1. MECHANICAL<br />

1.1. General Requirements<br />

The requirements for air conditioning, ventilation and heating for Fairmont Hotels and<br />

Resorts will vary widely due to the differences in climates of the cities in which the<br />

hotels or resorts are to be located. All latest ASHRAE standards 62-(latest edition) and<br />

55-(latest edition) must be strictly adhered to unless directed otherwise.<br />

The system is to be designed for all spaces except mechanical and electrical plant rooms<br />

to be air-conditioned.<br />

The design of the system is to take into account the following design criteria:<br />

a) Humidity, especially where hotels are in hot and humid climates<br />

b) Condition and/or ventilation air in all enclosed corridors having direct<br />

access to guestroom, as well as stairways and storage rooms adjacent to<br />

guestrooms<br />

c) Ceiling plenums will not be used for corridor air distribution<br />

d) Sizing of guestroom cooling loading should be based upon 97 ½ %<br />

ASHRAE, 1 person occupancy per king room, 2 person occupancy per<br />

double/double, (these numbers are to be doubled for resort hotels), 1,250<br />

watts of lighting, drapery sheets closed, no outside air infiltration and<br />

75 F (24 C) desired room cooling temperature<br />

e) Double directional, fully adjustable louver deflectors on fan coil air<br />

diffusers<br />

f) Guestroom are to be designed to maintain positive pressure<br />

g) High-rise hotels to be provided with toilet exhaust roof-top fans (to<br />

shutdown or limit speed during midday and night-time)<br />

h) All supply and return air grilles in public areas, when exposed to the<br />

public, are to linear type<br />

i) The design is to take into consideration both latent heat gain and<br />

dehumidification performance of air conditioning system as part of the<br />

energy analysis computer program<br />

j) Cooling load for health clubs and spa exercise rooms are to be calculated<br />

on a basis of a the room being fully occupied, with guests doing a<br />

vigorous workout<br />

k) Chilled water piping systems are to be designed with balancing capability<br />

l) The design is to take into consideration both latent heat gain and<br />

dehumidification performance of air conditioning system as part of the<br />

energy analysis computer program<br />

REV. MARCH 2006 190<br />