11.12.2012 Views

Basic Information about the European Directive 93/42/EEC on ...

Basic Information about the European Directive 93/42/EEC on ...

Basic Information about the European Directive 93/42/EEC on ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

III. Specific mdc-certificati<strong>on</strong> process<br />

<str<strong>on</strong>g>Basic</str<strong>on</strong>g> <str<strong>on</strong>g>Informati<strong>on</strong></str<strong>on</strong>g> MDD <str<strong>on</strong>g>93</str<strong>on</strong>g>/<str<strong>on</strong>g>42</str<strong>on</strong>g>/<str<strong>on</strong>g>EEC</str<strong>on</strong>g><br />

mdc divides <str<strong>on</strong>g>the</str<strong>on</strong>g> steps to obtain a certificati<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> following four phases:<br />

Phase 1: <str<strong>on</strong>g>Informati<strong>on</strong></str<strong>on</strong>g> / Preparati<strong>on</strong><br />

Phase 1<br />

<str<strong>on</strong>g>Informati<strong>on</strong></str<strong>on</strong>g> / Preparati<strong>on</strong><br />

Phase 2<br />

Assessment<br />

Phase 3<br />

Certificati<strong>on</strong><br />

Phase 4<br />

Surveillance<br />

Every project can <strong>on</strong>ly be as good as it is prepared. Therefore an exchange of informati<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

manufacturer and <str<strong>on</strong>g>the</str<strong>on</strong>g> notified body at an early stage is required. mdc always asks manufacturers to fill<br />

in a short questi<strong>on</strong>naire (see <str<strong>on</strong>g>the</str<strong>on</strong>g> last secti<strong>on</strong> of this brochure), which asks for data <str<strong>on</strong>g>about</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />

and products. On <str<strong>on</strong>g>the</str<strong>on</strong>g> basis of this questi<strong>on</strong>naire and some accompanying informati<strong>on</strong> mdc is usually<br />

enabled to provide a detailed tailored proposal with respect to time and costs for <str<strong>on</strong>g>the</str<strong>on</strong>g> whole process. In<br />

additi<strong>on</strong> mdc c<strong>on</strong>siders a pers<strong>on</strong>al meeting always as useful. In such a meeting questi<strong>on</strong>s like<br />

classificati<strong>on</strong>, selecti<strong>on</strong> of a suitable c<strong>on</strong>formity assessment procedure can be treated and discussi<strong>on</strong>s<br />

<str<strong>on</strong>g>about</str<strong>on</strong>g> involved organizati<strong>on</strong>al and technical issues may facilitate a smooth fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r certificati<strong>on</strong> process.<br />

With <str<strong>on</strong>g>the</str<strong>on</strong>g> applicati<strong>on</strong> of <str<strong>on</strong>g>the</str<strong>on</strong>g> manufacturer <str<strong>on</strong>g>the</str<strong>on</strong>g> certificati<strong>on</strong> process starts.<br />

Phase 2: Assessment<br />

To initiate <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment phase mdc proposes <str<strong>on</strong>g>the</str<strong>on</strong>g> audit team to <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant. The documentati<strong>on</strong> is<br />

assessed by <str<strong>on</strong>g>the</str<strong>on</strong>g> proposed auditors and/or experts. In cases of quality system certificati<strong>on</strong>s an audit is<br />

always performed at <str<strong>on</strong>g>the</str<strong>on</strong>g> manufacturer’s premises and if required at <str<strong>on</strong>g>the</str<strong>on</strong>g> premises of his subc<strong>on</strong>tractors.<br />

The audit follows an audit schedule, which is agreed up<strong>on</strong> in advance with <str<strong>on</strong>g>the</str<strong>on</strong>g> manufacturer. The<br />

results of <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment activities are reported in writing and <str<strong>on</strong>g>the</str<strong>on</strong>g> performance of necessary corrective<br />

acti<strong>on</strong>s is verified through a follow-up assessment.<br />

Phase 3: Certificati<strong>on</strong><br />

After completi<strong>on</strong> of <str<strong>on</strong>g>the</str<strong>on</strong>g> assessment <str<strong>on</strong>g>the</str<strong>on</strong>g> reports are handed over to mdc’s certificati<strong>on</strong> board. This board<br />

reviews <str<strong>on</strong>g>the</str<strong>on</strong>g> results and verifies that <str<strong>on</strong>g>the</str<strong>on</strong>g> certificati<strong>on</strong> process so far meets <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements. If <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

certificati<strong>on</strong> board can c<strong>on</strong>firm compliance with <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements a certificate will be issued. In case of<br />

a rejecti<strong>on</strong> mdc informs <str<strong>on</strong>g>the</str<strong>on</strong>g> applicant <str<strong>on</strong>g>about</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong>s for getting <str<strong>on</strong>g>the</str<strong>on</strong>g> certificate. The validity of<br />

certificates according to <str<strong>on</strong>g>the</str<strong>on</strong>g> MDD is usually for a period of 5 years.<br />

040100/6 Page 16 of 20 © mdc / 2009-11-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!