Minutes of the Meeting held on 20.07.2010. & 21.07.2010 at Scope ...
Minutes of the Meeting held on 20.07.2010. & 21.07.2010 at Scope ...
Minutes of the Meeting held on 20.07.2010. & 21.07.2010 at Scope ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> <strong>20.07.2010.</strong> & <strong>21.07.2010</strong> <strong>at</strong> <strong>Scope</strong> Minar,<br />
Laxmi Nagar, New Delhi under <str<strong>on</strong>g>the</str<strong>on</strong>g> Chairmanship <str<strong>on</strong>g>of</str<strong>on</strong>g> Additi<strong>on</strong>al Secretary (Coal)<br />
to review <str<strong>on</strong>g>the</str<strong>on</strong>g> progress <str<strong>on</strong>g>of</str<strong>on</strong>g> captive blocks and <str<strong>on</strong>g>the</str<strong>on</strong>g> associ<strong>at</strong>ed End Use Projects.<br />
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐<br />
A meeting under <str<strong>on</strong>g>the</str<strong>on</strong>g> Chairmanship <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Additi<strong>on</strong>al Secretary (Coal) was <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th and<br />
21 st July, 2010 in <strong>Scope</strong> Minar, Laxmi Nagar, New Delhi to review <str<strong>on</strong>g>the</str<strong>on</strong>g> progress <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal blocks alloc<strong>at</strong>ed upto 30 th June, 2010 al<strong>on</strong>g with <str<strong>on</strong>g>the</str<strong>on</strong>g>ir associ<strong>at</strong>ed end<br />
use projects. List <str<strong>on</strong>g>of</str<strong>on</strong>g> participants is enclosed <strong>at</strong> Annexure.<br />
At <str<strong>on</strong>g>the</str<strong>on</strong>g> outset, Chairman welcomed all <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g>ficers representing Ministries/ Departments <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Central/St<strong>at</strong>e Govt <strong>at</strong>tending <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting as well as different block alloc<strong>at</strong>tees. Inform<strong>at</strong>i<strong>on</strong><br />
was sought from each <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> company represent<strong>at</strong>ives (block alloc<strong>at</strong>tees) <strong>on</strong> milest<strong>on</strong>es<br />
achieved by <str<strong>on</strong>g>the</str<strong>on</strong>g>m since <str<strong>on</strong>g>the</str<strong>on</strong>g> last review meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 22 nd and 23 rd June, 2009. He<br />
pointed out th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> companies, for which Mine Plans have been approved, must start<br />
producti<strong>on</strong> as early as possible. He requested th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> respective St<strong>at</strong>e Governments must<br />
extend <str<strong>on</strong>g>the</str<strong>on</strong>g>ir help to block alloc<strong>at</strong>es. An ambitious target <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 51 MT has been<br />
kept for 2011‐12 (<str<strong>on</strong>g>the</str<strong>on</strong>g> terminal year <str<strong>on</strong>g>of</str<strong>on</strong>g> XI th five year plan). This can <strong>on</strong>ly be achieved if <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
c<strong>on</strong>cerned block alloc<strong>at</strong>tees take necessary initi<strong>at</strong>ives with earnest effort to develop <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
mines.<br />
Joint Secretary (Coal) desired th<strong>at</strong> <strong>on</strong>ly Joint venture companies (JVC) instead <str<strong>on</strong>g>of</str<strong>on</strong>g> individual<br />
alloc<strong>at</strong>ee (in case <str<strong>on</strong>g>of</str<strong>on</strong>g> jointly alloc<strong>at</strong>ed coal blocks) are resp<strong>on</strong>sible for submitting Bank<br />
Guarantee (BG) to <str<strong>on</strong>g>the</str<strong>on</strong>g> Office <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Coal C<strong>on</strong>troller. He has also asked all <str<strong>on</strong>g>the</str<strong>on</strong>g> JVCs to collect<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> st<strong>at</strong>us reports <str<strong>on</strong>g>of</str<strong>on</strong>g> coal blocks and <str<strong>on</strong>g>the</str<strong>on</strong>g>ir associ<strong>at</strong>ed End Use Projects <str<strong>on</strong>g>of</str<strong>on</strong>g> individual block<br />
alloc<strong>at</strong>ees and submit to <str<strong>on</strong>g>the</str<strong>on</strong>g> Office <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal C<strong>on</strong>troller <strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> end <str<strong>on</strong>g>of</str<strong>on</strong>g> every quarter. He also<br />
advised th<strong>at</strong> represent<strong>at</strong>ives <str<strong>on</strong>g>of</str<strong>on</strong>g> all <str<strong>on</strong>g>the</str<strong>on</strong>g> subsidiaries <str<strong>on</strong>g>of</str<strong>on</strong>g> CIL should <strong>at</strong>tend <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting.<br />
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> last review meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 22 nd & 23 rd June, 2009 were c<strong>on</strong>firmed.<br />
