22.02.2017 Views

go_e03_grader_h2.xlsx (answer)

GO! ECH03 H2 - Forecast 2.2

GO! ECH03 H2 - Forecast 2.2

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Buy here:<br />

http://homework.plus/products.php?product=<strong>go</strong>_<strong>e03</strong>_gr<br />

ader_<strong>h2.xlsx</strong>-%28<strong>answer</strong>%29<br />

GO! ECH03 H2 - Forecast 2.2<br />

Project Description:<br />

In the following project, you will edit a worksheet that will be used to prepare a five-year<br />

forecast of the costs associated with street maintenance.<br />

Instructions:<br />

For the purpose of grading the project you are required to perform the following tasks:<br />

Step Instructions Points<br />

Possible<br />

1 Start Excel. Download and open the file<br />

0.000<br />

named​<strong>go</strong>_<strong>e03</strong>_<strong>grader</strong>_<strong>h2.xlsx</strong>.


2 Change the Theme Colors to Paper. In cell A1 type ​City<br />

4.000<br />

of Pacifica Bay ​and then Merge & Center the title<br />

across columns A:F. Apply the Title cell style.<br />

3 In cell A2, type ​Street Maintenance Costs 2012 to<br />

4.000<br />

2016 ​and then Merge & Center the subtitle across<br />

columns A:F. Apply the Heading 1 cell style.<br />

4 In the range B4:F4, fill the year range with the values<br />

6.000<br />

2012 through 2016. Type ​Annual Street Costs ​in cell<br />

A5 and type​Percent Increase ​in cell A6.<br />

5 Change the width of column A to 20.00 (145 Pixels),<br />

10.000<br />

and then change the width of columns B:F to 11.00 (82<br />

Pixels). Type the following values in the indicated cells.<br />

B5: ​2194374<br />

C5: ​2438156


D5: ​2497489<br />

E5: ​2614252<br />

F5: ​2716008<br />

6 Apply the Currency [0] cell style to the values in B5:F5.<br />

6.000<br />

Apply the Heading 1 cell style to the years and apply the<br />

Heading 4 cell style to the range A5:A6.<br />

7 In cell C6, construct a formula to calculate the percent of<br />

10.000<br />

increase in annual street maintenance costs from 2012<br />

to 2013. Format the result with the Percent Style and<br />

then fill the formula through cell F6 to calculate the<br />

percent of increase in each year.<br />

8 In cell A8, type ​Projected Street Maintenance Costs<br />

4.000<br />

and then use Format Painter to copy the formatting from<br />

cell A2 to cell A8. Type ​Projected Increase ​in cell A10,<br />

and then type​Year ​in cell A12.


9 In cell A13, type ​Projected Costs ​and then in the range<br />

6.000<br />

B12:F12, use the fill handle to enter the years 2016<br />

through 2020. Apply Bold to the years. Copy cell F5 and<br />

paste to cell B13. Type ​6% ​in cell B10.<br />

10 To the range A10:B10, apply Bold and Italic. 4.000<br />

11 In cell C13, construct a formula to calculate the annual<br />

6.000<br />

projected street maintenance costs for the year 2017<br />

after the projected increase of 6% (stored in cell B10) is<br />

applied. Fill the formula through cell F13, and then use<br />

Format Painter to copy the formatting from cell B13 to<br />

the range C13:F13.<br />

12 In cell A15, type ​Projected Estimates 2016 to 2020<br />

6.000<br />

and then use Format Painter to copy the format from<br />

cell A8 to cell A15. In cells A17:A19, type the following<br />

row titles:<br />

Year


6% Increase<br />

4% Increase<br />

13 Copy the range B12:F12, and then Paste the selection<br />

10.000<br />

to B17:F17. Copy the range B13:F13 and then paste the<br />

Values & Number Formatting to the range B18:F18.<br />

Complete the Projected Estimates section of the<br />

worksheet by changing the Projected Increase in B10 to<br />

4% ​and then copying the range B13:F13 and pasting<br />

the Values & Number Formatting to B19:F19.<br />

14 Select rows 8:24, and then insert the same number of<br />

10.000<br />

blank rows as you selected (17 rows). Clear Formatting<br />

from the inserted rows. By using the data in A4:F5,<br />

insert a Line with Markers chart in the worksheet. Move<br />

the chart so that its upper right corner is positioned in<br />

cell F9.


15 Format the Bounds of the Vertical (Value) Axis so that<br />

4.000<br />

the Minimum is ​2000000 ​and the Major unit is at<br />

200000.<br />

16 Format the Fill of the Chart Area with a Texture fill by<br />

6.000<br />

applying the Parchment texture—in the third row, the<br />

fifth texture. Format the Border of the Chart Area by<br />

applying a Solid line using Olive Green, Accent 1,<br />

Darker 50%—in the fifth column, the last color. Change<br />

the Width of the border to 2. Format the Plot Area with a<br />

Solid fill using White, Background 1—in the first column,<br />

the first color.<br />

17 Click cell A1 to deselect the chart. From the Page Setup<br />

4.000<br />

dialog box, center the worksheet Horizontally. Insert a<br />

custom footer in the left section with the file name.<br />

18 Save and close the workbook. Exit Excel. Submit the file<br />

0.000<br />

as directed.


Total Points 100.00<br />

0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!