OPS 571 Final Exam 2016 Answers Free for Operation Management

you don't have OPS 571 Final Exam correct study material for learning? Get online tutorials and class assignment on university of phoenix education portal studentwhiz for your preparation.

you don't have OPS 571 Final Exam correct study material for learning? Get online tutorials and class assignment on university of phoenix education portal studentwhiz for your preparation.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>OPS</strong> <strong>571</strong> <strong>Final</strong> <strong>Exam</strong><br />

Greatest tutorial portal and best service. My<br />

experience was very nice with this portal and<br />

community team.<br />

Julian wegi<br />

http://www.studentwhiz.com


http://www.studentwhiz.com<br />

If you are UOP students and you want to have best study material <strong>for</strong> <strong>OPS</strong> <strong>571</strong><br />

<strong>Final</strong> <strong>Exam</strong> Studentwhiz is the trump education portal <strong>for</strong> university of phoenix<br />

students in the united states. We offer university of phoenix all courses complete<br />

solution and final exams questions and answers.<br />

http://www.studentwhiz.com/online-education/ops-<strong>571</strong>-final-exam.html


http://www.studentwhiz.com<br />

Q1. A major competitive dimension that <strong>for</strong>ms a company's strategic operational competitive position in their strategic<br />

planning is which of the following?<br />

1. Cost or price<br />

2. Focus<br />

3. Straddling<br />

4. Automation<br />

Q2. In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected<br />

demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is<br />

5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?<br />

1. 27<br />

2. 20<br />

3. 5<br />

4. 30<br />

Q3. Which of the following is a multifactor measure of productivity?<br />

1. Output/(Labor + Capital + Energy)<br />

2. Output/All resources used<br />

3. Output/(Materials)<br />

4. Output/Input


http://www.studentwhiz.com<br />

Q4. Which of the following is an alternative possible service encounter included in the service-system design matrix?<br />

1. Internet<br />

2. Automated teller (ATM)<br />

3. Face-to-face distance<br />

4. Questionnaire response<br />

Q5. In development of an operations and supply chain strategy, which of the following may be an important productspecific<br />

criteria to consider?<br />

1. Learning curve<br />

2. Supplier after-sale support<br />

3. Production lot size<br />

4. Focus<br />

6. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling <strong>for</strong> optimized production technology?<br />

1. An hour lost at a bottleneck saves an hour <strong>for</strong> the entire system<br />

2. Do not allow bottlenecks to govern the flow of the line<br />

3. Utilization and activation of a resource are not the same<br />

4. Balance the capacities, not the flows


Q7. You have just been assigned to oversee a series of projects. Functional areas will loan you personnel <strong>for</strong> each project,<br />

and separate project managers will be responsible <strong>for</strong> separate projects. These project managers will report to you. Which<br />

project management structure is being used?<br />

1. Matrix project<br />

2. Pure project<br />

3. Functional project<br />

4. Task <strong>for</strong>ce<br />

http://www.studentwhiz.com<br />

Q8. Which of the following is a reason that firms must develop more new products than ever?<br />

1. Commitments to joint venture partners<br />

2. Product life cycles are shorter<br />

3. They are replacing old customers with new ones<br />

4. To amortize heavy investments in development labs<br />

Q9. We would expect to see which of the following in an MRP system's inventory status file?<br />

1. End items produced<br />

2. Late/early delivery records<br />

3. Labor efficiency<br />

4. Scrap parts


when I used Studentwhiz education portal my experience was very<br />

good. its really very effective and interesting portal. Its provide all<br />

course study material an minimal price.<br />

Jane finch<br />

Marks can make a great difference to life. Click here <strong>for</strong> some<br />

magical deals.<br />

http://www.studentwhiz.com


http://www.studentwhiz.com<br />

Q10. The centroid method <strong>for</strong> plant location uses which of the following data?<br />

1. Inbound transportation costs<br />

2. Volume of goods to be shipped between existing points<br />

3. Transport times between facilities<br />

4. Correlation matrix of existing facilities<br />

Q11. The Pareto principle is best applied to which of the following inventory systems?<br />

1. EOQ<br />

2. Fixed-time-period<br />

3. Fixed-order quantity<br />

4. ABC classification<br />

Q12. A company can produce a small lot of products the first time at a cost of $2,000. If their 85 percent learning curve<br />

allows them to reduce their costs on each lot, what is the total cost of producing 5 lots?<br />

1. $8,062.00<br />

2. $4,031.00<br />

3. $9,376.50<br />

4. $10,000.00


http://www.studentwhiz.com<br />

Q13. You are a consultant called in to estimate the costs after the employees learn how to do a job more efficiently by<br />

repetition of new product. You find a company can produce a product the first time at a cost of $5,000. If their 90 percent<br />

learning curve allows them to reduce their costs on each unit, what is the total cost of producing 100 units of the new<br />

product?<br />

1. $290,700<br />

2. $500,000<br />

3. $390,000<br />

4. $250,687<br />

Q14. A material requirements planning system is an example of which of the following scheduling systems?<br />