Background Inform<strong>at</strong>i<strong>on</strong>:<br />
a) Blocks alloc<strong>at</strong>ed:
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Total 215 Coal blocks alloc<strong>at</strong>ed so far, out <str<strong>on</strong>g>of</str<strong>on</strong>g> which 8 blocks have been dealloc<strong>at</strong>ted by<br />
Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal till June, 2010.<br />
No <str<strong>on</strong>g>of</str<strong>on</strong>g> blocks to Govt. Companies No <str<strong>on</strong>g>of</str<strong>on</strong>g> blocks to Priv<strong>at</strong>e Companies No <str<strong>on</strong>g>of</str<strong>on</strong>g> Blocks Total Net<br />
Year <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
alloc<strong>at</strong>i<strong>on</strong><br />
Gross<br />
Allotted<br />
De‐ Net no. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
alloc<strong>at</strong>ed/ blocks as<br />
surrendered <strong>on</strong> d<strong>at</strong>e<br />
Gross<br />
Allotted<br />
De‐<br />
alloc<strong>at</strong>ed/<br />
surrendered<br />
Net no. <str<strong>on</strong>g>of</str<strong>on</strong>g> to UMPPs/<br />
blocks as <strong>on</strong> for Tariff<br />
d<strong>at</strong>e based bidding<br />
blocks<br />
for <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
year<br />
Till 2003 17 ‐ 17 23 1 22 ‐ 39<br />
2004 4 ‐ 4 1 1 0 ‐ 4<br />
2005 8 1 7 16 1 15 ‐ 22<br />
2006 32 1 31 15 0 15 6 52<br />
2007 34 1 33 17 0 17 1 51<br />
2008 3 ‐ 3 20 2 18 1 22<br />
2009 1 ‐ 1 12 ‐ 12 3 16<br />
2010 (till<br />
June, 10)<br />
‐ ‐ ‐ ‐ ‐ ‐<br />
1<br />
1<br />
99 3 96 104 5 99 12 207<br />
In additi<strong>on</strong> to above, mining lease in case <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e block, namely, Takli‐Jena‐Bellora<br />
(South) alloc<strong>at</strong>ed to Central Collieries Co. Ltd. has been declared void.<br />
b) St<strong>at</strong>us <str<strong>on</strong>g>of</str<strong>on</strong>g> coal blocks in producti<strong>on</strong>:<br />
Producti<strong>on</strong> from 26 coal blocks alloc<strong>at</strong>ed to 16 alloc<strong>at</strong>es has started till June, 2010. The<br />
details are as menti<strong>on</strong>ed below:<br />
Sl. Name <str<strong>on</strong>g>of</str<strong>on</strong>g> alloc<strong>at</strong>tee /JV Allotment Name <str<strong>on</strong>g>of</str<strong>on</strong>g> coal blocks No. <str<strong>on</strong>g>of</str<strong>on</strong>g> Year <str<strong>on</strong>g>of</str<strong>on</strong>g> Starting<br />
No<br />
year<br />
blocks producti<strong>on</strong><br />
1 CESC Ltd./ICML 1993 Sarsh<strong>at</strong>ali 1 Oct, 2002<br />
2 INDAL/ HINDALCO 1994 Talabira‐I 1 Oct, 2003<br />
3 WBSEB/BECML 1996 Tara (East) 1 1997<br />
4 WBPDCL/BECML 1996 Tara (West) 1 1997<br />
5 BLA Industries 1996 Gotitoria (E&W) 2 Oct, 2004<br />
6 JSPL Ltd. 1996 Gare Palma IV/1 1 Feb, 1999<br />
7 M<strong>on</strong>net Isp<strong>at</strong> Ltd. 1996 Gare Palma IV/5 1 June, 2004<br />
8 Jindal Power Ltd. 1998 GarePalma IV/2&3 2 June, 2007<br />
9 Jayaswal Neco Ltd. 1999 Gare Palma IV/4 1 Sept, 2006<br />
10 PSEB 2001 Panchwara Central 1 Mar, 2006<br />
11 Prakash Industries Ltd. 2003 Chotia 1 July, 2006<br />
12 Arunachal PMDCL 2003 Namchik Namphuk 1 April, 2007<br />
13 KPCL 2003 Baranj I‐IV, Kil<strong>on</strong>i and 6<br />
Manora Deep<br />
Aug, 2008<br />
14 RASL now SEML 2000 Gare Palma IV/7 1 March, 2009<br />
15 WBPDCL/BECML 2003 Barjora 1 March, 2009<br />
16 Usha Martin Ltd. 2003 K<strong>at</strong>hautia 1 Dec, 2008<br />
17 Steel Authority <str<strong>on</strong>g>of</str<strong>on</strong>g> India 1996 Tasra 1 Nov.2009<br />
2
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
(IISCO)<br />
18 Sunflag Ir<strong>on</strong> & Steel<br />
Co. Ltd.,<br />
19 Electrosteel Casting<br />
Ltd.<br />
2005 Belga<strong>on</strong> 1 Dec, 2007<br />
2005 Central Parb<strong>at</strong>pur 1 Dec,2008<br />
Total 26<br />
• Coal blocks marked in bold & italic have reached <str<strong>on</strong>g>the</str<strong>on</strong>g>ir Peak R<strong>at</strong>ed Capacity.<br />
• EUPs, for which <str<strong>on</strong>g>the</str<strong>on</strong>g>se blocks are alloc<strong>at</strong>ed, are running except for Prakash Industries and<br />
PSEB. For <str<strong>on</strong>g>the</str<strong>on</strong>g>se two blocks, coal is being utilized in <str<strong>on</strong>g>the</str<strong>on</strong>g>ir existing plants, new/expansi<strong>on</strong><br />
plants are yet to come up fully.<br />
• No represent<strong>at</strong>ives <str<strong>on</strong>g>of</str<strong>on</strong>g> Arunachal PMDCL (Namchik Namphuk block) <strong>at</strong>tended <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting.<br />
The st<strong>at</strong>us <str<strong>on</strong>g>of</str<strong>on</strong>g> progress in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> each block and its associ<strong>at</strong>ed end‐use project was reviewed<br />
over <str<strong>on</strong>g>the</str<strong>on</strong>g> two days and also <str<strong>on</strong>g>the</str<strong>on</strong>g> difficulties faced by <str<strong>on</strong>g>the</str<strong>on</strong>g> block alloc<strong>at</strong>ees were discussed. The<br />
