5<br />

Chenani-Khallani<br />

(NHC-TP)<br />

New alignment. Included under the <strong>project</strong> at Sl. No. 1.<br />

5 NH-1<br />

6<br />

NH-1D<br />

(old)<br />

Construction Operation and<br />

Maintenance of Zozila tunnel<br />

including approaches on NH-1<br />

(Srinagar-Sonmarg-Gumri road)<br />

on DBFOT (Annuity basis) Ch.<br />

94.500 to Ch. 119.000 Baltal-<br />

Minamarg<br />

Expression of Interest for<br />

Appointment of Independent<br />

Engineer<br />

Work of construction, operation<br />

and maintenance of Z-Morh<br />

tunnel on DBFOT (Annuity basis)<br />

14.083 7976 8026.77<br />

yet to be<br />

awarded<br />

6.50 2680.42 2680.42 01.04.2015<br />

M/s SSTL/<br />

IE-M/s EPTISA<br />

Servicios de<br />

Ingenieria SL<br />

Bids invited under EPC mode.<br />

Bid Due Date has been extended upto 01.05.2017.<br />

After financial closure, Appointed date was notified as 01-05-2015<br />

and the Escrow Agreement & Subsitution Agreement signed. At<br />

present, this work is under progress at site. M/s EPTISA Servicios<br />

de Ingenieria SL is the Independent Engineer for this <strong>project</strong>.<br />

The Construction work is under progress.<br />

Total 435.58 15156.42 15207.19