11.12.2012 Views

Specializing in the Electro-mechanical fields ... - Marina Company

Specializing in the Electro-mechanical fields ... - Marina Company

Specializing in the Electro-mechanical fields ... - Marina Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Specializ<strong>in</strong>g</strong> <strong>in</strong> <strong>the</strong> <strong>Electro</strong>-<strong>mechanical</strong> <strong>fields</strong> provid<strong>in</strong>g professional services to <strong>the</strong> construction and<br />

<strong>in</strong>dustrial sectors <strong>in</strong> <strong>the</strong> state of Qatar. Established <strong>in</strong> 1998<br />

MARINA with its offices <strong>in</strong> Doha is able to extend <strong>the</strong> service capabilities to all areas of Qatar.<br />

MARINA‘s current staff is made of qualified and tra<strong>in</strong>ed project managers, service eng<strong>in</strong>eers, skilled<br />

technicians and adm<strong>in</strong>istrative staff, all professional <strong>in</strong> <strong>the</strong>ir respective areas, provid<strong>in</strong>g timely and<br />

quality services. The company feels pride <strong>in</strong> <strong>the</strong> professional manner <strong>in</strong> which its commitment to<br />

customers is fulfilled.<br />

MARINA has established a full fledged contract<strong>in</strong>g division, capable of execut<strong>in</strong>g <strong>mechanical</strong> and<br />

electrical projects on a turnkey basis, right from design and development to erection, test<strong>in</strong>g<br />

commission<strong>in</strong>g and ma<strong>in</strong>tenance services for all types of projects.<br />

Our contract<strong>in</strong>g division is managed by a highly competent and well-qualified team of eng<strong>in</strong>eers who<br />

have ga<strong>in</strong>ed considerable experience <strong>in</strong> <strong>the</strong>ir specialized discipl<strong>in</strong>es and construction techniques <strong>in</strong> <strong>the</strong><br />

different parts of <strong>the</strong> world. We are able to provide <strong>the</strong> necessary support <strong>in</strong> design development,<br />

technical back up and assistance <strong>in</strong> procurement of materials for all our projects. Through our full<br />

fledged office, we can assure a high degree of efficiency and effectiveness, offer<strong>in</strong>g fast and most<br />

satisfactory response to client‘s requirements. Our agency arrangements and contacts with various<br />

suppliers <strong>in</strong> Europe and North America provide excellent support <strong>in</strong> Eng<strong>in</strong>eer<strong>in</strong>g and procurement of<br />

materials.<br />

S<strong>in</strong>ce <strong>the</strong> start<strong>in</strong>g of our firm, MARINA have cont<strong>in</strong>ued to grow and diversify, to f<strong>in</strong>d ways to better<br />

serve <strong>the</strong> market <strong>in</strong> terms of a total eng<strong>in</strong>eer<strong>in</strong>g solutions to customer requirements, whatever <strong>the</strong><br />

product, service or specification.<br />

Our areas of specialization <strong>in</strong>cludes but not limited to <strong>the</strong> follow<strong>in</strong>g:-<br />

1- <strong>Electro</strong>-<strong>mechanical</strong> works for <strong>in</strong>dustrial projects, multistory build<strong>in</strong>gs, and special design build<strong>in</strong>gs.<br />

2- Landscap<strong>in</strong>g <strong>Electro</strong>-<strong>mechanical</strong> works.<br />

3- M.V. and L.V. cable <strong>in</strong>stallation.<br />

4- Street light<strong>in</strong>g, underpass light<strong>in</strong>g and flood light<strong>in</strong>g of stadiums etc.<br />

5- Substation <strong>in</strong>stallation.<br />

6- A/C works up to chiller units‘ <strong>in</strong>stallation, package units, duct<strong>in</strong>g system, water l<strong>in</strong>ers, AHU's,<br />

F.C.U's all required valves.<br />

7- Plumb<strong>in</strong>g works for residential and high rise build<strong>in</strong>g.<br />

8- Fire fight<strong>in</strong>g spr<strong>in</strong>kler system, FHR, foam sys. IFm -200 for S/S, Elect. Rooms, Q. Tel room,<br />

computer rooms, all size's of fire pumps, Jockey pumps, diesel pumps, etc…<br />

We hope <strong>the</strong> above meets your requirement and assure you of best services at all times.<br />

Best Regards,<br />

Ahmad Awad<br />

General Manager<br />

3


KAHRAMAA LISENCE<br />

5


COMMERCIAL REGISTRATION<br />

6


COMMERCIAL REGISTRATION<br />

7


COMMERCIAL LISENCE<br />

8


S.no Full Name Nationality Occupation<br />

1 Hamdan Yousuf Al Marsoqi Qatari Manag<strong>in</strong>g Director<br />

2 Ahmed Loubani Jordanian General Manager<br />

3 Husse<strong>in</strong> Darwish Jordanian Adm<strong>in</strong> & F<strong>in</strong>ance Manager<br />

4 Bassam Saleh Syrian Head of Electrical Division<br />

5 Dhanraj Yadav Nepal Senior Electrical Eng<strong>in</strong>eer<br />

6 Hossam Eld<strong>in</strong>n Egyptian Senior Mechanical Eng<strong>in</strong>eer<br />

7 Osama Na‘nirat Jordanian Head of Mechanical Division<br />

8 Khaleel Bou Hyder Lebanon Senior Mechanical Eng<strong>in</strong>eer<br />

9 Hatem Elian Jordanian Head of QA/QC Dept.<br />

10 Edgardo Mission Arriesgado Pilip<strong>in</strong>o Senior Mechanical Eng<strong>in</strong>eer<br />

11 Sa<strong>the</strong>sh Kumar Sri Lanka Electrical Site Eng<strong>in</strong>eer<br />

12 Barkat Ali Yas<strong>in</strong> Pakistani Project Coord<strong>in</strong>ator<br />

13 Mohd. Mahmoud Saad Mohd Badr Egyptian Electrical Project Manager<br />

14 Amr Salama Emam El Shakhs Egyptian Electrical Project Manager<br />

15 Ahmed El Raked Egyptian Mechanical Site Eng<strong>in</strong>eer<br />

16 Mohammed Fawzi Osman Palest<strong>in</strong>e Electrical Site Eng<strong>in</strong>eer<br />

17 Ahmed Mohamed Mohamed El S. Egyptian Electrical Site Eng<strong>in</strong>eer<br />

18 Mandy Vega Mercel<strong>in</strong>o Pilip<strong>in</strong>o Electrical Site Eng<strong>in</strong>eer<br />

19 Lazaro Dalafu Dul<strong>in</strong> Pilip<strong>in</strong>o QA/QS<br />

20 Osama Ahmed Egyptian P/R (Head of section)<br />

21 Antonia B. Arago Jr Pilip<strong>in</strong>o Electrical site Eng<strong>in</strong>eer<br />

22 Robert R. Mendoza Pilip<strong>in</strong>o Electrical site Eng<strong>in</strong>eer<br />

23 Mohammad. Nurul Haque Bangladesh Electrical Foreman<br />

24 Khaleel Hejab Jordanian Mechanical Foreman<br />

25 Hussa<strong>in</strong> Miya Abdul R. Mullaji Indian Electrical Foreman<br />

26 Sadab Ali Khan Indian Electrical Foreman<br />

27 Salim Shahbaz khan Sargaroh Indian Electrical Foreman<br />

28 Khaled Qassem Jordanian Head of Civil Eng<strong>in</strong>eer<br />

29 Rajab Ali Husse<strong>in</strong>i Egyptian Civil Eng<strong>in</strong>eer<br />

30 Sameer Mohammed Ahmed Jordanian Draftsman<br />

31 Eslam Abdle Fattah Egyptian Draftsman<br />

32 Saifudd<strong>in</strong> R.V Indian Draftsman<br />

33 Hafsal Indian Draftsman<br />

34 Ahmad Reza Nepal Office Manager<br />

35 Ahmed Kamal Mohamed Ali Egyptian Chief Accountant<br />

36 Khaled Anees Mohd. Fayed Dewan Egyptian Accountant<br />

21


37 Karakkat Sirajudheen Indian Asst. Accountant<br />

38 M.V Saleem Indian Procurement Manager<br />

39 Mubarak Indian Purchaser<br />

40 Salahudd<strong>in</strong> Kawari Nepal Store Keeper<br />

41 Md. Kausar Reza Nepal Office Assistant<br />

S.No. Equipment & Tools Qty<br />

1 Electrical tool kits 215 Sets<br />

2 Hack saw 165 Sets<br />

3 Spanner Set 165 Sets<br />

4 Step Ladder 165 Sets<br />

5 Mobile Scaffolds 165 Sets<br />

6 Hand Gloves 165 Sets<br />

7 Measur<strong>in</strong>g Tape 165 Sets<br />

8 Spirit Level 165 Sets<br />

9 Hammer 165 Sets<br />

10 Pull<strong>in</strong>g Spr<strong>in</strong>g 165 Sets<br />

11 Round and Flat files 165 Sets<br />

12 Bend<strong>in</strong>g Spr<strong>in</strong>g 165 Sets<br />

13 Cloth 165 Sets<br />

14 Wrench 165 Sets<br />

15 Crimp<strong>in</strong>g Tool 165 Sets<br />

16 Cable Cutter Hydrolic 165 Sets<br />

17 Chisel flat 165 Sets<br />

18 Chisel po<strong>in</strong>t 165 Sets<br />

19 Padlock 165 Sets<br />

20 Knife 165 Sets<br />

21 Culwa 165 Sets<br />

22 Nose plaire 165 Sets<br />

23 Plaire 165 Sets<br />

24 Screw driver set 165 Sets<br />

22


S.no Mach<strong>in</strong>eries Qty<br />

1 Jig Saw Mach<strong>in</strong>es 54 Nos.<br />

2 Drill<strong>in</strong>g Mach<strong>in</strong>es 76 Nos.<br />

3 Gr<strong>in</strong>der Mach<strong>in</strong>es 73 Nos.<br />

4 Electric Blower Mach<strong>in</strong>es 48 Nos.<br />

5 Hole saw cutter Mach<strong>in</strong>es 87 Nos.<br />

6 Generators. 08 Nos.<br />

7 Pull<strong>in</strong>g W<strong>in</strong>shi 03 Nos.<br />

8 Mobile Cable Jack with Hydraulic 03 Nos.<br />

9 Manual cable stands 02 Nos.<br />

10 Cable Rollers 300 Nos.<br />

11 Hydraulic cutter 03 Nos.<br />

23


S.No. Test<strong>in</strong>g Equipments Qty<br />

1 Multi-meter 25 Nos.<br />

2 Megger 30 Nos.<br />

3 Avometer 30 Nos.<br />

4 Eart<strong>in</strong>g Test<strong>in</strong>g Equipment 33 Nos.<br />

5 Electrical cable detectors 23 Nos.<br />

6 Calibar 15 Nos.<br />

7 Speedo meter 30 Nos.<br />

8 Pressure meter 08 Nos.<br />

9 Insulation Tester 26 Nos.<br />

10 Step Ladders 90 Nos.<br />

11 Mobiles Sea hold (7 Mt.) 45 Nos.<br />

12 Hydraulic Crimp<strong>in</strong>g Tool 18 Nos.<br />

24


Electrical Division<br />

Activities Performed by <strong>the</strong> Division<br />

We wish to <strong>in</strong>troduce ourselves as a grade ―A‖ Electrical Contractor established <strong>in</strong> 1998. Our scope of<br />

activities extend to cover all aspects of Electrical Services to <strong>the</strong> different types of build<strong>in</strong>gs such as,<br />

Commercial, Residential, Industrial, Army Build<strong>in</strong>gs, Schools…etc.<br />

Activities Carried Out By The Division:-<br />

Small Power Installations:-<br />

Our Electric Division executed all types of small power low voltage works such as Light<strong>in</strong>g &<br />

Distribution boards, Bus Bar Riser, Bus Duct, all type of works – P.V.C, G.I, Cables, Lighten<strong>in</strong>g<br />

protections sys, light<strong>in</strong>g control panels,… etc.<br />

Sub-Ma<strong>in</strong> & Cubical Panels:-<br />

Sub-ma<strong>in</strong> Panels & Cubic Panels of different sizes and types have been <strong>in</strong>stalled by our electricians <strong>in</strong><br />

different projects, such as <strong>the</strong> army hanger‘s residential complex and multistory build<strong>in</strong>gs. These panels<br />

were <strong>in</strong>stalled, term<strong>in</strong>ated, tested & commissioned by our Electricians, foremen and under our<br />

eng<strong>in</strong>eers‘ supervision.<br />

Fire Alarm System:-<br />

Different types of Fire Alarm System (i.e. Conventional and Addressable) have been <strong>in</strong>stalled by our<br />

technicians us<strong>in</strong>g different types of <strong>mechanical</strong>ly protected cables and <strong>the</strong> normal cables depend<strong>in</strong>g on<br />

<strong>the</strong> <strong>in</strong>dividual projects requirements. Also, <strong>the</strong>se systems were tested and commissioned by MARINA<br />

and approved and certified by <strong>the</strong> Fire Fight<strong>in</strong>g Department.<br />

Public Address System:-<br />

Public Address System <strong>in</strong>cludes different sizes and different types of speakers (i.e. 6W, 12W, Box<br />

Speaker, Horn Speakers …etc), <strong>in</strong> addition to amplifiers & microphones were <strong>in</strong>stalled <strong>in</strong> different<br />

projects (mostly Mosques) by our technicians.<br />

Street Light<strong>in</strong>g & Feeder Pillar:-<br />

The electrical division has experience <strong>in</strong> erection of light poles; cabl<strong>in</strong>g; term<strong>in</strong>ation and commission<strong>in</strong>g<br />

of street light & feeder pillar were we have executed many different projects.<br />

Low Voltage System<br />

Our Low Voltage Division can carry <strong>the</strong> follow<strong>in</strong>gs:-<br />

1- Fire detection system<br />

2- CCTV system<br />

3- Communication system<br />

4- Door Access control system<br />

5- Video <strong>in</strong>tercom system<br />

26


6- P.A & V.E (Public Address & Voice Evacuation system)<br />

7- SMATV Systems.<br />

8- u.p.s System.<br />

9- Build<strong>in</strong>g Management system<br />

10- Automatic fire exit w<strong>in</strong>dow system.<br />

11- Voice evacuation system.<br />

(3B+G+14) Sailia Tower Arab Eng<strong>in</strong>eer<strong>in</strong>g<br />

Office Build<strong>in</strong>g at Old Salata 18 Months 10,500,000 Bureau<br />

(B+G+M+1) Commercial<br />

Development Build<strong>in</strong>g 18 Months 15,345,000 Arab Eng<strong>in</strong>eer<strong>in</strong>g<br />

(A&B) at Markhia South Bureau<br />

(2B+G+14) Al-A<strong>in</strong> Hotel 18 Months 12,780,000 James Cubit &<br />

at Old Salata Partners<br />

150 Villas Complex & 39<br />

Apartment Build<strong>in</strong>g at 16 Months 19,430,000 GHD<br />

Al-Rayyan area<br />

(G+1) CEID Build<strong>in</strong>g 16 Months 9,800,000 Consultant<br />

for M.O.I at Salwa Road Eng<strong>in</strong>eer<strong>in</strong>g Group<br />

(B+G+7) Floor Build<strong>in</strong>g<br />

-27 Flats at Muntaza 16 Months 7,000,000 Qatari<br />

Plann<strong>in</strong>g Group Architectural<br />

Labor Accommodation & Qatari<br />

Sub-Station for Qatar Clay 16 Months 13,000,000 Architectural<br />

Factory at Industrial Area Plann<strong>in</strong>g Group<br />

Stores + G+2<br />

Accommodation at 9 Months 3,000,000<br />

Industrial Area St. 38<br />

Renovation of Animal<br />

Resources Department 14 Months 6,675,000 James Cubit &<br />

Build<strong>in</strong>gs Partners<br />

40 Villa Complexes (Jena<br />

Garden) at Al-Waab 8 Months 11,380,000 Client<br />

For Sh. Jassim B<strong>in</strong> Hamad<br />

Al-Thani<br />

Al-Jazeera Channel 9 Months 8,900,000 United Consultant<br />

Adm<strong>in</strong>istration Build<strong>in</strong>g<br />

Al-Jazeera Channel New 16 Months 10,200,000 United Consultant<br />

Tra<strong>in</strong><strong>in</strong>g Center<br />

52 Villa Complex at Al- 16 Months 13,850,000 Universal<br />

Waab area Consultant<br />

(B+G+6) Residential 12 Months 4,250,000 Universal<br />

Build<strong>in</strong>g at Al-Saad Consultants<br />

27


(B+G+2) Office Build<strong>in</strong>g 8 Months 5,380,000 Gulf Design<br />

At Salwa Road Concepts<br />

Cable Pull<strong>in</strong>g works at Arai 2 Months 3,350,000 Consultant Eng<strong>in</strong>eer<strong>in</strong>g<br />

Club Group<br />

Ware House & 3 Floor Consultants<br />

Labor Accommodation for 8 Months 4,100,000 Eng<strong>in</strong>eer<strong>in</strong>g<br />

Mr. Mohamed Almerri Group<br />

Backup Generator System<br />

Ma<strong>in</strong>tenance for Al-Saad 3 Months 3,680,000 QNOC<br />

Club & Al Arabi Club<br />

Airport Ma<strong>in</strong>tenance for 2 Months 2,200,000 Qatar Airways<br />

Qatar Airways<br />

Cloth Factory 4 Warehouse 8 Months 7,800,000 Client<br />

at Industrial area St.34/35<br />

G+3Labour Accommodation<br />

& Stores at Industrial Area 12 Months 4,500,000 Al-Aqsa<br />

St. 1 Consultancy Eng<strong>in</strong>eer<strong>in</strong>g<br />

Sub-Station Works for Sh. 4 Months 3,200,000 Client<br />

Faisal at Al-Shahania<br />

National Paper Industries 3 Months 400,000 Client<br />

Co Cable Pull<strong>in</strong>g works At 2 Months 5,800,000 Client<br />

Al-Khor for Ashghal<br />

G+3 Labor Accommodation- Al-Aqsa<br />

on & Stores at Industrial 6 Months 4,850,000 Eng<strong>in</strong>eer<strong>in</strong>g<br />

Area St. 24 Consultancy<br />

Sub-Station Works for Mr.<br />

Rashed Al-Nuaimi at Sulami 3 Months 3,500,000 Client<br />

Area<br />

(G+1) Phase I & II Labour<br />

Accommodation for M<strong>in</strong>istry 12 Months 2,300,000 BED<br />

of Municipal Affairs at<br />

Al-Wakrah<br />

Farm House At Sulami for<br />

Shk. Khalid B<strong>in</strong> Nasser 6 Months 1,300,000 Client<br />

Al-Thani.<br />

Mosque at Al Najma 12 Months 8,600,000 Awqaf<br />

2B+G+6 Residential 14 Months 7,850,000 Client<br />

Build<strong>in</strong>gs at al Muntaza<br />

3B+G+M+14+PH at old 16 Months 14,300,000 Client<br />

Salata area office build<strong>in</strong>g<br />

28


Mosque at Abouhamour 9 Months 8,000,000 Qwqaf<br />

Palace for Sh. Hasan b<strong>in</strong> 12 Months 10,500,000 Client<br />

Abdullah at Al Khessa<br />

Office Build<strong>in</strong>g at al Saad 9 Months 9,300,000 Client<br />

Area<br />

(3B+G+53) & (3B+G+45) James Cubit<br />

1 Al-Baker Tw<strong>in</strong> Tower at July, 2011 55,000,000 Partners<br />

Dafna area<br />

(2B+G+14) Al Athiya<br />

2 Office Build<strong>in</strong>g June, 2010 12,800,000 James Cubit<br />

at Old Salata & Partners<br />

(2B+G+M+10) Panasonic James Cubit<br />

3 Showroom & Residential July, 2010 16,500,000 & Partners<br />

Build<strong>in</strong>g at Mushairb area<br />

(2B+G+M+7) Proposed<br />

4 Hotel for QIB at Airport June, 2010 9,970,000 Dorra<br />

Road<br />

5 Proposed Development for Feb, 2010 15,282,300 Consultant<br />

Grave Yard at Messemeer Eng<strong>in</strong>eer<strong>in</strong>g<br />

Group<br />

6 Hamad Medical City for 12 Months 12,800,000 TCIO<br />

Hamad Medical Corporation<br />

7 (2B+G+M+7) Residential<br />

Build<strong>in</strong>g at Nejma August, 2010 7,350,000 James Cubit<br />

area & Partners<br />

8 K-SPAN Roof & False Qatar<br />

Ceil<strong>in</strong>g works for Sept, 2010 8,300,000 Armed<br />

Internal Security Force Force's<br />

at Al-Rayyan<br />

29


General Manager<br />

Name : Ahmad Mohammed Lobani<br />

Nationality : Jordan<br />

Date of Birth : 1963<br />

Education : Bachelor of Science, Electrical Eng<strong>in</strong>eer<strong>in</strong>g. Sou<strong>the</strong>rn<br />

Ill<strong>in</strong>ois University – Carbon dale. The United States of<br />

America. Class of 1989<br />

I am a grade ―A‖ Licensed Electrical Eng<strong>in</strong>eer with 16 years of total project eng<strong>in</strong>eer<strong>in</strong>g, plann<strong>in</strong>g, and<br />

management experience, I have been responsible for both <strong>the</strong> managerial part of <strong>the</strong> work as well as <strong>the</strong><br />

technical part. Dur<strong>in</strong>g my supervision of various projects of different scales & types I have ga<strong>in</strong>ed an<br />

excellent proficiency over <strong>the</strong> follow<strong>in</strong>g <strong>fields</strong> with detailed eng<strong>in</strong>eer<strong>in</strong>g knowledge and <strong>the</strong> associated<br />

standards and codes:<br />

1. General, street, & stadium light<strong>in</strong>g<br />

2. Power, & backup generator complete with ATS panel system.<br />

3. Substations<br />

4. M.V. Panels<br />

5. Transformers<br />

6. Lighten<strong>in</strong>g protraction<br />

7. Cabl<strong>in</strong>g up to 4 CX 500mm cable<br />

8. Feeder Pillars<br />

9. Control Panels<br />

10. Fire Detection System (wired with MICC or FP-200)<br />

11. Electrical control automation<br />

12. Project cost estimation<br />

13. Burglar, <strong>in</strong>frared detection, security, Card Access Control, & C.C.T.V. systems<br />

14. Telephone, Computer network, & TV systems, and public address system<br />

15. Project Procurement, Plann<strong>in</strong>g, & F<strong>in</strong>ance<br />

Listed below are few of <strong>the</strong> different projects I supervised and executed:<br />

1. Support<strong>in</strong>g facilities of H.H. Sh. Hamad B<strong>in</strong> Khalifa Al Thani Wajaba palace. Contract value: QR<br />

2,300,000.00<br />

2. Qatar Petroleum computer lab at Ras Abu Aboud. Contract value: QR 1,400,000.00<br />

3. Qatar Petroleum test<strong>in</strong>g lab at Dukhan. Contract value: QR 900,000.00<br />

31


4. Qatar Central Dental Cl<strong>in</strong>ic. Contract value: QR 3,800,000.00<br />

5. 8-nos. different new mosques <strong>in</strong> different areas of town. Contract value: QR 9,600,000.00<br />

6. 55-nos. villas at Al Awqaf complex at Swidan area. Contract value: QR 2,475,000.00<br />

7. New central search and follow up build<strong>in</strong>g for M<strong>in</strong>istry of Interior. Contract value: QR 2,200,000.00<br />

8. Rebuild<strong>in</strong>g of <strong>the</strong> Amiri and M<strong>in</strong>isterial Lounges at Qatar Airport for <strong>the</strong> Islamic Summit <strong>in</strong> 1999.<br />

Contract value: QR 2,550,000.00<br />

9. Al-Udaid army base electrical works for 2-nos. major warehouses complete works us<strong>in</strong>g 110V-208V<br />

American standard current, fix<strong>in</strong>g of 2-nos. backup generators of 1000KVA each, supply & <strong>in</strong>stallation<br />

of 2-nos. M.V. Panels of 5000A & 4000A complete with transformers and all <strong>the</strong> sub circuits. Contract<br />

value: QR 9,800,000.00<br />

10. 8-nos. different government schools around Doha and villages. Contract value: QR 15,120,000.00<br />

11. 2-nos. al-Mumtazah Co-Operative build<strong>in</strong>gs. Contract value: QR 2,240,000.00<br />

12. NODCO New load<strong>in</strong>g area complete works with explosion proof materials for Q.P. Contract value:<br />

QR 2,000,000.00<br />

13. B+G+15 Multi story build<strong>in</strong>g (Dana Tower) private for Mr. Moh‘d Islamil Al Emadi at West Bay.<br />

Contract value: QR 1,600,000.00<br />

14. B+G+16 Multi story build<strong>in</strong>g for Mr. Hosa<strong>in</strong> Saleh Abdul Ghani next to Museum. Contract value:<br />

QR 2,900,000.00<br />

15. Al-Arabi Club complete renovation (Design and execute) for QNOC. Contract value: QR<br />

11,000,000.00<br />

16. Qatar Scientific Club. Contract value: QR 2,200,000.00<br />

17. Central Agriculture Build<strong>in</strong>g at Abu Hamour for BED. Contract value: QR 1,400,000.00<br />

18. (2B+G+15+PH) Al A<strong>in</strong> Hotel. Contract Value: 3,800,000.00<br />

19. (3B+G+14) Saliah Tower for Mr. Abdullah Saeed Mohd. Al Edha Contract Value: 6,800,000.00<br />

20. (B+G+M+1) Commercial Development for Sh. Hamad B<strong>in</strong> Jassim B<strong>in</strong> Jabr Al Thani. Contract<br />

Value: 10,800,000.00<br />

21. (2B+G+14) Al Athia Office Build<strong>in</strong>g for Abdullah B<strong>in</strong> Hamad Al Athiay. Contract Value:<br />

10,5000,000.00<br />

22. Um Goail<strong>in</strong>a Build<strong>in</strong>gs Complex. Contract Value: 43,000,000.00<br />

23. 150 Villa+39 Apartment Build<strong>in</strong>g for Sh. Faisal B<strong>in</strong> Nasser B<strong>in</strong> Hamad Al Thani. Contract Value:<br />

12,000,000.00<br />

24. (G+1) CEID Build<strong>in</strong>g for M<strong>in</strong>istry of Interior. Contract Value: 16,000,000.00<br />

Sep,88-Oct,90 - M/S Reliant “Hassan Ali b<strong>in</strong> Ali”<br />

(Site Eng<strong>in</strong>eer) I started my work carrier as an electrical eng<strong>in</strong>eer <strong>in</strong> this company. I have worked <strong>in</strong><br />

many th<strong>in</strong>gs that given me <strong>the</strong> different feel<strong>in</strong>g between <strong>the</strong> scientific <strong>the</strong>oretical learn<strong>in</strong>g and <strong>the</strong><br />

practical life experience <strong>in</strong> which I learned <strong>the</strong> basic rules of electrical works, especially <strong>in</strong> <strong>the</strong><br />

commercial contract<strong>in</strong>g part. My manager was a very nice person that he was teach<strong>in</strong>g and giv<strong>in</strong>g all his<br />

experiences to me. In this <strong>Company</strong> I learned how to read draw<strong>in</strong>gs, schematics, and how to follow up<br />

<strong>the</strong> sequence of works at site – check <strong>the</strong> workers, foreman and make sure of order<strong>in</strong>g all <strong>the</strong> required<br />

materials to keep works runn<strong>in</strong>g.<br />

Jan,91-Sep,92 - M/S. Qatar Power <strong>Company</strong><br />

(Project Eng<strong>in</strong>eer) I have shifted to this company because I have seen a better opportunity for me to be<br />

<strong>in</strong> a better position as a project eng<strong>in</strong>eer who is <strong>in</strong>-charge of execut<strong>in</strong>g a large size project <strong>in</strong> which I will<br />

learn and practice my understand<strong>in</strong>g of <strong>the</strong> procedures and rules of contract<strong>in</strong>g, also I found<br />

32


opportunity to learn more about <strong>the</strong> projects specifications, how to make cost<strong>in</strong>g for a projects and how<br />

to make cost sav<strong>in</strong>g to maximize my company profit <strong>in</strong> any project. Also I have learned <strong>in</strong> this company<br />

how to deal with <strong>the</strong> suppliers and how to f<strong>in</strong>alize all types of materials orders. This was my second<br />

opportunity to experience <strong>the</strong> execution of all types of<br />

electrical works, such as light<strong>in</strong>g, powers, sub station, low voltage systems – Public address systems,<br />

CCTV, Fire system etc…<br />

Nov,92-Aug,97 - M/S. Shannon Trad<strong>in</strong>g & contract<strong>in</strong>g<br />

(Head of Electrical Division) In January 1992 I have received an offer to be head of electrical division <strong>in</strong><br />

a small company named―SHANNON CONTRACTING CO.‖ <strong>in</strong> which I had to run a small electric<br />

section with<strong>in</strong> a civil con<br />

tract<strong>in</strong>g company. This company was execut<strong>in</strong>g projects like build<strong>in</strong>gs, villas, residential build<strong>in</strong>gs of<br />

six stories and some small <strong>in</strong>dustrial projects, so I as a head of section had to arrange <strong>the</strong> electrical<br />

works <strong>in</strong> accordance with <strong>the</strong> ma<strong>in</strong> civil contractors <strong>in</strong> <strong>the</strong> different sites at <strong>the</strong> same time which was a<br />

new experience to me. Also, I have learned how to make projects execution programs, how to make<br />

materials orders from overseas, how to manage different scall projects at <strong>the</strong> same time & how to<br />

manage a group of 40-60people at <strong>the</strong> time. This job also gave me <strong>the</strong> feel<strong>in</strong>g of company f<strong>in</strong>ance and<br />

f<strong>in</strong>anc<strong>in</strong>g control for small jobs/projects.<br />

Aug,97-June,2006 - M/S. Germ<strong>in</strong> Trad<strong>in</strong>g & contract<strong>in</strong>g.<br />

(Head of Division) 1997 was a very good year for me, <strong>in</strong> this year I managed to shift from be<strong>in</strong>g a head<br />

of a small electrical section <strong>in</strong> a contract<strong>in</strong>g company to be a partner <strong>in</strong> a company which is strictly<br />

―<strong>Electro</strong>-Mechanical‖ contract<strong>in</strong>g company. In this company I was <strong>the</strong> head of electrical division I have<br />

applied for grade (A) eng<strong>in</strong>eer certification from Kahramaa (Electricity Department) and after I<br />

completed a special exam, I have received certificate of be<strong>in</strong>g approved as a grade ―A‖ eng<strong>in</strong>eer which<br />

allow me to work <strong>in</strong> an<br />

unlimited scall of jobs. Also I had to deal with many deferent companies, firms, and people, we had<br />

many different types of projects (different aspects and sizes) such as office build<strong>in</strong>gs, residential<br />

build<strong>in</strong>gs, hotels, factories, <strong>in</strong>dustrial workshops, street light<strong>in</strong>g, schools and many governmental<br />

build<strong>in</strong>gs. These experiences have taken 10 years of my practical life <strong>in</strong> which I started <strong>in</strong> establish<strong>in</strong>g<br />

my own bus<strong>in</strong>ess.<br />

June,2006-Present - Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

(Partner & General Manager) Work<strong>in</strong>g as <strong>the</strong> General Manager, <strong>in</strong> which I am <strong>in</strong> charge of company<br />

plann<strong>in</strong>g, management, pric<strong>in</strong>g, quotation of projects, project follow up, materials purchas<strong>in</strong>g, f<strong>in</strong>anc<strong>in</strong>g<br />

plans, quality control & plann<strong>in</strong>g execution program. In this company I am try<strong>in</strong>g to follow <strong>the</strong> latest, IT<br />

systems, tools test<strong>in</strong>g equipments and giv<strong>in</strong>g <strong>the</strong> net connection between all my eng<strong>in</strong>eers and office<br />

staffs to help expedite <strong>the</strong> communication & job execution, also I am <strong>in</strong> <strong>the</strong> process of establish<strong>in</strong>g an<br />