details are given in <str<strong>on</strong>g>the</str<strong>on</strong>g> following paras:<br />
3
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
I. Coal Blocks allotted till 2003:<br />
Sl.<br />
No.<br />
a) 27 companies/Govt. PSUs were alloc<strong>at</strong>ed 40 coal blocks out <str<strong>on</strong>g>of</str<strong>on</strong>g> which 19 blocks were<br />
alloc<strong>at</strong>ed till 2002 and 21 blocks were allotted in 2003 itself. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>se, mining lease<br />
in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e block, namely, Takli‐Jena‐Bellora (South) alloc<strong>at</strong>ed to M/s. Central<br />
Collieries Co. Ltd has been declared void.<br />
b) Out <str<strong>on</strong>g>of</str<strong>on</strong>g> 39 coal blocks, producti<strong>on</strong> has started in 24 coal blocks (12 blocks allotted to<br />
PSUs and 12 to priv<strong>at</strong>e companies). Producti<strong>on</strong> has reached its peak r<strong>at</strong>ed capacity in<br />
respect <str<strong>on</strong>g>of</str<strong>on</strong>g> 9 coal blocks and <str<strong>on</strong>g>the</str<strong>on</strong>g>se blocks are not reviewed in this meeting. The details in<br />
respect <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remaining 15 producing blocks which have not reached <str<strong>on</strong>g>the</str<strong>on</strong>g> peak r<strong>at</strong>ed<br />
capacity is as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. RPG<br />
Industries/<br />
CESC Ltd.<br />
2. Steel<br />
Authority <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
India Ltd.<br />
3. Jayaswal<br />
Neco Ltd<br />
4. Jindal<br />
Power Ltd<br />
5. Raipur Alloys<br />
Ltd<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Sarsh<strong>at</strong>oli 10.08.93 Producti<strong>on</strong> target<br />
for next year is<br />
3.2 MT and PRC is<br />
3.5 MT.<br />
Tasra 26.02.96 Represent<strong>at</strong>ive<br />
informed th<strong>at</strong><br />
selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> MDO<br />
is finalized and is<br />
planning to<br />
produce 2.5 LT in<br />
2010‐11. PRC (4<br />
Mill t<strong>on</strong>es) will be<br />
achieved by 2012‐<br />
13.<br />
Gare‐<br />
Palma‐<br />
IV/4<br />
Gare‐<br />
Palrna‐<br />
IV/2 &<br />
IV/3<br />
Gare‐<br />
Palma‐<br />
IV/7<br />
6. PSEB Panchwara<br />
Central<br />
16.08.99 They are planning<br />
to produce 0.48<br />
MT (PRC) in 2010‐<br />
11.<br />
01.07.98 Assured to<br />
produce 5.25 MT<br />
in 2010‐11.<br />
25.04.200<br />
0<br />
Assured prod. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
3.5 LT in 2010‐11.<br />
PRC 1.2 MT by<br />
2015.<br />
EUP existing.<br />
28.12.01 Assured to<br />
adhere by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
PRC.<br />
4<br />
Remarks with Pending Milest<strong>on</strong>es<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed from next meeting.<br />
Remarks <strong>on</strong> progress:‐<br />
SAIL (IISCO) started Tasra mine since<br />
Nov.2009 and produced 0.063 Mill t<strong>on</strong>es<br />
in 2009‐10. SAIL applied to St<strong>at</strong>e Govt for<br />
transfer <str<strong>on</strong>g>of</str<strong>on</strong>g> mining lease from BCCL to SAIL<br />
in 2008 whereas Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand<br />
informed th<strong>at</strong> no mining lease applic<strong>at</strong>i<strong>on</strong><br />
is pending with <str<strong>on</strong>g>the</str<strong>on</strong>g>m.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Chairman has urged to let MOC know <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
st<strong>at</strong>us <str<strong>on</strong>g>of</str<strong>on</strong>g> ML within <strong>on</strong>e m<strong>on</strong>th time.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed from next meeting.<br />
(CCO to M<strong>on</strong>itor)<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed from next meeting.<br />
(CCO to M<strong>on</strong>itor)<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company was advised to achieve <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
PRC as early as possible.<br />
Remarks <strong>on</strong> progress:‐<br />
PSEB achieved PRC 7.0 MT in 2009‐10 and<br />
produced 8.37 MT coal in 2009‐10.<br />
PANEM (Mining JV) has projected to
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
7. WBPDCL Barjora 23.06.03 Company assured<br />
to produce 5 LT<br />
8. Usha Martin<br />
Ltd.<br />
9. Arunachal<br />
Pradesh<br />
MDCL<br />
10‐<br />
15.<br />
during 2010‐11.<br />
K<strong>at</strong>hautia 29.09.03 PRC (0.8 MT) is<br />
expected to be<br />
achieved by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
end <str<strong>on</strong>g>of</str<strong>on</strong>g> this year<br />
or next year i.e.<br />
2011‐12.<br />
Namchik<br />
Namphuk<br />
KPCL Baranj I‐<br />
IV, Kil<strong>on</strong>i<br />
and<br />
Manora<br />
Deep<br />
28.10.03 No <strong>on</strong>e was<br />
present in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
10.11.03 Expected to<br />
achieve PRC 2.5<br />
MT in 2010‐11<br />
5<br />
Remarks with Pending Milest<strong>on</strong>es<br />
produce 10.00 MT coal in 2010‐11<br />
whereas PSEB (block alloc<strong>at</strong>tee) has<br />
