11.12.2012 Views

Military Occupational Classification and Structure - U.S. Army

Military Occupational Classification and Structure - U.S. Army

Military Occupational Classification and Structure - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 10–92Y–2<br />

St<strong>and</strong>ards of grade TOE/MTOE—Continued<br />

Number of positions*<br />

Line Duty position Code Grade 1 2 3 4 5 6 7 8 9 10 Explanatory notes<br />

32 SENIOR SUPPLY SGT 92Y5O<br />

92Y50G1<br />

92Y5O2S<br />

33 OPERATIONS SER-<br />

GEANT<br />

MSG 1. S4 Sec/G4/Admin/Log Sec,<br />

Bde/Gp/Regt/Cmd/ACR/DIVARTY/<br />

Corps Arty/TA. Position coded with ASI 2S.<br />

2. S4 Sec, HHC Aslt Hel Bn (SOA). Position coded with ASI 2S<br />

<strong>and</strong> SQI S.<br />

3. Sup <strong>and</strong> Svc Div, HHC Theater Signal Cmd.<br />

4. G4 Fwd Elm, HHC <strong>Army</strong> Sig Cmd (FWD). Theater<br />

PERSCOM.<br />

5. ACofS Log, HHC Pers Cmd <strong>and</strong> Theater Pers (Modular).<br />

6. S4 Sec, TASOC.<br />

7. Tech Intel Sec, OpsAnalysis Co MI Bn TE.<br />

8. S4 Sec, EAC Intel Ctr/Avn Bde.<br />

9. Log Plns & Prog Div, HHC <strong>Army</strong> Svc Comp Cmd. Position<br />

coded with ASI 2S.<br />

10. S4 Sec, HHC/MMC DISCOM. Position coded with ASI 2S.<br />

11. Plans/Procedures Sec, MMC, COSCOM.<br />

12. Dist Opns Br, HHC Theater Spt Cmd.<br />

13. S4 Sec, HHC Abn Div & Armor Div.<br />

14. Prop Bk, Cl VII Ofc, DISCOM.<br />

15. Sup & Maint Div, HHC Th Sig Cmd.<br />

16. Hq Spt Sec, HHB FA Bde.<br />

92Y5O MSG Hq Cmdt, HHC <strong>Army</strong> Svc Comp Cmd.<br />

34 FIRST SERGEANT 92Y5M 1SG 1. Principal NCO of a company with 75 or more personnel.<br />

2. Hq & Sup Co, FSB, LID.<br />

Notes:<br />

1. *Blank spaces in this column indicate not applicable.<br />

2. When TOE/MTOE organizations are supported by an augmentation TDA, augmentation (Aug) <strong>and</strong> base paragraphs will be graded in the aggregate.<br />

3. When no grading guidance is provided by this table for coding TOE/MTOE, TRADOC MSCs <strong>and</strong> Non-TRADOC specified proponent (TOE Combat Developers) will<br />

coordinate with appropriate Branch Personnel Proponents (listed in AR 600–3) to support additional grading of manpower requirements.<br />

Table 10–92Y–3<br />

St<strong>and</strong>ards of grade TDA<br />

Number of positions*<br />

Line Duty position Code Grade 1 2 3 4 5 6 7 8 9 10 Explanatory notes<br />

1 SUPPLY SPECIALIST<br />

ARMORER<br />

2 SUPPLY SPECIALIST<br />

ARMORER<br />

92Y1O<br />

92Y1OG3<br />

92Y1O<br />

92Y1OG3<br />

3 SUPPLY SERGEANT 92Y2O<br />

92Y2OG3<br />

PFC 1 2 2 3 3 4 4 4 1. Grades of additional positions will be in same pattern.<br />

2. Armorer position graded per lines 1 <strong>and</strong> 2.<br />

SPC 1 1 1 2 2 3 3 4 4<br />

3. Use with ASI G3 as appropriate.<br />

SGT 1 1 1 1 1 1 1 1 1 2<br />

4 SUPPLY SPECIALIST 92Y1O SPC 1. Gymnasium/Field House.<br />

2. Mat Ops Div <strong>and</strong> Spt Br, USA Foreign Science <strong>and</strong> Technology<br />

Ctr.<br />

3. Detachment Unit Supply.<br />

4. Tech Spt Inst Div, USA Elm Def Spec Weapons Fld Cmd.<br />

5. Sup Mgmt Sec, USA Elm on Site Inspection Agency.<br />

6. Elec Prod Br, USA Elm American Information Svc.<br />

7. Ofc of Cdr, USA Elm JT Interoperability <strong>and</strong> Engr Org.<br />

8. Hq Cmdt, USA Elm USCENTCOM Spec Ops Cmd.<br />

9. Mat Sec Aug, USA Reserve Storage Acty.<br />

10. Tng Sup Ctr, 411 CS HHD Spt Bn (Aug).<br />

11. Spt Div, USAG Ft Hood. Subsequent position also graded<br />

SPC.<br />

12. Range Ctrl Br, USAG Ft Riley.<br />

13. Bach Housing Br, USAG Ft Carson.<br />

14. Range Ofc, USAG Ft Lewis. Second position graded PFC.<br />

15. Avn Div, Hq Van Bks <strong>and</strong> Signal Cell, USAG Ft Lewis.<br />

16. Log Sec, USA ISC Ft Meyer.<br />

17. ACR PB Tm, NTC <strong>and</strong> Ft Irwin.<br />

18. Admin Sec, USA Elm Supreme Hq Allied Powers Europe.<br />

19. Engr Plt, Staff <strong>and</strong> Faculty USMA.<br />

DA PAM 611–21 • 31 March 1999<br />

815

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!