09.06.2017 Views

FAIRMONT HOTELS & RESORTS -DESIGN STANDARDS

Hotel Design

Hotel Design

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FAIRMONT</strong> <strong>HOTELS</strong> & <strong>RESORTS</strong> · <strong>DESIGN</strong> <strong>STANDARDS</strong><br />

CONSTRUCTION REQUIREMENTS<br />

Model Room Manual (continued)<br />

• Architectural layout<br />

• Furniture plan and specifications<br />

• Millwork detail shop drawings<br />

• Electric schematic and rough in locations<br />

• Electric equipment cut-sheets<br />

• Data/Com schematics and rough in-locations<br />

• Hardware schedules and cut-sheets<br />

• Plumbing schedules and cut-sheets<br />

• Door and window cut-sheets<br />

• Finish schedule; paint carpet, marble, etc.<br />

• Fan coil schedule and cut-sheets<br />

• Lighting fixture schedules and cut-sheets<br />

• Fire protection schematic and cut-sheets<br />

• FF & E schedule and cut-sheets, mini bar, room safe, etc.<br />

3.6. Guest Room Inspection Checklists<br />

Attached are the Guestroom Inspection and Guestroom MEP Inspection Checklists.<br />

These checklists shall be used when inspecting rooms for acceptance and through to<br />

room turnover to operations. These lists shall form the basis of any punch list.<br />

REV. MARCH 2006 - 10 -<br />

© 2002, Fairmont Hotels and Resorts. All Rights Reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!