projected to produce 7 MT coal in 2010‐<br />
11. Coal is utilized in existing units <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
PSEB. No represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> PSEB was<br />
present in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting. The expansi<strong>on</strong><br />
plants have not come up.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Chairman has urged th<strong>at</strong> PSEB being <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block alloc<strong>at</strong>tee should <strong>at</strong>tend <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting in future. He directed th<strong>at</strong><br />
producti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> coal can be as per approved<br />
mine plan & producti<strong>on</strong> bey<strong>on</strong>d th<strong>at</strong> is<br />
not desirable. PSEB to be asked to furnish<br />
Utilis<strong>at</strong>i<strong>on</strong> Certific<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> coal utilized in<br />
last FY. The positi<strong>on</strong> may also be<br />
intim<strong>at</strong>ed to CPD secti<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed from next meeting.<br />
(CCO to m<strong>on</strong>itor)<br />
Remarks <strong>on</strong> progress:‐<br />
Started mine since Dec 08 and produced<br />
0.062 MT in 2009‐10. Represent<strong>at</strong>ive<br />
informed th<strong>at</strong> coal is being utilized in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
existing EUP.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed in <str<strong>on</strong>g>the</str<strong>on</strong>g> next meeting<br />
(CCO to M<strong>on</strong>itor).<br />
Remarks <strong>on</strong> progress:‐<br />
CCO has reported th<strong>at</strong> producti<strong>on</strong> from<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block started since April, 2007.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
To take up with St<strong>at</strong>e Govt.<br />
Remarks <strong>on</strong> progress:‐<br />
KPCL has requested to alloc<strong>at</strong>e those<br />
alloc<strong>at</strong>ed blocks which are not being<br />
developed by <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>ees.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Will not be reviewed from next meeting<br />
(CCO to m<strong>on</strong>itor). The Committee took<br />
note <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> company’s request.<br />
• The blocks which will achieve PRC in <str<strong>on</strong>g>the</str<strong>on</strong>g> current year (2010‐11), shall not be reviewed<br />
from <str<strong>on</strong>g>the</str<strong>on</strong>g> next meeting. The progress shall be c<strong>on</strong>stantly m<strong>on</strong>itored by CCO and if <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
progress is not found s<strong>at</strong>isfactory, CCO shall bring <str<strong>on</strong>g>the</str<strong>on</strong>g> same to <str<strong>on</strong>g>the</str<strong>on</strong>g> notice <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
committee.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
• The blocks which reach <str<strong>on</strong>g>the</str<strong>on</strong>g> PRC producti<strong>on</strong>, need not be reviewed by <str<strong>on</strong>g>the</str<strong>on</strong>g> committee.<br />
However, in case <str<strong>on</strong>g>the</str<strong>on</strong>g> CCO finds any irregularity or o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise, it may bring up <str<strong>on</strong>g>the</str<strong>on</strong>g> issue<br />
before <str<strong>on</strong>g>the</str<strong>on</strong>g> committee.<br />
c) The progress in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> remaining 15 n<strong>on</strong>‐producing coal blocks allotted till 2003<br />
is as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Utkal Coal<br />
Ltd.<br />
2. M<strong>on</strong>net Isp<strong>at</strong><br />
Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
3. B.S.Isp<strong>at</strong> Ltd. Marki<br />
Mangli‐I<br />
4. GVK Power<br />
Ltd.<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Utkal‐C 29.05.98/<br />
Nov. 01<br />
Utkal–B2 16.08.99/<br />
Feb. 03<br />
Tokisud<br />
North<br />
25.4.01/<br />
Oct. 04<br />
07.01.02 /<br />
July, 05<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Coal producti<strong>on</strong><br />
by March, 2011<br />
depending up<strong>on</strong><br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> forest<br />
clearance.<br />
Company assured<br />
to sign ML deed<br />
within 60 days<br />
and to apply for<br />
mine opening<br />
permissi<strong>on</strong> to<br />
CCO within next<br />
30 days.<br />
Mining activity/<br />
Coal producti<strong>on</strong><br />
by Dec., 10<br />
Assured to start<br />
coal producti<strong>on</strong><br />
by Sept.2010<br />
Assured to start<br />
box cut by March,<br />
2011 and coal<br />
producti<strong>on</strong> by<br />
6<br />
Remarks with Pending Milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML & LA are still pending.<br />
Company informed th<strong>at</strong> during survey for<br />
prepar<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> forest diversi<strong>on</strong> proposal,<br />
