CONSTRUCTION REQUIREMENTS<br />

2. PRE-OPENING, OCCUPATION AND INSTALLATION REQUIREMENTS<br />

2.1. General<br />

The construction company is required to provide the following services:<br />

a) Fairmont Hotels & Resorts will be permitted to occupy the building in<br />

stages as it is completed for the purpose of installing the FF&E<br />

The contractor will be responsible for providing Fairmont Hotels &<br />

Resorts with the following services at no cost during the FF&E<br />

installation program:<br />

i) Heating, cooling and humidity control as required to protect the<br />

FF&E<br />

ii) Temporary Lighting<br />

iii) Completely clean all areas of the building prior to hand over to<br />

Fairmont Hotels & Resorts including interior and exterior glass,<br />

all finishes, vacuuming all floors, polishing all mirrors, chrome,<br />

plumbing fixtures, etc.<br />

iv) Removing from a central point on each floor all packing cases,<br />

boxes, wrapping, off-cuts, etc. brought into the building by<br />

Fairmont Hotels & Resorts.<br />

v) Exclusive use of at least two elevators during normal working<br />

hours and exclusive use of at least three elevators outside these<br />

hours including providing all necessary elevator operators.<br />

b) All areas must be fully operational and completely free of deficiencies<br />

when turned over to Fairmont Hotels & Resorts.<br />

c) Where an area includes equipment, including specialty equipment<br />

supplied and installed under an FF&E contract, all equipment must be<br />

connected, tested, and fully operational when turned over to Fairmont<br />

Hotels & Resorts, including:<br />

i) Food and beverage equipment<br />

ii) Laundry and valet equipment<br />

iii) Computer equipment<br />

iv) Telephone equipment<br />

v) Garbage compaction equipment<br />

The construction contractor is responsible for coordinating with the<br />

specialty equipment contractors, and Fairmont Hotels & Resorts, to<br />

ensure these requirements are met.<br />

REV. MARCH 2006 - 4 -<br />