26.01.2017 Views

2j7YOwO

2j7YOwO

2j7YOwO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REFERENCE TABLES<br />

Table R19. Targets for Renewable Power installed Capacity and/or Generation<br />

Note: Text in bold indicates new/revised in 2015, brackets ‘[ ]’ indicate previous targets where new targets were enacted, and text in italics indicates policies adopted at the state/provincial level.<br />

COUNTRY TECHNOLOGY TARGET<br />

Algeria Electricity 22 GW by 2030<br />

Antigua and<br />

Barbuda<br />

Bio-power from waste-to-energy 1 GW by 2030<br />

Geothermal power 15 MW by 2030<br />

Solar PV 13.5 GW by 2030<br />

CSP 2 GW by 2030<br />

Wind power 5 GW by 2030<br />

Electricity 5 MW by 2030<br />

Argentina Electricity 3 GW by 2016<br />

Geothermal power 30 MW by 2016<br />

Armenia Hydropower (small-scale) 377 MW by 2020; 397 MW by 2025<br />

Geothermal power 50 MW by 2020; 100 MW by 2025<br />

Solar PV 40 MW by 2020; 80 MW by 2025<br />

Wind power 50 MW by 2020; 100 MW by 2025<br />

Austria Bio-power from solid biomass and biogas 200 MW added 2010–2020<br />

Hydropower 1 GW added 2010–2020<br />

Solar PV 1.2 GW added 2010–2020<br />

Wind power 2 GW added 2010–2020<br />

Azerbaijan Electricity 1 GW by 2020<br />

Bangladesh Bio-power from solid biomass 2 MW by 2014; 100,000 plants of 2.6 m 3 capacity capable of<br />

producing 40 MW of electricity<br />

Bio-power from biogas 4 MW by 2014; 7 MW by 2017<br />

Biogas digesters 150,000 plants by 2016<br />

Solar PV 500 MW by 2015<br />

Solar PV (off-grid and rural)<br />

6 million solar home systems by 2016 (240 MW total); 50 minigrids<br />

of 150 kW each; 1,550 solar irrigation pumps by 2017<br />

Wind power 400 MW by 2030<br />

Belgium<br />

No national target<br />

Wallonia Electricity 8 TWh/year by 2020<br />

Bhutan Electricity 20 MW by 2025<br />

Bio-power from solid biomass 5 MW by 2025<br />

Solar PV 5 MW by 2025<br />

Wind power 5 MW by 2025<br />

Bolivia Electricity 160 MW renewable energy capacity added 2015–2025<br />

Bosnia and Hydropower 120 MW by 2030<br />

Herzegovina<br />

Solar PV 4 MW by 2030<br />

Wind power 175 MW by 2030<br />

Brazil Bio-power 19.3 GW by 2021<br />

Hydropower (small-scale) 7.8 GW by 2021<br />

Wind power 15.6 GW by 2021<br />

Bulgaria Hydropower Three 174 MW plants commissioned by 2017–2018<br />

Solar PV 80 MW solar PV park operational by 2014<br />

Burundi Bio-power from solid biomass 4 MW<br />

Hydropower<br />

212 MW<br />

Solar PV<br />

40 MW<br />

Wind power<br />

10 MW<br />

170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!