boundaries and areas were changed due<br />
to mism<strong>at</strong>ch between Forest and Revenue<br />
Dept. This required modific<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
already approved MP, EMP clearance &<br />
resulted in delay. However modified MP<br />
is approved, EMP clearance obtained.<br />
Forest diversi<strong>on</strong> proposal sent to St<strong>at</strong>e<br />
Govt. by PCCF. R&R site has been<br />
approved. All clearance is expected by<br />
Dec. 2010.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Stare‐II forest clearance, ML & LA<br />
pending. R&R problem has been sorted<br />
out now. For EUP is to be commenced by<br />
Dec.2010 and is hopeful to synchr<strong>on</strong>ise<br />
EUP producti<strong>on</strong> with coal block<br />
producti<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Opening permissi<strong>on</strong> obtained in May,<br />
2010. Assured to start coal producti<strong>on</strong> in<br />
Sept. 2010 and to produce 2 LT coal in<br />
2010‐11. PRC (3.3 LT) is targeted to<br />
achieve by 2011‐12.<br />
Remarks:<br />
Stage‐II FC & LA are pending.<br />
It was badly delayed for both mine & EUP.<br />
Now sancti<strong>on</strong> for ML has been issued by
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
5‐6. WBPDCL Gangaram<br />
chak &<br />
Gangaram<br />
chak‐<br />
Bhadulia<br />
7. CMDC<br />
(Govt. Disp.)<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
23.6.03/<br />
Dec.06<br />
Tara 14.8.03/<br />
Feb 07<br />
8. JSPL Utkal B‐1 29.9.03/<br />
Mar. 07<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Dec.2011. EUP in<br />
Aug.2012<br />
Assured to start<br />
producti<strong>on</strong> by<br />
May, 2011.<br />
No assurance<br />
Assured to start<br />
coal producti<strong>on</strong><br />
by Dec. 10.<br />
6 MTPA Sp<strong>on</strong>ge<br />
Ir<strong>on</strong> Plant by Dec.<br />
2011.<br />
7<br />
Remarks with Pending Milest<strong>on</strong>es<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Government. Govt <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand<br />
advised GVK to procure 50% land from<br />
Raiy<strong>at</strong>s through direct negoti<strong>at</strong>i<strong>on</strong> and<br />
balance 50% by Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks:<br />
ML for 47.65 Hec. forest land executed <strong>on</strong><br />
06.12.07. Compens<strong>at</strong>ory forest land for<br />
105.16 hector purchased. Land acquisiti<strong>on</strong><br />
under direct negoti<strong>at</strong>i<strong>on</strong> is in progress.<br />
Opening permissi<strong>on</strong> submitted to CCO, is<br />
pending for grant <str<strong>on</strong>g>of</str<strong>on</strong>g> forest clearance.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Chairman asked alloc<strong>at</strong>ee to sort out <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
problem with <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt. The<br />
company was asked to explore possibility<br />
for granting <str<strong>on</strong>g>of</str<strong>on</strong>g> opening permissi<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
n<strong>on</strong> forest mining lease area.<br />
Remarks:<br />
No serious effort by <str<strong>on</strong>g>the</str<strong>on</strong>g> company. FC,<br />
EMP, ML & LA are pending. Prior<br />
approval for grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML for 2400 Ha area<br />
granted by MOC. Block is fallen under “A”<br />
c<strong>at</strong>egory <str<strong>on</strong>g>of</str<strong>on</strong>g> forest area demarc<strong>at</strong>ed by<br />
MOEF. Land for EUP obtained and Tender<br />
work completed.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
FC (Stage‐II) , ML & LA are pending,<br />
All compliance for Stage‐II forest<br />
clearance completed. Necessary papers<br />
are with Secy., Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Orissa. Tribal &<br />
R& R issues are major problems. GoO will<br />
settle <str<strong>on</strong>g>the</str<strong>on</strong>g> issue in next 3 m<strong>on</strong>ths.<br />
EUP: Company informed th<strong>at</strong> out <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 MT<br />
Sp<strong>on</strong>ge ir<strong>on</strong> project, 2 MT is linked with<br />
this block. 270 MW CPP is middling based.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
9‐<br />
10.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Field Mining<br />
& Isp<strong>at</strong> Ltd.<br />
11. G<strong>on</strong>dwana<br />
Isp<strong>at</strong> Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Chinora &<br />
Warora<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
8.10.03/<br />
Oct, 06<br />
Majra 29.10.03/<br />
April,07<br />
12. TVNL Badam 03.11.03/<br />
May 07<br />
13. Bhusan Steel<br />
& Power Ltd.<br />
14. Shree<br />
Baidyan<strong>at</strong>h<br />
Ayurved Ltd.<br />
Jamkhani 12.11.03/<br />
Nov,08<br />
Bhandak<br />
West<br />
27.11.03/<br />
May, 2007<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Coal producti<strong>on</strong><br />
depends up<strong>on</strong><br />
grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML.<br />
No assurance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
coal producti<strong>on</strong>.<br />