<strong>in</strong>dependent quality control division to follow all projects, eng<strong>in</strong>eers and company activities, hop<strong>in</strong>g to<br />

be one of <strong>the</strong> lead<strong>in</strong>g <strong>Electro</strong>-Mechanical companies <strong>in</strong> <strong>the</strong> country.<br />

Language<br />

Arabic as mo<strong>the</strong>r tongue<br />

English as a second language<br />

Hobbies<br />

Sports and read<strong>in</strong>g.<br />

33


CERTIFICATE<br />

34


An Electrical Eng<strong>in</strong>eer hav<strong>in</strong>g 14-years experience <strong>in</strong> execut<strong>in</strong>g different types of electrical works.<br />

Practical Experiences:-<br />

1994-1996<br />

M/S. General <strong>Company</strong> for Electrical and Communicative works.<br />

He was worked <strong>in</strong> executive and prose cutive management, Mid. Voltages department 20Kv and low<br />

voltages<br />

0,4Kv, <strong>in</strong>clud<strong>in</strong>g earth cables extension, transformers <strong>in</strong>sulation and feed<strong>in</strong>g <strong>in</strong>dustrial project, lodg<strong>in</strong>gs<br />

and street lightn<strong>in</strong>g.<br />

1996-1998<br />

M/S. Qasuon <strong>Company</strong><br />

He was an Eng<strong>in</strong>eer <strong>in</strong> electrical energy section and executed many projects to feed <strong>in</strong>dustrial project<br />

and<br />

lodg<strong>in</strong>s and commercial and execut<strong>in</strong>g protective circuits, earthl<strong>in</strong>g nets and energy controll<strong>in</strong>g boards.<br />

1999-2001<br />

M/S. Qasuon <strong>Company</strong><br />

As an Electrical Eng<strong>in</strong>eer, He was worked <strong>in</strong> feed<strong>in</strong>g and lightn<strong>in</strong>g adm<strong>in</strong>istrative build<strong>in</strong>gs and lod<strong>in</strong>gs<br />

with <strong>the</strong>ir streets.<br />

2001-2003<br />

M/S. Qasuon <strong>Company</strong><br />

He was worked as a head for <strong>mechanical</strong> and electrical section <strong>in</strong> one of <strong>the</strong> projects related to <strong>the</strong><br />

company,<br />

and that feed <strong>in</strong>dustrial and commercial projects, lad<strong>in</strong>gs and different k<strong>in</strong>ds of lightn<strong>in</strong>g.<br />

2001-2004<br />

M/S. Marbu trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

As an Electrical Eng<strong>in</strong>eer, He was supervised many Projects <strong>in</strong> term<strong>in</strong>ations cables and substations.<br />

2005-onwards<br />

M/s. Mar<strong>in</strong>a Trad<strong>in</strong>g & Cont. Co.<br />

As a head of Electrical Division<br />

35


Work Experience<br />

Project : (2B+G+14) Al athiya office build<strong>in</strong>g<br />

Position : Electrical Eng<strong>in</strong>eer<br />

Period : 2009 up to Date<br />

Responsibility: -<br />

All Electrical works<br />

F.A CCTV, SMATV, VE & PA and all control system<br />

Busbar system (1000 A)<br />

Generator System (ATS)<br />

Car Park ventilation system with<br />

Project : Al A<strong>in</strong> Hotel (2B+G+14PH)<br />

: Labor accommodation <strong>in</strong>dustrial area<br />

Position : Electrical Eng<strong>in</strong>eer<br />

Period : 2009 up to now<br />

Responsibility: -<br />

: All Electrical <strong>in</strong>stallation works<br />

: Transformer supply & Installation<br />

: M.V panel supply & Term<strong>in</strong>ate<br />

: Cable pull<strong>in</strong>g works<br />

: Street light works<br />

: Fire alarm system<br />

Project : Graveyard at Mesaimeer<br />

Position : Electrical Eng<strong>in</strong>eer<br />

Period : 2009 up to now<br />

Responsibility: -<br />

All Electrical <strong>in</strong>stallation works (MV, LV) supply and test<strong>in</strong>g & communition<strong>in</strong>g CCTV supply<br />

P.A & V.E system<br />

Central Battery System<br />

36


Bus bar system<br />

Fire man exit door under control by F.A<br />

F.A System<br />

Light<strong>in</strong>g Protection system<br />

37


Personal Information<br />

Address : El Amir Mostafa St. Begwar 2, Moharam Bak, Alex. Egypt.<br />

Tel. Number : +2 03 494 3560<br />

Current Address : Doha, Qatar<br />

Tel. Number : +974 516 7421<br />

Email : bader10_77@yahoo.com<br />

: mohamed.saad@ieee.org<br />

Date of Birth : 23 / 10 / 1977<br />

Marital Status : Married<br />

Military Service : Completed<br />

EDUCATION<br />

Faculty : Eng<strong>in</strong>eer<strong>in</strong>g<br />

University : Alexandria<br />

Graduate : B.Sc. of Electrical Power<br />

Graduation Year : May -2001<br />

Cumulative Graduation Grade : Good<br />

Graduation Project : Power System Stability<br />

Project Graduation : Excellent<br />

ADDITIONAL QUALIFICATION / SKILLS<br />

� Qatari Driv<strong>in</strong>g License.<br />

� Microsoft Operat<strong>in</strong>g System.<br />

� Microsoft Office Package.<br />

� Draw<strong>in</strong>g: Auto CAD<br />

� Project Management: MS Project, Primavera<br />

� Matlab<br />

� MathCAD<br />

� Ecodial S 4.02 CB4<br />

� DIALux 4.7<br />

� Computer Trouble Shoot<strong>in</strong>g & Ma<strong>in</strong>tenance<br />

38


MEMBERSHIP<br />

Classified From Qatar General Electricity & Water Corporation As Eng<strong>in</strong>eer Grade (B)<br />

NFPA Membership No. 2735770<br />

NFPA Member Section: [Build<strong>in</strong>g Fire Safety System]<br />

IEEE Membership No. 90431991<br />

� NFPA13 Attendance Certificate.<br />

� NFPA20 Attendance Certificate.<br />

� NFPA25 Attendance Certificate.<br />

Arabic (Native): Excellent<br />

English: Excellen<br />

1 Falcon Power Systems 07/2001 01/2002 Electrical Eng. (Tech. Office Eng.)<br />

2 Falcon Power Systems 03/2003 07/2003 Electrical Eng. (Site Eng.)<br />

3 Egyptians Electricity Authority 07/2003 Now Electrical Eng. (Operator Eng.)<br />

4 Falcon Power Systems 09/2003 12/2007 Electrical Eng. (Design, Study and<br />

Supervisor Eng.)<br />

5 Mar<strong>in</strong>a Trad<strong>in</strong>g &Contract<strong>in</strong>g 12/2007 Now Electrical Eng. (Doha-Qatar) (Sr. Eng.)<br />

Location: Falcon Power System<br />

Position: Electrical Eng<strong>in</strong>eer (Technical Office Eng<strong>in</strong>eer) Responsibility:<br />

� Work <strong>in</strong> <strong>the</strong> Technical Office <strong>in</strong> <strong>the</strong> <strong>Company</strong><br />

� Study for Complete Power System (Electrical Panel Board — light<strong>in</strong>g System<br />

— Lightn<strong>in</strong>g<br />

� System — Ground System — Fire Alarm System — CCTV System…….)<br />

� Supervisor on <strong>the</strong> project under construction<br />

� Prepare <strong>the</strong> time schedule for <strong>the</strong> project under construction<br />

� Make assembly for <strong>the</strong> materials & tools <strong>in</strong> <strong>the</strong> projects.<br />

� Work <strong>in</strong> study<strong>in</strong>g <strong>the</strong> Tenders & Prepare <strong>the</strong> offers (Technical, Commercial) for<br />

<strong>the</strong> project under<br />

� construction.<br />

� Prepar<strong>in</strong>g for Shop Draw<strong>in</strong>g.<br />

39


� Prepar<strong>in</strong>g for as Built Draw<strong>in</strong>g.<br />

Position : Electrical Power Eng<strong>in</strong>eer (Site Eng<strong>in</strong>eer)<br />

Location : Falcon Power System<br />

Owner : The M<strong>in</strong>istry of Health & Population<br />

Contractor : Falcon Power System<br />

Responsibility<br />

� Work as Site Eng<strong>in</strong>eer <strong>in</strong> Project of Gamal Abd Elnaser Hospital<br />

� Installation of light<strong>in</strong>g system & power circuits with all its components & access.<br />

� Installation of Earth systems with all its parts<br />

� Installation of Fire alarm systems with all its components<br />

� Installation of Nurse Call System with all system parts.<br />

Work as Site Eng<strong>in</strong>eer <strong>in</strong> Mansoura Waste Water Pump Stations Owner: The National Organization for<br />

Potable Water & Sanitary Darl<strong>in</strong>gton (NOPWSD) with <strong>the</strong> (USAID organization) Consultant : CDM<br />

(Camp Dresser & Mackee Inc) Dr/A. Abd Elwarith Office Contractor: The Morgantti Group Inc Project<br />

: Contract D (Water & waste water facilities) Mansouraa Waste water Facilities<br />

Responsibility: - Pump Station #27:-<br />

� Installation for MV Switch gear (11kV).<br />

� Installation for (2) transformers (11kV/380V) with rat<strong>in</strong>g power of (1.5 MVA)<br />

� Installation for Diesel Generator (0.75 MVA).<br />

� Installation for (380V) switch gear with all acc. & components<br />

� Installation for <strong>the</strong> light<strong>in</strong>g system (<strong>in</strong>door, outdoor) with different type of fixtures (wall,<br />

ceil<strong>in</strong>g,…etc)<br />

� Installation for emergency light<strong>in</strong>g systems (battery units, remote heads)<br />

� Installation for power socket <strong>in</strong> all <strong>the</strong> pump station with different type (<strong>in</strong>door, outdoor (WP)<br />

Period from: 07/2003 To 12/2007<br />

Location: Egyptians Electricity Authority<br />

Position: Electrical Eng<strong>in</strong>eer (Operator Eng<strong>in</strong>eer)<br />

Responsibility:<br />

� 4 years Work as a supervisor about protection and ma<strong>in</strong>tenance Semoha<br />

� Substation (220/66/11kv) and work as operator eng<strong>in</strong>eer <strong>in</strong> <strong>the</strong> same station<br />

Period from: 09/2003 To 12/2007<br />

Location: Falcon Power System<br />

Position: Electrical Eng<strong>in</strong>eer (Design Eng<strong>in</strong>eer)<br />

Responsibility:<br />

� Work <strong>in</strong> <strong>the</strong> Technical Office <strong>in</strong> <strong>the</strong> <strong>Company</strong><br />

40


� Supervisor on <strong>the</strong> project under construction<br />

� Prepare <strong>the</strong> time schedule for <strong>the</strong> project under construction<br />

� Make assembly for <strong>the</strong> materials & tools <strong>in</strong> <strong>the</strong> projects<br />

� Work <strong>in</strong> study<strong>in</strong>g <strong>the</strong> operations & prepare <strong>the</strong> offers (Technical, Commercial)<br />

for <strong>the</strong> project under construction<br />

Period from : 12/2007 To Now<br />

Location: Mar<strong>in</strong>a Trad<strong>in</strong>g and Contract<strong>in</strong>g<br />

Position: Electrical Eng<strong>in</strong>eer (Project Eng<strong>in</strong>eer)<br />

Owner: Sh. Hamad B<strong>in</strong> Jassim B<strong>in</strong> Jaber Al-Thani Consultant : Arab Eng<strong>in</strong>eer<strong>in</strong>g Bureau Contractor: C<br />

R C Responsibility:<br />

� Work as Project Eng<strong>in</strong>eer <strong>in</strong> Project of Commercial Development at Markhiya<br />

� Installation for MV — Panel.<br />

� Installation for (3) Transformers (1600 KVA).<br />

� Installation for Diesel Generator (500 & 250KVA) with all accessories.<br />

� Installation for DB‘S & SMB‘S.<br />

� Installation for <strong>the</strong> light<strong>in</strong>g system (<strong>in</strong>door, outdoor) with different type of<br />

fixtures (wall, ceil<strong>in</strong>g,…etc).<br />

� Installation for Raised Floor Trunk<strong>in</strong>g System.<br />

� Installation for Fire alarm and Voice alarm systems.<br />

� Installation for CCTV and Access Control System.<br />

� Installation for Busbar (1600A) System.<br />

� Installation for Cable Tray & Trunk<strong>in</strong>g.<br />

� Installation for Earth<strong>in</strong>g System.<br />

� Installation for Lightn<strong>in</strong>g Protection System.<br />

� Handover to Kahramaa.<br />

� Handover to Civil Defense.<br />

Period from: 10/2008 To Now<br />

Location: Mar<strong>in</strong>a Trad<strong>in</strong>g and Contract<strong>in</strong>g<br />

Position: Electrical Eng<strong>in</strong>eer (Project Eng<strong>in</strong>eer)<br />

Owner: Mr. Ahmed Abdul Aziz Al-Baker<br />

Consultant: James Cubitt & Partners Eng<strong>in</strong>eer<strong>in</strong>g Consultancy<br />

Contractor: C R C Responsibility:<br />

� Work as Project Eng<strong>in</strong>eer <strong>in</strong> Project of Al-Baker Executive Towers @<br />

Dafna(Under Construction)<br />

� Installation for SMB‘S & DB‘S<br />

� Installation for <strong>the</strong> light<strong>in</strong>g system (<strong>in</strong>door, outdoor) with different type of<br />

fixtures (wall, ceil<strong>in</strong>g,…etc)-Wir<strong>in</strong>g<br />

� Installation for Fire alarm and Voice alarm systems -Wir<strong>in</strong>g<br />

� Installation for CCTV and Access Control System- Wir<strong>in</strong>g<br />

� Installation for Cable Tray & Trunk<strong>in</strong>g<br />

41


� Installation for Earth<strong>in</strong>g System<br />

� Installation for lightn<strong>in</strong>g Protection System.<br />

� Material Submittal Arrangement.<br />

� Shop Draw<strong>in</strong>g Review.<br />

References<br />

1. Egyptians Electricity Authority: +2 03 50 52 741 - +2 03 42 77 431<br />

2. Falcon Power Systems: +2 03 49 59 496 - +2 03 49 57 204<br />

3. Mar<strong>in</strong>a Trad<strong>in</strong>g and Contract<strong>in</strong>g: +974 43 222 50 - +974 43 257 08<br />

42


Personal Information<br />

Nationality : EGYPTAIN<br />

Birth date : 5 Mar, 1982<br />

Gender : Male<br />

Marital Status : Married<br />

Number of Dependants : 1<br />

Education<br />

Faculty of Eng<strong>in</strong>eer<strong>in</strong>g<br />

Bachelor Electrical Power Eng<strong>in</strong>eer<strong>in</strong>g<br />

Menofia University – Egypt<br />

May – 2004<br />

Work Experience<br />

A- PROJECT MANGER<br />

MARINA TRADING AND CONTRACTING<br />

(DOHA –QATAR)<br />

FROM 20-1-2008 TILL NOW<br />

JOB DESCRIPTION<br />

I worked as project manger for construction of all electrical works and prepar<strong>in</strong>g <strong>the</strong> material submittals<br />

,shop draw<strong>in</strong>gs, material arrangements , coord<strong>in</strong>ation with an<strong>the</strong>r contractors , make <strong>in</strong>spection on <strong>the</strong><br />

works and I have good relations with consultants and contractors:-<br />

FOR THE FOWLLING PROJECTS:<br />

1. (B+G+2+6Sotes) Labor accommodation at Industrial Area.<br />

(Light, Small power socket, Fire alarm System, MV Panel, Sub-Ma<strong>in</strong> Switch Board , Distribution<br />

Boards, Transformer ,cable tray and trunkn<strong>in</strong>g).<br />

2. (Crim<strong>in</strong>al Evidence & Information Department) at Salwa Road (M<strong>in</strong>istry of Interior).<br />

(Light, Small power socket, Fire alarm System, MV Panel, Sub Ma<strong>in</strong> Switch Board, Distribution<br />

Boards, Transformer ,Generator ,UPS System and Raised floor sockets ,CCTV system, Voice alarm<br />

System, Access control System, Cable tray and trunk<strong>in</strong>g).<br />

3. (Farm at Ummul Quhab) M<strong>in</strong>istry of Municipality and Agriculture. (Transformers, 10Km Medium<br />

voltage cables and Medium voltage Panels).<br />

4. Factory Build<strong>in</strong>g + Accommodation @ Industrial area.<br />

(Light, Small power socket, Fire alarm System, MV Panel, Sub Ma<strong>in</strong> Switch Board, Distribution<br />

Boards, Transformer ,Generator, Cable tray and trunk<strong>in</strong>g).<br />

5. Panasonic Showroom & Residential Build<strong>in</strong>g (2B+G+M+10) @ Musherib Area.<br />

(Light, Small power socket, Fire alarm System,5no MV Panel, 35 no Sub Ma<strong>in</strong> Switch<br />

48


Board,320 no DistributionBoards, 5 no Transformer , 1000KVA Generator,2 NO UPS System and<br />

Raised floor sockets, Cable tray, trunk<strong>in</strong>g ,BMS system, Intercom system and CCTV System.<br />

6. (2B+G+M+7) Residential Build<strong>in</strong>g at Nejma area. Light, Small power socket, Fire alarm System, MV<br />

Panel, Sub Ma<strong>in</strong> Switch Board, Distribution Boards, Transformer , 1000KVA Generator, UPS System<br />

and Raised floor sockets, Cable tray , trunk<strong>in</strong>g BMS system, Intercom system and CCTV System.<br />

B- Electrical Eng<strong>in</strong>eer<br />

TEC CONSULTANT OFFICE.<br />

CAIRO –EGYPT.<br />

From 21/8/2005 up 6/6/2006<br />

1) DESIGN ENGINEER<br />

Design electrical works which divide <strong>in</strong>to two items:<br />

1. Internal electrical works (light, power socket, UPS system, telephone works, data works, fire alarm<br />

systems,<br />

SMATV systems and Sound systems).<br />

2. External electrical works (transformers <strong>in</strong>stallations, medium voltage networks, generators<br />

<strong>in</strong>stallations,<br />

low voltage networks, SMATV networks, fire networks, telephone networks).for <strong>the</strong> follow<strong>in</strong>g projects:<br />

a. American School In New Cairo –Cairo Egypt.<br />

b. El Raajhy Palace <strong>in</strong> K<strong>in</strong>gdom Of Saudi Arabia.<br />

c. Palm Hills Compound In 6th Of October City –Cairo –Egypt<br />

d. Sharm<strong>in</strong>g Hills Hotel and Spa <strong>in</strong> Sharm El Sheikh –Egypt.<br />

e. El Reehab Compound (300 Villa -400 Flat) Reehab City –Cairo Egypt.<br />

f. Ra<strong>in</strong>bow Hotel And Resort In Sharm El Sheikh.<br />

2) SITE ENGINEER<br />

From 10/6/2006 up 15/1/2008<br />

I worked as project eng<strong>in</strong>eer and Supervision on construction of <strong>the</strong> electrical works for <strong>the</strong> follow<strong>in</strong>g<br />

Items:-<br />

(Light, power socket, UPS system, telephone works, data works, fire alarm systems, SMATV systems,<br />

transformers <strong>in</strong>stallations , medium voltage networks ,generators <strong>in</strong>stallations ,low voltage networks<br />

,TV,<br />

networks, fire networks, telephone networks for <strong>the</strong> networks for <strong>the</strong> follow<strong>in</strong>g projects:-<br />

1. PORTO MARINA RESORT AND SPA IN MARNORTH COAST-EGYPT. (450 Guest room – SPA<br />

– 6<br />

lakes – 2 swimm<strong>in</strong>g pools - mar<strong>in</strong>a).<br />

2. SHARMING HILLS HOTEL AND SPA IN SHARM EL SHEIKH –EGYPT. (230 GEST ROOM-2<br />

SWIMMING POOL- 2 LAKES)<br />

3. RAINBOW HOTEL AND RESORT IN SHARM EL SHEIKH –EGYPT. (MAIN BUILDING, 370<br />

GUEST ROOM, BEACH RESTURANT).<br />

4. OCEAN BLUE RESORT (MARINA-NORTH COAST-EGYPT). (300 VILLA,CLUB HOUSE)<br />

5. PALM HILLS COMPOUND IN 6th of O‘CTOBER CITY –CAIRO –EGYPT. (VILLAS – CLUB<br />

HOUSE –SPA –INTERNATIONAL FOOTBALL PLAYGROUND – 9 TENNIS COURTS - 4<br />

SQUASH<br />

COURTS – OLYMPIC SWIMMING POOL)<br />

C-Electrical Eng<strong>in</strong>eer<br />

49


ELIACO COMPANY FOR DISTRIBUTION BOARDS & POWER FACTOR IMPROVEMENT.<br />

AUTHORIZE<br />

PANEL BUILDER OF SCHNEIDER ELECTRIC-EGYPT. CAIRO-EGYPT.<br />

From 1/7/2004 up 20/8/2005<br />

JOB DESCRIPTION<br />

1. Study <strong>the</strong> offers and draw<strong>in</strong>gs<br />

2. Prepare <strong>the</strong> shop draw<strong>in</strong>gs<br />

3. Design and calculation of power factor improvement panels<br />

4. Design <strong>the</strong> MCC PANELS For Pumps and Air Conditions<br />

5. Familiar with SCHNEIDER and ABB products<br />

6. Supervision on manufactur<strong>in</strong>g of Medium Voltage Panels, SMSB‘S, DB‘S and Capacitor Bank Panels<br />

Languages:<br />

Arabic : Excellent (As a mo<strong>the</strong>r tongue)<br />

English : Very Good (As a second tongue)<br />

Tra<strong>in</strong><strong>in</strong>g Certificates on SCHNEIDER ELECTRIC, ABB EGYPT<br />

FACULTY OF ENGINEERING (Bachelor Electrical Power Eng<strong>in</strong>eer<strong>in</strong>g)<br />

MENOFIA UNIVERSITY – EGYPT<br />

TOTAL GRADE: MAY 2004<br />

MENOFIA UNIVERSITY -EGYPT<br />

Organization Role Member s<strong>in</strong>ce<br />

Egyptian Eng<strong>in</strong>eers Association Membership JUNE 2004<br />

Contact Information<br />

Address: Doha-QATAR<br />

Mobile Phone: +974 508 4172<br />

E-Mail: eng_amrsalama2008@yahoo.com<br />

50


Name : Dhanraj Yadav<br />

Nationality : Nepal<br />

Date Of Birth : June 18th , 1969<br />

Academic Qualification: B.E (Electrical Eng<strong>in</strong>eer<strong>in</strong>g)<br />

The Institution of Eng<strong>in</strong>eers (India)<br />

A- From November 2006 – up-to-date<br />

Employer<br />

Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. Doha Qatar<br />

Position<br />

Senior Electrical Eng<strong>in</strong>eer<br />

Description of Duties<br />

I <strong>in</strong>volved <strong>in</strong> <strong>in</strong>stallation, supervis<strong>in</strong>g, test<strong>in</strong>g & commission<strong>in</strong>g of <strong>the</strong> follow<strong>in</strong>gs;<br />

- MV Panel, Sub Ma<strong>in</strong> Switch Board & Distribution Boards<br />

- Transformer, Generator & UPS System<br />

- Floor Boxes<br />

- CCTV system<br />

- Fire alarm System & Voice alarm System<br />

- Access control System<br />

- Light & Small power<br />

- Cable Tray and Trunk<strong>in</strong>g<br />

B- From August, 1996 – March, 2002<br />

Employer<br />

Nepal Or<strong>in</strong>d Magnesite (P) .LTD – Nepal<br />

Position<br />

Site Electrical Eng<strong>in</strong>eer<br />

Description of Duties<br />

- Transmission of 11 KV electrical power from generat<strong>in</strong>g station to our power station<br />

- Transmission and distribution of electrical power <strong>in</strong>side <strong>the</strong> factory area Lamosangu, M<strong>in</strong>es area<br />

Kharidhunga,<br />

Angle station Tauthli, Angle station Tekanpur.<br />

- Electrification to different consumer <strong>in</strong>side <strong>the</strong> factory area, m<strong>in</strong>es area, as well as <strong>the</strong> area of different<br />

angle station.<br />

- Operation and ma<strong>in</strong>tenance of electrical equipments.<br />

- Supervision of all electrical equipments <strong>in</strong>side <strong>the</strong> factory area<br />

55


C- From May, 2002 – August, 2006<br />

Employer<br />

Everest Eng<strong>in</strong>eer<strong>in</strong>g Consultant<br />

Position<br />

Electrical Eng<strong>in</strong>eer<br />

Description of Duties<br />

- Transmission of electrical power from grid station to different distribut<strong>in</strong>g station.<br />

- Distribution of such power to different consumer for driv<strong>in</strong>g <strong>the</strong>ir different electrical items for different<br />

uses.<br />

- And electrification to <strong>the</strong> rural areas <strong>in</strong> Dhanusha & Mahotari districts.<br />

English : Excellent<br />

Nepalese : Excellent (As a mo<strong>the</strong>r tongue)<br />

H<strong>in</strong>di, Urdu : Very Good<br />

Arabic : Speak<strong>in</strong>g<br />

I, <strong>the</strong> undersigned, certify that to <strong>the</strong> best of my knowledge and belief, this Bio-Data correctly describes<br />

my<br />

qualifications, my experience and myself.<br />

Signature:<br />

56


Nationality : Srilankan<br />

Date of Birth : 5 January 1979<br />

� National Diploma <strong>in</strong> Technology <strong>in</strong> Electrical Eng<strong>in</strong>eer<strong>in</strong>g University of<br />

� Moratuwa, Srilanka.Completed short course <strong>in</strong> <strong>Electro</strong>nic and Pneumatic<br />

� Controllers and use of Programmable Logic Controllers<br />

� (PLC).<br />

� Department of Mechanical Eng<strong>in</strong>eer<strong>in</strong>g, University of Moratuwa.<br />

� Council of Eng<strong>in</strong>eer<strong>in</strong>g Institution – Electrical Eng<strong>in</strong>eer<strong>in</strong>g (CEI)- U.K<br />

� Part -1 Completed<br />

� Part -2(Graduate Dip) - Follow<strong>in</strong>g<br />

Doha Qatar (Six Years)<br />

All Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. W.L.L Doha-Qatar started as a site Eng<strong>in</strong>eer 2005 and develop<br />

my knowledge and got various type of experience <strong>in</strong> various system <strong>the</strong>n promoted as a project Eng<strong>in</strong>eer<br />

2007, <strong>in</strong> this experience and couple with my previous experience also my activity (Hard work, will<strong>in</strong>g to<br />

learn for latest technology and latest system it is developed my carrier and it is effected to my position<br />

as project coord<strong>in</strong>ator 2009<br />

Also I am a certified Eng<strong>in</strong>eer for fire alarm system <strong>in</strong> CDD (Civil Defense Dept). From 2009<br />

Project Eng<strong>in</strong>eer (Electrical) For<br />

Project : 52 Villas + Club House + Mosque<br />

: Labor accommodation <strong>in</strong>dustrial area<br />

Position : Site Eng<strong>in</strong>eer.<br />

Period : 2005 to 2007<br />

Responsibility: -<br />

: In charge for all Electrical Installation works<br />

: Transformer supply & Install<br />

: M.V Panel supply & Term<strong>in</strong>ate<br />

: Cable pull<strong>in</strong>g works<br />

: Street light works<br />

: Fire alarm system<br />

Project : Al Jazeera Channel<br />

: Sailia Tower ( 3B+G+14) floor<br />

Position : Project Eng<strong>in</strong>eer<br />

57


Period : 2007 to 2009<br />

Responsibility: -<br />

All Electrical <strong>in</strong>stallation works ( MV, LV) supply & Test<strong>in</strong>g & communition<strong>in</strong>g<br />

CCTV Supply<br />

P.A & V.E system<br />

Control panel system & UPS System<br />

Busbar system<br />

Fire man exit door under control by F.A<br />

F.A System<br />

Light<strong>in</strong>g protection system<br />

Project : (2B+G+14) Al athiya office build<strong>in</strong>g<br />

: ( 2B+G+M+7) QIB Hotel<br />

Position : Project Coord<strong>in</strong>ator<br />

Period : 2009 to up to date<br />

Responsibility: -<br />

All <strong>Electro</strong>-Mechanical works<br />

F.A CCTV , SWATV, VE & PA and all control system<br />

Busbar system ( 1000A)<br />

Generator System ( ATS)<br />

Car ventilation system with<br />

Srilanka (Three Years)<br />

2. At Illukkumbura Industrial Automation pvt ltd, Colombo-Sri Lanka as Tra<strong>in</strong>ee (Site Eng<strong>in</strong>eer) from<br />

Feb<br />

2003 to Aug 2003 at Copper factory, work shop (Panel design and Term<strong>in</strong>ation), Garment factory.<br />

3. At Ceylon Electricity Board, Colombo-Sri Lanka as Tra<strong>in</strong>ee from Aug 2003 to Feb 2004 - Electrical<br />

power: Generation, Transmission, Distribution with Operation & Ma<strong>in</strong>tenance.<br />

4. At Light Eng<strong>in</strong>eer<strong>in</strong>g Enterprises, Colombo-Sri Lanka as Site Eng<strong>in</strong>eer From Feb 2004 to Feb 2005<br />

• Site Eng<strong>in</strong>eer for Poly<strong>the</strong>ne Factory project (all Electrical <strong>in</strong>stallation works).<br />

• Site Eng<strong>in</strong>eer for Beruwala Hotel project (all Electrical <strong>in</strong>stallation works).<br />

5. At Build<strong>in</strong>g Services (M & E) Eng<strong>in</strong>eer<strong>in</strong>g pvt ltd, Colombo-Sri Lanka as <strong>Electro</strong> Mechanical Site<br />

Eng<strong>in</strong>eer<br />

from 21Feb 2005 to 25 Oct 2005at Colombo Plaza Hotel Project (Refreshment)<br />

• Fire Detection System.<br />

• Fire Fight<strong>in</strong>g System.<br />

• Good Familiarity with Kahramaa (QGEWC) - Qatar (From BS) Installation regulations<br />

• Good experience <strong>in</strong> MV <strong>in</strong>stallation - Cable, Bus Bar, panels (M.V,ATS, SMSB, DB, LCP &<br />

MCC),Central<br />

battery system,UPS, Transformer, Generator...etc<br />

• Good experience <strong>in</strong> LV <strong>in</strong>stallation (Fire Alarm, CCTV, SMATV, PA, Tel, Data…)<br />

• Good experience <strong>in</strong> Civil Defense Requirements<br />

58


• Experience <strong>in</strong> team work and Leadership<br />

• Good Experience <strong>in</strong> Project Co-ord<strong>in</strong>ation- Consultant, Ma<strong>in</strong> Contractors & o<strong>the</strong>r Sub contractors<br />

• Ability to work <strong>in</strong>dependently and meet deadl<strong>in</strong>es<br />

• Good adaptability with new technologies<br />

• Good Communication, Presentation & Documentation skills<br />

English Good<br />

Address: Trad<strong>in</strong>g & Contract<strong>in</strong>g Co, P-O-15534 , Doha Qatar<br />

Mobile No.: +974 57 11 823<br />

E-Mail: asa<strong>the</strong>es05@yahoo.com<br />

59


Name : Antonio B. Arago Jr<br />

Sex : Male<br />

Civil Status : Married<br />

Nationality : Filip<strong>in</strong>o<br />

Birth date : September 21, 1970<br />

Birth place : Mab<strong>in</strong>i, Batangas.<br />

Passport No. : XX0847098<br />

Contact No. : 09182689914<br />

E-mail : jhun_arago1970@yahoo.com<br />

To be employed <strong>in</strong> prestigious company which drives <strong>in</strong>dividuals to achieve <strong>the</strong>ir maximum potential on<br />

electrical and general construction and develop fur<strong>the</strong>r talents and skills for cont<strong>in</strong>uous career<br />

improvement.<br />

Good team leader and hardwork<strong>in</strong>g. With perseverance and determ<strong>in</strong>ation to accomplished assigned<br />

task. Flexible and responsive to <strong>the</strong> chang<strong>in</strong>g needs of <strong>the</strong> work<strong>in</strong>g environment. Self motivated and<br />

quick learner. Can communicate well.<br />

Knowledge <strong>in</strong> computer (Auto-Cad, ms word, excel and <strong>in</strong>ternet brows<strong>in</strong>g)<br />

