10.12.2012 Views

Euradwaste '08 - EU Bookshop - Europa

Euradwaste '08 - EU Bookshop - Europa

Euradwaste '08 - EU Bookshop - Europa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

sented in the accompanying poster, show a small increment in transmission velocities associated<br />

with micro-crack closure.<br />

a b<br />

Figure 11: a) Example measured waveform and P-wave amplitude ratio (calculated against a reference<br />

survey on ‘undamaged’ sandstone taken at the highest hydrostatic load) b) Waveform and<br />

amplitude ratio for the Wave 3D model that best fits the survey shown in a).<br />

Velocity (m/s)<br />

5000<br />

4500<br />

4000<br />

3500<br />

3000<br />

2500<br />

2000<br />

0 10 20 30<br />

Stage<br />

40 50 60<br />

Vp1<br />

Vp1 model<br />

Vp2<br />

Vp2 model<br />

Vp3<br />

Vp3 model<br />

Vs1<br />

Vs1 model<br />

Vs2<br />

Vs2 model<br />

Vs3<br />

Vs3 model<br />

Crack density<br />

438<br />

0.1<br />

S1<br />

0.09<br />

S2<br />

0.08<br />

S3<br />

0.07<br />

0.06<br />

0.05<br />

0.04<br />

0.03<br />

0.02<br />

0.01<br />

0<br />

0 10 20 30 40 50 60<br />

Stage<br />

a b<br />

Figure 12: a) Monitored and EMT modelled transmission velocities in the direction of the three<br />

principal stress axes during the cyclic loading of the Crosland Hill sandstone cube. b) Inverted<br />

crack densities in the three directions.<br />

Velocity change (m/s)<br />

5<br />

0<br />

-5<br />

-10<br />

-15<br />

-20<br />

-25<br />

-30<br />

-35<br />

Vp (DZ)<br />

Vp model (DZ)<br />

Vs (DZ)<br />

Vs model (DZ)<br />

Excavation<br />

-40<br />

0<br />

0 5 10<br />

Time (days)<br />

15 20<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Excavation depth (m)<br />

Crack density<br />

0.2205<br />

0.2155<br />

0.2105<br />

0.2055<br />

0.2005<br />

0.1955<br />

Crack density<br />

Excavation<br />

0.1905<br />

0<br />

0 5 10<br />

Time (days)<br />

15 20<br />

a b<br />

Figure 13: a) Monitored and modelled (EMT) transmission velocities through a ray path skimming<br />

the surface of SKB’s HRL deposition hole during its excavation. b) Inverted crack densities.<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Excavation depth (m)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!