EUP: Sp<strong>on</strong>ge Ir<strong>on</strong><br />
plant and CPP by<br />
Dec., 2011.<br />
Assured to start<br />
producti<strong>on</strong> by<br />
March, 2011.<br />
The company<br />
represent<strong>at</strong>ive<br />
committed to<br />
commence coal<br />
producti<strong>on</strong> from<br />
Dec.10<br />
8<br />
Remarks with Pending Milest<strong>on</strong>es<br />
Remarks:<br />
MP, EMP approved. ML & LA pending. No<br />
forest land involved. LA is under<br />
negoti<strong>at</strong>i<strong>on</strong> stage. Company<br />
represent<strong>at</strong>ives menti<strong>on</strong>ed about an<br />
interim judgment <str<strong>on</strong>g>of</str<strong>on</strong>g> H<strong>on</strong>’ble Court. EUP<br />
depends <strong>on</strong> grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML. Legal issues to<br />
be examined by MOC.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML & LA are pending. All formalities<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> forest clearance are completed. Stage‐I<br />
FC is pending. Forest clearance is <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
main problem. 630 Ha <str<strong>on</strong>g>of</str<strong>on</strong>g> entire area is<br />
within <str<strong>on</strong>g>the</str<strong>on</strong>g> buffer z<strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> forest. The<br />
represent<strong>at</strong>ive st<strong>at</strong>ed th<strong>at</strong> as so<strong>on</strong> as <str<strong>on</strong>g>the</str<strong>on</strong>g>y<br />
get <str<strong>on</strong>g>the</str<strong>on</strong>g> FC, <str<strong>on</strong>g>the</str<strong>on</strong>g>y would be able to start<br />
producti<strong>on</strong> from <str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:<br />
FC & LA are pending. The company<br />
represent<strong>at</strong>ive informed th<strong>at</strong> 100 HA land<br />
acquired. Forest clearance is <str<strong>on</strong>g>the</str<strong>on</strong>g> main<br />
issue to be sorted out. The alloc<strong>at</strong>tee is<br />
giving <str<strong>on</strong>g>the</str<strong>on</strong>g> similar reply & not taking acti<strong>on</strong><br />
to develop <str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Stage‐I FC is obtained. 302.29 hector <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
land got transferred to company. R&R<br />
process has been started. 131 Corers<br />
deposited for R & R project. 57 acres land<br />
transferred in <str<strong>on</strong>g>the</str<strong>on</strong>g> name <str<strong>on</strong>g>of</str<strong>on</strong>g> company. EUP<br />
is oper<strong>at</strong>ing. The committee advised th<strong>at</strong><br />
land acquisiti<strong>on</strong> and R&R issues to be<br />
settled immedi<strong>at</strong>ely.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
MP not yet approved. O<str<strong>on</strong>g>the</str<strong>on</strong>g>r milest<strong>on</strong>es<br />
are pending for want <str<strong>on</strong>g>of</str<strong>on</strong>g> MP approval. The<br />
company represent<strong>at</strong>ive informed th<strong>at</strong><br />
land for <str<strong>on</strong>g>the</str<strong>on</strong>g> 1 st 60 MW Power Plant, is
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
15. OMDC<br />
(Govt. Disp)<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Utkal‐D 19.12.03/<br />
June 07<br />
Assurance made<br />
by Company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
After settling<br />
share issue,<br />
mining activity<br />
will start.<br />
9<br />
Remarks with Pending Milest<strong>on</strong>es<br />
acquired. The committee was informed<br />
th<strong>at</strong> approval <str<strong>on</strong>g>of</str<strong>on</strong>g> mine plan is delayed due<br />
to <str<strong>on</strong>g>the</str<strong>on</strong>g> fact th<strong>at</strong> company has changed<br />
capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP, loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP, purpose<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUP, name <str<strong>on</strong>g>of</str<strong>on</strong>g> company and<br />
shareholding p<strong>at</strong>tern <str<strong>on</strong>g>of</str<strong>on</strong>g> company since<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block is alloc<strong>at</strong>ed. The company is not<br />
serious for development <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block for<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> purpose it is allotted.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Almost all st<strong>at</strong>utory clearances obtained.<br />
Land acquisiti<strong>on</strong> completed. EMP and FC<br />
Stage‐I are cleared. R&R in <strong>on</strong>e village is<br />
going <strong>on</strong>. Commencement <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong><br />
is affected for n<strong>on</strong>‐finaliz<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> JV<br />
notific<strong>at</strong>i<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
II. Coal blocks allotted during 2004:<br />
Sl.<br />
No.<br />
a) During 2004, out <str<strong>on</strong>g>of</str<strong>on</strong>g> 5 blocks alloc<strong>at</strong>ed (3 Govt. PSUs and 1 Pvt. Company). Umaria (West)<br />