WORKING EXPERIENCE:<br />

ELECTRICAL ENGINEER<br />

Dolph<strong>in</strong> Steel Construction LLC.<br />

Al Garhoud, Dubai, U.A.E.<br />

October 2006 – May 2008<br />

Duties and Responsibilities:<br />

� Responsible for evaluation of electrical, plumb<strong>in</strong>g and fire fight<strong>in</strong>g works plan, specifications<br />

and contracts for proper implementation.<br />

� Represent <strong>the</strong> company for <strong>the</strong> meet<strong>in</strong>g with <strong>the</strong> client and consultant to present <strong>the</strong> sample of<br />

materials and specifications of documents to avoid delay of <strong>the</strong> project.<br />

� Follow up on <strong>the</strong> purchas<strong>in</strong>g department and <strong>the</strong> supplier regard<strong>in</strong>g <strong>the</strong> materials<br />

60


needed for <strong>the</strong> project, and ensur<strong>in</strong>g that <strong>the</strong> quality of material and <strong>in</strong>stallation of work <strong>in</strong><br />

accordance with <strong>the</strong> acceptance criteria identified for <strong>the</strong> project<br />

� Inspect (<strong>in</strong> conjunction with QC Eng<strong>in</strong>eer) <strong>the</strong> material delivered to <strong>the</strong> site stores and <strong>the</strong>re upon<br />

prepare /submit <strong>the</strong> <strong>in</strong>spection request to <strong>the</strong> Consultants.<br />

� To supervise and ensure proper ma<strong>in</strong>tenance of materials and to advice on technology and<br />

modifications required for a simpler and cost sav<strong>in</strong>g mechanism.<br />

� To supervise and monitor <strong>the</strong> site labor force through General Foreman and or Supervisors,<br />

monitor<strong>in</strong>g <strong>the</strong> work of any subcontractors to complete <strong>the</strong> work as per customer>s satisfaction.<br />

� Responsible for supervision of all <strong>in</strong>stallation such as, pvc conduit lay<strong>in</strong>g, G.I conduit fix<strong>in</strong>g,<br />

loop<strong>in</strong>g and r<strong>in</strong>g wir<strong>in</strong>g, DB dress<strong>in</strong>g, electrical fitt<strong>in</strong>gs fix<strong>in</strong>g, cable tray and armored cable<br />

lay<strong>in</strong>g for DB and electrical room, ground<strong>in</strong>g test<strong>in</strong>g, cladd<strong>in</strong>g and term<strong>in</strong>ation of electrical<br />

components <strong>in</strong> electrical room, test<strong>in</strong>g, commission<strong>in</strong>g <strong>in</strong> electrical such as: power, light<strong>in</strong>g, LV<br />

panel, SMDB, MDB, feeders, and capacitor banks, transfer switch for stand by generator,<br />

plumb<strong>in</strong>g such as: WSP (water pressure test<strong>in</strong>g), WDP, transfer pump and booster pump<br />

connection, sanitary fitt<strong>in</strong>gs, and fire fight<strong>in</strong>g such as: fire alarm sys, smoke and heat detector,<br />

spr<strong>in</strong>kler, FHC & FHR, emergency light, and fire fight<strong>in</strong>g motors.<br />

� To resolve any unexpected technical difficulties and o<strong>the</strong>r problems that may arise at any time.<br />

� Responsible for <strong>the</strong> preparation of all submittals, progress reports and bill<strong>in</strong>gs<br />

Site Electrical Eng<strong>in</strong>eer<br />

L.N. Salvador Construction<br />

Calapan City, Oriental M<strong>in</strong>doro Philipp<strong>in</strong>es<br />

October 2001- August 2006<br />

Duties and Responsibilities:<br />

� Careful study<strong>in</strong>g of <strong>the</strong> electrical design of <strong>the</strong> plan.<br />

� Supervis<strong>in</strong>g <strong>the</strong> pip<strong>in</strong>g, wir<strong>in</strong>g, electrical fitt<strong>in</strong>gs fix<strong>in</strong>g, DB, MDB, feeders, and transformer.<br />

� Responsible for <strong>the</strong> preparation of all submittals, progress reports and bill<strong>in</strong>gs.<br />

� Material take-off and giv<strong>in</strong>g roughly estimation of <strong>the</strong> material used <strong>in</strong> <strong>the</strong> construction.<br />

� Handles people with discipl<strong>in</strong>e, efficiency and <strong>in</strong> good relation with <strong>the</strong> colleagues.<br />

� Implement<strong>in</strong>g of electrical standard codes.<br />

61


Site Electrical Eng<strong>in</strong>eer<br />

ELR Everybody‘s Construction<br />

Lipa City, Batangas, Philipp<strong>in</strong>es<br />

August 1998 – September 2001<br />

Duties and responsibilities:<br />

� Supervis<strong>in</strong>g <strong>the</strong> <strong>in</strong>stallation of wir<strong>in</strong>g, light<strong>in</strong>g, and power.<br />

� Implement<strong>in</strong>g of electrical standard codes.<br />

� Fully supervision on <strong>the</strong> on go<strong>in</strong>g construction and does not waste man-hour duties and materials<br />

as well.<br />

� Coord<strong>in</strong>at<strong>in</strong>g to <strong>the</strong> superior <strong>in</strong> case of any related problems and implement solutions.<br />

Electrical Foreman<br />

GUNA Elektro Corporation<br />

Makati City, Philipp<strong>in</strong>es<br />

April 1995 - April 1998<br />

Duties and Responsibilities:<br />

� Responsible for <strong>the</strong> availability of manpower for a specific scope of work.<br />

� Responsible for implementation of electrical works as <strong>in</strong>structed by <strong>the</strong> project <strong>in</strong>-charge and<br />

eng<strong>in</strong>eer.<br />

� Hands-on and supervision on <strong>in</strong>stallation of transformer, motor controls center, power, light<strong>in</strong>g,<br />

and auxiliary system, trouble shoot<strong>in</strong>g test<strong>in</strong>g, and commission<strong>in</strong>g.<br />

� Mak<strong>in</strong>g daily progress reports.<br />

� Responsible for <strong>the</strong> time keep<strong>in</strong>g table of <strong>the</strong> workers.<br />

� Responsible for submitt<strong>in</strong>g <strong>the</strong> DTR.<br />

� Check<strong>in</strong>g and monitor<strong>in</strong>g <strong>the</strong> employees if <strong>the</strong>y follow <strong>the</strong> time management rule.<br />

COLLEGE : BS ELECTRICAL ENGINEERING<br />

Batangas State University<br />

Batangas Philipp<strong>in</strong>es<br />

Graduated : 1995<br />

SHORT COURSE : COMPUTER AIDED DESIGN AND DRAFTING (AUTO CAD)<br />

AMA Computer Learn<strong>in</strong>g Center<br />

Batangas City Philipp<strong>in</strong>es<br />

December 2008<br />

LANGUAGE : English, Filip<strong>in</strong>o<br />

(H<strong>in</strong>di – basic)<br />

62


Senior Eng<strong>in</strong>eer<br />

Date of Birth : November 1, 1967<br />

Age : 42<br />

Citizenship : Filip<strong>in</strong>o<br />

Marital Status : Married<br />

Present Address : 12 Filip<strong>in</strong>as Avenue, Dulumbayan Teresa Rizal, Philip 1880<br />

E-Mail Address : rmendoza1880@yahoo.com<br />

Telephone no : (+632) 2139748<br />

Mobile No. : (+974 - 7770526<br />

EDUCATION<br />

Bachelor of Science <strong>in</strong> Electrical Eng<strong>in</strong>eer<strong>in</strong>g @ University of Sto.Tomas <strong>in</strong> Espana, Manila,<br />

Philipp<strong>in</strong>es<br />

Government Education<br />

Registered Electrical Eng<strong>in</strong>eer<strong>in</strong>g Exam<strong>in</strong>ation (79.25%) - passed @ Professional Regulatory<br />

Commission (Manila, Philipp<strong>in</strong>es)<br />

National College Entrance Exam<strong>in</strong>ation (96%)<br />

Professional application<br />

IIEE -Institute of Integrated Electrical Eng<strong>in</strong>eer @ Dona Piedad St., Cubao, Quezon City, Philipp<strong>in</strong>es<br />

Objective<br />

To utilize my skills and abilities, to obta<strong>in</strong> a challeng<strong>in</strong>g position <strong>in</strong> <strong>the</strong> field of Eng<strong>in</strong>eer<strong>in</strong>g and to be of<br />

great use to <strong>the</strong> company.<br />

Skills<br />

1. Has experience <strong>in</strong> <strong>the</strong> construction/<strong>in</strong>stallation, <strong>in</strong>spection, test<strong>in</strong>g and commission<strong>in</strong>g of (4.16KV,<br />

13.8KV, 34.5KV, 69KV, 110KV and 380KV) electrical power system and equipment, e.g. power<br />

transformer, switchgear, MCC, distribution panel, breakers, relays, battery chargers, low/high voltage<br />

cable, overhead l<strong>in</strong>es/equipment etc.<br />

2. Has <strong>the</strong> experience <strong>in</strong> <strong>the</strong> construction of manufactur<strong>in</strong>g and <strong>in</strong>dustrial plant (Fujitsu-ten, IMI, Phil<br />

Kyoritsu <strong>in</strong> Batangas, etc), high rise build<strong>in</strong>gs (Phil Plaza Hotel), oil ref<strong>in</strong>ery plant (Patron Oil<br />

63


ef<strong>in</strong>ery <strong>in</strong> Bataan), <strong>in</strong>ternational air port(Bacolod Intl airport, Iloilo Intl Airport), port developments<br />

(SBMA), etc.<br />

3. Well verse with electrical substation and underground and overhead transmission<br />

4. Familiar with <strong>mechanical</strong> and civil works<br />

5. Familiar with fire alarm system, HVAC system, pag<strong>in</strong>g system and o<strong>the</strong>rs<br />

6. Well verse <strong>in</strong> controll<strong>in</strong>g quality, safety and productivity of a certa<strong>in</strong> construction project<br />

7. Knowledgeable of operat<strong>in</strong>g PC, MS office programs<br />

8. Knowledgeable of Quality Management, Project Management and Safety<br />

9. Knowledgeable of <strong>in</strong>stallation and tests for power transformer, Power cables, switchgears and o<strong>the</strong>r<br />

electrical equipment (based on IEC, IEEE and o<strong>the</strong>r <strong>in</strong>dustry standards)<br />

10. Knowledgeable of audit<strong>in</strong>g Quality Management System<br />

11. Has <strong>the</strong> knowledge of <strong>in</strong>stallation, <strong>in</strong>spection, test<strong>in</strong>g and commission<strong>in</strong>g of power transformer of up<br />

to 300 MVA<br />

12. Capable of review<strong>in</strong>g material submittals, ITP, Quality Manual and Test<strong>in</strong>g and commission<strong>in</strong>g<br />

procedures based on PTS/SOW (Project Technical Specification/Scope of work), Saudi Electricity<br />

<strong>Company</strong> Standards, NEC, IEEE, IEC and o<strong>the</strong>r <strong>in</strong>ternational standards<br />

13. Knowledgeable of establish<strong>in</strong>g quality plan and monitor<strong>in</strong>g of its strict implementation<br />

Work<strong>in</strong>g Experience<br />

1. Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g <strong>Company</strong> (April 25 up to present)<br />

Served as an electrical eng<strong>in</strong>eer for <strong>the</strong> construction of high rise build<strong>in</strong>g projects of <strong>the</strong> company. Scope<br />

of <strong>the</strong> project are medium voltage, low voltage and extra low voltage.<br />

ٍ 2. Saudi Eng<strong>in</strong>eer<strong>in</strong>g Group International (July 22, 2007 up to July 29, 2009)<br />

Served as electrical eng<strong>in</strong>eer<strong>in</strong>g consultant for construction projects of Saudi Electricity <strong>Company</strong> (<strong>the</strong><br />

sole company for power, transmission and distribution of electricity <strong>in</strong> Saudi Arabia)<br />

Projects consists of Substation and Transmission (underground and overhead) of power <strong>in</strong>volv<strong>in</strong>g<br />

13.8KV, 34.5KV, 69KV, 110KV and 380KV<br />

Brief Description: Review contractor‘s submittal us<strong>in</strong>g company standards, project technical<br />

specification/scope of work, <strong>in</strong>dustry standards such as ASTM, IEEE, IEC, etc.<br />

Visit construction project to assess <strong>the</strong> projects and <strong>in</strong>spect each item completed.<br />

Prepare punch list<strong>in</strong>gs and monitor corrective action.<br />

Witness test<strong>in</strong>g and commission<strong>in</strong>g of electrical equipment and monitor adherence to <strong>the</strong> test<strong>in</strong>g and<br />

commission<strong>in</strong>g standard.<br />

Check as-built draw<strong>in</strong>g prepared by contractors.<br />

Anticipate problem before it happen and do necessary action.<br />

Assist each contractor <strong>in</strong> resolv<strong>in</strong>g issues, problems encountered for early project completion<br />

64


3. Eng<strong>in</strong>eer<strong>in</strong>g Equipment Incorporated (February 12, 2007 up to July 20, 2007)<br />

largest construction company <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es<br />

Served as QC Supervisor for 1.3 billion peso oil ref<strong>in</strong>ery project <strong>in</strong> Petron Bataan <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es<br />

Brief description: Prepare quality plan, ITP, Quality procedures and submit to <strong>the</strong> client for approval.<br />

Apply TQM to achieve good quality of project.<br />

Evaluate work<strong>in</strong>g procedure and give technical <strong>in</strong>puts with regards to quality and reliability of each<br />

work, <strong>in</strong>stallation, test<strong>in</strong>g and o<strong>the</strong>rs.<br />

Supervise 8 QC electrical eng<strong>in</strong>eer and uphold quality and reliability of <strong>the</strong> system.<br />

Coord<strong>in</strong>ation with top management and <strong>the</strong> client regard<strong>in</strong>g quality status and provision of corrective<br />

measures. Prepare NCR on nonconform<strong>in</strong>g materials or process and monitor its corrective and<br />

preventive action <strong>in</strong> order to avoid recurrence of <strong>the</strong> problem.<br />

4. Sumisetsu Philipp<strong>in</strong>es Inc. (May 2005 up to January 20, 2007)<br />

Subsidiary of Sumitomo Densetsu of Japan<br />

Served as QC Eng<strong>in</strong>eer for all construction and ma<strong>in</strong>tenance projects of <strong>the</strong> company <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es.<br />

Some of <strong>the</strong> projects were Iloilo airport, Bacolod airport, Subic bay port, Mitsumi Philipp<strong>in</strong>es Inc.,<br />

Sanyo manufactur<strong>in</strong>g plant, etc ( around 40 projects <strong>in</strong> a row).<br />

Brief description: Total Quality Management of all <strong>the</strong> construction and ma<strong>in</strong>tenance project of <strong>the</strong><br />

company <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es. Handle compla<strong>in</strong>ts and provide measures to satisfy customer/client. Monitor<br />

calibration of measur<strong>in</strong>g and test equipment for all projects. Monitor<strong>in</strong>g quality system of construction<br />

and ma<strong>in</strong>tenance projects of <strong>the</strong> company. Coach<strong>in</strong>g and monitor<strong>in</strong>g of site personnel regard<strong>in</strong>g quality.<br />

Do whatever it takes to conform to client‘s quality<br />

requirements at m<strong>in</strong>imal costs and without jeopardiz<strong>in</strong>g progress.Help <strong>in</strong> solv<strong>in</strong>g technical problems<br />

encountered <strong>in</strong> <strong>the</strong> project.<br />

5. HCCT Eng<strong>in</strong>eer<strong>in</strong>g and Technical Services (December 2003 ~ April 2005)<br />

Served as Quality and Safety Eng<strong>in</strong>eer for <strong>the</strong> construction of Fujitsu Ten manufactur<strong>in</strong>g plant <strong>in</strong> Sta<br />

Rosa Laguna and Pilip<strong>in</strong>as Kyoritsu Incorporated <strong>in</strong> Lipa, Batangas<br />

Brief Description: Inspection of quality and safety dur<strong>in</strong>g construct<strong>in</strong>g and <strong>in</strong>stallation.<br />

Coord<strong>in</strong>ation with project management as well as to <strong>the</strong> client regard<strong>in</strong>g noncompliance.<br />

Material and equipment <strong>in</strong>spection prior to <strong>in</strong>stallation to avoid loss and spoilage.<br />

Prepare report regard<strong>in</strong>g quality and safety.<br />

Anticipate quality and safety problem before it happen to avoid loss <strong>in</strong> terms of manpower,<br />

spoilage, and money. Prepare RFI and submit to client. Attend to client‘s compla<strong>in</strong>t and<br />

65


equest.<br />

6. Vanguard Power Corporation (November 2001 ~ October 2003)<br />

Served as Project Eng<strong>in</strong>eer for <strong>the</strong> construction of IMI Philipp<strong>in</strong>es manufactur<strong>in</strong>g plant <strong>in</strong> LTI, Laguna,<br />

Philipp<strong>in</strong>es<br />

Brief Description: Oversee electrical <strong>in</strong>stallation dur<strong>in</strong>g <strong>the</strong> construction of IMI manufactur<strong>in</strong>g plant.<br />

Coord<strong>in</strong>ate to different department/contractor/subcontractor/test<strong>in</strong>g <strong>in</strong>stitute regard<strong>in</strong>g project concerns.<br />

Prepare work<strong>in</strong>g schedule and submit to <strong>the</strong> project manager for approval. Prepare material and<br />

equipment request based on work<strong>in</strong>g schedule and submit to <strong>the</strong> project manager for approval. Assess<br />

manpower requirements and request <strong>the</strong> same to <strong>the</strong> project manager for approval. Implement work<br />

execution giv<strong>in</strong>g emphasis on quantity and quality. Report progress to <strong>the</strong> project manager and prepare<br />

improvement report regard<strong>in</strong>g productivity.<br />

Facilitate/coord<strong>in</strong>ate test<strong>in</strong>g and commission<strong>in</strong>g with <strong>the</strong> clients representative. Respond to client‘s<br />

requirements and compla<strong>in</strong>ts punctually. Do whatever it takes to complete <strong>the</strong> project at m<strong>in</strong>imal costs,<br />

less spoilage, while achiev<strong>in</strong>g customer satisfaction.<br />

Responsible for <strong>the</strong> performance of <strong>the</strong> part of <strong>the</strong> work accord<strong>in</strong>g to <strong>the</strong> established construction /<br />

<strong>in</strong>stallation procedures and <strong>in</strong> house standard criteria. Prepare as-built draw<strong>in</strong>g for submission to client.<br />

Plan & manage <strong>the</strong> resources and equipment available to carry out <strong>the</strong> project works.<br />

Keep up-to date on development <strong>in</strong> site works.<br />

Inform Project/Construction Manager for po<strong>in</strong>t that can affect <strong>the</strong> Project schedule.<br />

Keep <strong>the</strong> Supervisors advised of <strong>the</strong> project's status, changes <strong>in</strong> scope and o<strong>the</strong>r matters of<br />

importance and confer with <strong>the</strong> supervisor regard<strong>in</strong>g potential problems.<br />

Review and evaluate work procedures / specifications of materials, equipment and services<br />

provided by <strong>the</strong> vendors and sub-contractors. Coord<strong>in</strong>ation with o<strong>the</strong>r department <strong>in</strong> relation with <strong>the</strong><br />

project requirements.<br />

7. Matsushita Communication Industrial Corporation of <strong>the</strong> Philipp<strong>in</strong>es (Jan. 1997 ~ Sept 2001)<br />

Manufacturer of NATIONAL PANASONIC electronics and appliancesPosition1: Ma<strong>in</strong>tenance Eng<strong>in</strong>eer<br />

(January 1997 ~ October 1998)<br />

Brief Description: Supervise ma<strong>in</strong>tenance personnel and monitor effectiveness of ma<strong>in</strong>tenance work<strong>in</strong>g<br />

procedures and preventive ma<strong>in</strong>tenance schedule. Monitor supply of ma<strong>in</strong>tenance materials and<br />

calibration of measur<strong>in</strong>g and test equipment. Ma<strong>in</strong>ta<strong>in</strong> plant facilities and equipment such as switchgear,<br />

panel boards, MCC, pumps, HVAC, cool<strong>in</strong>g tower, chillers, etc.<br />

Position2: QC Eng<strong>in</strong>eer (October 1998~September 2001)<br />

Brief Description: Total quality management for <strong>in</strong>com<strong>in</strong>g materials, process quality, outgo<strong>in</strong>g quality<br />

and handle quality of supplier and handl<strong>in</strong>g customer quality compla<strong>in</strong>t.<br />

66


8. Mener Survey<strong>in</strong>g and Construction <strong>Company</strong> (November 1992 ~ October 1996)<br />

Served as Project Eng<strong>in</strong>eer for FRC cement corporation project <strong>in</strong> Teresa, Rizal, Philipp<strong>in</strong>es<br />

and Solid Cement Corporation project <strong>in</strong> Antipolo City, Philipp<strong>in</strong>es<br />

Brief Description: Oversee construction and ma<strong>in</strong>tenance works for <strong>the</strong> said client. Report directly to <strong>the</strong><br />

project manager about work schedule and manpower requirements. Coord<strong>in</strong>ate with Draftsman for <strong>the</strong><br />

preparation and submittal of shop draw<strong>in</strong>g. Coord<strong>in</strong>ate project concern with different<br />

department/contractor/subcontractor/test<strong>in</strong>g <strong>in</strong>stitute. Request materials and equipment needed based on<br />

work schedule. Projects Scope <strong>in</strong>volve <strong>in</strong>stallation of MCC, Switchgear, panel boards, cabl<strong>in</strong>g and<br />

transformer. Do whatever it takes to complete <strong>the</strong> project at m<strong>in</strong>imal costs while achiev<strong>in</strong>g customer<br />

satisfaction. Prepare as-built draw<strong>in</strong>g for submittal. Responsible for <strong>the</strong> performance of <strong>the</strong> part of <strong>the</strong><br />

work accord<strong>in</strong>g to <strong>the</strong> established construction / <strong>in</strong>stallation procedures and <strong>in</strong> house standard criteria.<br />

Plan & manage <strong>the</strong> resources and equipment available to carry out <strong>the</strong> project works.<br />

Keep up-to date on development <strong>in</strong> site works.<br />

Inform Project/Construction Manager for po<strong>in</strong>t that can affect <strong>the</strong> Project schedule.<br />

Keep <strong>the</strong> Supervisors advised of <strong>the</strong> project's status, changes <strong>in</strong> scope and o<strong>the</strong>r matters of<br />

importance and confer with <strong>the</strong> supervisor regard<strong>in</strong>g potential problems.<br />

Review and evaluate work procedures / specifications of materials, equipment and services<br />

provided by <strong>the</strong> vendors.<br />

Sem<strong>in</strong>ar Attendance<br />

1. Basic Leadership Sem<strong>in</strong>ar - June 18, 1999<br />

2. Electrical Estimat<strong>in</strong>g - August 1 and 8, 1993<br />

3. Life and Safety Preparedness - May 12, 2206<br />

4. Construction Safety and health Course for Safety Officer<br />

(40 Hours) - January 19 ~ February 10, 2006<br />

5. Total Quality and Internal Audit<strong>in</strong>g - August 30 and 31, 2005<br />

6. Basic Quality Control - April 22, 1999<br />

7. Basic course on Environmental Protection - October 31, 2000<br />

8. VLF sem<strong>in</strong>ar regard<strong>in</strong>g high voltage test<strong>in</strong>g equipment - November 18-21, 2007<br />

67


Date of Birth : 22 January 1980<br />

Place of Birth : Roxas City, Philipp<strong>in</strong>es<br />

Age : 30 years old<br />

Height : 5‘9‖<br />

Nationality : Filp<strong>in</strong>o<br />

Religion : Christian<br />

Fa<strong>the</strong>r‘s Name : Manuel Marcel<strong>in</strong>o<br />

Mo<strong>the</strong>r‘s Name : Flora Marcel<strong>in</strong>o<br />

To be engaged <strong>in</strong> a more reputable work and companies that will provide opportunities and avenues on<br />

application of my technical skills with emphasis <strong>in</strong> eng<strong>in</strong>eer<strong>in</strong>g and human relationship.<br />

Have almost 9 years experience <strong>in</strong> <strong>the</strong> field of Electrical Construction projects and <strong>Electro</strong>/Mechanical<br />

projects both abroad and locally. My work <strong>in</strong>volves supervision, plann<strong>in</strong>g, wir<strong>in</strong>g <strong>in</strong>stallation,<br />

term<strong>in</strong>ation, troubleshoot<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g electro/<strong>mechanical</strong> equipments such as<br />

High/Medium(HV/MV) voltage, low voltage power supply cables, switchgear, panel boards,<br />

transformer, Automatic Transfer Switch (ATS), Un-Interruptible Power Supply (UPS), mobile<br />

generator, stand-by generator, different types of motor pumps, CCTV and Fire Alarm System and<br />

Protection. Ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g normal Operation of HVAC Units such as Package Centralized AC, split type,<br />

w<strong>in</strong>dow type and <strong>the</strong> newly canatal units. Have been authorized personnel to operate Build<strong>in</strong>g<br />

Management System (BMS) - <strong>the</strong> modern time technical system on <strong>the</strong> entire exchange facilities<br />

through PC connection and application to all <strong>Electro</strong>/Mechanical equipments.<br />

September 07-2009 up to Present<br />

Position: Electrical Eng<strong>in</strong>eer/Electrical Site Eng<strong>in</strong>eer<br />

Employer: Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g <strong>Company</strong><br />

Type of Project: TOWER, HOTEL, MALL, VILLAS AND ETC. PROJECTS<br />

Scope of Employer‘s Contract: General (MEP) Mechanical Electrical & plumb<strong>in</strong>g contractors.<br />

List of Active Runn<strong>in</strong>g Projects <strong>in</strong> Doha - Qatar<br />

� 2B+G+M+7 STOREY HOTEL PROJECT at AIRPORT ROAD<br />

68


� EXECUTIVE TOWER 1 48 STOREY at DAFNA<br />

� EXECUTIVE TOWER 2 52 STOREY at DAFNA<br />

� 2B+G+M+10 STOREY PANASONIC showroom at MUSHAIRB<br />

� And o<strong>the</strong>r runn<strong>in</strong>g projects.<br />

Job Description / Duties and Responsibilities:<br />

� Supervision <strong>in</strong> site and Plann<strong>in</strong>g for <strong>the</strong> progress of projects.<br />

� Assure construction project are completed <strong>in</strong> compliance <strong>in</strong> <strong>the</strong> draw<strong>in</strong>gs and specification,<br />

with<strong>in</strong> schedule.<br />

� Preparation of shop draw<strong>in</strong>gs and follow up <strong>the</strong> approval with<strong>in</strong> <strong>the</strong> consultants.<br />

� Preparation of material submittals, weekly & daily reports for <strong>the</strong> projects.<br />

� Rout<strong>in</strong>e <strong>in</strong>spection of <strong>the</strong> project<br />

� Knowledge <strong>in</strong> Qatar kharamma electric company codes, rules, methods and procedures.<br />

� Ensure that Implementation of company policies.<br />

� Ability to work well <strong>in</strong> team environment for GM, Consultants and co-eng<strong>in</strong>eer,<br />

� Responsible for coord<strong>in</strong>at<strong>in</strong>g and monitor<strong>in</strong>g over all field construction activities Electrical<br />

system, power distribution , fire alarm detection cabl<strong>in</strong>g, wir<strong>in</strong>g, light<strong>in</strong>g and security devices<br />

and etc.<br />

March 2005-March 2008<br />

Position: Electrical Eng<strong>in</strong>eer / Electrical Ma<strong>in</strong>tenance<br />

Employer: I-Man <strong>Company</strong> Western Region Jeddah-District, KSA<br />

Type of Project: Saudi Telecom Project <strong>Electro</strong>/Mechanical Ma<strong>in</strong>tenance<br />

Employer‘s Contracts: Servic<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g all <strong>Electro</strong>/<strong>mechanical</strong> equipments of Saudi telecom<br />

Sites, Exchange and Public Offices.<br />

List of Saudi Telecom sites, exchange & public office visited and ma<strong>in</strong>ta<strong>in</strong>ed by electro/<strong>mechanical</strong><br />

Ma<strong>in</strong>tenance team:<br />

� SEA-MEA-WE4 Mar<strong>in</strong>e Cable Exchange<br />

� Mushreefah STC Exchange / Public Office<br />

� Nuzah STC Exchange<br />

� Kaladeyah Saudi Airl<strong>in</strong>es<br />

� Muhamadeyah STC Exchange<br />

� Salamah Central STC Exchange & Public Office<br />

� K<strong>in</strong>g Abdulaziz Saudi Domestic and Int‘l Airport<br />

� Rowais STC Exchange<br />

� Over 50 Saudi Telecom Cab<strong>in</strong> HARD RISLU Sites<br />

Job Description / Duties and Responsibilities:<br />

� Act<strong>in</strong>g Supervisor <strong>in</strong> three Saudi telecom sites. In-charge and responsible to Ma<strong>in</strong>ta<strong>in</strong>,<br />

troubleshot different types of <strong>Electro</strong>/Mechanical alarms, Assist Sub-contractor technicians and<br />

Coord<strong>in</strong>ate with build<strong>in</strong>g foreman to give new work order.<br />

� Member of electro/<strong>mechanical</strong> ma<strong>in</strong>tenance emergency team – 24-hour on call. Check,<br />

troubleshoot diff, types of electro/<strong>mechanical</strong> equipment.<br />

� Coord<strong>in</strong>ate with SCECO and STC representative for conduct<strong>in</strong>g monthly shut-down for<br />

generator test and perform preventive ma<strong>in</strong>tenance to all equipments of Saudi Telecom<br />

Exchange and Public Office.<br />

69


� Authorize to operate and control <strong>the</strong> set-up/schedule of Build<strong>in</strong>g Management System (BMS)<br />

connection with PC control to all electro/<strong>mechanical</strong> equipment <strong>in</strong> <strong>the</strong> entire build<strong>in</strong>g and<br />

exchange.<br />

� Hands on <strong>the</strong> operation and ma<strong>in</strong>tenance of medium voltage switchgear, generator, automatic<br />

transfer switch (ATS), un-<strong>in</strong>terruptible power supply (UPS), rectifiers, DC plant, high voltage<br />

transformer, different types of motor pumps, CCTV, fire alarm system and protection.<br />

� In-charge of all electrical works <strong>in</strong>clud<strong>in</strong>g wir<strong>in</strong>g <strong>in</strong>stallation, term<strong>in</strong>ation troubleshoot<strong>in</strong>g and<br />

replacement of electrical components when necessary.<br />

� Servic<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g all electro/<strong>mechanical</strong> equipments of Saudi telecom sites, exchange<br />

and public offices<br />

� Ma<strong>in</strong>tenance of normal operation, sett<strong>in</strong>g and schedule of (HVAC) units.<br />

� Check<strong>in</strong>g and ma<strong>in</strong>tenance of fire alarm system accessories restore default if <strong>the</strong>re is an active<br />

alarm. Perform rout<strong>in</strong>e safety <strong>in</strong>spection.<br />

� Capable of read<strong>in</strong>g as-built electrical draw<strong>in</strong>g, power s<strong>in</strong>gle l<strong>in</strong>e and schematic diagram.<br />

Additional work<strong>in</strong>g experience:<br />

� SOCOMEC <strong>Company</strong>- Un-<strong>in</strong>terruptible Power Supply ( UPS) <strong>in</strong>stallation and Term<strong>in</strong>ation from<br />

February 17, 2007 to March 03. 2007.<br />

� Benlad<strong>in</strong> group <strong>Company</strong> M<strong>in</strong>istry of City jail Ubhur Project- MMTS, Control Circuit, Panel<br />

