Brochure v12.sm

30.03.2017 Views

McIntosh DBR McIntosh DBR CARROT HILL ABOUT THE PROJECT The owners of Carrot Hill came to us with a comprehensive plan: they had an empty plot and their dream house already designed by a leading London architect. Needless to say, they were itching to get going. THE CHALLENGE Carrot Hill was commissioned as a ‘design and build’, as the client lived outside the UK and wanted us to take on full responsibility for the project. A large family home, it needed to be built to exacting standards and follow the Code for Sustainable homes at Code 5 to qualify as a zero-imprint property. We communicated with the client regularly over Skype, and photographic updates were regularly provided to keep them fully up to speed with how the build was progressing. There were a number of design elements that required great deliberation regarding their workability and practicality, all of which was dealt with in-house. THE SOLUTION Any missing information or clashes with design details from the original architect’s drawings that arose were overcome using local designers and engineers. We deployed our local team of tradesmen to undertake the various packages and stages of the build, working to our internal programme. The house was delivered to the client as agreed and on time. Carrot Hill is an overwhelming success, both architecturally and in terms of construction, and the clients couldn’t be happier with their new home. It’s due to be entered into the building awards early next year. 18 19

McIntosh DBR<br />

McIntosh DBR<br />

CARROT<br />

HILL<br />

ABOUT THE PROJECT<br />

The owners of Carrot Hill came to us with a comprehensive plan: they had an empty plot and their dream house already<br />

designed by a leading London architect. Needless to say, they were itching to get going.<br />

THE CHALLENGE<br />

Carrot Hill was commissioned as a ‘design and build’, as<br />

the client lived outside the UK and wanted us to take on<br />

full responsibility for the project. A large family home, it<br />

needed to be built to exacting standards and follow the<br />

Code for Sustainable homes at Code 5 to qualify as a<br />

zero-imprint property.<br />

We communicated with the client regularly over Skype,<br />

and photographic updates were regularly provided to<br />

keep them fully up to speed with how the build was<br />

progressing. There were a number of design elements that<br />

required great deliberation regarding their workability and<br />

practicality, all of which was dealt with in-house.<br />

THE SOLUTION<br />

Any missing information or clashes with design details<br />

from the original architect’s drawings that arose were<br />

overcome using local designers and engineers. We<br />

deployed our local team of tradesmen to undertake the<br />

various packages and stages of the build, working to our<br />

internal programme. The house was delivered to the client<br />

as agreed and on time.<br />

Carrot Hill is an overwhelming success, both<br />

architecturally and in terms of construction, and the clients<br />

couldn’t be happier with their new home. It’s due to be<br />

entered into the building awards early next year.<br />

18<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!