21.02.2017 Views

OPS 571 Final Exam 2016 Answers Free for Operation Management

you don't have OPS 571 Final Exam correct study material for learning? Get online tutorials and class assignment on university of phoenix education portal studentwhiz for your preparation.

you don't have OPS 571 Final Exam correct study material for learning? Get online tutorials and class assignment on university of phoenix education portal studentwhiz for your preparation.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

http://www.studentwhiz.com<br />

Q15. Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is<br />

considered as which one of the following planning horizons?<br />

1. Long range<br />

2. Current<br />

3. Short range<br />

4. Intermediate range<br />

Q16. You want to determine the upper control line <strong>for</strong> a p-chart <strong>for</strong> quality control purposes. You take several samples of<br />

a size of 100 items in your production process. From the samples, you determine the fraction defective is 0.05 and the<br />

standard deviation is 0.01. If the desired confidence level is 99.7 percent, which of the following is the resulting UCL value<br />

<strong>for</strong> the line?<br />

1. 0.39<br />

2. 0.06<br />

3. 0.08<br />

4. 0.05