Board <strong>in</strong>stallation and term<strong>in</strong>ation.<br />

June 2003 – March 2005<br />

Position: Electrical Ma<strong>in</strong>tenance<br />

Employer: Mandaluyong Medical Center, Mandaluyong City, Philipp<strong>in</strong>es<br />

Type of Project: Health Care Facilities Operation and Ma<strong>in</strong>tenance.<br />

Scope of Employer‘s Contact: Facilities Ma<strong>in</strong>tenance Services on <strong>the</strong> build<strong>in</strong>g system and equipment.<br />

Job Description / Duties and Responsibilities:<br />

� Facilities ma<strong>in</strong>tenance services and on <strong>the</strong> build<strong>in</strong>g system and equipment.<br />

� Ma<strong>in</strong>ta<strong>in</strong> electrical system and electro/<strong>mechanical</strong> equipments of <strong>the</strong> entire medical center<br />

facility.<br />

� Perform actual Check<strong>in</strong>g for fire alarm System, Light<strong>in</strong>g and power system.<br />

� Responsible for Electrical system, wir<strong>in</strong>g, <strong>in</strong>stallation and troubleshoot<strong>in</strong>g.<br />

� Hands-on Operation and Ma<strong>in</strong>tenance power handl<strong>in</strong>g units such as, ATS, UPS, MV Switchgear,<br />

Power Generators, Transformer, Panel Board, Circuit Breakers, emergency Power system and<br />

electrical controls.<br />

� Repair and Ma<strong>in</strong>tenance of light<strong>in</strong>g fixtures, switches, boxes, breakers and o<strong>the</strong>r electrical<br />

<strong>in</strong>stallation and term<strong>in</strong>ation.<br />

� Conduct preventive ma<strong>in</strong>tenance on Air Condition<strong>in</strong>g Units, Pag<strong>in</strong>g system, CCTV, Security<br />

system and Control panels.<br />

� Perform rout<strong>in</strong>e safety <strong>in</strong>spection and test to all electro/<strong>mechanical</strong> equipments of Medical<br />

Facilities.<br />

March 2000 – April 2003<br />

Position: Electrician/ Electrical Ma<strong>in</strong>tenance<br />

Employer: D & S Eng<strong>in</strong>eer<strong>in</strong>g and Services, Philipp<strong>in</strong>es<br />

70


Type of Project: Banks, public Mall and Commercial Build<strong>in</strong>g.<br />

Scope of Employer‘s Contacts: Ma<strong>in</strong>tenance and Servic<strong>in</strong>g to <strong>the</strong> entire build<strong>in</strong>g.<br />

Job Description / Duties and Responsibilities:<br />

� Repair and Ma<strong>in</strong>tenance of light<strong>in</strong>g fixtures, switches, boxes, breakers and o<strong>the</strong>r electrical<br />

<strong>in</strong>stallation and term<strong>in</strong>ation.<br />

� Servic<strong>in</strong>g additional electrical supply, motors and control circuits.<br />

� Worked <strong>in</strong> wir<strong>in</strong>g <strong>in</strong>stallation, term<strong>in</strong>ation panel board, breakers <strong>in</strong>clud<strong>in</strong>g conductors and<br />

raceway of all types.<br />

� Work <strong>in</strong> wir<strong>in</strong>g <strong>in</strong>stallation, term<strong>in</strong>ation panel board, breakers <strong>in</strong>clud<strong>in</strong>g conductors and raceway<br />

of all types.<br />

� Prepare monthly report to all Electrical and Air Condition A/C system.<br />

� Repair and Ma<strong>in</strong>tenance of light<strong>in</strong>g fixtures, switches, boxes, breakers and o<strong>the</strong>r electrical<br />

<strong>in</strong>stallation and term<strong>in</strong>ation.<br />

� Servic<strong>in</strong>g additional electrical supply, motors and control circuits.<br />

� Operate generator test and ma<strong>in</strong>tenance.<br />

1996 – 2001 Colegio Dela Purisima Concepcion, Roxas City - Philipp<strong>in</strong>es<br />

Bachelor of Science <strong>in</strong> Electrical Eng<strong>in</strong>eer<strong>in</strong>g<br />

Five Year Course Graduated<br />

1992 -1996<br />

Capiz Institute of Technology, Roxas City - Philipp<strong>in</strong>es<br />

Secondary Education<br />

1986 - 1992<br />

Banica Elementary School, Roxas City - Philipp<strong>in</strong>es<br />

Elementary Education<br />

Graduated – 1986<br />

� Member – Institute of Integrated Electrical Eng<strong>in</strong>eer of <strong>the</strong> Philipp<strong>in</strong>es, Inc. (IIEE State of Qatar<br />

Chapter) ―LV Power Distribution System Design, Short Circuit Calculation and Philipp<strong>in</strong>e<br />

Electrical Code‖ at MILLENIUM HOTEL Al-Saad Doha State of Qatar.<br />

� Build<strong>in</strong>g Management System Tra<strong>in</strong><strong>in</strong>g – Modern time technical system PC application Jeddah<br />

k<strong>in</strong>gdom of Saudi Arabia.<br />

� PC Hardware and Software Assembly and Installation- Taif k.s.a.<br />

� Computer literate, Assemble hardware and Software Installation.<br />

� Advance knowledge <strong>in</strong> Build<strong>in</strong>g Management System (BMS), <strong>the</strong> Modern time technical system<br />

PC application.<br />

� Knowledge us<strong>in</strong>g vertex GPS and compass for network<strong>in</strong>g telecommunication.<br />

� Knowledge <strong>in</strong> pc and laptop ma<strong>in</strong>tenance, <strong>in</strong>stallation, troubleshoot<strong>in</strong>g and upgrad<strong>in</strong>g.<br />

� Able to read and analyze auto cad draw<strong>in</strong>gs, power s<strong>in</strong>gle l<strong>in</strong>e diagram, as-built<br />

draw<strong>in</strong>g, electrical layout and schematic diagram.<br />

71


Engr. AHMED AWAD<br />

General Manager Mar<strong>in</strong>a trad<strong>in</strong>g & Contract<strong>in</strong>g <strong>Company</strong><br />

P.O. Box 15534, Doha - State of Qatar<br />

Telephone No.: +974 4569003<br />

Engr. Abdullah Aldadi<br />

Build<strong>in</strong>g Instrument Supervisor, STC SEA-ME-WE-4 Mar<strong>in</strong>e Cable Exchange, Saudi Telecom Mar<strong>in</strong>e<br />

Cable Exchange<br />

Salamah district, Jeddah K.S.A.<br />

Telephone No.: +966 0504676843<br />

Engr. Cesar Tragura /Electrical Eng<strong>in</strong>eer<br />

I-Man <strong>Company</strong>. Saudi Telecom project. P.O. Box: 10115, Jeddah, 21433 K.S.A.<br />

Mobile No.: +966 0501490922<br />

72


AHMED MOHAMMED MOHAMMED EL - SAYED<br />

Electrical Eng<strong>in</strong>eer<br />

Date of Birth : 22nd Sept. 1985.<br />

Present Address : Qatar, Doha.<br />

Nationality : Egyptian.<br />

E-mail : Eng_Ah_Elharris@yahoo.com<br />

Mobile : +974 33288346<br />

� Al-Azhar University, Faculty of Eng<strong>in</strong>eer<strong>in</strong>g, Cairo, Egypt.<br />

� B.S.E.E. (Bachelor of science <strong>in</strong> Electrical Eng<strong>in</strong>eer<strong>in</strong>g )<br />

� Specialization: (Electrical Power & Mach<strong>in</strong>e Section)<br />

� Overall Grade: (Very Good with Honors degree)<br />

� Graduation Project: (Electrical Installations)<br />

� Graduation Project grade: (Excellent) 2003-2008<br />

1- MARINA Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. May 2009 up to present. Qatar, Doha.<br />

POSITION: Electrical eng<strong>in</strong>eer.<br />

JOB DESCRIPTION: Electrical power system design of residential and commercial build<strong>in</strong>gs<br />

Technically<br />

assigned <strong>in</strong> electrical design and implementation of power, light<strong>in</strong>g and auxiliary systems for<br />

build<strong>in</strong>g automation system, revision of plans, design and provide electrical shop draw<strong>in</strong>gs for<br />

implementation, conduct site <strong>in</strong>spections, attend meet<strong>in</strong>gs and coord<strong>in</strong>ate sequence of works<br />

with o<strong>the</strong>r trade contractors and monitor progress of electrical works.<br />

2- APEK Egypt <strong>Company</strong> Co………January 2009 to March 2009. Egypt, Cairo.<br />

POSITION: designer control circuit.<br />

JOB DESCRIPTION: Automation control system by us<strong>in</strong>g different type of PLC and SCADA system&<br />

Also make control by automatic control by us<strong>in</strong>g contactor, relays, pushbutton and timers.<br />

73


T<br />

� The Arab Contactors Osman Ahmed Osman &CO. From 5-8-2007<br />

Electrical Installations. TO 30-8-2007<br />

� ELSWEDY (EGYTECH) Cables Industry Technology & Control From 15-7-2007<br />

& P.L.C. & <strong>the</strong> Insulation & <strong>the</strong> TO 13-8-2007<br />

Aggregate Plann<strong>in</strong>g.<br />

� ABB -ARAB. The K<strong>in</strong>ds of Transformers manufacture From 30-7-2006 & C.B. & Disconnects<br />

& Fuses. TO 3-8-2006<br />

� Station Tra<strong>in</strong><strong>in</strong>g Center. Field: Electrical Power Stations. Consist From 2-7-2006 of» P.L.C. &<br />

SCADA & Protection & TO 20-7-2006 Transformer & Control.<br />

� Section of left Network Field: Electrical Power Transformers. From 12-8-2006 Consist of <strong>the</strong><br />

Transformer ma<strong>in</strong>tenance TO 23-8-2006 & <strong>the</strong> Insulator. for El-Sharkia.<br />

SKILLS<br />

-Arabic (Mo<strong>the</strong>r tongue)<br />

-English (Good written and speak)<br />

Computer knowledge. -I got International Computer Driv<strong>in</strong>g License (ICDL) Certificate.<br />

-W<strong>in</strong>dows, Ms Office, Internet, matlab, Auto CAD, PhotoShop program, FORTRAN programm<strong>in</strong>g.<br />

� Computer Network and AutoCAD 2008 2D. From 26-1-2008 Laboratory & Information to 4-2-<br />

2008 Center.<br />

� Technology Competency Automatic Control Circuit <strong>in</strong> Cubic From 27-1-2008 Center. Cab<strong>in</strong>et<br />

for Electrical Mach<strong>in</strong>es. To 31-1-2008<br />

� Telecom. A.B.Panasonic. Course P.L.C. consist of «Component From 14-6-2008 Connection &<br />

Programs Designer& <strong>the</strong> to 14-7-2008 program Download and Operation& Operation on<br />

Simulation<br />

Dur<strong>in</strong>g study<strong>in</strong>g years, <strong>the</strong>re were several visit to different electrical companies:<br />

M<strong>in</strong>istry of Electrical and Energy. Cairo Egyptian Electricity Hold<strong>in</strong>g <strong>Company</strong>. Research&<br />

Eng<strong>in</strong>eer<strong>in</strong>g Sector. Extra High Voltage RESEARCH Center. (2006- 2007)<br />

3-BROTHERS<br />

For Eng<strong>in</strong>eer<strong>in</strong>g& Electrical Manufactur<strong>in</strong>g. Roxy, Cairo I have Tra<strong>in</strong><strong>in</strong>g Course on New Light<strong>in</strong>g<br />

Program (RELUX PROGRAM) (2007- 2008)<br />

74


Full Name : Mohammed Fawzi Osman<br />

Nationality : Palest<strong>in</strong>ian<br />

Date of Birth : 7th June 1984<br />

Place of Birth : Doha/Qatar<br />

Marital Status : S<strong>in</strong>gle<br />

Contact No. : +974-66804662<br />

E-mail : bofawzi007@hotmail.com<br />

* High school degree (science) issued from Mohammed b<strong>in</strong> abd-alazeez al manea Secondary School.<br />

* B.Sc. degree electronic eng<strong>in</strong>eer issued from Mehran university of eng<strong>in</strong>eer<strong>in</strong>g & technology –<br />

PAKISTAN \ KARACHI.<br />

*Course of CCNA 5.0 issue from COMPUTER TRANING & TESTING CENTER (PVT)LTD.<br />

*Course of wireless communication eng<strong>in</strong>eer from XPEDIENT TECHNOLOGIES_KARACHI.<br />

From JAN. 2009 UP-TO-PRESENT<br />

As (electrical eng<strong>in</strong>eer) for MARINA TRADING & CONTACTING. Co.<br />

On Project: 1- COMMERCIAL DEVELOPMENT MALL at Markhiya south city (B+G+M+1).<br />

2-PANASONIC SHOWROOM & RESIDENTIALBUILDING (2B+G+ M+ 10 FLOORS)<br />

Arabic : Mo<strong>the</strong>r tongue.<br />

English : Speak, read & write fluently.<br />

Urdu : Speak<br />

*Brows<strong>in</strong>g Internet.<br />

*Read<strong>in</strong>g.<br />

� Very good knowledge of all essential computer skills.<br />

� AutoCAD<br />

� A good team player.<br />

� Good adm<strong>in</strong>istrative & communications skills.<br />

� Flexible & easy to deal with.<br />

75


� Patient & helpful.<br />

� Confident.<br />

� Fully equipped with work ethics.<br />

I‘m look<strong>in</strong>g forward to use my <strong>in</strong>terpersonal and academic skills <strong>in</strong> a challeng<strong>in</strong>g environment<br />

I hereby certify that all <strong>in</strong>formation provided here <strong>in</strong> true<br />

Accurate and reliable to <strong>the</strong> best of my knowledge and belief<br />

References are available upon request.<br />

1 – MD NOORUL HAQUE ABDUR-RAHMAN<br />

He has 40 Years experience <strong>in</strong> <strong>the</strong> state of Qatar. He has executed different projects cover<strong>in</strong>g &<br />

<strong>in</strong>stallation & test<strong>in</strong>g & commission<strong>in</strong>g of all Electrical works<br />

2 – HUSSEIN MULLAJI<br />

He has 27 Years experience <strong>in</strong> <strong>the</strong> field of <strong>in</strong>stallation, test<strong>in</strong>g & commission<strong>in</strong>g of <strong>the</strong> all Electrical<br />

works.<br />

3 – GIR BAHADUR RANA<br />

He has 14 Years experience <strong>in</strong> <strong>the</strong> field of <strong>in</strong>stallation, test<strong>in</strong>g & commission<strong>in</strong>g M.V panel and light<br />

fitt<strong>in</strong>g works<br />

4 – ADEL ABDUL FATTAH EL_HAMARNAH<br />

He has 12 years experience <strong>in</strong> this field of <strong>in</strong>stallation, test<strong>in</strong>g & commission<strong>in</strong>g M.V panel & light<br />

fitt<strong>in</strong>g works.<br />

5 – SADAB ALI KHAN<br />

He has 5 years experience <strong>in</strong> this field of <strong>in</strong>stallation, test<strong>in</strong>g & commission<strong>in</strong>g M.V panel & light fitt<strong>in</strong>g<br />

works.<br />

76


CERTIFICATE<br />

77


A/C, Plumb<strong>in</strong>g, Dra<strong>in</strong>age & Fire Fight<strong>in</strong>g Division<br />

79


Activities Performed<br />

Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g offers competent, cost effective and high quality eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>mechanical</strong> services for different type of facilities, environment, <strong>in</strong>dustrial, commercial, governmental<br />

and <strong>in</strong>stitutional. Our services also <strong>in</strong>clude hotels, museums, laboratories, adm<strong>in</strong>istration and domestic<br />

high-rise build<strong>in</strong>g, hospital with clean classes consideration is ano<strong>the</strong>r important type of facilities<br />

covered by our specialized eng<strong>in</strong>eer<strong>in</strong>g team our <strong>mechanical</strong> division started <strong>in</strong> 2001 with P & D <strong>the</strong>n<br />

<strong>in</strong> 2002 we established our A/c div. Then <strong>in</strong> 2005 we have started our fire detection/fire fight<strong>in</strong>g div.<br />

<strong>the</strong>n <strong>in</strong> 2009 we have received our civil defense certificate copy <strong>in</strong>cised.<br />

Most of our key staff has more than 20 years experiences with <strong>mechanical</strong> firms; <strong>the</strong>y have long<br />

experience <strong>in</strong> prestigious projects Qatar, Gulf countries and <strong>the</strong>ir home land.<br />

Our vision is to make radical quality advancement with <strong>mechanical</strong> contact<strong>in</strong>g market, and to become a<br />

preferable and recommended contractor <strong>in</strong> Qatar Market<br />

Our missions to contribute to <strong>the</strong> development of <strong>the</strong> country by <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> human resources and to<br />

realize environmental safety and cleaners by strictly follow<strong>in</strong>g codes and <strong>in</strong>ternational standards<br />

Our strategy <strong>in</strong> accident prevention and safety when execution <strong>the</strong> works <strong>in</strong> personal safety above all<br />

over pr<strong>in</strong>cipal is respect<strong>in</strong>g safety regulation is an absolute obligation; our attitude is th<strong>in</strong>k better works.<br />

Activities Done by <strong>the</strong> Division<br />

A/c system<br />

Mar<strong>in</strong>a trad<strong>in</strong>g & contract<strong>in</strong>g Mechanical division has full experience staff to execute all type of A/C<br />

works. Our staff can deal with <strong>the</strong> different type standards, and brands, of A/c verities, we have executed<br />

many types of projects with different types and application of A/C system such as Air Cooled, Water<br />

Cooled, chiller, AHU, FCU, VRV system, chilled water pumps secondary or primary and secondary<br />

chilled water circuit, based that over staff have <strong>the</strong> capabilities to do <strong>the</strong> test<strong>in</strong>g and commission<strong>in</strong>g of<br />

A/c system all over works is to <strong>the</strong> standard rules & regulation of QCS. ASHRE, ASME and code of<br />

practice. System such as Air Cooled, Water Cooled,<br />

Hot and cold water system<br />

The plumb<strong>in</strong>g & Dra<strong>in</strong>age staff executes Hot & Cold Water system us<strong>in</strong>g copper pip<strong>in</strong>g comply<strong>in</strong>g with<br />

BS 2871 both table ―X‖ & ―Y‖ or any o<strong>the</strong>r type of G.I pipes, all size‘s of pump Ps. any system<br />

designed by consultants.<br />

Cold water system is carried out ei<strong>the</strong>r us<strong>in</strong>g gravity method or by pressure application depend<strong>in</strong>g on<br />

projects. Demand hot water system could be executed by ei<strong>the</strong>r <strong>in</strong>dividual storage s<strong>in</strong>gle heaters or by<br />

<strong>the</strong> use or central heaters with circulation pumps.<br />

Irrigation System<br />

automatic & semi-automatic systems are both executed us<strong>in</strong>g a set of high pressure PVC<br />

80


pip<strong>in</strong>g to constitute <strong>the</strong> r<strong>in</strong>g ma<strong>in</strong> and branch connections, set of pressure pumps, quick coupl<strong>in</strong>g valves<br />

drip emitters…etc.<br />

It is carried out us<strong>in</strong>g a set of fire fight<strong>in</strong>g pumps, steel pip<strong>in</strong>g net-works, spr<strong>in</strong>kler system, dry and wet<br />

riser, deluge valve system and all shall be UL listed FM approved. The system is always made under<br />

pressure to give immediate provision of water at <strong>the</strong> time of fire occurrence, <strong>the</strong> fire fight<strong>in</strong>g works<br />

executed based on <strong>the</strong> design criteria, civil defense regulation and NFPA, 10, 13, 14, 20, 21 standards.<br />

The staff also carries out <strong>Electro</strong>-Mechanical <strong>in</strong>stallation for swimm<strong>in</strong>g pools, both skimmer and<br />

overflow types.<br />

All sort of above or underground dra<strong>in</strong>age pipe<strong>in</strong>g is carried out by <strong>the</strong> division us<strong>in</strong>g UPVC, ESVC and<br />

cast iron pip<strong>in</strong>g all <strong>in</strong> accordance with project specifications and requirement.<br />

The division‘s staff is capable to carry out all sorts of ventilation works of G.I duct<strong>in</strong>g, pre-<strong>in</strong>sulat<strong>in</strong>g<br />

duct, duct<strong>in</strong>g and all k<strong>in</strong>ds of fix<strong>in</strong>g ventilation fans and <strong>in</strong> accordance with project specifications and<br />

requirement.<br />

81


Aziz Petrol Station 3 month project 1,120,000.00 Fire Fight<strong>in</strong>g Client<br />

B+G+6 Build<strong>in</strong>g 12 month project 2,910,000.00 Package Unit Universal Consultant<br />

Office Build<strong>in</strong>g B+G+2 8 month project 850,000.00 Duct Split Unit Gulf Design Concept<br />

Farm house for Sh. 4 month 1,650,000.00 Package Unit Client<br />

Khaleed Al Thani<br />

B+G+3 office Build. 12 month project 11,670,000.00 chiller system Gulf Design Concept<br />

Chiller fire fightg.<br />

Hanger at Al Udaid 4 month project 20,500,000.00 Package Unit U.S Army<br />

Base if<br />

Cambridge Schoo l 6 month project 8,400,000.00 Duct Split Unit Gulf Design concept<br />

Package unit<br />

Sh. Jasem B<strong>in</strong> Hamad 8 months<br />

40 Villa complex at 4,600,000.00 Split/A/C, Fire GHD<br />

Al Waab area fire fight<strong>in</strong>g<br />

Plumb<strong>in</strong>g and dra<strong>in</strong>age<br />

Renovation of animal 2.5 months 2,600,000.00 Package Units & Client<br />

resource department P & D fire fight<strong>in</strong>g Ashghal Dep+ C.E.G<br />

Abdul Ghani Tower 14 months 11,175,000.00 Chilled A/C planet, James Cubit &<br />

B+G+14 Build<strong>in</strong>g Fire fight<strong>in</strong>g, Partners<br />

plumb<strong>in</strong>g & dra<strong>in</strong>age<br />

Al Jazeera Channel<br />

Adm<strong>in</strong>istration Buld. 9 months 640,000.00 Package ducted United<br />

fire fight<strong>in</strong>g, Consultant<br />

Plumb<strong>in</strong>g &<br />

Dra<strong>in</strong>age<br />

52 Villas 16 months 2,132,000.00 Split Type A/C, Universal<br />

Fire Fight<strong>in</strong>g, Consultant<br />

Plumb<strong>in</strong>g & Dra<strong>in</strong>age<br />

B+G+6 Build<strong>in</strong>g 12 month project 3,635,000.00 Split ducted A/C Universal<br />

at al saad area fire fight<strong>in</strong>g plu- Consultant<br />

mb<strong>in</strong>g & dra<strong>in</strong>age<br />

Place for sh.<br />

Mohamed 6 month project 7,245,000.00 Chilled A/C planet, Client<br />

Al thani plumb<strong>in</strong>g & Universal Lions<br />

Dra<strong>in</strong>age<br />

Al A<strong>in</strong> hotel 18 months 13,000,000.00 Chilled A/C plant James Cubit<br />

2B+G+M+14 BH plumb<strong>in</strong>g &dra<strong>in</strong>age & Partners.<br />

& fire fight<strong>in</strong>g<br />

Al Athiya Tower 18 months 14,300,000.00 Chilled water syst- A.E.B office<br />

2B+G+14 em plumb<strong>in</strong>g & dra<strong>in</strong>age & fire<br />

Fight<strong>in</strong>g<br />

3B+G+14 Office Chilled water sys.<br />

Build<strong>in</strong>g of old salata 16 Months 11,300,000 P & D fire fight<strong>in</strong>g sys<br />

82


(2B+G+M+7)<br />

Residen- 12 Months project 3,400,000 Package A/C Units, JCP<br />

tial Build<strong>in</strong>g at Fire Fight<strong>in</strong>g, Plu-<br />

Nejma area mb<strong>in</strong>g & Dra<strong>in</strong>age<br />

System<br />

(2B+G+M+7)<br />

Proposed 14 month project 8,200,000 Split type A/C, Dara Eng<strong>in</strong>eer<strong>in</strong>g<br />

Hotel for QIB at Airport Duct Road Type Consultant<br />

A/C, Fire Fight<strong>in</strong>g,<br />

Plumb<strong>in</strong>g & Dra<strong>in</strong>age<br />

System<br />

Al Jazeera Channel<br />

New Tra<strong>in</strong><strong>in</strong>g Centre 12 month project 4,500,000 Split type A/C, United Consultant<br />

Duct Type A/C,<br />

Fire Fight<strong>in</strong>g, Plumb<strong>in</strong>g<br />

& Dra<strong>in</strong>age<br />

System<br />

Proposed Development 13 months projects 3,600,000 Split type A/C, CEG<br />

for Grave Yard at Duct Type A/C,<br />

Messemeer Fire Fight<strong>in</strong>g, Plumb<strong>in</strong>g<br />

& Dra<strong>in</strong>age System<br />

(2B+G+M+1) Comm- 12 Months Projects 5,200,000 Fire Fight<strong>in</strong>g, Plu- AEB<br />

ercial Development At mb<strong>in</strong>g, Dra<strong>in</strong>age<br />

Markia South System & Irrigation<br />

System<br />

2B+G+2 at Qatar 09 Months. 7,300,000 Package A/c sys. Qatar armed<br />

Armold force's Tarigne P & D fire fight<strong>in</strong>g force's Engg.<br />

B<strong>in</strong> Zird Camp<br />

70 Villa's + 22 no. 12 Months 18,680,000 Chilled A/c for Drill GHD<br />

G+2 build<strong>in</strong>g +club & split for balance<br />

House at Al Rayyan P&D fir fight<strong>in</strong>g<br />

Irrigation sys.<br />

3B+G+14 office 15 Months 12,320,000 Chiller A/c P&D sys. Top Design.<br />

Build<strong>in</strong>g at Cornish road<br />

2B+G+6 residential 09 Months. 7,630,000 Ducted split P&D Al Jazeera<br />

Build<strong>in</strong>g for Mr. fire fight<strong>in</strong>g Cons.<br />

Abdullah al dabgh at<br />

Al Muntazah area.<br />

150 villa+39 No. G+2 18 Months. 23,800,000 Package A/c split GHD<br />

Build<strong>in</strong>gs + Club lions P&D fire fight<strong>in</strong>g<br />

For sh. Khalid b<strong>in</strong> Irrigation sys.<br />

Nasser at Rayyan area<br />

83


Hussam Eld<strong>in</strong> Abdel-Azeem Hassan Eissa<br />

84


Head Of Mechanical Div.<br />

Name : Hussam Eld<strong>in</strong> Abdel-Azeem Hassan Eissa Nationality :<br />

Nationality : Egyptian<br />

Date of Birth : 07 th October 1964<br />

Education : B. Sc. Mechanical Eng<strong>in</strong>eer<strong>in</strong>g – Power (1990) Faculty of Eng<strong>in</strong>eer<strong>in</strong>g –<br />

Helwan University<br />

� More than n<strong>in</strong>eteen years of varied experience <strong>in</strong> Mechanical Eng<strong>in</strong>eer<strong>in</strong>g works related to<br />

residential, commercial build<strong>in</strong>gs and <strong>in</strong>dustrial projects.<br />

Good knowledge <strong>in</strong> aspects of management report<strong>in</strong>g<br />

Computer Skills:<br />

� Microsoft W<strong>in</strong>dows XP<br />

� Microsoft Office<br />

� AutoCAD<br />

� Elite fire fight<strong>in</strong>g hydraulic calculation software<br />

Elite cool<strong>in</strong>g load calculation software<br />

Elite S pipe hydraulic calculation software<br />

Elite D pipe hydraulic calculation software<br />

Technical Membership<br />

� Membership <strong>in</strong> American Society of Heat<strong>in</strong>g, Refrigerat<strong>in</strong>g and Air- Condition<strong>in</strong>g Eng<strong>in</strong>eers,<br />

Inc. "ASHRAE".<br />

� Membership grade: Associate.<br />

Member ID No : 8131765<br />

� Membership <strong>in</strong> Qatar Architecture Development, Inc. Membership grade:<br />

Grade A ―Mechanical eng<strong>in</strong>eer<strong>in</strong>g department‖.<br />

<strong>Company</strong> Worked with<br />

� Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

� United Consultants, Doha – Qatar<br />

� Design and Project Management Eng<strong>in</strong>eer<strong>in</strong>g Co, Egypt<br />

� Clima Consult<strong>in</strong>g Office, Egypt.<br />

� Project Eng<strong>in</strong>eer<strong>in</strong>g Office, Egypt.<br />

� Consult<strong>in</strong>g Eng<strong>in</strong>eer<strong>in</strong>g Bureau, Egypt<br />

� National Services Project Organization "NSPO"<br />

� (Military Service), Egypt Army.<br />

Professional Experience:<br />

85


Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

Head of Mechanical Div.<br />

Date : Feb 2010 – to Present<br />

Position : Head of Mechanical Div.<br />

Firm : Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

Job Description : Handl<strong>in</strong>g & develop<strong>in</strong>g <strong>the</strong> <strong>mechanical</strong> div. specially <strong>the</strong><br />

A/C Div & Fire fight<strong>in</strong>g Div.<br />

Major Works : -Mesameer Grave yard<br />

o Mosque , Family accommodations , Labors<br />

o Accommodation, majles , ambulance , guards house<br />

o Alnaqee Hotel at air port St_<br />

o NAJMA (2B +G+M+6 )<br />

Date : September, 2008 to January 2010<br />

Firm : United Consultants, Doha - Qatar<br />

Position : Senior Mechanical Eng<strong>in</strong>eer (Design and Supervision).<br />

Job Description : Mechanical Senior Eng<strong>in</strong>ee<br />

- Review of design draw<strong>in</strong>gs and documents.<br />

- Follow up <strong>the</strong> <strong>mechanical</strong> design & <strong>in</strong>stallations such as:" HVAC system,<br />

fire fight<strong>in</strong>g system and plumb<strong>in</strong>g works, regard<strong>in</strong>g to <strong>the</strong> <strong>in</strong>ternational<br />

standards such as: "ASHRAE, SMACNA, BS, NFPA & ASPE", also<br />

reference to QCS, kahramaa and Civil Defense Department requirements.<br />

- Review material & shop draw<strong>in</strong>gs submittal.<br />

- Co-ord<strong>in</strong>ate between all activities.<br />

Major Works : Al Rames Tower ( 2 B + G + 35 F ) (172,000,000 Q.R).<br />

- This Build<strong>in</strong>g Consists of 2 Basements Ground Public Area, First, 2nd And<br />

3 rd To 35 Floor Office build<strong>in</strong>g (1897 T.R).<br />

- Spr<strong>in</strong>kler system for garage floors and offices floors fire fight<strong>in</strong>g<br />

- Ord<strong>in</strong>ary hazard class, fire hose real cab<strong>in</strong>et <strong>in</strong> all floor fire smoke stop<br />

lobby , a stand alone ventilation system is designed for save live us<strong>in</strong>g two<br />

roof mounted smoke fans and two staircase pressurization Fans and one fire<br />

smoke stop lobby.<br />

- Two fire water Tank each 72 m³ ,750 g.p.m at 195 m<br />

Fire electrical Pump. also diesel pump standby , one jokey pump<br />

-<br />

Pump room at 2 nd basement.<br />

86


- Domestic water tank at second basement<br />

Red Crescent (107 Villa) (103,000,000 Q.R).<br />

(107 villa Residential Build<strong>in</strong>g + Club + Mosque +G + Service Build<strong>in</strong>g)<br />

These accommodation Consists of 107 v (G + 1) Floor Residential Build<strong>in</strong>g<br />

(2 T.R 382 unit). Air conditioned by a VRV system<br />

(2, 1.5&1.5 Ton.) (382,264&434) split &w<strong>in</strong>dow unit<br />

side wall exhaust fan used for ventilation <strong>in</strong> toilet and kitchen area<br />

