REFERENCE TABLES<br />
Table R19. Targets for Renewable Power installed Capacity and/or Generation<br />
Note: Text in bold indicates new/revised in 2015, brackets ‘[ ]’ indicate previous targets where new targets were enacted, and text in italics indicates policies adopted at the state/provincial level.<br />
COUNTRY TECHNOLOGY TARGET<br />
Algeria Electricity 22 GW by 2030<br />
Antigua and<br />
Barbuda<br />
Bio-power from waste-to-energy 1 GW by 2030<br />
Geothermal power 15 MW by 2030<br />
Solar PV 13.5 GW by 2030<br />
CSP 2 GW by 2030<br />
Wind power 5 GW by 2030<br />
Electricity 5 MW by 2030<br />
Argentina Electricity 3 GW by 2016<br />
Geothermal power 30 MW by 2016<br />
Armenia Hydropower (small-scale) 377 MW by 2020; 397 MW by 2025<br />
Geothermal power 50 MW by 2020; 100 MW by 2025<br />
Solar PV 40 MW by 2020; 80 MW by 2025<br />
Wind power 50 MW by 2020; 100 MW by 2025<br />
Austria Bio-power from solid biomass and biogas 200 MW added 2010–2020<br />
Hydropower 1 GW added 2010–2020<br />
Solar PV 1.2 GW added 2010–2020<br />
Wind power 2 GW added 2010–2020<br />
Azerbaijan Electricity 1 GW by 2020<br />
Bangladesh Bio-power from solid biomass 2 MW by 2014; 100,000 plants of 2.6 m 3 capacity capable of<br />
producing 40 MW of electricity<br />
Bio-power from biogas 4 MW by 2014; 7 MW by 2017<br />
Biogas digesters 150,000 plants by 2016<br />
Solar PV 500 MW by 2015<br />
Solar PV (off-grid and rural)<br />
6 million solar home systems by 2016 (240 MW total); 50 minigrids<br />
of 150 kW each; 1,550 solar irrigation pumps by 2017<br />
Wind power 400 MW by 2030<br />
Belgium<br />
No national target<br />
Wallonia Electricity 8 TWh/year by 2020<br />
Bhutan Electricity 20 MW by 2025<br />
Bio-power from solid biomass 5 MW by 2025<br />
Solar PV 5 MW by 2025<br />
Wind power 5 MW by 2025<br />
Bolivia Electricity 160 MW renewable energy capacity added 2015–2025<br />
Bosnia and Hydropower 120 MW by 2030<br />
Herzegovina<br />
Solar PV 4 MW by 2030<br />
Wind power 175 MW by 2030<br />
Brazil Bio-power 19.3 GW by 2021<br />
Hydropower (small-scale) 7.8 GW by 2021<br />
Wind power 15.6 GW by 2021<br />
Bulgaria Hydropower Three 174 MW plants commissioned by 2017–2018<br />
Solar PV 80 MW solar PV park operational by 2014<br />
Burundi Bio-power from solid biomass 4 MW<br />
Hydropower<br />
212 MW<br />
Solar PV<br />
40 MW<br />
Wind power<br />
10 MW<br />
170