block alloc<strong>at</strong>ed to M/s Sainik Finance Ltd was dealloc<strong>at</strong>ed.<br />
b) The performance <str<strong>on</strong>g>of</str<strong>on</strong>g> 4 coal blocks, which were alloc<strong>at</strong>ed to Govt. PSUs, is as follows.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
1 NALCO Utkal‐E<br />
2‐3. CSEB P<strong>at</strong>uria<br />
&<br />
Gidmuri<br />
4. NTPC Pakri<br />
Barwadih<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./Target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
27.08.04/<br />
Feb. 08<br />
23.09.04/<br />
Mar, 08<br />
11.10.04/<br />
April, 08<br />
Assurance made<br />
by Company in Remarks with Pending Milest<strong>on</strong>es<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
Block was unexplored and GR was<br />
available in 4/05. FC, EMP, ML executi<strong>on</strong><br />
and Land Acquisiti<strong>on</strong> pending. Due to<br />
boundary dispute, revised ML submitted,<br />
EMP & LA are expected so<strong>on</strong>. The<br />
company was asked to submit time<br />
schedule within 2 m<strong>on</strong>ths (i.e. acti<strong>on</strong> plan<br />
with d<strong>at</strong>es).<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee viewed it seriously and<br />
urged to bring this to <str<strong>on</strong>g>the</str<strong>on</strong>g> notice <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
NALCO Authority. If <str<strong>on</strong>g>the</str<strong>on</strong>g> company does<br />
not resp<strong>on</strong>d within 2 m<strong>on</strong>ths, issue show‐<br />
cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Assured to start<br />
producti<strong>on</strong> by<br />
Sept.2010.<br />
10<br />
Remarks <strong>on</strong> progress:‐<br />
No serious effort by <str<strong>on</strong>g>the</str<strong>on</strong>g> company. ML,<br />
FC, EMP & Land Acquisiti<strong>on</strong> are still<br />
pending.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
FC (Stage‐II) and Land Acquisiti<strong>on</strong> are still<br />
pending. Stage‐I forest clearance just<br />
obtained. Represent<strong>at</strong>ive informed th<strong>at</strong><br />
payment has been made to 71 people<br />
under land acquisiti<strong>on</strong> process. MDO will<br />
be finalized within <strong>on</strong>e m<strong>on</strong>th. PPA signed<br />
with DVC/JSEB. The committee expressed<br />
c<strong>on</strong>cern over <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal<br />
block. Due to failure <str<strong>on</strong>g>of</str<strong>on</strong>g> NTPC to develop<br />
block in time, <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> target <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
MOC is in jeopardy.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
III. Coal Blocks allotted during 2005:<br />
Sl.<br />
No.<br />
a) Out <str<strong>on</strong>g>of</str<strong>on</strong>g> 24 coal blocks allotted during <str<strong>on</strong>g>the</str<strong>on</strong>g> year, 8 were allotted to Govt PSUs and 16 were<br />
allotted to priv<strong>at</strong>e sector companies. The Kasta (East) block alloc<strong>at</strong>ed to DVC and<br />
Panchbahini block alloc<strong>at</strong>ed to M/s. Shri Radhe Ind. Ltd. were de‐alloc<strong>at</strong>ed by MOC.<br />
b) Out <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 22 coal blocks stands allotted in <str<strong>on</strong>g>the</str<strong>on</strong>g> year, 2 coal blocks allotted to priv<strong>at</strong>e<br />
companies have started producing. The details are as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Sunflag Ir<strong>on</strong><br />
& Steel Ltd.<br />
2. Electrosteel<br />
Castings Ltd.<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Belga<strong>on</strong> 28.03.05/<br />
started<br />
Central<br />
Parb<strong>at</strong>pur<br />
07.07.05/<br />
July,08<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured prod.<br />
0.12 MT in 09‐10<br />
Producti<strong>on</strong><br />
started<br />
11<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
Producti<strong>on</strong> started. Coal produced up to<br />
March, 09 is 0.051.MT. CCO expressed<br />
diss<strong>at</strong>isfacti<strong>on</strong> regarding use <str<strong>on</strong>g>of</str<strong>on</strong>g> coal<br />
produced from <str<strong>on</strong>g>the</str<strong>on</strong>g> block as <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
expansi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> DRI plant has not come up<br />
yet.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company to be asked to clarify <strong>on</strong><br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> report <str<strong>on</strong>g>of</str<strong>on</strong>g> CCO.<br />
Remarks <strong>on</strong> progress:‐<br />
Producti<strong>on</strong> started from December,<br />
2008.Their target <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> during<br />
2010‐11 is 0.24 MT and <str<strong>on</strong>g>the</str<strong>on</strong>g>y will be<br />
<strong>at</strong>taining PRC in 2014‐15.<br />
c) To Govt Companies: 7 coal blocks (excluding Kasta (East) to DVC which was de‐alloc<strong>at</strong>ed)<br />
were alloc<strong>at</strong>ed to 6 Govt. PSUs/Corpor<strong>at</strong>i<strong>on</strong>s/Companies and 1 Priv<strong>at</strong>e Company. Talibira<br />