Fire hydrant through street for fire protection system<br />

fire ext<strong>in</strong>guisher to be used <strong>in</strong> <strong>the</strong> kitchen area<br />

manholes through road dra<strong>in</strong>age water to septic tank<br />

soak way for ra<strong>in</strong> water dra<strong>in</strong>age<br />

Qatar Petroleum (Waste Storage Facilities) at Messaied<br />

Design work (foam-water spr<strong>in</strong>kler system )<br />

Extra hazard<br />

surface dra<strong>in</strong>age gully dra<strong>in</strong> to general network<br />

Oil <strong>in</strong>terceptor used to remove oil from dra<strong>in</strong>age Water<br />

AL BAWAKIR (G + 5) Office Build<strong>in</strong>g - Al Saad (46,000,000 Q.R)<br />

Design work (wet spr<strong>in</strong>kler system ) Ord<strong>in</strong>ary 2 hazard<br />

Qatar C<strong>in</strong>ema (B+G+10 F) Residential Build<strong>in</strong>g (97,000,000 Q.R)<br />

These Build<strong>in</strong>g Consists of one Basements Ground<br />

Public Area, first To 10 Floor Residential build<strong>in</strong>g<br />

(1320 T.R total load). Air conditioned by a VRV system<br />

(2&3 Ton. Ref.) Indoor F.C.U. (9.25&11.37 Ton. Ref.)<br />

Outdoor condensation unit.<br />

Spr<strong>in</strong>kler system for garage floors ord<strong>in</strong>ary hazard class2, and Residential floors fire light hazard<br />

spr<strong>in</strong>kler system ,fire hose real cab<strong>in</strong>et <strong>in</strong> all floor fire smoke stop lobby us<strong>in</strong>g 6 smoke fans , a stand<br />

alone ventilation system is designed for save live us<strong>in</strong>g four roof Mounted smoke pressurization Fans.<br />

two fire water Tank each 72 m³, Pump room at basement.<br />

750 g.p.m at 105 m fire electrical Pump . also diesel pump standby, one jokey pump<br />

2 domestic water tank and lift<strong>in</strong>g pump set (3 duty+1 Standby) 8 L/s and 75 m head 14.8 Kw each and 4<br />

hydropenumatic tanks each one 1250 liters. Roof pressure distribution pumps (2 duty + 1 stand by) each<br />

one 3 l/s @ 20m head, and 2 hydropenumatic Tanks each one 300 liters.<br />

2 submersibles pump each 3 l/s at 10 m Head at basement floor for garage area, build<strong>in</strong>g dra<strong>in</strong>age<br />

system to general dra<strong>in</strong>age network<br />

Badr Sultan Obaidan ( 30 Villas ) (15,000,000 Q.R)<br />

30 Villa Residential Build<strong>in</strong>g + Club)<br />

87


These accommodation Consists of 30 v (G + 1) Floor Residential Build<strong>in</strong>g (2 T.R 382 unit). Air<br />

conditioned by a VRV system (2, 1.5&1.5 Ton.) (382,264&434) split &w<strong>in</strong>dow unit<br />

Side wall exhaust fan used for ventilation <strong>in</strong> toilet and kitchen area<br />

Fire hydrant through street for fire protection system fire ext<strong>in</strong>guisher to be used <strong>in</strong> <strong>the</strong> kitchen area<br />

Manholes through road dra<strong>in</strong>age water to septic tank<br />

Soak away for ra<strong>in</strong> water dra<strong>in</strong>age<br />

AL KHOR COMPLEX (Store + Office + Accommodation) Build<strong>in</strong>g.<br />

Design work (water spr<strong>in</strong>kler system )Ord<strong>in</strong>ary 2 hazard<br />

A Class 2 Wet Standpipe System With 150 mm [1250 GPM + (317.5 GPM)Calculated Spr<strong>in</strong>kler] Shall<br />

Give The System Flow Rate. Fire Hose Was Used To Satisfy O<strong>the</strong>r Requirement Of NFPA 14 And<br />

Local Authority. The 65 mm. Fire Hose Can Be Use By<br />

Build<strong>in</strong>g. Occupant As Well By Fire Brigade Man In Case Fire Broke Out. Also Portable Fire<br />

Ext<strong>in</strong>guisher will be provided as per NFPA 10.<br />

GIOFIL BUBBLES FACTORY & LABORATORY BLDG<br />

SYSTEM DESCRIPTION for Stone Bubbles Factory<br />

All oven shall be supplied with its own safety system<br />

An. Automatic Wet Spr<strong>in</strong>kler System Will Be Provided. Office And Laboratory Room Area Shall Be<br />

Designed To Ord<strong>in</strong>ary Hazard Group 2 As Per NFPA 13. This Spr<strong>in</strong>kler Hydraulic Calculation Will Be<br />

Based On The Area Where The Highest Head Was Applied, 11 Fire Hydrants Shall be connected to<br />

pipes Ø 200 mm Loop<br />

Around factory& Office area as shown per attached Draw<strong>in</strong>g.<br />

Fire Hose Real Double Cab<strong>in</strong>et for use <strong>in</strong>side factory and office build<strong>in</strong>g stair case<br />

QATAR MEDIA SERVICE BUILDING (12,000,000 Q.R)<br />

6 Wet Standpipe Hydrants At Site System With 150 mm Siamese connection And 2 FIRE RISER Shall<br />

Be Used. So [1250 +342 GPM] Shall Give The System Flow Rate. Fire Hose Was Used To Satisfy<br />

O<strong>the</strong>r Requirement Of NFPA 14 And Local Authority.<br />

The 65 mm. Fire Hose Can Be Used By Build<strong>in</strong>g.<br />

Occupant As Well By Fire Brigade Man In Case Fire Broke Out. Also Portable Fire Ext<strong>in</strong>guisher will<br />

be provided as per NFPA 10.<br />

G+2 ACCOMMODATION AND G+M GARAGE WITH OFFICES<br />

PROJECT (SH. FAHAD JASSIM HAMAD AL THANI<br />

88


Type Of Occupancy : Office Build<strong>in</strong>g<br />

Area Operation : 1500 ft 2<br />

Density : 0.2 GPM/ft 2 /m<strong>in</strong> pressure(100<br />

PSI) for Hose<br />

Hazard Classification : ORDINARY Hazard (Group 2)<br />

Hose Stream Allowance : 850 GPM<br />

Max. Coverage Of Spr<strong>in</strong>kler : TWO STORIES BUILDING<br />

Number Of Spr<strong>in</strong>kler Calculated : NON SPRINKLER SYSTEM.<br />

System Flow Rate : 527 GPM<br />

System Inflow Pressure : 153 Psi<br />

Date<br />

:<br />

January, 2007 – September, 2008<br />

Firm : Design and Project Management Eng<strong>in</strong>eer<strong>in</strong>g Co, Egypt<br />

Position : Project Manager<br />

Job Description<br />

Major Works<br />

: Mechanical Senior Eng<strong>in</strong>eer.<br />

- Review of design draw<strong>in</strong>gs and documents.<br />

- Follow up <strong>the</strong> <strong>mechanical</strong> <strong>in</strong>stallations such as:" HVAC system, fire<br />

fight<strong>in</strong>g system and plumb<strong>in</strong>g works, regard<strong>in</strong>g to <strong>the</strong> <strong>in</strong>ternational<br />

standards such as "ASHRAE, SMACNA, BS, NFPA and ASPE".<br />

- Review material & shop draw<strong>in</strong>gs submittal.<br />

- Value eng<strong>in</strong>eer<strong>in</strong>g study of design tender document<br />

Date : October, 1999 – September, 2008<br />

Firm : Clima consult<strong>in</strong>g office, Egypt.<br />

Position : Design Eng<strong>in</strong>eer<br />

Job Description<br />

Major Works<br />

: Mechanical Assistance Eng<strong>in</strong>eer-Part Time.<br />

- Prepar<strong>in</strong>g design draw<strong>in</strong>gs and documents.<br />

- Technical support.<br />

89


Date : January, 2006 – January, 2007<br />

Firm : Alam Sons(Mechanical Contractors)<br />

Position : Technical Office eng<strong>in</strong>eer.<br />

Job Description<br />

Major Works<br />

Firm : National Services Project Organization "NSPO"<br />

(Military service), Egypt Army.<br />

Position : Soldier.<br />

Job Description<br />

Major Works<br />

_ WORK FIELD<br />

: - Prepar<strong>in</strong>g design draw<strong>in</strong>gs and documents.<br />

-<br />

-<br />

- January, 2006 – January, 2007<br />

Date : January, 2006 – January, 2007<br />

Firm : Sanitaire S.A.E. (Mechanical Contractors)<br />

Position : Technical Office eng<strong>in</strong>eer.<br />

Job Description<br />

Major Works<br />

: - Prepar<strong>in</strong>g shop draw<strong>in</strong>gs and documents.<br />

-<br />

Date : January, 1991 – March, 1992<br />

: Construct<strong>in</strong>g of ear<strong>the</strong>d telephone network under Siemens Consultant<br />

: (Contract<strong>in</strong>g Mechanical Works) fire fight<strong>in</strong>g , plumb<strong>in</strong>g &H.V.A.C.<br />

ICE (Diesel, Spark) – Pumps - Boilers – Agriculture Mach<strong>in</strong>es – Pneumatic –<br />

R.O Stations – Plumb<strong>in</strong>g -H.V.A.C -Fire Fight<strong>in</strong>g and A-CAD Shop Drawer<br />

PRESENTED WITH MY BEST, THANKS.<br />

90


Head of Mechanical Department.<br />

Has over N<strong>in</strong>eteen Years of experience work<strong>in</strong>g for lead<strong>in</strong>g Supervision Contract<strong>in</strong>g firms <strong>in</strong> Jordan and<br />

Qatar, on Mechanical Eng<strong>in</strong>eer<strong>in</strong>g-related works of Construction Projects. His areas of expertise <strong>in</strong>clude<br />

HVAC, Water Supply, Dra<strong>in</strong>age, Sewerage, Irrigation, Fire Protection systems and Infrastructure works<br />

etc.<br />

Bachelor of Science Mechanical Eng<strong>in</strong>eer<strong>in</strong>g, Philipp<strong>in</strong>es, 1988<br />

Germ<strong>in</strong> Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. Qatar, 3 years.<br />

Qatar <strong>Electro</strong> Mechanical Group, Qatar, 1 year.<br />

Eleaf Contract<strong>in</strong>g Co. Jordan, 1 year.<br />

Arab Construction Co. Jordan, 3 years.<br />

Rateb Abu Hammad Eng<strong>in</strong>eer<strong>in</strong>g & Contract<strong>in</strong>g Co. Jordan. 1 year.<br />

Khaled Maraqa <strong>Electro</strong> Mechanical Est. 2 years<br />

Arab Sanitary Paper Convert<strong>in</strong>g Co. 1 year.<br />

Zeidan Refrigeration Co. 1 year.<br />

MARINA TRADING &CONTRACTING.CO, Qatar.<br />

Has jo<strong>in</strong>ed Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co.<br />

<strong>in</strong> March 2008 as a head of Mechanical department.<br />

ARAB ENGINEERING BUREAU, Doha, Qatar.<br />

Has jo<strong>in</strong>ed Arab Eng<strong>in</strong>eer<strong>in</strong>g Bureau from September 2003 up to February 2008 as a Senior Mechanical<br />

Eng<strong>in</strong>eer. He was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g projects:<br />

Breed<strong>in</strong>g Centre and Staff Accommodation for Sh. Saoud B<strong>in</strong> Mohd. B<strong>in</strong> Al Thani – completed<br />

Dukhan Residential Development Phase – II for Qatar Real Estate <strong>Company</strong>- completed<br />

Extension of Al A<strong>in</strong> Shopp<strong>in</strong>g Centre Phase 3 - completed<br />

Granada Light<strong>in</strong>g Showroom for Granada Trad<strong>in</strong>g. - completed<br />

Al Mahmoud Tower (B+G+20 Floors) - completed<br />

Qatar Embassy <strong>in</strong> Sudan - completed<br />

Qatar Embassy <strong>in</strong> Jeddah - completed<br />

HBK Tower - completed<br />

Commercial Bank Plaza (3B+G+22 Floors) .<br />

94


� United Tower at Al Saad (B+G+21 floors) - completed<br />

� English School for H. E. Sh. Hamad B<strong>in</strong> Jassim B<strong>in</strong> Jaber Al Thani - completed<br />

� Qatar Insurance <strong>Company</strong> Tower (2B+G+20 Floors) .<br />

� Al Wosail Tower (B+G+16 Floors) .<br />

� Al Zobara Tower (B+G+20 Floors) completed<br />

� Several Residential Complex Projects – on go<strong>in</strong>g<br />

Khaled Maraqa <strong>Electro</strong>-Mechanical Est., 2 years<br />

As Senior Services Eng<strong>in</strong>eer, his ma<strong>in</strong> responsibilities <strong>in</strong>clude <strong>the</strong> follow<strong>in</strong>g:<br />

� Site supervision and monitor<strong>in</strong>g of all <strong>mechanical</strong> <strong>in</strong>stallations.<br />

� Preparation and review of all material submittals and shop draw<strong>in</strong>gs.<br />

� Clarify<strong>in</strong>g Contractor‘s queries on a daily basis.<br />

� Inspection of all <strong>mechanical</strong> works and Quality Control implementation.<br />

� Test<strong>in</strong>g and Commission<strong>in</strong>g of HVAC & o<strong>the</strong>r Mechanical Systems such as Chillers, Pumps, Air<br />

� handl<strong>in</strong>g units, Fan coil units, MV panels, etc, and also Ma<strong>in</strong>tenance of <strong>the</strong>se equipments.<br />

� Assist<strong>in</strong>g QA/QS <strong>in</strong> quantity take off, monthly valuations and f<strong>in</strong>alization of <strong>the</strong> Project Cost.<br />

Plumb<strong>in</strong>g & Dra<strong>in</strong>age Net work:<br />

� Sanitary Dra<strong>in</strong>age and Sewerage System.<br />

� Surface Ground Water Dra<strong>in</strong>age– External to build<strong>in</strong>g.<br />

� Plumb<strong>in</strong>g Fixtures – Ma<strong>in</strong> Network and Domestic cold and hot water system.<br />

Heat<strong>in</strong>g Ventilation and Air Condition<strong>in</strong>g:<br />

� Pipe work, Ductwork, Pumps, and Air Handl<strong>in</strong>g equipment, Water Chillers, Fans, Valves,<br />

� Miscellaneous control and Instrument <strong>in</strong>stallation.<br />

� Fire Fight<strong>in</strong>g System:<br />

� Fire Fight<strong>in</strong>g, Spr<strong>in</strong>kler net work<br />

� Fire Fight<strong>in</strong>g Pump<br />

� Fire Hydrant Net work<br />

Test<strong>in</strong>g & Commission<strong>in</strong>g of all Systems:<br />

Test<strong>in</strong>g and Commission<strong>in</strong>g of all <strong>the</strong> above work<br />

GERMIN TRADING AND CONTRACTING, Doha, Qatar.<br />

August 2002 - August 2003.<br />

As Senior Mechanical Eng<strong>in</strong>eer, his Ma<strong>in</strong> Responsibilities were:<br />

Supervis<strong>in</strong>g & Execut<strong>in</strong>g all Mechanical works at site such as Plumb<strong>in</strong>g, Dra<strong>in</strong>age,<br />

Irrigation Fire fight<strong>in</strong>g and Infrastructure works.<br />

Prepar<strong>in</strong>g Specifications and Conduct<strong>in</strong>g Material Test<strong>in</strong>g and Commission<strong>in</strong>g.<br />

� Check<strong>in</strong>g all Material Submittals and Shop Draw<strong>in</strong>gs<br />

� Supervision of all Irrigation systems such as Pumps and distribution network for Landscap<strong>in</strong>g<br />

� Supervision of Plumb<strong>in</strong>g Water system <strong>in</strong> Roads, such as <strong>the</strong> m<strong>in</strong>or roads with<strong>in</strong> compound.<br />

� Inspection of Contractor‘s workmanship and Quality Control measures implemented.<br />

95


� Certify<strong>in</strong>g Materials on site and percentage of work done.<br />

� Test<strong>in</strong>g and Commission<strong>in</strong>g of HVAC & o<strong>the</strong>r Mechanical Systems such as Chillers, Pumps, Air<br />

� Handl<strong>in</strong>g units, Fan Coil units, MV panels, etc, and also Ma<strong>in</strong>tenance of <strong>the</strong>se equipments<br />

The follow<strong>in</strong>g is a list of projects, which he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> Supervision of Mechanical works:<br />

� Residential Palace for Shk. Hassan at Umsalal.<br />

� Worked for Several Projects at Al Udaied and Sayliya American Base.<br />

� Al Dana Tower.<br />

� Abed Al-Gnani Tower.<br />

� 80 Villas (package 7 project) for Ras Gas at Al Khor.<br />

QATAR ELECTROMECHANICAL GROUP<br />

August 1999 - August 2000<br />

As Head of Mechanical Department, he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g project:<br />

Tivoli Furniture Showroom<br />

Sadafco Store at Industrial Area<br />

ELAF CONTRACTING CO., Jordan<br />

March 1999 - August 1999<br />

As Mechanical Project Manager, he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g project:<br />

Thiban Government Hospital<br />

ARAB CONSTRUCTION CO., Jordan<br />

November 1996 - March 1999<br />

As Senior Site Eng<strong>in</strong>eer, he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g project from tender<strong>in</strong>g till <strong>the</strong> execution<br />

And hand<strong>in</strong>g over:<br />

� Amman Sheraton Hotel<br />

� Safeway Department Store<br />

� Dunes Club<br />

� Cairo Amman Bank<br />

� Sewage Water Treatment plants with a capacity of 250 cum/day package type<br />

� Sewage Water Treatment plants with a capacity of 1000 cum/day conventional type<br />

� Reverse Osmosis Water Treatment Plants<br />

� At Zark City projects.<br />

As Project Mechanical Eng<strong>in</strong>eer, his Ma<strong>in</strong> Responsibilities were:<br />

� Check<strong>in</strong>g <strong>the</strong> design of <strong>the</strong> systems such as, pump<strong>in</strong>g stations, Lift<strong>in</strong>g stations, Lift<strong>in</strong>g tanks,<br />

lift<strong>in</strong>g pumps, aeration tanks,<br />

� Aeration System, settl<strong>in</strong>g tanks, Agitators, Blowers, Filtration system, R O plants, dos<strong>in</strong>g<br />

systems etc.<br />

� Layout preparation based on <strong>the</strong> complete plant design, plant room layout and f<strong>in</strong>aliz<strong>in</strong>g <strong>the</strong><br />

equipment locations.<br />

96


� Locat<strong>in</strong>g <strong>the</strong> pump<strong>in</strong>g stations and verify<strong>in</strong>g <strong>the</strong> capacity of <strong>the</strong> pumps.<br />

� Coord<strong>in</strong>at<strong>in</strong>g with <strong>the</strong> civil construction team.<br />

Procur<strong>in</strong>g <strong>the</strong> technical materials such as pumps agitators, glass l<strong>in</strong>e steel tanks, cutters gr<strong>in</strong>ders, oil<br />

water separators, Multimedia sand filters, ultra violet treatment systems, compactors, membrane<br />

systems, RO membranes, dos<strong>in</strong>g systems, controls and Locat<strong>in</strong>g <strong>the</strong> pump<strong>in</strong>g stations and verify<strong>in</strong>g<br />

<strong>the</strong> capacity of <strong>the</strong> pumps.<br />

� Coord<strong>in</strong>at<strong>in</strong>g with <strong>the</strong> civil construction team.<br />

� Procur<strong>in</strong>g <strong>the</strong> technical materials such as pumps agitators, glass l<strong>in</strong>e steel tanks, cutters gr<strong>in</strong>ders,<br />

Oil water separators, Multimedia sand filters, ultra violet treatment systems, compactors,<br />

membrane systems, RO membranes, dos<strong>in</strong>g systems, controls and control panels etc.<br />

� Installation of <strong>the</strong> above equipments and systems.<br />

� Test<strong>in</strong>g, commission<strong>in</strong>g and handl<strong>in</strong>g over after complet<strong>in</strong>g <strong>the</strong> one year ma<strong>in</strong>tenance.<br />

Equipments Used:<br />

Sewage pumps<br />

� M/s KSB, M/s ABS, M/s Grundfos<br />

RO Plant<br />

� M/s Prom<strong>in</strong>ent, M/s Culligan, M/s Mettito and M/s Vivendi<br />

Agitators.<br />

� Own fabricated, M/s ABS.<br />

RATEB ABU HAMMAD ENGINEERING & CONTRACTING CO., Jordan.<br />

November 1995 - October 1996<br />

As <strong>Electro</strong><strong>mechanical</strong> Project Manager, he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g project:<br />

Zarka Sports Stadium.<br />

Marka Airport Term<strong>in</strong>al Build<strong>in</strong>g.<br />

Khaled Maraqa <strong>Electro</strong> Mechanical Est. Co., Jordan.<br />

November 1993 - October 1995.<br />

As Mechanical Project Manager, he was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g project:<br />

� Hashmaite Library Al – Albayt University<br />

� Urban Development Hous<strong>in</strong>g<br />

� Marka Tra<strong>in</strong><strong>in</strong>g Center<br />

Arab Sanitary Paper Convert<strong>in</strong>g Co. Jordan<br />

August 1992 - October 1993<br />

Ma<strong>in</strong>tenance Eng<strong>in</strong>eer:<br />

ZEIDAN REFRIGERATING CO., Jordan<br />

January 1991 - August 1992.<br />

Ma<strong>in</strong>tenance Eng<strong>in</strong>eer:<br />

KHALED MARAQA ELECTRO MECHANICAL EST. CO., Jordan<br />

January 1989 - December 1990.<br />

Site Eng<strong>in</strong>eer:<br />

97


Doha, Qatar<br />

Mobile : +974-697-8107<br />

Email : khalilbouhaidar@yahoo.com<br />

Marital Status : Married<br />

Nationality : Lebanese<br />

Visas status : Residence permits (transferable sponsorship)<br />

Driv<strong>in</strong>g licenses : Valid Qatari driv<strong>in</strong>g license and Lebanese driv<strong>in</strong>g license<br />

Interests: volleyball, swimm<strong>in</strong>g, SCUBA div<strong>in</strong>g and P<strong>in</strong>g-<br />

Pong.<br />

� 1986 University of Balmand, Beirut-Lebanon<br />

B.A. Degrees <strong>in</strong> General Mechanics<br />

Certification: NFPA 13 - NFPA 20 - NFPA 25 – civil defense Certificate<br />

Objective<br />

My objective is to be work<strong>in</strong>g <strong>in</strong> a well recognized company, which will allow me to use<br />

My knowledge, experience and skills, as well as excell<strong>in</strong>g <strong>in</strong> my field more.<br />

Arabic : Native language<br />

English : Fluent (speak<strong>in</strong>g writ<strong>in</strong>g and read<strong>in</strong>g)<br />

French : Fluent (speak<strong>in</strong>g writ<strong>in</strong>g and read<strong>in</strong>g)<br />

Computer Skills<br />

Microsoft office 2003-2007<br />

� AutoCAD, Auto Gann (French software)<br />

� MS Project<br />

Summary of Key Skills<br />

� Multi-task oriented with ability to organize and prioritize duties<br />

� Strong analytical and research<br />

� Strong communication skills<br />

� Able to relate well to people of diverse backgrounds and positions<br />

� Self-motivated and self-starter and decision-maker<br />

� Flexible<br />

� work well <strong>in</strong>dependently or <strong>in</strong> a team<br />

� Able to build and lead a team<br />

Experience Description.<br />

Period from: 2008 - 2009<br />

NoorTech. Doha-Qatar<br />

98


NoorTech, is engaged <strong>in</strong> <strong>the</strong> <strong>mechanical</strong> works. I f<strong>in</strong>ished with <strong>the</strong>m <strong>the</strong> project of Qatalum service build<strong>in</strong>g.<br />

Tasks <strong>in</strong>clude:<br />

� Assist drafters <strong>in</strong> develop<strong>in</strong>g <strong>the</strong> structural design of products, us<strong>in</strong>g draft<strong>in</strong>g tools or computerassisted<br />

design/draft<strong>in</strong>g equipment and software.<br />

� Supervis<strong>in</strong>g <strong>the</strong> shop draw<strong>in</strong>g<br />

� Select<strong>in</strong>g <strong>the</strong> equipments<br />

� Test<strong>in</strong>g and commission<strong>in</strong>g<br />

� Responsible for all <strong>the</strong> HVAC, Plumb<strong>in</strong>g, Fire fight<strong>in</strong>g works<br />

� Hold<strong>in</strong>g weekly meet<strong>in</strong>gs with <strong>the</strong> eng<strong>in</strong>eer team <strong>in</strong> order to evaluate <strong>the</strong> work<br />

Mar<strong>in</strong>a <strong>Electro</strong><strong>mechanical</strong>. Doha-Qatar<br />

Mar<strong>in</strong>a <strong>Electro</strong><strong>mechanical</strong> <strong>Company</strong> is specialized <strong>in</strong> <strong>the</strong> electro<strong>mechanical</strong> works. I worked with <strong>the</strong>m as<br />

coord<strong>in</strong>ator of <strong>the</strong> <strong>mechanical</strong> works. I was Responsible for all <strong>the</strong> plumb<strong>in</strong>g, fire fight<strong>in</strong>g system and <strong>the</strong><br />

HVAC. I worked on <strong>the</strong> Markhia Mall project, QIB hotel and Aljazira tra<strong>in</strong><strong>in</strong>g center.<br />

Tasks <strong>in</strong>clude:<br />

� Oversee <strong>in</strong>stallation, operation, ma<strong>in</strong>tenance, and repair to ensure that mach<strong>in</strong>es and equipment<br />

are <strong>in</strong>stalled and function<strong>in</strong>g accord<strong>in</strong>g to specifications.<br />

� Specify system components or direct modification of products to ensure conformance with<br />

eng<strong>in</strong>eer<strong>in</strong>g design and performance specifications.<br />

� Pass<strong>in</strong>g Investigate equipment failures and difficulties to diagnose faulty operation, and to make<br />

recommendations to ma<strong>in</strong>tenance crew.<br />

� Conduct research that tests and analyzes <strong>the</strong> feasibility, design, operation and performance of<br />

equipment, components and systems.<br />

Period from: 2004 – 2008<br />

SIP Eng<strong>in</strong>eer<strong>in</strong>g Saudi Technical Limited. Consult<strong>in</strong>g office Beirut-Lebanon, Riyad_Saudi Arabia<br />

SIP Eng<strong>in</strong>eer<strong>in</strong>g Saudi Technical Limited is engaged <strong>in</strong> <strong>the</strong> consult<strong>in</strong>g work. I worked with <strong>the</strong>m as<br />

coord<strong>in</strong>ator and design eng<strong>in</strong>eer. I f<strong>in</strong>ished with <strong>the</strong>m <strong>the</strong> Palace Build<strong>in</strong>g project <strong>in</strong> jaddah, Yamaha mall <strong>in</strong><br />

Alryad and Alryad courts center.<br />

Tasks <strong>in</strong>clude:<br />

� <strong>in</strong>vestigation and report<br />

� detailed design and preparation of contract documents<br />

� Acceptance of Works, commission<strong>in</strong>g of systems, and resolution of f<strong>in</strong>al account.<br />

� Conduct research that tests and analyzes <strong>the</strong> feasibility, design, operation and performance of<br />

equipment, components and systems.<br />

� Recommend to my Client <strong>the</strong> advantages of a full professional service provid<strong>in</strong>g cont<strong>in</strong>uity from<br />

<strong>in</strong>ception to completion of <strong>the</strong> project.<br />

� Select<strong>in</strong>g <strong>the</strong> equipments for <strong>the</strong> HVAC, calculat<strong>in</strong>g <strong>the</strong> block load and supervis<strong>in</strong>g <strong>the</strong> shop<br />

draw<strong>in</strong>gs<br />

� Responsible for <strong>the</strong> plumb<strong>in</strong>g, pipe sizes, pump capacity, electric water heaters capacity, dra<strong>in</strong>age<br />

system<br />

Period from: 2000 – 2004<br />

Elie Selwan <strong>Company</strong> Beirut-Lebanon<br />

99


Elie Selwan Co is specialized <strong>in</strong> <strong>the</strong> consult<strong>in</strong>g work. I was work<strong>in</strong>g as consult<strong>in</strong>g <strong>mechanical</strong> eng<strong>in</strong>eer. I<br />

f<strong>in</strong>ished two projects with <strong>the</strong>m, <strong>the</strong> <strong>in</strong>terior police complex project and <strong>the</strong> central dra<strong>in</strong>age of Beirut<br />

project.<br />

Tasks <strong>in</strong>clude:<br />

� Inspection and approval for HVAC system and Fire Fight<strong>in</strong>g system (dry & wet) .<br />

� Conduct research that tests and analyzes <strong>the</strong> feasibility, design, operation and performance of<br />

equipment, components and systems.<br />

� Select<strong>in</strong>g <strong>the</strong> equipments for <strong>the</strong> HVAC, calculat<strong>in</strong>g <strong>the</strong> block load and supervis<strong>in</strong>g <strong>the</strong> shop<br />

draw<strong>in</strong>gs<br />

� Responsible for <strong>the</strong> plumb<strong>in</strong>g, pipe sizes, pump capacity, electric water heaters capacity, dra<strong>in</strong>age<br />

system<br />

Period from: 1994 – 2000<br />

Redco <strong>Company</strong> UAE<br />

Redco is a construction company based <strong>in</strong> UAE. I worked as <strong>mechanical</strong> eng<strong>in</strong>eer on a lot of projects<br />

<strong>in</strong>clud<strong>in</strong>g Lutha Islamic bank build<strong>in</strong>g and Dubaii complex almanara.<br />

Tasks <strong>in</strong>clude:<br />

� Swimm<strong>in</strong>g pool and Filtration equipment-founta<strong>in</strong> System and pump distribution<br />

� Oversee <strong>in</strong>stallation, operation, ma<strong>in</strong>tenance, and repair to ensure that mach<strong>in</strong>es and equipment<br />

are <strong>in</strong>stalled and function<strong>in</strong>g accord<strong>in</strong>g to specifications.<br />

� Fire fight<strong>in</strong>g and HVAC system<br />

Period from: 1986 – 1994<br />

Sogex International <strong>Company</strong> UAE<br />

Sogex International <strong>Company</strong> is a construction company based <strong>in</strong> UAE. I worked as <strong>mechanical</strong> eng<strong>in</strong>eer<br />

<strong>the</strong> follow<strong>in</strong>g projects: Hadda complex residential build<strong>in</strong>gs (SANA), Airport International Hodaida<br />

Tasks <strong>in</strong>clude:<br />

� Central HVAC-Fire Fight<strong>in</strong>g-Groov<strong>in</strong>g system ( Victaulic ) ( national )Weld<strong>in</strong>g system ( dry & wet<br />

system )-water supply and dra<strong>in</strong>age<br />

� Fire fight<strong>in</strong>g and HVAC system<br />

100


101


102


103


104


105


106


107


108


AHMED MOHAMED AHMED MOSTAFA<br />

PROJECT ENGINEER<br />

PERSONAL INFORMATION<br />

Mobile: +97477620268.<br />

E-Mail: ahmedmostafa_xp@yahoo.com<br />

CAREER OBJECTIVE<br />

It is my <strong>in</strong>ner confidence built due to <strong>the</strong> knowledge I have perceived through all <strong>the</strong>se years of learn<strong>in</strong>g<br />

which will help me to excel <strong>in</strong> <strong>the</strong> field I am subjected to. I am capable of adjust<strong>in</strong>g myself to any<br />

environment.<br />

Educational Qualifications<br />

Degree University/Board<br />

Bachelors' degree <strong>in</strong><br />

Mechanical eng<strong>in</strong>eer<br />

Present Employer.<br />

Alexandria University, Egypt<br />

( 2006)<br />

Responsibilities: As a Senior Mechanical Eng<strong>in</strong>eer I have overall responsibility for all estimat<strong>in</strong>g jobs,<br />

under my control, report<strong>in</strong>g directly to <strong>the</strong> Project Manager and/or Construction Manager.<br />

My duties <strong>in</strong>clude but would not be limited to <strong>the</strong> follow<strong>in</strong>g:<br />