1. Infinite loading, backward scheduling<br />

2. Finite loading, backward scheduling<br />

3. Infinite loading, <strong>for</strong>ward scheduling<br />

4. Finite loading, <strong>for</strong>ward scheduling


http://www.studentwhiz.com<br />

Q15. Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is<br />

considered as which one of the following planning horizons?<br />

1. Long range<br />

2. Current<br />

3. Short range<br />

4. Intermediate range<br />

Q16. You want to determine the upper control line <strong>for</strong> a p-chart <strong>for</strong> quality control purposes. You take several samples of<br />

a size of 100 items in your production process. From the samples, you determine the fraction defective is 0.05 and the<br />

standard deviation is 0.01. If the desired confidence level is 99.7 percent, which of the following is the resulting UCL value<br />

<strong>for</strong> the line?<br />

1. 0.39<br />

2. 0.06<br />

3. 0.08<br />

4. 0.05


http://www.studentwhiz.com<br />

Q17. The objectives of work center scheduling include which of the following?<br />

1. Providing variety to work<strong>for</strong>ce<br />

2. Following all the priority rules<br />

3. Minimizing setup costs<br />

4. Avoiding tradeoffs<br />

Q18. For which of the following should we use an R-chart to monitor process quality?<br />

1. Deciding whether an airliner has sufficient fuel <strong>for</strong> its trip<br />

2. Determining whether vehicles from a motor pool will run<br />

3. Weighing trucks at a highway inspection station to determine if they are overloaded<br />

4. Student grades measured from 1 to 100<br />

Q19. Which of the following is a major factor that distinguishes service design and development from manufacturing<br />

design and development?<br />

1. The service package has the same legal protection available to manufactured goods.<br />

2. The service process and service product can be developed independently.<br />

3. Manufacturing is far more capital intensive than services.<br />

4. The service package is the major output of the development process.


http://www.studentwhiz.com<br />

Q20. Which of the following is a time-to-market per<strong>for</strong>mance measure used in judging product development per<strong>for</strong>mance?<br />

1. Customer loyalty<br />

2. Product reliability<br />

3. Yield<br />

4. Frequency of new-product introductions<br />

Q21. In business <strong>for</strong>ecasting, what is usually considered a medium-term time period?<br />

1. One to six months<br />

2. Three months to two years<br />

3. Six weeks to one year<br />

4. One to five years<br />

Q22. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's<br />

used to classify poka-yokes?<br />

1. Task<br />

2. Trust<br />

3. Time<br />

4. Teamwork


http://www.studentwhiz.com<br />

From my side Studentwhiz is the best educational portal<br />

<strong>for</strong>ever. Its complete study material, assignments, and<br />

expert team are all very good. I am really thankful <strong>for</strong> this<br />

education portal.<br />

Loopaze root<br />

It is no rocket science to get good marks.<br />

Click here:-


23. Assuming no safety stock, what is the reorder point (R) given an average daily demand of 78 units and a lead time of 3<br />

days?<br />

1. 421<br />

2. 234<br />

3. 26<br />

4. 78<br />

http://www.studentwhiz.com<br />

Q24. Which of the following is a measure of operations and supply management efficiency used by Wall Street?<br />

1. Earnings per share growth<br />

2. Current ratio<br />

3. Dividend payout ratio<br />

4. Receivable turnover<br />

Q25. A project starts out as which of the following?<br />

1. Critical path method (CPM)<br />

2. A latest-start-time estimate<br />

3. A series of milestones<br />

4. A statement of work


Q26. The ability to rapidly and inexpensively switch production from one product to another enables what are<br />

sometimes referred to as:<br />

1. Economies of shape<br />

2. Economies of scope<br />

3. Economies of size<br />

4. Economies of scale<br />

http://www.studentwhiz.com<br />

Q27. According to the theory of constraints, which of the following is a financial measurement that can be used to<br />

measure the firm's ability to make money?<br />

1. Inventory<br />

2. Sales<br />

3. Net profit<br />

4. Throughput<br />

Q28. What is a work breakdown structure?<br />

1. A depiction of the activities making up a project<br />

2. A Gantt chart<br />

3. A list of the activities making up the higher levels of the project<br />

4. A definition of the hierarchy of project tasks, subtasks, and work packages


http://www.studentwhiz.com<br />

29. If a firm produced a standard item with relatively stable demand, the smoothing constant alpha (reaction rate to<br />

differences) used in an exponential smoothing <strong>for</strong>ecasting model would tend to be in which of the following ranges?<br />

1. 5 to 10 percent<br />

2. 60 to 120 percent<br />

3. 20 to 80 percent<br />

4. 20 to 50 percent<br />

Q30. What transportation mode has very high initial investment costs but gives a very low cost per mile <strong>for</strong> products<br />

that are highly specialized and require no packaging?<br />

1. Water<br />

2. Highway<br />

3. Pipeline<br />

4. Rail


More online courses<br />

LAW 575 <strong>Final</strong> <strong>Exam</strong><br />

LDR 300 <strong>Final</strong> <strong>Exam</strong><br />

LDR 531 <strong>Final</strong> <strong>Exam</strong><br />

STR 581 Capstone <strong>Final</strong> <strong>Exam</strong>ination Part 1<br />

For more in<strong>for</strong>mation click here :-<br />

http://www.studentwhiz.com