11.12.2012 Views

Food Safety Audit - Packinghouse - Florida Department of ...

Food Safety Audit - Packinghouse - Florida Department of ...

Food Safety Audit - Packinghouse - Florida Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FDACS 07085 Rev 05/11<br />

Page 30 <strong>of</strong> 31<br />

FOOD SAFETY AUDIT-TOMATO GOOD AGRICULTURE PRACTICES<br />

PACKINGHOUSE<br />

14. Product Traceability and Recall Procedures<br />

Item# Requirement Procedure Verification Corrective Action/<br />

14.1 Lot identification shall be<br />

labeled on all cases and<br />

clearly legible.<br />

14.2 There are written product<br />

tracing and recall<br />

procedures.<br />

14.3 Operation routinely tests<br />

the product tracing<br />

procedures.<br />

14.4 A successful mock recall<br />

test has been performed in<br />

the last 12 months.<br />

□ C<br />

□ CAN<br />

□ IAR<br />

□ NA<br />

□ C<br />

□ CAN<br />

□ NA<br />

□ C<br />

□ CAN<br />

□ NA<br />

□ C<br />

□ CAN<br />

□ NA<br />

A product coding system is in place<br />

where product or raw material shall<br />

be labeled with grower and lot<br />

identification, and coded to enable<br />

access to date <strong>of</strong> harvest and/or<br />

packing, origin (name <strong>of</strong> farm,<br />

grower and/or packing location), and<br />

country <strong>of</strong> origin for traceback<br />

purposes.<br />

Operation has developed a written<br />

crisis management and recall action<br />

plan, including designation <strong>of</strong> recall<br />

team and responsibilities, flow chart<br />

<strong>of</strong> the recall process, plan for product<br />

recovery and disposition.<br />

Operation shall have a procedure<br />

and maintain records to identify all<br />

outgoing product lots and shipments<br />

with all component tomato lots, in<br />

both traceback and trace forward<br />

directions, to achieve 100%<br />

reconciliation <strong>of</strong> shipped product<br />

within 2 hours. Operation shall<br />

perform and document a trace<br />

exercise at least once per quarter,<br />

while in operation. This may be<br />

performed during the audit or during<br />

a mock recall.<br />

Operation shall test all recall<br />

procedures, in a mock process, at<br />

least annually.<br />

<strong>Audit</strong>or reviews coding procedures,<br />

observes cases for appropriate coding,<br />

and verifies compliance by review <strong>of</strong><br />

records.<br />

<strong>Audit</strong>or reviews the traceback and<br />

recall procedures for completeness,<br />

accuracy.<br />

<strong>Audit</strong>or asks operation to traceback<br />

one, auditor-selected product lot to all<br />

supplier lots, and trace forward one<br />

supplier lot to all product lots and<br />

shipments. <strong>Audit</strong>or verifies operation<br />

capability to reconcile 100% <strong>of</strong> shipped<br />

product lot within 2 hrs. <strong>Audit</strong>or<br />

requests records to support either the<br />

traceback or trace forward, and verifies<br />

accessibility within 2 hours.<br />

<strong>Audit</strong>or reviews records <strong>of</strong> the most<br />

recent mock recall.<br />

Disposition<br />

Boxes with missing, inaccurate<br />

or illegible coding are labeled<br />

with appropriate identification.<br />

Procedure is developed or<br />

revised. Retraining is<br />

performed.<br />

Procedure is developed or<br />

revised. Retraining is<br />

performed.<br />

Procedure is developed or<br />

revised. Retraining is<br />

performed. Test is repeated<br />

until operation passes.<br />

Procedures are developed or<br />

revised. Retraining is<br />

performed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!