Receiv<strong>in</strong>g design documents and review<strong>in</strong>g <strong>the</strong> same.<br />

Prepar<strong>in</strong>g technical submittal accord<strong>in</strong>g to <strong>the</strong> project specification..<br />

Review<strong>in</strong>g design draw<strong>in</strong>gs and prepare detailed shop draw<strong>in</strong>g accord<strong>in</strong>gly.<br />

Co-ord<strong>in</strong>ate <strong>the</strong> HVAC works along with <strong>the</strong> civil trades (Architectural and Structural).<br />

Co-ord<strong>in</strong>ate <strong>the</strong> HVAC works with <strong>the</strong> o<strong>the</strong>r electro-<strong>mechanical</strong> works.<br />

Follow <strong>the</strong> approval of <strong>the</strong> technical submittal and shop draw<strong>in</strong>g with <strong>the</strong> consultant.<br />

Follow <strong>the</strong> delivery of <strong>the</strong> material assur<strong>in</strong>g <strong>the</strong> delivery as per <strong>the</strong> construction program.<br />

Allocat<strong>in</strong>g <strong>the</strong> man power accord<strong>in</strong>g to <strong>the</strong> site activities and work priorities.<br />

Prepar<strong>in</strong>g weekly / monthly reports.<br />

Report<strong>in</strong>g to <strong>the</strong> project Manager/ Operation Manager.<br />

Prepar<strong>in</strong>g cost analysis for any additional works.<br />

Approval of <strong>the</strong> works done through consultant <strong>in</strong>spections. Rais<strong>in</strong>g RFI, <strong>in</strong>spection for work<br />

109


done, <strong>in</strong>spection for material etc.<br />

� Prepar<strong>in</strong>g as built draw<strong>in</strong>g, M & O manuals.<br />

� Follow<strong>in</strong>g and attend<strong>in</strong>g consultant snags and clos<strong>in</strong>g <strong>the</strong> same, obta<strong>in</strong><strong>in</strong>g completion certificate.<br />

� Coord<strong>in</strong>at<strong>in</strong>g to project Consultant, Ma<strong>in</strong> Contractor and o<strong>the</strong>r services for implementation of<br />

project to avoid h<strong>in</strong>drances and delays of <strong>the</strong> project.<br />

� Review<strong>in</strong>g a check<strong>in</strong>g of contract draw<strong>in</strong>gs, specifications, agreed procedures and method of<br />

statements.<br />

� Prepar<strong>in</strong>g cost analysis, additive and deductive cost.<br />

� Direct<strong>in</strong>g Site Eng<strong>in</strong>eers/ Inspectors.<br />

� Ensur<strong>in</strong>g that <strong>the</strong> project <strong>mechanical</strong> work is carried out <strong>in</strong> accordance with <strong>the</strong> required quality,<br />

cost and time constra<strong>in</strong>ts.<br />

Projects Details as on date.<br />

1. 2B + G + 23 RD FLOOR TOWER 13 AT THE VIVA BAHRIYA, THE PEARL -QATAR.<br />

Client: M/s. THE LAND INVESTMENT & REALESTATE DEVELOPMENT COMPANY.<br />

Consultant: M/s MZ & PARTENERS.<br />

Type of System: Water supply system, Dra<strong>in</strong>age system, Chilled Water System, Fire fight<strong>in</strong>g<br />

system, HVAC system.<br />

POSITION: PROJECT ENGINEER.<br />

Job description<br />

As a Senior Mechanical Eng<strong>in</strong>eer I have overall responsibility for all estimat<strong>in</strong>g jobs, under my control,<br />

report<strong>in</strong>g directly to <strong>the</strong> Project Manager and/or Construction Manager.<br />

My duties <strong>in</strong>clude but would not be limited to <strong>the</strong> follow<strong>in</strong>g:<br />

� Coord<strong>in</strong>at<strong>in</strong>g to project Consultant, Ma<strong>in</strong> Contractor and o<strong>the</strong>r services for<br />

implementation of project to avoid h<strong>in</strong>drances and delays of <strong>the</strong> project.<br />

� Review<strong>in</strong>g a check<strong>in</strong>g of contract draw<strong>in</strong>gs, specifications, agreed<br />

procedures and method of statements.<br />

� Prepar<strong>in</strong>g cost analysis, additive and deductive cost.<br />

� Direct<strong>in</strong>g Site Eng<strong>in</strong>eers/ Inspectors.<br />

� Ensur<strong>in</strong>g that <strong>the</strong> project <strong>mechanical</strong> work is carried out <strong>in</strong> accordance<br />

with <strong>the</strong> required quality, cost and time constra<strong>in</strong>ts.<br />

Coord<strong>in</strong>ation and adm<strong>in</strong>istration of <strong>mechanical</strong> related materials, equipment and draw<strong>in</strong>g submittals<br />

110


2. 2B + G + 21 RD FLOOR TOWER 14 AT THE VIVA BAHRIYA, THE PEARL -QATAR.<br />

Client: M/s. THE LAND INVESTMENT & REALESTATE DEVELOPMENT COMPANY.<br />

Consultant: M/s MZ & PARTENERS.<br />

Type of System: Water supply system, Dra<strong>in</strong>age system, Chilled Water System, Fire fight<strong>in</strong>g<br />

system, HVAC system.<br />

POSITION: PROJECT ENGINEER.<br />

Job description<br />

As a Senior Mechanical Eng<strong>in</strong>eer I have overall responsibility for all estimat<strong>in</strong>g jobs, under my control,<br />

report<strong>in</strong>g directly to <strong>the</strong> Project Manager and/or Construction Manager.<br />

My duties <strong>in</strong>clude but would not be limited to <strong>the</strong> follow<strong>in</strong>g:<br />

Report directly to <strong>the</strong> Construction Manager and Project Manager<br />

� Attend technical meet<strong>in</strong>gs with Consultant / Clients<br />

� Coord<strong>in</strong>ate with <strong>the</strong> correspond<strong>in</strong>g suppliers for <strong>the</strong> technical<br />

� specifications of <strong>the</strong> work concerned<br />

� Initiate contract and variation order claims<br />

� Ensure safety is be<strong>in</strong>g implemented <strong>in</strong> all aspects.<br />

Coord<strong>in</strong>ation and adm<strong>in</strong>istration of <strong>mechanical</strong> related materials, equipment and draw<strong>in</strong>g submittals<br />

Previous Employer.<br />

Designation: SITE ENGINEER.<br />

Organization: M/s AL-Aali for trad<strong>in</strong>g & contract<strong>in</strong>g LLC.<br />

Projects Details.<br />

1. Drugs Enforcement Department build<strong>in</strong>gs:<br />

Client: M/s MINISTRY OF INTERIOR.<br />

Consultant: M/s Sketch Eng<strong>in</strong>eer<strong>in</strong>g Consultant Office.<br />

Type of System: Water supply system, Dra<strong>in</strong>age system, Fire fight<strong>in</strong>g system, HVAC system.<br />

POSITION: SITE ENGINEER<br />

111


RESPONSIBILITIES:<br />

Report directly to <strong>the</strong> Construction Manager and Project Manager Attend technical meet<strong>in</strong>gs with<br />

onsultant / Clients<br />

� Coord<strong>in</strong>ate with <strong>the</strong> correspond<strong>in</strong>g suppliers for <strong>the</strong> technical<br />

� specifications of <strong>the</strong> work concerned<br />

� Initiate contract and variation order claims<br />

� Ensure safety is be<strong>in</strong>g implemented <strong>in</strong> all aspects.<br />

� Time to time <strong>in</strong>spection of daily electrical works and see to it that works<br />

Were be<strong>in</strong>g done <strong>in</strong> accordance with <strong>the</strong> specifications.<br />

� Ensur<strong>in</strong>g that <strong>the</strong> project <strong>mechanical</strong> work is carried out <strong>in</strong> accordance with <strong>the</strong> required quality,<br />

cost and time constra<strong>in</strong>ts.<br />

2. Crim<strong>in</strong>al research Department build<strong>in</strong>gs:<br />

Client: M/s MINISTRY OF INTERIOR.<br />

Consultant: M/s AL-SRAIYA Eng<strong>in</strong>eer<strong>in</strong>g Consultants.<br />

Type of System: Water supply system, Dra<strong>in</strong>age system, Fire fight<strong>in</strong>g system, HVAC system.<br />

POSITION: SITE ENGINEER<br />

RESPONSIBILITIES:<br />

Report directly to <strong>the</strong> Construction Manager and Project Manage<br />

� Attend technical meet<strong>in</strong>gs with Consultant / Clients<br />

� Coord<strong>in</strong>ate with <strong>the</strong> correspond<strong>in</strong>g suppliers for <strong>the</strong> technical<br />

� specifications of <strong>the</strong> work concerned<br />

� Initiate contract and variation order claims<br />

� Ensure safety is be<strong>in</strong>g implemented <strong>in</strong> all aspects.<br />

� Time to time <strong>in</strong>spection of daily electrical works and see to it that works<br />

Were be<strong>in</strong>g done <strong>in</strong> accordance with <strong>the</strong> specifications.<br />

� Ensur<strong>in</strong>g that <strong>the</strong> project <strong>mechanical</strong> work is carried out <strong>in</strong> accordance with<br />

<strong>the</strong> required quality, cost and time constra<strong>in</strong>ts.<br />

3. 77 villa complexes & clubhouse:<br />

Consultant: M/s CONSULTANT ENGINEERING GROUP.<br />

Type of System: Water supply system, Dra<strong>in</strong>age system, Fire fight<strong>in</strong>g system.<br />

POSITION: SITE ENGINEER<br />

112


RESPONSIBILITIES:<br />

Report directly to <strong>the</strong> Construction Manager and Project Manager<br />

Software Proficiency<br />

� Attend technical meet<strong>in</strong>gs with Consultant / Clients<br />

� Coord<strong>in</strong>ate with <strong>the</strong> correspond<strong>in</strong>g suppliers for <strong>the</strong> technical<br />

� specifications of <strong>the</strong> work concerned<br />

� Initiate contract and variation order claims<br />

� Ensure safety is be<strong>in</strong>g implemented <strong>in</strong> all aspects.<br />

� Time to time <strong>in</strong>spection of daily <strong>mechanical</strong> works and see to it that works<br />

Were be<strong>in</strong>g done <strong>in</strong> accordance with <strong>the</strong> specifications.<br />

� Ensur<strong>in</strong>g that <strong>the</strong> project <strong>mechanical</strong> work is carried out <strong>in</strong> accordance with<br />

<strong>the</strong> required quality, cost and time constra<strong>in</strong>ts.<br />

Operat<strong>in</strong>g Systems : W<strong>in</strong>dows-98/XP.<br />

Design<strong>in</strong>g Package : Auto-CAD.<br />

O<strong>the</strong>r computer Applications : MS OFFICE (Excel, Word),<br />

Short course <strong>in</strong> Primavera.<br />

Personal Details<br />

Fa<strong>the</strong>r’s Name Mohammed. Ahmed<br />

Date of Birth 21 ST March 1983<br />

Sex Male<br />

Nationality Egyption<br />

Languages Arabic, English<br />

Permanent Address 33 El nassr st, El Manshiya, Alex, Egypt.<br />

Phone +974-7620268<br />

113


Date of birth : 20/12/1976<br />

Address : Warak elarab-oraba st, Giza<br />

Marital status : S<strong>in</strong>gle<br />

Telephone : 0161981339<br />

Seek<strong>in</strong>g for challeng<strong>in</strong>g <strong>in</strong> refrigeration, Air conditions, ventilation networks, fire fight<strong>in</strong>g,<br />

Plumb<strong>in</strong>g or related <strong>fields</strong><br />

Graduation Year : 2003<br />

B.S.C. OF : Eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong> <strong>mechanical</strong><br />

A<strong>in</strong> shams University<br />

Faculty of eng<strong>in</strong>eer<strong>in</strong>g<br />

Graduation project Central air condition (Dr. Maged Negm)<br />

Project Grade : Very Good<br />

Last year grade : Good<br />

Computer skills<br />

Ms Word, Ms- Excel, Power Po<strong>in</strong>t, AutoCAD, Net and Access<br />

1. Egicat <strong>Company</strong> For Central Air Condition<strong>in</strong>g System<br />

2. Integrated Consultant Group ( I.C.G)<br />

3. Bakry Consultant Eng<strong>in</strong>eer<strong>in</strong>g<br />

4. Alaanab Compnay <strong>in</strong> Qatar<br />

5. Site Eng<strong>in</strong>eer<br />

114


Air condition system<br />

� - Chilled water system ( chilled, pumps, ahu, & fcu)<br />

� - Direct Expansion Unit<br />

� - Ventilations system ( fresh, exhaust, pressurization & circulation)<br />

� - Duct work & accessories<br />

� - Chilled water pipes & accessories<br />

� - Test<strong>in</strong>g, commission<strong>in</strong>g & start up for above mentioned items<br />

Network<br />

Stream, compressed air ad medical gas networks<br />

Fire fight<strong>in</strong>g system<br />

1.3.1 Fire fight<strong>in</strong>g pump rooms, fire hose reel, fire hose rack, fire hose, pillar type fire hydrant, Siamese<br />

connection, Co2 system, spr<strong>in</strong>klers system and ext<strong>in</strong>guishers<br />

1.4 Plumb<strong>in</strong>g system dra<strong>in</strong>age system, domestic water system, water tanks & Booster pumps set<br />

1. Designer Eng<strong>in</strong>eer<br />

Air Condition system<br />

2.1.1 Cool<strong>in</strong>g load estimation (Manual, soft ware)<br />

2.1.2 Pipes siz<strong>in</strong>g, duct siz<strong>in</strong>g, equipments selection (manual software)<br />

Fire fight<strong>in</strong>g system<br />

Pipe siz<strong>in</strong>g for stand pipe & hose system (manual software)<br />

Pipes siz<strong>in</strong>g for spr<strong>in</strong>klers system (manual, software)<br />

Pipes siz<strong>in</strong>g for comb<strong>in</strong>ed system (Hydraulic calculations)<br />

Co2 system (cyl<strong>in</strong>der capacity, pipe siz<strong>in</strong>g)<br />

Plumb<strong>in</strong>g system<br />

Pipes siz<strong>in</strong>g for domestic water network (Manual)<br />

Pipes siz<strong>in</strong>g for dra<strong>in</strong>age, vent, ra<strong>in</strong> water, hot water (manual)<br />

Selection for domestic water pumps (GPM, HEAD)<br />

2. Execut<strong>in</strong>g supervisor eng<strong>in</strong>eer<br />

Air condition system<br />

Plumb<strong>in</strong>g system<br />

Fire fight<strong>in</strong>g system<br />

Waste water treatment plant<br />

Water lift station<br />

Reverse osmosis plant<br />

Boilers room<br />

Laundries equipments<br />

Kitchen equipment<br />

115


A. Hospital<br />

1. Mirs pharmaceutical plant ( abouzabal)<br />

2. Air force hospital ( Tagamoa)<br />

3. Faiha hospital ( Saudi Arabia)<br />

4. Borg elerab hospital ( borg elerab)<br />

B. Hotels<br />

1. Air park hotel<br />

2. Caribbean world some bay<br />

3. Leak view hotel<br />

C. Adm<strong>in</strong>istration & Residence Build<strong>in</strong>g<br />

4. Micro adm<strong>in</strong>istration build<strong>in</strong>g<br />

5. Hous<strong>in</strong>g & development bank<br />

6. Ashraf farag adm<strong>in</strong>istration build<strong>in</strong>g\<br />

7. Wady elnile club<br />

8. Alexandria police club<br />

9. Katamia down town<br />

10. Age khan villa ( swan)<br />

1. Elnabila boat (Aswan)<br />

Foreign Language : Arabic Mo<strong>the</strong>r Language<br />

English good write & spoken<br />

116


Nationality : Egyptian<br />

Mobile No. : +974 6681 8869<br />

Email : Ahmed.elraqed@gmail.com<br />

Date of Birth : 25 OCT, 1983.<br />

Place of Birth : Egypt.<br />

Marital Status : S<strong>in</strong>gle.<br />

� Bachelor's degree <strong>in</strong> electrical eng<strong>in</strong>eer<strong>in</strong>g, Cairo University.<br />

� More than two and half year of varied experience <strong>in</strong> electrical and <strong>mechanical</strong> eng<strong>in</strong>eer<strong>in</strong>g works<br />

relatedto residential and commercial build<strong>in</strong>gs.<br />

� Good knowledge <strong>in</strong> aspects of management report<strong>in</strong>g.<br />

To secure a responsible position where extensive background of varied eng<strong>in</strong>eer<strong>in</strong>g experiences could<br />

be applied with <strong>the</strong> opportunity for future advancement and professional growth.<br />

Nov 2007 – Present Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co, Qatar<br />

This company is active <strong>in</strong> <strong>in</strong>stall & ma<strong>in</strong>tenance of <strong>the</strong> electro-<strong>mechanical</strong> <strong>in</strong>stallations that related to<br />

residential<br />

and commercial build<strong>in</strong>gs.<br />

� <strong>Electro</strong>-<strong>mechanical</strong> site eng<strong>in</strong>eer.<br />

� Review <strong>the</strong> shop draw<strong>in</strong>gs of <strong>the</strong> electrical and <strong>mechanical</strong> works.<br />

� Follow up <strong>the</strong> <strong>Electro</strong>-<strong>mechanical</strong> <strong>in</strong>stallations such as:" lightn<strong>in</strong>g protection system, light<strong>in</strong>g<br />

system, power system, fire alarm system, fire fight<strong>in</strong>g system and plumb<strong>in</strong>g works, regard<strong>in</strong>g to<br />

<strong>the</strong> <strong>in</strong>ternational standards such as:"NEC, BS, NFPA, etc…", also reference to kahrama and civil<br />

defense department requirements.<br />

� Takeoff <strong>the</strong> required materials.<br />

� Co-ord<strong>in</strong>ate between <strong>the</strong> electrical and <strong>mechanical</strong> works.<br />

� Preparation daily reports about <strong>the</strong> site work activity.<br />

Install all fire fight<strong>in</strong>g systems that related to residential and commercial build<strong>in</strong>gs such as<br />

117


"FHR Cab<strong>in</strong>ets,<br />

Spr<strong>in</strong>kler system, fire fight<strong>in</strong>g pumps, FM-200 Agent system".<br />

Good knowledge about <strong>the</strong> hydraulic calculations of <strong>the</strong> fire fight<strong>in</strong>g systems.<br />

� Good knowledge about test<strong>in</strong>g & commission<strong>in</strong>g of fire fight<strong>in</strong>g systems, basically accord<strong>in</strong>g to<br />

NFPA standards & Local civil defense department requirements.<br />

� Preparation all test<strong>in</strong>g & commission<strong>in</strong>g reports of fire fight<strong>in</strong>g systems.<br />

� Proficient <strong>in</strong> Microsoft office applications i.e. excel, word, <strong>in</strong>ternet.<br />

� Well-versed <strong>in</strong> a computerized environment.<br />

� Varied experience <strong>in</strong> us<strong>in</strong>g some eng<strong>in</strong>eer<strong>in</strong>g programs Such as:‖Autocad, Matlab, Etab, etc…..‖<br />

� Good <strong>in</strong> English, speak<strong>in</strong>g & writ<strong>in</strong>g as well as Arabic.<br />

� Have a local driv<strong>in</strong>g license.<br />

� Have approved certificate from civil defense to practic<strong>in</strong>g fire fight<strong>in</strong>g works.<br />

1. NFPA Sem<strong>in</strong>ar that <strong>in</strong>cluded fire fight<strong>in</strong>g Standard codes:<br />

(NFPA13-2010, NFPA20-2010 & NFPA25-2008‖.<br />

2. At Somid company for petroleum pipel<strong>in</strong>e, Egypt.<br />

In this tra<strong>in</strong><strong>in</strong>g, I got <strong>in</strong>formation about:<br />

� Electric supply<strong>in</strong>g system.<br />

� The control system located <strong>in</strong> <strong>the</strong> company.<br />

� The types of circuit breaker us<strong>in</strong>g to protection aga<strong>in</strong>st short circuit current such as (vacuum, sf6,<br />

gas,<br />

� .etc).<br />

� Some details about <strong>the</strong> earth<strong>in</strong>g system.<br />

Some details about <strong>the</strong> lightn<strong>in</strong>g protection system.<br />

3. At Tepco company for distribution boards, Egypt.<br />

In this tra<strong>in</strong><strong>in</strong>g, I got <strong>in</strong>formation about:<br />

� Low & Medium voltage distribution board, <strong>in</strong>clud<strong>in</strong>g some components as: circuit breaker, relay,<br />

control circuit, measur<strong>in</strong>g devices, capacitor tripp<strong>in</strong>g unit, current & voltage transformer.<br />

� Knock, <strong>in</strong>clud<strong>in</strong>g some components as: r<strong>in</strong>g ma<strong>in</strong> unit, power transformer, low voltage<br />

distribution board, protection devices as "circuit breakers, earth fault <strong>in</strong>dicator, etc ….."<br />

University : Cairo University.<br />

Course : BCs <strong>in</strong> Electrical Eng<strong>in</strong>eer<strong>in</strong>g.<br />

Grade year : May, 2007.<br />

� Open-m<strong>in</strong>ded.<br />

� Sociable and understandable.<br />

118


� Ability to work with team.<br />

� Ability to work under pressure.<br />

119


120


121


122


123


Nationality : Philipp<strong>in</strong><br />

Date of Birth:<br />

College: Cebu Institute of Technology , Cebu City (1968 -1974)<br />

Graduate School: Master of Science <strong>in</strong> Management Eng<strong>in</strong>eer<strong>in</strong>g (MSMan. Eng‘g.)<br />

University of San Jose- Recoletos , Cebu City (1979 -1980)<br />

1. Sr. Mechanical Eng<strong>in</strong>eer<br />

28 September 2009 to present, Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. ,W. L.L, P.O Box 15534, Doha ,<br />

Qatar<br />

Project Handled / Supervised:<br />

1.1 AL-Jazeera New Tra<strong>in</strong><strong>in</strong>g Center-(G + F + Roof) Two (2) Build<strong>in</strong>gs<br />

Duties & Responsibilities:<br />

1.0 Project <strong>in</strong>-charge for <strong>Electro</strong><strong>mechanical</strong> works such as HVAC, Plumb<strong>in</strong>g & Dra<strong>in</strong>age<br />

System , and Fire Fight<strong>in</strong>g system.<br />

2.0 Process , <strong>in</strong>itiate request for gravity , hydrostatic pressure test for approval by <strong>the</strong> consultants.<br />

3.0 General supervision of all electro<strong>mechanical</strong> system , review and recommend corrective actions for<br />

<strong>the</strong> consultant approval.<br />

4.0 Prepare ,<strong>in</strong>itiate, witness <strong>the</strong> process of test<strong>in</strong>g and commission<strong>in</strong>g of <strong>the</strong> equipments.<br />

2.0 Sr. Mechanical Eng<strong>in</strong>eer<br />

4 August 2006 – to- Present, Arab Eng<strong>in</strong>eer<strong>in</strong>g Bureau, P.O. Box 1148 , Doha , Qatar<br />

Projects Handled / Supervised:<br />

1.1 AL-Barjeel Residential Tower ( 2B + G + 60)<br />

1.2 AL-Qassar Office Tower ( 2B + G + 24)<br />

1.3 AL Alawi Office Tower (2B + G + 19)<br />

1.4 Commercial bank Plaza Tower ( 3B +G + M + 22 )<br />

Duties & Responsibilities:<br />

1.0 Perform all <strong>the</strong> duties that may be assigned/ requested by <strong>the</strong> Project Manager / Construction<br />

Manager.<br />

2.0 Review , approve , and process all <strong>mechanical</strong> submittals and samples for compliance of <strong>the</strong> project<br />

specifications <strong>in</strong> accordance with <strong>the</strong> National & International codes of standards.<br />

3.0 Respond to site memos necessary for <strong>the</strong> Project Manager / Resident Eng<strong>in</strong>eer review.<br />

4.0 Review , process , request of <strong>in</strong>formation (RFI) on <strong>mechanical</strong> related works and prepare appropriate<br />

response requir<strong>in</strong>g design issues and thru channel <strong>the</strong> same.<br />

5.0 Review contractor <strong>mechanical</strong> change order proposals and prepare recommendations for <strong>the</strong><br />

Resident Eng<strong>in</strong>eer review.<br />

6.0 Review, evaluate , and recommend valuation payment figures for Project Manager/Resident<br />

Eng<strong>in</strong>eer review and approval.<br />

124


7.0 Witness all test<strong>in</strong>g & commission<strong>in</strong>g , simulation test , & start –up operation related to <strong>mechanical</strong><br />

equipment & apparatus.<br />

8.0 Liaise with <strong>the</strong> client eng<strong>in</strong>eers, local authorities , or o<strong>the</strong>r m<strong>in</strong>isterial agencies hav<strong>in</strong>g jurisdiction<br />

over <strong>the</strong> project.<br />

9.0 Review, approve <strong>the</strong> contractors as-built draw<strong>in</strong>gs , O &M manual submittals.<br />

3.0 Sr. Mechanical Eng<strong>in</strong>eer<br />

23 July 2005 –to- 27 Jun 2006, Construction Development <strong>Company</strong>, P.O. Box 8388 , Doha , Qatar<br />

Projects Handled & Supervised:<br />

1.0 AL-Fardan Tw<strong>in</strong> Tower (2B +G + M + 40) – Apartment Tower<br />

2.0 AL-Fardan Tw<strong>in</strong> Tower (2B +G + M + 30)- Office Tower<br />

Duties & Responsibilities:<br />

1.0 Responsible for <strong>the</strong> general site supervision of both Towers( Apartment & Office).<br />

3.0 Manned , supervise, and general monitor<strong>in</strong>g of <strong>the</strong> go<strong>in</strong>g rough<strong>in</strong>g-<strong>in</strong>s, sleev<strong>in</strong>g, blockout<br />

<strong>in</strong>stallations of all <strong>the</strong> <strong>mechanical</strong> services from raft foundations up to roof levels.<br />

4.0 Anticipations of <strong>the</strong> duct shaft blockout <strong>in</strong>stallations for all <strong>mechanical</strong> services risers, grat<strong>in</strong>g<br />

channels, road gullies, sump & lift pits, manholes, water tank, concrete fire tanks, GRP sectional tanks<br />

sleeves and pipe rough<strong>in</strong>g-<strong>in</strong>s. Fire tank, Domestic and Irrigation tank pipe sleeves <strong>in</strong>stallation.<br />

5.0 Manned <strong>the</strong> operations of <strong>the</strong> QA/QC department , and witness process of gravity test<strong>in</strong>g pressure,<br />

grilles & diffuser air balance, <strong>mechanical</strong> equipment & apparatus test<strong>in</strong>g and commission<strong>in</strong>g,<br />

simulation, and start-up.<br />

4.0 Sr. Mechanical Eng<strong>in</strong>eer /HVAC Design<br />

16 Dec. 2004 to 20 Jul 2005, Gulf Eng<strong>in</strong>eer<strong>in</strong>g & Industrial Consultancy, P.O. Box 9811, Doha, Qatar<br />

Projects Handled & Supervised:<br />

Qatar Sports Club Renovation Project<br />

Duties & Responsibilities:<br />

1.0 Review , process , approve all technical submittals , samples and shop draw<strong>in</strong>gs.<br />

2.0 Respond HVAC load calculations , duct layout preparations of <strong>the</strong> follow<strong>in</strong>g projects:<br />

a) Expansion of AL- Wakra Dental Cl<strong>in</strong>ic , Omar B<strong>in</strong> Khateb Cl<strong>in</strong>ic.<br />

3.0 Liaise with Client Eng<strong>in</strong>eers ,QNOC-SFID, local authorities hav<strong>in</strong>g jurisdiction over <strong>the</strong> project.<br />

4.0 Review, evaluate contractors claim and prepare recommendation for approval by <strong>the</strong> Project<br />

Manager.<br />

5.0 Witness all <strong>the</strong> process of test<strong>in</strong>g and commission<strong>in</strong>g of related <strong>mechanical</strong> equipments.<br />

5.0 Operations Manager<br />

01May ‘02 –30 Dec. ‗04, PSME System Builders - Plumb<strong>in</strong>g Sanitary Mechanical Electrical System,<br />

Manila, Philipp<strong>in</strong>es<br />

Projects Handled /Completed:<br />

1.0 Philipp<strong>in</strong>e Seafarer Bldg. ( B + G +10 )- Split units Installations.<br />

2.0 Semi-Con Plant ( B + 2 Floors)- <strong>Electro</strong>-<strong>mechanical</strong> equipment <strong>in</strong>stallations.<br />

3.0 Residential Houses - 12 Units – St. Monique Valais Subdivision, B<strong>in</strong>angonan.<br />

Electrical & Plumb<strong>in</strong>g works <strong>in</strong>stallations.<br />

Duties & Responsibilities:<br />

1.0 Manned and general supervision of site electro-<strong>mechanical</strong> <strong>in</strong>stallations.<br />

6.0 Sr. Project Eng<strong>in</strong>eer / MEP Head<br />

125


12 Feb. ‘98 – to- 23 Feb. ‗02, L & M Maxco Co., Inc., Makati , Philipp<strong>in</strong>es<br />

Projects Supervised & Completed:<br />

1.0 The One McK<strong>in</strong>ley Place - (4B + G + M + 48 + Helipad)<br />

2.0 The FEU Eng<strong>in</strong>eer<strong>in</strong>g Bldg. - ( G + 3 + Attic )<br />

3.0 The National Book Store - ( B + G + 3 + Roof Deck)<br />

Duties & Responsibilities:<br />

1.0 Respond to HVAC Plans design review , cool<strong>in</strong>g load calculations, Duct layouts, and duct size up.<br />

2.0 Respond to pump siz<strong>in</strong>g , pressure loss and static pressure calculations, flow rates and power<br />

consumption rates calculations.<br />

3.0 Perform <strong>the</strong> duties of head<strong>in</strong>g all electro-<strong>mechanical</strong> related <strong>in</strong>stallations. Respond to subcontractor‘s<br />

queries perta<strong>in</strong><strong>in</strong>g to design and o<strong>the</strong>r related issues.<br />

4.0 Respond to site correspondences, site memos, and issuance of Site <strong>in</strong>structions & Non-compliance<br />

notices.<br />

7.0 Sr. Project Eng<strong>in</strong>eer / HVAC Eng<strong>in</strong>eer<br />

10Jan. ‘97-to-12 Feb.‘98, Jose Alil<strong>in</strong>g & Associates, Makati, Philipp<strong>in</strong>es<br />

Project Supervised / Completed:<br />

1.0 The Discovery Suites: (5 B + G + M + 42 + Helipad)<br />

Address: ADB Ave.,Ortigas Complex , Mandaluyong<br />

Duties & Responsibilities:<br />

1.0 Review, process, and approve all <strong>mechanical</strong> related technical submittals , samples ,and<br />

shop draw<strong>in</strong>gs to check compliance with <strong>the</strong> Project Specifications.<br />

2.0 Perform load calculations, ductwork layout , and cost estimates<br />

3.0 Review contractors valuation payment and prepare recommendation for review bt <strong>the</strong> Construction<br />

Manager.<br />

4.0 Responsible for all site coord<strong>in</strong>ation works for all nom<strong>in</strong>ated trade contractor regard<strong>in</strong>g <strong>mechanical</strong><br />

related services , and process all request for <strong>in</strong>formation (RFI).<br />

5.0 Review , approve , as-built draw<strong>in</strong>gs ,manuals , and witness test<strong>in</strong>g & commission<strong>in</strong>g.<br />

6.0 Perform all o<strong>the</strong>r duties that may be assigned / requested by <strong>the</strong> Construction Manager.<br />

7.0 Respond to site correspondences, site memos and queries.<br />

8.0 Asst. Project Manager<br />

08 Jan. ‘96 – 30 May ‗97, Triplewell Construction Corporation, Sta.Rosa, Laguna , Philipp<strong>in</strong>es<br />

Projects Handled / Supervised:<br />

1.0 Integrated Micro-electronics Inc. - Bldg. ―D‖<br />

2.0 Integrated Micro-electronics Inc. - Bldg ―E‖<br />

3.0 Integrated Micro-electronics Inc. - Bldg. ―F‖<br />

Duties & Responsibilities:<br />

1.0 general supervision of all electro-<strong>mechanical</strong> <strong>in</strong>stallations packages such as : HVAC system,<br />

