07.03.2017 Views

pdfjoiner

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

For ‘in-house’ departments, quality manuals which document<br />

operating policies and procedures need to be verified. These<br />

will cover not only existing activities such as purchasing, repair<br />

and pre-planned maintenance but also other activities such as<br />

document control, corrective action and quality records.<br />

If ‘in-house’ maintenance is chosen, enough time and money<br />

must be allocated for training of technicians to a level<br />

equivalent to that of the supplier so that they are able to provide<br />

a high-quality, safe service. Regular on-going training provided<br />

by the supplier should be the norm.<br />

10.5 Spares<br />

Suppliers have a responsibility to provide spares for seven years<br />

after delivery of the last example of a particular model.<br />

The responsibility for obsolete devices more than seven years<br />

old is that of the Trust, and the need for insurance should be<br />

assessed and acted upon.<br />

10.6 Modifications<br />

If a modification is undertaken on a CE marked device, other<br />

than by the manufacturer, then responsibility for the safety and<br />

liability for the modification changes to the organisation that<br />

has completed the modification. One particular example is if a<br />

device labelled as single-use is reprocessed for further use.<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!