Nepal <strong>project</strong>s<br />

S.No NAME OF ROAD/CHAINAGES LENGTH(KM) COST OF<br />

WORKS (IN<br />

CRORES NRs)<br />

INCL VAT<br />

STATUS AS ON 15.03.2017<br />

Branch Office: Kathmandu (Nepal)<br />

NAME OF CONTRACTOR BIDS CALLED ON BIDS RECEIVED<br />

ON<br />

BIDS FINALIZED ON<br />

1<br />

2<br />

MANMAT-KALAIYA-<br />

MATIYARWA<br />

0.00 -15.00<br />

MANMAT-KALAIYA-<br />

MATIYARWA 15.00- 26.66<br />

15 26.13 Ashish DS JV 28-8-2015 7/10/2015 30-12-2015<br />

11.66 22.45 Ashish DS JV 28-8-2015 7/10/2015 30-12-2015<br />

JANAKPUR-YADUKUHA<br />

8 16.63 30.39 Diwa Nirman Sewa 28-8-2015<br />

0.00 - 16.63<br />

7/10/2015 30-12-2015<br />

BIRENDRABAZAR-YADUKUHA-<br />

3 MAHINTHPUR<br />

17 33.75 Raman Const. 28-8-2015 7/10/2015 30-12-2015<br />

0.00 - 17.00<br />

BIRENDRABAZAR-YADUKUHA-<br />

4 MAHINTHPUR<br />

15.31 Pappu Roshan 10/11/2016 12/12/2016 18-01-2017<br />

17.00-32.31<br />

5 MAISTHAN-GAUSHALABAZAR-<br />

25.4 96 Lama Danfe golden goods JV 7/12/2016 19-12-2016 7/1/2017<br />

SAMSI<br />

0.00- 25.40<br />

6 TAMAGADI-SIMRAUNGADH<br />

20 28-01-2017<br />

0.00-20.00<br />

7 TAMAGADI-SIMRAUNGADH<br />

19.745 28-01-2017<br />

20 - 39.745<br />

9<br />

JALESHWOR-HARDI RIVER<br />

0.00 - 28.00<br />

28 28-01-2017<br />

10<br />

BIRGUNJ- THORI<br />

0.00 - 27.00<br />

27<br />

11<br />

BIRGUNJ- THORI<br />

27 - 53<br />

26<br />

12<br />

KANEPOKHARI-RANGELI<br />

0.00 - 25.40<br />

25.4 28-01-2017<br />

KALYANPUR-BARSAIN-<br />

13 SUBHRANPATTI<br />

17.29 28-02-2017<br />

0.00 - 17.29<br />

14<br />

LAMAHI- KOILABAS<br />

0.00 - 33.036<br />

33.036 28-01-2017<br />

TOTAL 297.471 208.72