Plumb<strong>in</strong>g/ Sanitary system, fire fight<strong>in</strong>g system , BMS system and Electrical system.<br />

2.0 Respond to review of shop draw<strong>in</strong>g submittals, material submittals and progress bill<strong>in</strong>g review. Site<br />

correspondences ,site memos , site queries relat<strong>in</strong>g to design issues.<br />

9.0 Eng<strong>in</strong>eer<strong>in</strong>g / Ma<strong>in</strong>tenance Manager<br />

19 July `94 –to-15 May 95, Pan Pacific Service Contractors Inc., Manila , Philipp<strong>in</strong>es<br />

Project Handled & Supervised:<br />

126


1.0 Bataan Ref<strong>in</strong>ery Plant<br />

Duties & Responsibilities:<br />

0.0 Supervision of Plant Heat<strong>in</strong>g equipment <strong>in</strong>stallations.<br />

1.0 Rotat<strong>in</strong>g equipment <strong>in</strong>stallations such as: Air compressors, chiller plant equipments, pump<strong>in</strong>g<br />

stations, sewage treatment plants , boiler plant equipments and steam turb<strong>in</strong>es .<br />

10.0 Ma<strong>in</strong>tenance Eng<strong>in</strong>eer (O&M)<br />

10 Dec. ‘88 –to-23Feb.‘93, Royal Commission Yanbu Project, Mad<strong>in</strong>at Yanbu Al-S<strong>in</strong>aiyah ,K.S.A<br />

Project s Handled & Supervised:<br />

1.0 Power & Water Desal<strong>in</strong>ation Plant 2.0 Sewage Treatment Plant<br />

2.0 Pump<strong>in</strong>g Stations 4.0 Rotat<strong>in</strong>g Equipments<br />

3.0 HVAC Chiller Plant Equipments & HVAC Equipments<br />

Duties & Responsibilities:<br />

1.0 general supervision of on-go<strong>in</strong>g plant heat<strong>in</strong>g equipment.<br />

2.0 General supervision of plant equipment ma<strong>in</strong>tenance such as :<br />

a) rotat<strong>in</strong>g equipment such as pumps, motors, fans, blowers, air compressors, boiler, turb<strong>in</strong>e pumps,<br />

steam turb<strong>in</strong>e, chiller plant and AHU equipments, recondition<strong>in</strong>g and repairs of all <strong>the</strong>se equipments<br />

3.0 Prepare and develop equipments ma<strong>in</strong>tenance repair plan & work programs<br />

4.0 Respond to required test, commission<strong>in</strong>g, and start-up operations.<br />

11.0 QA/QC Manager / Ma<strong>in</strong>tenance Manager<br />

17 Jul ‘85 to 28 Oct. ‗88, Services Ma<strong>in</strong>tenance Co.,Ltd., Mad<strong>in</strong>at Yanbu Al-S<strong>in</strong>aiyah,K.S.A<br />

Projects Handled / Supervised :<br />

1.0 Power & Water Desal<strong>in</strong>ation Plant<br />

2.0 Sewage Water Treatment Plant<br />

3.0 Pump Stations<br />

4.0 Vehicle Equipments<br />

5.0 Chiller Plant Equipments & HVAC Equipments<br />

Duties & Responsibilities:<br />

1.0 General supervision of all plant ma<strong>in</strong>tenance operations, Annual preventive ma<strong>in</strong>tenance plan,<br />

Operations & Ma<strong>in</strong>tenance Plan,Quality control program and standard procedures for Inspection<br />

preparations.<br />

2.0 Respond to test, commission<strong>in</strong>g, and start-up operations of newly <strong>in</strong>stalled <strong>mechanical</strong> equipments.<br />

12.0 Mechanical Eng<strong>in</strong>eer / Equipment Eng<strong>in</strong>eer<br />

30 Jun ‘82 to 31 July ‗83, Saudi Arabia Logistics & Ind‘l. Ltd., Dharan Airport , K.S.A<br />

Project Handled & Supervised:<br />

1.0 Jubail Desal<strong>in</strong>ation Power Plant. Jubail ,K.S.A<br />

1.1 Boiler Installations – 8-units<br />

1.2 Sea Water Pump<strong>in</strong>g Stations<br />

Duties & Responsibilities:<br />

1.0 General site supervision of seawater pump stations<br />

2.0 Prepare program of works for <strong>the</strong> equipments, work programs, manpower /workforce<br />

Schedules , preventive ma<strong>in</strong>tenance service & equipment logs and progress reports.<br />

3.0 Supervision of boiler set-ups and <strong>in</strong>stallation of pip<strong>in</strong>g , pumps and o<strong>the</strong>r rotat<strong>in</strong>g equipments.<br />

13.0 Equipment Eng<strong>in</strong>eer /Plant Eng<strong>in</strong>eer<br />

127


20 May ‘80 to 20 May 82, General Trad<strong>in</strong>g & Ma<strong>in</strong>t. Co., Philipp<strong>in</strong>es, Project Supervised / Handled<br />

1.0 Pepsi Cola / Coca Cola Plant 2.0 San Miguel Brewery Plant<br />

Duties & Responsibilities:<br />

1.0 General plant supervision of subcontracted reverse osmosis plant <strong>in</strong>stallation, rotat<strong>in</strong>g<br />

equipments,HVAC plant equipments ,pumps <strong>in</strong>stallations , repairs & ma<strong>in</strong>tenance<br />

2.0 Preparation of program of works and work force schedul<strong>in</strong>g, preventive ma<strong>in</strong>tenance service<br />

schedules of all plant equipments.<br />

3.0 Conduct site audits and witness <strong>the</strong> test<strong>in</strong>g , commission<strong>in</strong>g and start-up operations.<br />

14.0 Mechanical Eng<strong>in</strong>eer<strong>in</strong>g Professor<br />

14 Nov.‘76 to 30 Apr. ‗80, University of San Jose Recoletos, Cebu, Philipp<strong>in</strong>es<br />

Duties & Responsibilities:<br />

1.0 Rout<strong>in</strong>e <strong>in</strong>structions to Junior and senior eng<strong>in</strong>eer<strong>in</strong>g students.<br />

2.0 Provide basic technical knowledge to students ga<strong>in</strong>ed from actual practice.<br />

3.0 The follow<strong>in</strong>g list of subjects taught:<br />

a) Eng<strong>in</strong>eer<strong>in</strong>g Thermodynamics 1 & 2<br />

b) Internal Combustion Eng<strong>in</strong>es<br />

c) Internal Combustion Eng<strong>in</strong>es<br />

d) Elements of Heat Transfer<br />

e) Elements of Mechanism<br />

f) Steam Power Eng<strong>in</strong>eer<strong>in</strong>g<br />

15.0 Rotat<strong>in</strong>g Equipment Eng<strong>in</strong>eer / Boiler Tender<br />

28 Apr.‘74 to 30 Oct. ‗76, Atlas Consolidated M<strong>in</strong><strong>in</strong>g & Dev. Corp. , Toledo City, Philipp<strong>in</strong>es<br />

Project Handled / Supervised:<br />

1.0 Copper Ref<strong>in</strong>ery Power Plant 2.0 ACMC Power Plant, Sangi,Toledo City<br />

Duties & Responsibilities:<br />

1.0 Respond to <strong>mechanical</strong> <strong>in</strong>strumentation works on pneumatic equipments ,rotat<strong>in</strong>g equipments ,<br />

HVACplant equipments , HVAC controls , adjust<strong>in</strong>g and ma<strong>in</strong>tenance.<br />

2.0 Repairs of <strong>mechanical</strong> components such as compressors, turb<strong>in</strong>e pumps, centrifugal and rotary<br />

pump,feed pumps, exciters and o<strong>the</strong>r HVAC plants equipment and accessories.<br />

3.0 Prepares program of works, schedules, and PMS schedules and monthly progress.<br />

Mechanical Eng<strong>in</strong>eers Board Exam February 1974 84.40 % Feati , Mla.<br />

Membership to Civic Organization:<br />

Board of Director: Philipp<strong>in</strong>e Society of Mechanical Eng<strong>in</strong>eer -79 to ‗80<br />

Member PAMEE: Philipp<strong>in</strong>e Association of Mechanical & Electrical Eng<strong>in</strong>eers - 74 to present<br />

1. Fire Safety Control & Prevention - Royal Commission Yanbu , K.S.A<br />

2. Fire Safety Supervisor Tra<strong>in</strong><strong>in</strong>g - Royal Commission Yanbu , K.S.A<br />

3. Fire Safety Hazard , Fire Drill - Power & Desal<strong>in</strong>ation Plant , Yanbu<br />

4. Ladder & Scaffold Safety - Royal Commission Yanbu , K.S.A<br />

5. Air Pollution & Control - Power & Desal<strong>in</strong>ation Plant , Yanbu<br />

6. International Safety Organization - ISO 9000-2001, L&M Maxco Co. , Inc. , Phils.<br />

128


MECHANICAL FOREMEN<br />

1 – KHALEEL MOHAMMED HEJAB<br />

He has 8 years experience <strong>in</strong> <strong>the</strong> state of Qatar. He has executed different projects cover<strong>in</strong>g hot & cold<br />

water system. Fire fight<strong>in</strong>g system, irrigation system, dra<strong>in</strong>age system and central pumps system, etc…<br />

2 – YASER AHMED EL SAYED ABD EL ALL<br />

He has 5 years experience <strong>in</strong> <strong>the</strong> field of <strong>in</strong>stallation, test<strong>in</strong>g & commission<strong>in</strong>g of <strong>the</strong> Water supply,<br />

Dra<strong>in</strong>age, Sewerage, Irrigation system.<br />

3 – MOHAMED RAMADAN KHALIL ABD ALLA<br />

He has t years experience <strong>in</strong> <strong>the</strong> field of <strong>in</strong>stallation, test<strong>in</strong>g & commissi0n<strong>in</strong>g of <strong>the</strong> Water supply,<br />

Dra<strong>in</strong>age, Sewage, Irrigation system.<br />

4 – QUEROWIN DETAL SAN FELIPE<br />

He has 7 years experience <strong>in</strong> <strong>the</strong> execution of <strong>the</strong>, Plumb<strong>in</strong>g & Dra<strong>in</strong>age: also <strong>in</strong>stallation, Test<strong>in</strong>g and<br />

Commission<strong>in</strong>g of HVAC & o<strong>the</strong>r Mechanical Systems such as Chillers, Pumps, Air Handl<strong>in</strong>g units,<br />

Fan Coil units, etc, and also Ma<strong>in</strong>tenance of <strong>the</strong>se equipments.<br />

5 – NOEL DOMINGO GARCIA<br />

He has 6 years experience <strong>in</strong> <strong>the</strong> execution of <strong>the</strong>, Plumb<strong>in</strong>g & Dra<strong>in</strong>age: also Installation, Test<strong>in</strong>g and<br />

commission<strong>in</strong>g of HVAC & o<strong>the</strong>r <strong>mechanical</strong> Systems such as Chillers Pumps, Air Handl<strong>in</strong>g units, Fan<br />

Coil units, etc, and also Ma<strong>in</strong>tenance of <strong>the</strong>se equipments.<br />

129


130


Our Contract<strong>in</strong>g & Ma<strong>in</strong>tenance divisions have been established <strong>in</strong> 2004 <strong>in</strong> which we aim to give a very<br />

High quality services for our customers <strong>in</strong> <strong>the</strong> shortest time and most professional methods. This will be<br />

<strong>in</strong> cover<strong>in</strong>g all <strong>the</strong> customers‘ requirements of <strong>the</strong> different services such as Civil works Electrical,<br />

Plumb<strong>in</strong>g, Dra<strong>in</strong>age, A/C, Ventilation & Pa<strong>in</strong>t<strong>in</strong>g etc…<br />

Our division carryout <strong>the</strong> follow<strong>in</strong>g activities.<br />

1. All Civil works of rebuild<strong>in</strong>g of walls, doors, w<strong>in</strong>dows.<br />

2. All ma<strong>in</strong>tenance & dismantl<strong>in</strong>g of ceramics, marbles, supply & fix of <strong>the</strong> same <strong>in</strong> rooms, bathroom<br />

hall & kitchens<br />

3. Pa<strong>in</strong><strong>in</strong>g all types of pa<strong>in</strong>t<strong>in</strong>gs after removal of <strong>the</strong> exist<strong>in</strong>g by water jet or o<strong>the</strong>r methods.<br />

4. Doors & jo<strong>in</strong>ery chang<strong>in</strong>g & ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g <strong>the</strong> exist<strong>in</strong>g complete with pa<strong>in</strong>t<strong>in</strong>g.<br />

5. False ceil<strong>in</strong>g supply & fix of all types of systems (Tiles 60X60, gypsum board etc…<br />

6. Land scap<strong>in</strong>g works design & execute.<br />

7. Water proof<strong>in</strong>g works<br />

Assur<strong>in</strong>g you of our best services at all times<br />

Best Regards<br />

Management<br />

131


132


Doha –Qatar (P. Box: 1179)<br />

Mob : +974 6669 0665<br />

Res : +974 6666 3466<br />

e.mail : khalid.2666@hotmail.com<br />

Date of Birth : 26 June 1966<br />

Nationality : Jordanian<br />

Gender : Male<br />

Marital Status : Married<br />

Place of Birth : Qatar<br />

Education<br />

1982-1985 - High school - Al _ Esteqlal High School, Qatar<br />

1985-1990 - BSCE (Bachelor of science <strong>in</strong> civil Eng<strong>in</strong>eer) from Far Eastern University , Manila-<br />

Philipp<strong>in</strong>es<br />

1982-1983 - English course <strong>in</strong> London-England<br />

1990 up to date - Member <strong>in</strong> Jordan Eng<strong>in</strong>eer Association<br />

1990-1991<br />

Site eng<strong>in</strong>eer <strong>in</strong> Qatar build<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g company, Qatar<br />

Type of project: Commercial market<br />

1992-2001<br />

Project Eng<strong>in</strong>eer <strong>in</strong> Al-kayam trd. <strong>Company</strong><br />

Type of Projects: villas, build<strong>in</strong>g, complex<br />

2001-2010<br />

Project Manager of Jawhart Al Ethad Trad<strong>in</strong>g & Construction <strong>Company</strong> and Al Etedal trad<strong>in</strong>g<br />

Type of Projects: Build<strong>in</strong>gs, Complex, Teach<strong>in</strong>g Center, land Scap<strong>in</strong>g, Stores, all type of Ma<strong>in</strong>tenance<br />

work,<br />

1. Us<strong>in</strong>g computers, read<strong>in</strong>g, swimm<strong>in</strong>g<br />

2. Inter net, AutoCAD<br />

Arabic : speak<strong>in</strong>g and writ<strong>in</strong>g<br />

English : speak<strong>in</strong>g and writ<strong>in</strong>g<br />

Phillipp<strong>in</strong>o : speak<strong>in</strong>g only<br />

I, <strong>the</strong> undersigned, certify that to <strong>the</strong> best of my knowledge and belief, this Bio-Data correctly<br />

133


describes my qualifications, my experience and me.<br />

SL NO. PROJECT NAME DURATION CONTRACT CONSULTANT<br />

OF PROJECT VALUE Q.R<br />

1 Palace of sh. Jassim Al Thani 6 Months 750,000.00 Client<br />

2 Industrial Area St. # 37 3 Months 450,000.00 Client<br />

3 School at Dafnah area for Mr. Mohamed 10 Months 88,000.00 Client<br />

Al Mohandy<br />

4 Shaikha Maha Al Thani place at 8 Months 1,100,000.00 Client<br />

Ummsalal Ali<br />

5 Farm House for Sh. Khalid Al- Thani at 4 Months 900,000.00 Client<br />

Salasmi Area<br />

6 36 Villas At Al Waab 12 Months 1,500,000.00 Client<br />

7 (B+G+7) Build<strong>in</strong>g at Nejma Area 6 Months 860,000.00 Gulf Design<br />

8 Air Port Ma<strong>in</strong>tenance of Qatar Airways 4 Months 690,000.00 Qatar Airways<br />

offices<br />

9 (B+G+3) Office Build<strong>in</strong>g 8 Months 780,000.00 Client<br />

10 Internal Security Force (Lakhwiya) 6 Months 1,800,000.00 Client<br />

11 Sub Stations at Mr. Rashid Al Noaimi 4 Months 680,000.00 Client<br />

farm<br />

134


SL NO. PROJECT NAME CONTRACT<br />

VALUE QR.<br />

1 (G+6) at Al Muntazah area for Shaikh Hessah Al Thani 1,860,000.00<br />

2 Ma<strong>in</strong>tenance of Electrical works at Industrial Area St.# 24 for 890,000.00<br />

Sh. Nawaf B<strong>in</strong> Jassim Al Thani<br />

3 40 Villas for Sh. Khalid B<strong>in</strong> Nasser Al Thani at Al Waab Area 2,600,000.00<br />

4 Ma<strong>in</strong>tenance of Electrical Works at Industrial area St# 10 for 670,000.00<br />

Mohammad Al Yamay<br />

5 House at Al Matar for Shaikh Abdullah Al Thani 890,000.00<br />

6 3 Floors Build<strong>in</strong>g at Umm Gwail<strong>in</strong>a area for Mr. Mohammad Ali 590,000.00<br />

7 Farm at Umm Baab ( for Sh. Abdullah B<strong>in</strong> Ahmed 510,000.00<br />

8 Villa at Al Azizia for Mr. Ibraheem Sultan Al Hajrry 180,000.00<br />

135


SL NO. NAME OCCUPANCY CONTACT NO .<br />

1 Ahmed Awad G.M 55135599<br />

2 Khaled S. Qassem Projects Manager 66690665<br />

3 Husse<strong>in</strong> Darwish F<strong>in</strong>ance Manager 55546563<br />

4 Mohammad Hamadah Project Site eng<strong>in</strong>eer 55167417<br />

5 Rajab Ali Husse<strong>in</strong>y Site Foreman (Civil) 55325309<br />

6 Khalil Hejab Site Foreman (<strong>Electro</strong>-Mechanical) 55275397<br />

7 Abdullah Abdulnabee Site Foreman (Pa<strong>in</strong>t<strong>in</strong>g) 55707204<br />

8 Fouzul Ameen Driver 55038570<br />

9 Mr. Larry (Q.S/QA) 33653763<br />

10 Samer Mohammad Tech Office Drafts Man 55047815<br />

136


137


138


Head of QA/QC DEP:<br />

A Mechanical Eng<strong>in</strong>eer hav<strong>in</strong>g 20- years experience <strong>in</strong> execut<strong>in</strong>g different types of <strong>mechanical</strong> works.<br />

2005 up-to date<br />

Mechanical Eng<strong>in</strong>eer – Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. Involved <strong>in</strong> supervision of Public Health and<br />

Air-condition<strong>in</strong>g <strong>in</strong>stallation for various build<strong>in</strong>gs at Qatar Armed Forces bases and Camps.<br />

Responsibilities <strong>in</strong>clude development and specifications, <strong>in</strong>spection of Contractor>s work, shop<br />

draw<strong>in</strong>gs submitted byte Contractor and liaison with Architects, Eng<strong>in</strong>eer and Clients.<br />

2002-2005<br />

Mechanical Eng<strong>in</strong>eer – White Young Qatar. Involved <strong>in</strong> supervision of Public Health and Aircondition<strong>in</strong>g<br />

<strong>in</strong>stallation for various build<strong>in</strong>gs at Qatar Armed Forces bases and Camps. Responsibilities<br />

<strong>in</strong>clude development and specifications, <strong>in</strong>spection of Contractor>s work, shop draw<strong>in</strong>gs submitted by<br />

<strong>the</strong> Contractor and liaison with Architects, Eng<strong>in</strong>eer and Clients.<br />

1998-2002<br />

<strong>Electro</strong>-Mechanical Eng<strong>in</strong>eer – Self employed. Involved <strong>in</strong> construction of Residential and Commercial<br />

Build<strong>in</strong>gs.<br />

1996-1998<br />

Public Health Eng<strong>in</strong>eer – Qatar build<strong>in</strong>g Eng. Co. Doha-Qatar. Responsible for supervision for various<br />

build<strong>in</strong>g familiar with tender<strong>in</strong>g works up to submission, Quotations, As-built Draw<strong>in</strong>gs and Preparation<br />

of Operation and Ma<strong>in</strong>tenance Manuals.<br />

1993-1996<br />

Public Health Eng<strong>in</strong>eer – Shannon Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. Supervision of Public Health Installation<br />

for various Build<strong>in</strong>gs, familiar with Tender<strong>in</strong>g Works and Quotations, Swimm<strong>in</strong>g Pool Section <strong>in</strong>charge.<br />

1992-1993<br />

Public Health Eng<strong>in</strong>eer – Marbu Cont. Est. Doha-Qatar. Responsible for supervision of Public Health<br />

<strong>in</strong>stallation for various Build<strong>in</strong>g, familiar with Tender<strong>in</strong>g works and quotations.<br />

1991-1992<br />

139


Public Heath Eng<strong>in</strong>eer – Qatar Eng<strong>in</strong>eer & Associates, Doha-Qatar. Responsible for Supervision of<br />

Public Health Installation for various Build<strong>in</strong>g responsibilities <strong>in</strong>clude Development & Specifications,<br />

Inspections of Contractors works to ensure quality con troll and Workmanship, check<strong>in</strong>g of proposed<br />

Equipment, Shop<br />

Draw<strong>in</strong>gs submitted by <strong>the</strong> Contractor and liaison with Architects, Eng<strong>in</strong>eer and Clients.<br />

1990-1991<br />

Eng<strong>in</strong>eer – QGPC (Onshore Operations) Umm Said, Qatar. Responsible for prepar<strong>in</strong>g requisitions, for<br />

spare parts and records of elements <strong>in</strong> pipes.<br />

1987-1990<br />

Mechanical Eng<strong>in</strong>eer – SEMA <strong>Company</strong>, Doha-Qatar. Involved <strong>in</strong> <strong>the</strong> Design and Installation<br />

Operations of Air-condition<strong>in</strong>g and Refrigeration Systems.<br />

140


Nationality : Filip<strong>in</strong>o<br />

Date of Birth : September 19, 1965<br />

Marital Status : Married<br />

1. Bachelor of science <strong>in</strong> civil Eng<strong>in</strong>eer<strong>in</strong>g from cagayan state university, Philipp<strong>in</strong>es Period<br />

1982 to April 1987<br />

2. Licensed civil Eng<strong>in</strong>eer, from Philipp<strong>in</strong>es <strong>in</strong> <strong>the</strong> period of December 22, 1988<br />

Special Courses and Tra<strong>in</strong><strong>in</strong>g<br />

1. HIGHLY PROFICIENT IN MS EXCEL AND MS WORD<br />

2. MS PROJECT PROGRAMMING & PLANNING<br />

3. BASIC <strong>in</strong> COMPUTER ADD DESIGN (CAD)<br />

4. UNDERPINNING & SOIL NAILING SEMINAR<br />

5. BASIC <strong>in</strong> STRUCTURAL ADD DESIGN (STAAD)<br />

LAND CONVERSION SEMINAR<br />

Name of <strong>Company</strong> / Country : MARINA TRADING & CONTRACTING CO.<br />

W.L.L., P.O. Box: 15534 DOHA, QATAR<br />

Project Specialization : MEP PROJECTS<br />

Position Held : QUANTITY SURVEYOR<br />

Period from: Sep-2009 to Present<br />

� To assess <strong>the</strong> agreement of <strong>the</strong> contract and to be aware of <strong>the</strong> stipulated conditions <strong>the</strong>reon.<br />

� To handle quality assurance and control of <strong>the</strong> runn<strong>in</strong>g projects of <strong>the</strong> company<br />

� To prepare <strong>the</strong> Bill of Quantity of a Tender Project based on draw<strong>in</strong>gs and<br />

141


specifications us<strong>in</strong>g <strong>the</strong> updated unit rates.<br />

� Dialogue with <strong>the</strong> General Manager concern<strong>in</strong>g f<strong>in</strong>alization of Tender BOQ prior to submit.<br />

� To conduct re-quantification of some Runn<strong>in</strong>g Projects of <strong>the</strong> <strong>Company</strong> due to changes of<br />

draw<strong>in</strong>gs and <strong>the</strong>reon agree with proponent for a Variation Order.<br />

� To communicate Eng<strong>in</strong>eer–<strong>in</strong>-charge <strong>in</strong> every Project be<strong>in</strong>g managed by <strong>the</strong> <strong>Company</strong> so to<br />

ga<strong>the</strong>r accomplishment report and evaluate <strong>the</strong>reon.<br />

� To prepare a monthly valuation report of all runn<strong>in</strong>g projects by <strong>the</strong> company.<br />

Name of <strong>Company</strong> / Country : AL-HABTOOR ENGINEERING ENTERPRISES<br />

CO. L.L.C., P.O. Box: 320 Dubai, UAE<br />

Project Specialization : Overall BUILDING CONSTRUCTION<br />

Position Held : QUANTITY SURVEYOR Code # 55731<br />

Period from: 2008 to 2009<br />

� To adm<strong>in</strong>ister all contractual matters perta<strong>in</strong><strong>in</strong>g to <strong>the</strong> Ma<strong>in</strong> Contract & Subcontracts and to keep<br />

<strong>the</strong> Project Manager appraised concern<strong>in</strong>g such contractual matters.<br />

� Measurement and proper settlement of subcontract account <strong>in</strong> accordance with company<br />

procedure and provisions of <strong>the</strong> contract.<br />

� Ensur<strong>in</strong>g timely submission of <strong>in</strong>terim valuations & expedit<strong>in</strong>g timely receipts of certificates and<br />

payments.<br />

� To carry out measurements as per <strong>the</strong> relevant method of measurement under <strong>the</strong> contract where<br />

applicable.<br />

� To identify, quantify and motivate for payment <strong>in</strong> terms of contract all variations between<br />

Tender and Contract documents.<br />

� To prepare <strong>in</strong>itial contract allowable budgets, revised Contract forecast and monthly cost reports.<br />

� To reconcile actual bulk material quantities aga<strong>in</strong>st Tender & Contract documents.<br />

� To participate <strong>in</strong> meet<strong>in</strong>g with Consultant, Subcontractors, etc. <strong>in</strong> pursuance to commercial and<br />

contractual matters.<br />

� To assess ―Risk‖ items <strong>in</strong> BOQ or draw<strong>in</strong>gs and advice or remedial measures.<br />

� To monitor site expenditure and advice on risk areas or cost over-run items.<br />

� To oversee <strong>the</strong> activities of site accountants.<br />

Name of <strong>Company</strong> / Country : M.S.AL-SUWAIDI INDUSTRIAL SERVICE<br />

142


COMPANY LTD, P.O. Box 991, AL-JUBAIL –<br />

31951, K.S.A.<br />

Project Specialization : OPERATION & MAINTENANCE- RIYADH<br />

ARAMCO REFINERY<br />

Position Held : QUANTITY SURVEYOR Code # 55731<br />

Period from: 2007 to 2008<br />

� Prepare quantity surveys for all discipl<strong>in</strong>es so to organize construction ―Progress Monitor<strong>in</strong>g<br />

System‖ for schedule, control and analysis purposes.<br />

� Preparation of budget for each service order issued and monitor, study each package, collect<br />

details, site visits, analyze scope of work aga<strong>in</strong>st <strong>the</strong> actual variation.<br />

� Monitor progress, material delivery and revision of schedule as per new development at site.<br />

� Cost control us<strong>in</strong>g JD Edwards‘s job cost and f<strong>in</strong>ance module.<br />

� Prepare and update <strong>in</strong>voices based on actual accomplishment of ongo<strong>in</strong>g Service Order /<br />

Contract for client evaluation and approval.<br />

� Prepare weekly report, project control sheet and project performance report so to update<br />

management profit status as per budgeted schedule.<br />

� Prepare monthly project review report <strong>in</strong>clud<strong>in</strong>g narrative overview of <strong>the</strong> project graphical<br />

presentation of progress s-curve show<strong>in</strong>g <strong>the</strong> basel<strong>in</strong>e early start/f<strong>in</strong>ish; late start f<strong>in</strong>ish and<br />

superimpos<strong>in</strong>g <strong>the</strong> actual progress <strong>in</strong> order to def<strong>in</strong>e <strong>the</strong> variance.<br />

� Coord<strong>in</strong>ate with proponent concerns on work <strong>in</strong>terfaces between civil work and electro<strong>mechanical</strong><br />

work so to comply with <strong>in</strong>stallation procedures.<br />

� Coord<strong>in</strong>ate with <strong>the</strong> proponent concern<strong>in</strong>g additive and deductive costs <strong>in</strong> certa<strong>in</strong> item of work<br />

that may arise <strong>in</strong> <strong>the</strong> service order be<strong>in</strong>g issued.<br />

� Prepare Payment certificate for every bill<strong>in</strong>g be<strong>in</strong>g requested by <strong>the</strong> subcontractors of <strong>the</strong><br />

company.<br />

Name of <strong>Company</strong> / Country : LCD BUILDERS & CONTRACTOR <strong>in</strong> <strong>the</strong> Metro<br />

Manila and Baguio City, Philipp<strong>in</strong>es<br />

Project : GENERAL CONSTRUCTION e.g. Lump Sum<br />

Contract, Cost Plus Agreement and Labor Cost Projects. Our Group<br />

specializes Medium Structured Build<strong>in</strong>gs, Residential Houses, Doctor‘s<br />

Cl<strong>in</strong>ic and Enhancement of Offices.<br />

Position Held : QUANTITY SURVEYOR Code # 55731<br />

143


Period from: 2005 to 2007<br />

� To look, deal, negotiate and/or participate <strong>in</strong> Bidd<strong>in</strong>g of a proposed project for <strong>the</strong> <strong>Company</strong>.<br />

� To lead <strong>the</strong> preparation of <strong>the</strong> plans, design and specification, survey works and process<strong>in</strong>g of<br />

permits of a new project.<br />

� Responsible for <strong>the</strong> implementation and monitor<strong>in</strong>g of <strong>the</strong> work based on procedures and method of<br />

construction developed by <strong>the</strong> undersigned.<br />

� To coord<strong>in</strong>ate with <strong>the</strong> National Government of concern<strong>in</strong>g limitations of <strong>the</strong> project and Contract<br />

concern.<br />

� To communicate with <strong>the</strong> lead workers <strong>in</strong> different discipl<strong>in</strong>e so to organize <strong>the</strong> workflow def<strong>in</strong><strong>in</strong>g<br />

all work <strong>in</strong>terfaces, plann<strong>in</strong>g preparation, equipment utilization and movements.<br />

� To suggest and recommend more functionality of <strong>the</strong> project should <strong>the</strong> client requires.<br />

� To submit weekly report to <strong>the</strong> Client with correspond<strong>in</strong>g photocopies of <strong>the</strong> project so he/she could<br />

be updated.<br />

� To coord<strong>in</strong>ate with client concerns on schedules, recovery plan and <strong>in</strong>form solution if certa<strong>in</strong> task<br />

has difficulties so to meet <strong>the</strong> milestone of <strong>the</strong> project.<br />

Name of <strong>Company</strong> / Country : LEXBER, INC. – PHILIPPINES<br />

#63 Panay Avenue, Quezon City Philipp<strong>in</strong>es<br />

(SPECIALIZES IN SUBDIVISIONS FOR CONDO UNITS,<br />

ECONOMIC AND SOCIALIZED HOUSING)<br />

Position Held : SITE ENGINEER to SENIOR PROJECT OFFICER<br />

Period from: 1988 to 2004<br />

As Senior Project Officer:<br />

� To lead <strong>the</strong> Project Management Team <strong>in</strong> <strong>the</strong> implementation of <strong>the</strong> work (The Project) be<strong>in</strong>g<br />

prepared by <strong>the</strong> Team itself for strictly monitor<strong>in</strong>g <strong>the</strong> specification, quality assurances and costs.<br />

