5<br />
Chenani-Khallani<br />
(NHC-TP)<br />
New alignment. Included under the <strong>project</strong> at Sl. No. 1.<br />
5 NH-1<br />
6<br />
NH-1D<br />
(old)<br />
Construction Operation and<br />
Maintenance of Zozila tunnel<br />
including approaches on NH-1<br />
(Srinagar-Sonmarg-Gumri road)<br />
on DBFOT (Annuity basis) Ch.<br />
94.500 to Ch. 119.000 Baltal-<br />
Minamarg<br />
Expression of Interest for<br />
Appointment of Independent<br />
Engineer<br />
Work of construction, operation<br />
and maintenance of Z-Morh<br />
tunnel on DBFOT (Annuity basis)<br />
14.083 7976 8026.77<br />
yet to be<br />
awarded<br />
6.50 2680.42 2680.42 01.04.2015<br />
M/s SSTL/<br />
IE-M/s EPTISA<br />
Servicios de<br />
Ingenieria SL<br />
Bids invited under EPC mode.<br />
Bid Due Date has been extended upto 01.05.2017.<br />
After financial closure, Appointed date was notified as 01-05-2015<br />
and the Escrow Agreement & Subsitution Agreement signed. At<br />
present, this work is under progress at site. M/s EPTISA Servicios<br />
de Ingenieria SL is the Independent Engineer for this <strong>project</strong>.<br />
The Construction work is under progress.<br />
Total 435.58 15156.42 15207.19