotels & Resorts · Design Standards<br />

SERVICES AND SYSTEMS<br />

Mechanical/General Requirements (continued)<br />

permit one unit to be removed from service for repairs and maintenance<br />

without seriously affecting the operations of the hotel. The minimum<br />

boiler selection must be two units each sized to provide approximately<br />

two thirds of the peak load<br />

i) If boilers are to be oil fired then the capacity of the fuel storage facilities<br />

must be designed to accommodate a two-week supply.<br />

All air conditioning installations are to be of the central plant type, supplying chilled<br />

water to the various air-handling units.<br />

As the equipment is to be designed to operate on a 24 hours, 365 day per year basis it<br />

must be selected in multiple units with sufficient spare capacity to maintain comfort of<br />

the guests during periods of average weather conditions and occupancy during times<br />

when one unit may be taken out of service.<br />

The selection of the refrigeration plant equipment, excluding the kitchen refrigeration<br />

equipment, which will be supplied under the kitchen equipment contract, must take into<br />

consideration the following criteria:<br />

a) Climatic conditions and degree of discomfort expected if breakdown<br />

occurs<br />

b) Availability and reliability of supply<br />

c) Cost of water<br />

d) Chemical and physical properties of available water<br />

e) Availability, quality and cost of electrical energy supply<br />

f) Availability and cost of hotel produced steam<br />

g) Availability of skilled maintenance labor<br />

h) Type of equipment with which local maintenance labor is familiar<br />

i) Availability of manufacturer’s local service organization and their skill<br />

levels<br />

j) Availability of replacement parts<br />

k) Chiller quantity and capacity calculations are to be based upon the same<br />

criteria as for boilers<br />

l) All condensers are to be water cooled and piped to a complete cooling<br />

tower water system<br />

m) If the cooling towers for the air conditioning plant do not operate year<br />

round, then a separate cooling tower is to be installed for the refrigeration<br />

plant and ice makers<br />

REV. MARCH 2006 192<br />