Stakeholder‘s negotiator and dispute facilitator.<br />

� To organize project procedure and construction method statements<br />

� To preside <strong>the</strong> weekly coord<strong>in</strong>ation meet<strong>in</strong>g with <strong>the</strong> Project Team, Contractors and<br />

Subcontractors so to coord<strong>in</strong>ate proper flow of <strong>the</strong> project and to<br />

144


communicate/counteract status of ongo<strong>in</strong>g works, concerns, variation of plans, schedules and<br />

recommendations.<br />

� To lead <strong>the</strong> preparation of weekly and monthly reports for management review, <strong>in</strong>dicat<strong>in</strong>g<br />

basel<strong>in</strong>e schedule and brief <strong>in</strong>formation concern<strong>in</strong>g update of <strong>the</strong> ongo<strong>in</strong>g projects, recommend<br />

solutions should <strong>the</strong>re be th<strong>in</strong>gs additive nor deductive costs of <strong>the</strong> project.<br />

� To lead <strong>the</strong> twice a week walk thru meet<strong>in</strong>g and supervision with <strong>the</strong> project team so to have an<br />

assurance <strong>in</strong> perform<strong>in</strong>g <strong>the</strong> actual specification <strong>in</strong> every task be<strong>in</strong>g undertaken.<br />

� Attend monthly management meet<strong>in</strong>g with <strong>the</strong> Board of Directors of <strong>the</strong> company and <strong>in</strong>form <strong>the</strong><br />

status and developments of <strong>the</strong> project <strong>in</strong> order to def<strong>in</strong>e <strong>the</strong> issues and concerns.<br />

� To communicate with stakeholder and negotiate disputes should <strong>the</strong>re be th<strong>in</strong>gs to facilitate<br />

arrangement.<br />

As Project Eng<strong>in</strong>eer:<br />

� To coord<strong>in</strong>ate with <strong>the</strong> Project Super<strong>in</strong>tendent of Contract concern<br />

� Monitor safe work<strong>in</strong>g environment for <strong>the</strong> benefit of <strong>the</strong> personnel/workers.<br />

� To monitor sub-contract works for specification and quality compliance.<br />

� To assist estimates as required and execute all technical issue at site.<br />

� To be knowledgeable about all draw<strong>in</strong>gs, data sheets and contract specifications.<br />

� Attend Job explanation meet<strong>in</strong>g and progress meet<strong>in</strong>g with client as required<br />

� To conduct supervision and monitor<strong>in</strong>g of <strong>the</strong> implemented project.<br />

As Site Eng<strong>in</strong>eer / QA/QC Eng<strong>in</strong>eer:<br />

� To monitor and delegate <strong>the</strong> manpower requirements of each item of work <strong>in</strong> <strong>the</strong> project.<br />

� Monitor<strong>in</strong>g <strong>the</strong> implementation of <strong>the</strong> company procedures and to be aware of non conformance<br />

so to implement corrective actions as required.<br />

� To coord<strong>in</strong>ate with <strong>the</strong> client‘s representative on <strong>in</strong>spection and test coverage and obta<strong>in</strong><strong>in</strong>g<br />

necessary approvals.<br />

� Ensure work progress schedule and consumables are <strong>in</strong> control and approval<br />

� Ensur<strong>in</strong>g <strong>the</strong> performance of <strong>in</strong>spection activities on civil jobs.<br />

145


General Objective:<br />

A professional with proven record <strong>in</strong> Civil and <strong>Electro</strong>-Mechanical Eng<strong>in</strong>eer<strong>in</strong>g. Ever ready to face<br />

challenges, very much motivated and enthusiastic and ambitious for work<strong>in</strong>g <strong>in</strong> a high paced<br />

environment. Capable of tak<strong>in</strong>g multiple tasks of technical and managerial nature. A person fully<br />

equipped with all <strong>the</strong> basic computer tools can efficiently work <strong>in</strong> demand<strong>in</strong>g<br />

computer environment. Self - motivated and <strong>in</strong>dependent, yet able to work <strong>in</strong> a medium to large team as<br />

a leader and as a team member; and communicate ideas effectively. Posses a discipl<strong>in</strong>ed, professional<br />

and quality centered approach with strong analytical and problem solv<strong>in</strong>g skills; and able to work under<br />

pressure and <strong>in</strong> a dynamic cross-functional, cross - borders and cross - cultural environment.<br />

146


This outl<strong>in</strong>e method statement describes a proven approach to <strong>the</strong> successful management and control of<br />

activities associated with <strong>the</strong> Mechanical, Electrical and Fire Protection Services.<br />

Separately we describe our proposals and procedures of management from receipt of contract award<br />

Through:<br />

� Draw<strong>in</strong>g production and Operation & Ma<strong>in</strong>tenance Manuals Delivery.<br />

� Plant, equipment and subcontract procurement.<br />

� Quality Assurance and Project Control.<br />

� Relevant construction activity method statements.<br />

� Test<strong>in</strong>g, commission<strong>in</strong>g and handover procedures.<br />

� Site Safety Management.<br />

This methodology demonstrates major project team work<strong>in</strong>g experience to ensure overall project<br />

objectives are achieved.<br />

PROJECT MANAGEMENT CONTROL PROCEDURES.<br />

Project management is a forward-look<strong>in</strong>g activity: one can only <strong>in</strong>fluence or control that which is yet to<br />

Happen. The emphasis <strong>in</strong> Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. is <strong>the</strong>refore on plann<strong>in</strong>g, review, record<strong>in</strong>g<br />

and report<strong>in</strong>g of actual and anticipated progress towards meet<strong>in</strong>g <strong>the</strong> project‘s objectives.<br />

Control is about action plans – Who will do what? By when? And to what standard? And it is about<br />

<strong>in</strong>tervention to get back on course or to f<strong>in</strong>d better alternatives. It is a management behavior, backed up<br />

by well-targeted objectives and rapid <strong>in</strong>formation.<br />

With<strong>in</strong> <strong>the</strong> context of established company procedures, <strong>the</strong> Project Manager is tasked to def<strong>in</strong>e <strong>the</strong><br />

contracts objectives, plan <strong>the</strong> strategy and <strong>in</strong>itiate implementation. The skill of a Project Manager is<br />

multi-faceted, and his grasp must be sufficient to make balanced decisions and to know when to call for<br />

specialist guidance and support. Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. place emphasis on early<br />

identification of difficulties, focus on corrective action to be taken, and forewarn<strong>in</strong>g of <strong>the</strong> consequences<br />

of failure to get <strong>the</strong> project back on track – whe<strong>the</strong>r <strong>the</strong>se difficulties and <strong>the</strong>ir resolution lie with Mar<strong>in</strong>a<br />

Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. or o<strong>the</strong>r parties.<br />

147


148


A plann<strong>in</strong>g / logistics manager will be part of <strong>the</strong> Project Manager Team.<br />

Project Roles:<br />

Plann<strong>in</strong>g/ Logistic<br />

� Assist client and Project Teams effectively, plan, co-ord<strong>in</strong>ate and monitor design and<br />

construction progress<br />

Plann<strong>in</strong>g Procedure<br />

149


Pre Construction method Statement<br />

Immediately follow<strong>in</strong>g contract award our project management team will be established to <strong>in</strong>itiate<br />

project liaison with <strong>the</strong> professional team. Our early <strong>in</strong>volvement is welcomed on all projects to ensure<br />

<strong>the</strong> best production levels are achieved, dur<strong>in</strong>g <strong>the</strong> site construction period. The liaison with <strong>the</strong> site<br />

team is a fundamental necessity for communication prior to any work<strong>in</strong>g activities. Initial activities will<br />

focus on <strong>the</strong> development and submission of:<br />

� A Project Specific Quality Plan<br />

� Project Programmers<br />

� Design and draw<strong>in</strong>g production schedules<br />

� A procurement plan with appropriate submissions<br />

� Details of specialist equipment manufacture and operat<strong>in</strong>g performance<br />

� F<strong>in</strong>alization of construction sequence activities<br />

� A logic l<strong>in</strong>ked cost plan and management procedures<br />

� Detailed draw<strong>in</strong>g development<br />

The Preparation and Content of <strong>the</strong> Project plann<strong>in</strong>g Documents<br />

Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. plann<strong>in</strong>g documents may be strategic, tactical or logistic <strong>in</strong> purpose.<br />

Presentation takes a number of forms, appropriate to <strong>the</strong> type of <strong>the</strong> project and <strong>the</strong> stage of its<br />

execution. Typical form of documents used <strong>in</strong> <strong>the</strong> company re;<br />

� Illustrative sketches<br />

� Network analysis <strong>in</strong> presence from<br />

� Bar charts<br />

� Schedules or matrices of data<br />

Construction program shall be formulated, based upon <strong>the</strong> contractual program as amended by<br />

subsequent <strong>in</strong>struction from <strong>the</strong> Project Manager.<br />

The construction program shall be of <strong>the</strong> ―bar-l<strong>in</strong>e‖ form, supplemented, at <strong>the</strong> discretion of <strong>the</strong> Project<br />

Manager.<br />

The construction program shall conta<strong>in</strong> <strong>the</strong> follow<strong>in</strong>g <strong>in</strong>formation:<br />

150


All key access dates<br />

Availability of scaffold<strong>in</strong>g (if applicable). Permanente statutory services facilitate commission<strong>in</strong>g.<br />

Release of necessary <strong>in</strong>formation<br />

All hold po<strong>in</strong>ts, such as completion of test<strong>in</strong>g, completion of static check<strong>in</strong>g, and completion of clean<strong>in</strong>g<br />

and availability of power, and periods/dates between after and client‘s witness.<br />

A detailed program for <strong>the</strong> full schematics and work<strong>in</strong>g draw<strong>in</strong>gs shall be formulated, based upon <strong>the</strong><br />

construction program. The program shall conta<strong>in</strong> <strong>the</strong> follow<strong>in</strong>g <strong>in</strong>formation:<br />

� Start and f<strong>in</strong>ish dates for each group of draw<strong>in</strong>gs<br />

� Required <strong>in</strong>formation release dates from client<br />

� Required <strong>in</strong>formation dates from supplier<br />

� Client approval dates (and periods) for draw<strong>in</strong>gs<br />

All <strong>the</strong>se shall be <strong>in</strong> accordance with <strong>the</strong> requirements of <strong>the</strong> construction program.<br />

Shortly after an order is received from <strong>the</strong> client, <strong>the</strong> Project Manager shall ensure that a buy<strong>in</strong>g program<br />

is produced. It is a prediction of when orders must be placed <strong>in</strong> order to ensure delivery on <strong>the</strong> program<br />

dates.<br />

This procedure requires <strong>the</strong> list<strong>in</strong>g of all future orders to be placed on suppliers and sub-contractors,<br />

toge<strong>the</strong>r with <strong>the</strong> follow<strong>in</strong>g m<strong>in</strong>imum <strong>in</strong>formation aga<strong>in</strong>st each future order;<br />

� Description of material/sub-contract<br />

� Order can be placed<br />

� Date materials required on site taken from <strong>the</strong> construction program.<br />

The standard proforma ―material Control Chart‖ may be used for <strong>the</strong> Buy<strong>in</strong>g Program. Alternatively, <strong>the</strong><br />

Buy<strong>in</strong>g Plan may be set up on a PMS Phase provid<strong>in</strong>g <strong>the</strong> m<strong>in</strong>imum <strong>in</strong>formation listed under <strong>the</strong> above<br />

bullets.<br />

Once <strong>the</strong> construction program has been agreed, programs will be prepared and issued for <strong>the</strong> major<br />

subcontract elements of <strong>the</strong> works, typically builders work ductwork, control/<strong>in</strong>strumentation and o<strong>the</strong>r<br />

specialist contractors.<br />

The sub-contract programs shall conta<strong>in</strong> <strong>the</strong> follow<strong>in</strong>g <strong>in</strong>formation as applicable;<br />

� Draw<strong>in</strong>g production periods<br />

� Draw<strong>in</strong>g approval periods<br />

� Manufactur<strong>in</strong>g/delivery periods<br />

151


� Installation/erection periods<br />

� Commission<strong>in</strong>g period and handover<br />

As with <strong>the</strong> construction program all ―hold‖ po<strong>in</strong>ts will be <strong>in</strong>dicated.<br />

A commission<strong>in</strong>g programs shall be formulated <strong>in</strong> conjunction with <strong>the</strong> Project Program.<br />

� Key dates shall be given on this program as follows;<br />

� Completion of static checks<br />

� Date for statutory services to be made available<br />

� Sett<strong>in</strong>g to work of each system (<strong>in</strong>itial scans)<br />

� Completion of dynamic checks<br />

� Periods and dates between offer and client‘s witness<br />

� Client tra<strong>in</strong><strong>in</strong>g<br />

A program of manpower levels will be produced to <strong>in</strong>dicate <strong>the</strong> levels of manpower required at each<br />

stage of construction.<br />

At <strong>the</strong> discretion of <strong>the</strong> Project manager, a series of short-term programs may be formulated: ei<strong>the</strong>r for<br />

<strong>the</strong> project as a whole or for smaller sections of <strong>the</strong> work at Foreman level.<br />

Such short-term programs shall be formulated on Mar<strong>in</strong> Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. proforma or similar<br />

type proforma. If, due to <strong>the</strong> complex nature, <strong>the</strong> type of proforma to be used will be to <strong>the</strong> discretion of<br />

<strong>the</strong> Project Manager.<br />

152


Draw<strong>in</strong>g Production Method Statement.<br />

Follow<strong>in</strong>g contract award our Project Manager would review all latest issue specifications and draw<strong>in</strong>gs.<br />

From this <strong>in</strong>formation – and <strong>in</strong> compliance with <strong>the</strong> agreed sequence of construction program – we will<br />

develop and produce a detailed draw<strong>in</strong>g production program. We will discuss and agree <strong>the</strong> detail and<br />

means of document control and data transfer to comply with <strong>the</strong> Project control system.<br />

We shall <strong>in</strong>itiate schedules of <strong>in</strong>formation required and <strong>in</strong>corporate updated detail to <strong>the</strong> co-ord<strong>in</strong>ate<br />

construction issue build<strong>in</strong>g services draw<strong>in</strong>gs we submit for approval <strong>the</strong>n issue for construction.<br />

Multi-service co-ord<strong>in</strong>ate draw<strong>in</strong>gs will be produced, detail<strong>in</strong>g builders work associated activities and<br />

all Mechanical & Electrical <strong>in</strong>terfaces.<br />

All draw<strong>in</strong>gs shall be numbered consecutively and <strong>the</strong> number<strong>in</strong>g system shall be <strong>in</strong> accordance with <strong>the</strong><br />

draw<strong>in</strong>g production and standard section of prelim<strong>in</strong>aries and general conditions.<br />

The earliest of design <strong>in</strong>formation and details is essential to allow <strong>the</strong> draw<strong>in</strong>g process to more forward<br />

<strong>in</strong> l<strong>in</strong>e with <strong>the</strong> project program.<br />

It will be important to allow <strong>in</strong> <strong>the</strong> pre construction period adequate time for <strong>the</strong> detailed draw<strong>in</strong>g<br />

program and development.<br />

153


154


Procurement Method Statement.<br />

In conjunction with design and development and project plann<strong>in</strong>g activities we will liase with all<br />

nom<strong>in</strong>ated suppliers and sub-traders and structure <strong>the</strong> supplier cha<strong>in</strong>.<br />

This progress <strong>in</strong>itiates <strong>the</strong> development of a draft Procurement Plan – logic l<strong>in</strong>ked to <strong>the</strong> sequence and<br />

detail of <strong>the</strong> construction program. The plan will be submitted for client comment and approval.<br />

The plan will be supported by relevant schedules and technical submission which will <strong>in</strong>dicate:<br />

� Critical path dates for client approval<br />

� Drop dead dates for confirmation of <strong>in</strong>structions<br />

� Equipment/systems manufactur<strong>in</strong>g and <strong>in</strong>stall<strong>in</strong>g periods to suit area access/availability<br />

� Works <strong>in</strong>spection/test dates for Eng<strong>in</strong>eer‘s attendance<br />

� Prefabrication activities<br />

� Commission<strong>in</strong>g liaison and attendances with <strong>the</strong> Ma<strong>in</strong>tenance and Commission<strong>in</strong>g Personnel<br />

We will effectively monitor progress aga<strong>in</strong>st <strong>the</strong> plan, mak<strong>in</strong>g factory visit when necessary and arrange<br />

regular progress meet<strong>in</strong>g/discussions with key suppliers of plant and specialist trades.<br />

155


156


Quality Assurance & Quality Control Procedures.<br />

It is our policy to provide services and goods, which meet <strong>the</strong> agreed contractual specifications and<br />

quality standers def<strong>in</strong>ed by <strong>the</strong> customer.<br />

To this end, every contract is required:<br />

� To ma<strong>in</strong>ta<strong>in</strong> a staff able to <strong>in</strong>terpret, clarify and conform to <strong>the</strong> clients requirements<br />

� To ensure, by proper selection and exam<strong>in</strong>ation, that goods supplied and/or <strong>in</strong>corporated are<br />

suitable and safe to operate<br />

� To make sure that <strong>the</strong> goods and systems are <strong>in</strong>stalled <strong>in</strong> a satisfactory manner<br />

� To commission completed systems so that <strong>the</strong>ir operation and ma<strong>in</strong>tenance is facilitated<br />

� I so required by <strong>the</strong> build<strong>in</strong>g owner, to ensure that <strong>the</strong> completed and commissioned systems are<br />

on a regular and systematic basis<br />

Fur<strong>the</strong>rmore, once we are accredited a QA system <strong>in</strong> compliance with ISO 9002 & 9003 (Mar<strong>in</strong>a<br />

accredited and we follow <strong>the</strong>se procedures <strong>in</strong> carry<strong>in</strong>g out our operations):<br />

� To observe <strong>the</strong> Quality Assurance Manual and Procedures and/or <strong>the</strong> QA plan agreed and<br />

specific to a project<br />

� To plan, control and document, <strong>in</strong> a systematic manner, those procedures necessary to provide<br />

<strong>the</strong> specified level of Quality Assurance<br />

� To ma<strong>in</strong>ta<strong>in</strong> such records as will substantiate <strong>the</strong> Quality Assurance applied throughout each<br />

project undertaken<br />

� Demonstration and certification where required<br />

In addition, ISO 9001 undertak<strong>in</strong>g a design responsibility is required:<br />

� To determ<strong>in</strong>e and def<strong>in</strong>e <strong>the</strong> design <strong>in</strong>tent and performance standards<br />

� To derive and record system design criteria and data <strong>in</strong> such a manner that <strong>the</strong>y can, and will, be<br />

Checked with<strong>in</strong> <strong>the</strong> <strong>Company</strong> and can be <strong>in</strong>dependently checked by outside nom<strong>in</strong>ees<br />

� To convey appropriate system design parameters to those responsible for purchas<strong>in</strong>g,<br />

157


<strong>in</strong>stall<strong>in</strong>g,<br />

Commission<strong>in</strong>g and ma<strong>in</strong>ta<strong>in</strong> <strong>the</strong> equipment or systems concerned<br />

As part of Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. cont<strong>in</strong>u<strong>in</strong>g program of quality Assurance we strive to<br />

achieve Zero Defects <strong>in</strong> our <strong>in</strong>stallations and services <strong>in</strong> partnership with our clients.<br />

For such standards to be achieved, it is necessary for all parties to <strong>the</strong> contract to be actively <strong>in</strong>volved <strong>in</strong><br />

a team approach with <strong>the</strong> spirit of co-operation to recognize and implement <strong>the</strong> standards outl<strong>in</strong>ed with<strong>in</strong><br />

<strong>the</strong> contract documents from <strong>in</strong>ception to completion.<br />

Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. undertakes to promote cont<strong>in</strong>ual professional development of our<br />

project management employees and sub-contractors to ensure an appropriate level of experience is<br />

matched to <strong>the</strong> challenge of each particular project.<br />

To facilitate Zero Defects Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. toge<strong>the</strong>r with its clients, will jo<strong>in</strong>tly<br />

undertake <strong>the</strong> follow<strong>in</strong>gs:<br />

� Def<strong>in</strong>e <strong>the</strong> scope<br />

� Plan<br />

� Program<br />

� Review <strong>the</strong> build ability<br />

� Set and agree <strong>the</strong> standards<br />

� Breed a culture of care<br />

� Cont<strong>in</strong>uous monitor<strong>in</strong>g of:<br />

� Procurement<br />

� Installation<br />

� Commission<strong>in</strong>g<br />

� Implement ―De-snag to Zero Defects‖<br />

�<br />

This is a policy of cont<strong>in</strong>uous development designed to enhance <strong>the</strong> product we deliver to <strong>the</strong> mutual<br />

benefit of our clients and <strong>the</strong> Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. <strong>in</strong> its desire for long-term relationships<br />

and repeat bus<strong>in</strong>ess.<br />

158


Construction Method Statement.<br />

On time completion of <strong>the</strong> <strong>mechanical</strong>, electrical and public health build<strong>in</strong>g services <strong>in</strong>stallation<br />

will be achieved if three key issues are addressed:<br />

� Skilled Human Resource is dedicated to <strong>the</strong> works with good project team communication<br />

� Material is available just <strong>in</strong> time to meet required production rates <strong>in</strong> l<strong>in</strong>e with <strong>the</strong> construction<br />

program<br />

� Early liaison to develop f<strong>in</strong>al design solution, <strong>in</strong> <strong>the</strong> weeks programm<strong>in</strong>g stage, to ensure<br />

adequate manufactur<strong>in</strong>g and prefabrication periods are available. This will facilitate a structured<br />

delivery and <strong>in</strong>stallation sequence to be set-up to prevent ―bottle-neck‖ <strong>in</strong> <strong>the</strong> construction<br />

process.<br />

MARINA TRADING & CONTRACTING CO. can and will provide:<br />

A dedicated project team, <strong>the</strong> right team with <strong>the</strong> right attitude, embrac<strong>in</strong>g key staff from <strong>the</strong> specialist<br />

sub trace organizations that form part of an <strong>in</strong>tegrated supplier cha<strong>in</strong>.<br />

The skills and project management experience <strong>in</strong>herent <strong>in</strong> an organization familiar with Qatar projects.<br />

A proven ability to collaborate with <strong>the</strong> client teams and pr<strong>in</strong>cipal equipment suppliers and develop<br />

logical plans to sequence construction activates.<br />

To be aware of <strong>the</strong> client‘s and <strong>the</strong> user‘s needs and operation procedures.<br />

In accordance with <strong>the</strong> mutual agreed program.<br />

159


Effective plann<strong>in</strong>g and co-operation are vital to achiev<strong>in</strong>g <strong>the</strong> construction program. We will setup<br />

a team as necessary but may <strong>in</strong>clude:<br />

� A Project Manager<br />

� Project Eng<strong>in</strong>eers<br />

� Trade Foreman<br />

� Supervisors.<br />

Each team will be supported by a core group <strong>in</strong>clud<strong>in</strong>g:<br />

� Design and eng<strong>in</strong>eer<strong>in</strong>g staff<br />

� CAD Eng<strong>in</strong>eers<br />

� Site wide Safety Team<br />

� Planners<br />

� Document Control and Secretarial Staff<br />

� Commission<strong>in</strong>g Eng<strong>in</strong>eers<br />

� Quantity Surveyors<br />

�<br />

Progress will be proactively monitored aga<strong>in</strong>st <strong>the</strong> various programs to identity potential problems- and<br />

implement solutions- to ma<strong>in</strong>ta<strong>in</strong> efficient progress.<br />

The actual sequence of <strong>in</strong>stallations will be determ<strong>in</strong>ed by our team <strong>in</strong> collaboration with <strong>the</strong> Ma<strong>in</strong><br />

Contractor and <strong>the</strong> Professional team, o<strong>the</strong>r Trade Contractors and <strong>the</strong> master program.<br />

We are committed to improv<strong>in</strong>g health and Safety and Welfare at work <strong>in</strong> <strong>the</strong> Construction <strong>in</strong>dustry.<br />

Our site team has all been tra<strong>in</strong>ed <strong>in</strong> safety on construction sites and <strong>the</strong> management of safe work<strong>in</strong>g<br />

practices.<br />

Our Eng<strong>in</strong>eers will organize delivery of plant and materials to site – <strong>in</strong> consultation with <strong>the</strong> Ma<strong>in</strong><br />

Contractor – to suit area/access availability as and when <strong>the</strong>y can be <strong>in</strong>corporated <strong>in</strong>to <strong>the</strong> works.<br />

Best possible practices will be employed and a specialist sub-contractor to delivery large items of plant<br />

safely.<br />

Good communication and notification methods will be essential <strong>in</strong> controll<strong>in</strong>g all deliveries<br />

PREFABRICATIONS/STANDARDIZATION OF COMPONENT AND SUB ASSEMBLIES<br />

We will prefabricate as much a of <strong>the</strong> services <strong>in</strong>stallation as practical <strong>in</strong> standardized components<br />

to:<br />

160


� Reduce to a m<strong>in</strong>imum <strong>the</strong> need for site storage.<br />

� Reduce our site labor force.<br />

� Maximize <strong>the</strong> quality of f<strong>in</strong>ished works.<br />

161


Prefabrication/Pre-assembly of Plant and Systems would <strong>in</strong>clude:<br />

� Pipe work for Plant rooms<br />

162


� Pipe work for Risers<br />

� Repetitive pipe work systems<br />

� Ductwork pieces<br />

� Common support bracket try systems<br />

� Module construction and system arrangements<br />

� Standardized equipment<br />

All clearly labeled floor-by-floor and/or system-by-system.<br />

163


Follow<strong>in</strong>g contract award throughout <strong>the</strong> period of design development and <strong>the</strong>reafter, we will be<br />

responsible for supervis<strong>in</strong>g all services commission<strong>in</strong>g and test<strong>in</strong>g activities.<br />

We will lease with <strong>the</strong> clients team, <strong>the</strong> commission<strong>in</strong>g Eng<strong>in</strong>eer and co-ord<strong>in</strong>ate <strong>the</strong> activities of our<br />

suppliers and specialist sub traders test and commission<strong>in</strong>g personnel.<br />

Their early <strong>in</strong>volvement will ensure:<br />

� Work<strong>in</strong>g schemes take full account of test and commission<strong>in</strong>g requirements, m<strong>in</strong>imiz<strong>in</strong>g second<br />

fix access requirements and maximiz<strong>in</strong>g ma<strong>in</strong>ta<strong>in</strong>ability.<br />

� The seamless <strong>in</strong>terface between <strong>the</strong> various M&E systems<br />

� Plant and equipment orders <strong>in</strong>corporate test and commission<strong>in</strong>g requirements<br />

� Ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g exist<strong>in</strong>g systems where appropriate without disruption to <strong>the</strong> occupants<br />

We will assist draft<strong>in</strong>g relevant sections of <strong>the</strong> commission<strong>in</strong>g Quality Plan and <strong>the</strong> be responsible for<br />

<strong>the</strong> production of a detailed Test & Commission<strong>in</strong>g Program to <strong>in</strong>tegrate all aspects of our works with<strong>in</strong><br />

<strong>the</strong> overall project program.<br />

We will lease with Manufacturer/Supplier personnel and advise on <strong>the</strong> system completion<br />

priorities to achieve commission<strong>in</strong>g program requirements. They will <strong>in</strong>put to <strong>the</strong> preparation of:<br />

� Relevant Method Statements cover<strong>in</strong>g delivery, offload<strong>in</strong>g, position<strong>in</strong>g and <strong>in</strong>stallation of plant<br />

and services, commission<strong>in</strong>g checks, ma<strong>in</strong> and sub ma<strong>in</strong> power on tests<br />

� Test and Commission<strong>in</strong>g record preparation<br />

� Demonstration and Handover procedures<br />

� Operation and Ma<strong>in</strong>tenance documents and Manuals<br />

� Client Tra<strong>in</strong><strong>in</strong>g programs<br />

164


165


Mar<strong>in</strong>a Trad<strong>in</strong>g & Contract<strong>in</strong>g Co. is fully appreciative of <strong>the</strong> importance of provid<strong>in</strong>g O & M<br />

documentation and record draw<strong>in</strong>gs to co<strong>in</strong>cide with <strong>the</strong> handover of <strong>the</strong> project.<br />

Depend<strong>in</strong>g on <strong>the</strong> size and how complicated <strong>the</strong> project is we would ei<strong>the</strong>r prepare <strong>the</strong>m <strong>in</strong>-house or<br />

subcontract to a specialist organization. The process of accumulat<strong>in</strong>g <strong>in</strong>formation and wir<strong>in</strong>g diagrams<br />

specific to <strong>the</strong> plant and equipment to be <strong>in</strong>stalled on <strong>the</strong> project is <strong>in</strong>itiated at <strong>the</strong> time of order. At <strong>the</strong><br />

same time <strong>the</strong> draft manual can be prepared based on <strong>the</strong> specification and draw<strong>in</strong>gs and amended<br />

ongo<strong>in</strong>g dur<strong>in</strong>g <strong>the</strong> project to reflect variations to <strong>the</strong> <strong>in</strong>stallation, omissions and additions.<br />

A parallel exercise is carried out with prepar<strong>in</strong>g record draw<strong>in</strong>gs, a set of work<strong>in</strong>g draw<strong>in</strong>gs are reta<strong>in</strong>ed<br />

<strong>in</strong> isolation to <strong>the</strong> draw<strong>in</strong>gs used for <strong>in</strong>stallation, <strong>the</strong>se draw<strong>in</strong>gs reflect variations to <strong>the</strong> <strong>in</strong>stallation and<br />

as areas of <strong>the</strong> build<strong>in</strong>g are completed <strong>the</strong> relevant draw<strong>in</strong>gs are amended and recorded as <strong>in</strong>stalled<br />

draw<strong>in</strong>gs.<br />

The process is cont<strong>in</strong>ual throughout <strong>the</strong> life of <strong>the</strong> project with key dates identified on <strong>the</strong> program<br />

identify<strong>in</strong>g latest <strong>in</strong>formation to be available from suppliers/manufacturers, access to completed areas to<br />

record serial numbers and <strong>in</strong>formation from plant and equipment, issue of draft manual for comments<br />

and/or approval. The only section that con not be <strong>in</strong>corporated until completion of <strong>the</strong> project are <strong>the</strong><br />

commission<strong>in</strong>g data sheets, we would lease closely with our commission<strong>in</strong>g of <strong>the</strong> project and<br />

preparation of <strong>the</strong> result for <strong>in</strong>corporation <strong>in</strong>to <strong>the</strong> manuals.<br />

166


167


168


Office Build<strong>in</strong>g 2B + G + 14 – Old Salata area – Al saliah Tower<br />

`<br />

169


Office Build<strong>in</strong>g 2B + G + 14 – Salata area – Al Attiyah Tower<br />

170


Al Baker Tower (3B + G + 53 / 3B + G + 45)<br />

171


QIB Hotel (2B + G + M + 7)<br />

172


Panasonic Showroom & Residential Build<strong>in</strong>g (2B + G + M + 10 Floors)<br />

173


Commercial Build<strong>in</strong>g A (B + G + M + 1) at Markhia area<br />

174


Commercial Build<strong>in</strong>g B (B + G + M + 1) at Markhia area<br />

175


(G + 1) Crim<strong>in</strong>al Evidence & Info. Dept. Build<strong>in</strong>g (M<strong>in</strong>istry of Interior)<br />

Salwa Road<br />

176


B + G + 6 + P.H (Mechanical floors at Salata area)<br />

177


Al A<strong>in</strong> Hotel (2B + G + 14 + P.H) at old Salata<br />

178


(2B + G + M + 14 + P.H) at Najma Area<br />

179


(2B + G + M + 7) at Najma Area<br />

180


52 Villas + Club House + Adm<strong>in</strong>istration + Mosque – Al – Waab are<br />

181


40 Villas + Club House + Adm<strong>in</strong>istration Build<strong>in</strong>g – Al Waab area<br />

182


Mosque G + M + Imam Accommodation – Salata area<br />

183


150 Villas + 39 Apartment Build<strong>in</strong>gs at Al Rayyan<br />

184


150 Villas + 39 Apartment Build<strong>in</strong>gs at Al Rayyan<br />

185


150 Villas + 39 Apartment Build<strong>in</strong>gs at Al Rayyan<br />

186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!