– II coal block was to be developed with Talibira – III block <str<strong>on</strong>g>of</str<strong>on</strong>g> MCL for c<strong>on</strong>serv<strong>at</strong>i<strong>on</strong> &<br />
maximum extracti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> coal. Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r, Talibira – II coal block is jointly allotted with <strong>on</strong>e<br />
priv<strong>at</strong>e company. On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g>ir performances, it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1 WBMDTC Ltd.<br />
(Govt.<br />
Dispens<strong>at</strong>i<strong>on</strong>)<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Trans<br />
Damodar<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
14.01.05/<br />
March, 09<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured to start<br />
producti<strong>on</strong> in<br />
Dec.2010.<br />
Remarks with Pending milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
Opening permissi<strong>on</strong> granted <strong>on</strong><br />
20.11.2008. Some coal to be extracted<br />
by Sept.10. Major part <str<strong>on</strong>g>of</str<strong>on</strong>g> coal will be<br />
produced by Dec.10. Secti<strong>on</strong> 4<br />
notific<strong>at</strong>i<strong>on</strong> for 213 acres land issued.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee asked WBMDCL to<br />
provide inform<strong>at</strong>i<strong>on</strong> regarding end users<br />
(name, loc<strong>at</strong>i<strong>on</strong> & capacity) <str<strong>on</strong>g>of</str<strong>on</strong>g> all <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
blocks allotted for commercial mining to<br />
MOC & CCO.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
2‐3 DVC<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Barjora<br />
North<br />
Khagra<br />
Joydev<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
03.03.05/<br />
Sept., 08<br />
03.03.05/<br />
Mar. 08<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
OB removal by<br />
Sept.10 and coal<br />
producti<strong>on</strong> by<br />
April, 2011.<br />
Assured to start<br />
producti<strong>on</strong> by<br />
2012‐13<br />
(Depending <strong>on</strong><br />
ML executi<strong>on</strong>)<br />
12<br />
Remarks with Pending milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
FC, Land acquisiti<strong>on</strong> is still pending.<br />
Represent<strong>at</strong>ive menti<strong>on</strong>ed th<strong>at</strong> 48 Ha<br />
land under lease hold area requires to be<br />
surrendered to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB. DVC agreed<br />
to surrender th<strong>at</strong> part. Mining lease<br />
executi<strong>on</strong> will be completed within 3‐4<br />
m<strong>on</strong>ths.<br />
Remarks <strong>on</strong> progress:‐<br />
MP, ML, Land acquisiti<strong>on</strong> pending. No<br />
forest land involved. ML applic<strong>at</strong>i<strong>on</strong><br />
forwarded to MOC by St<strong>at</strong>e Govt. <strong>on</strong><br />
14.7.10. Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB is insisting th<strong>at</strong> LA<br />
to be undertaken by way <str<strong>on</strong>g>of</str<strong>on</strong>g> direct<br />
negoti<strong>at</strong>i<strong>on</strong>. LA negoti<strong>at</strong>i<strong>on</strong> started.<br />
Company represent<strong>at</strong>ive intim<strong>at</strong>ed th<strong>at</strong><br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB will not help for acquiring<br />
land.<br />
Decisi<strong>on</strong>/Advise/Comment: The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g> development<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
4 WBPDCL Panchwa 26.04.05/ Assured Coal Remarks <strong>on</strong> progress:‐<br />
ra North May. 11 producti<strong>on</strong> by Unexplored, GR available in 3/07.<br />
March, 2011 Previous approval <str<strong>on</strong>g>of</str<strong>on</strong>g> MOC, ML, FC and<br />
LA are pending. Govt.<str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand<br />
sought clarific<strong>at</strong>i<strong>on</strong> for form<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> JV.<br />
MOC has to seek advice from Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Law regarding JV. BG lapsed.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit renewed bank<br />
Guarantee to Office <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Coal<br />
5 MCL/ NLC/ Talabira 10.11.05 / No assurance<br />
C<strong>on</strong>troller within 15 days positively.<br />
Remarks <strong>on</strong> progress:‐<br />
HINDALCO –II May,09<br />
FC, EMP & LA are pending. LA is in<br />
progress by priv<strong>at</strong>e negoti<strong>at</strong>i<strong>on</strong>. EMP is<br />
under prepar<strong>at</strong>ory stage <strong>at</strong> CMPDIL. Land<br />
acquired under CBA handed over. Stage‐I<br />
Forest clearance for 359 TPD smelter and<br />
900 MW Power Project <str<strong>on</strong>g>of</str<strong>on</strong>g> HINDALCO is<br />
expected shortly. No inform<strong>at</strong>i<strong>on</strong> about<br />
EUP <str<strong>on</strong>g>of</str<strong>on</strong>g> NLC. BG not deposited by <str<strong>on</strong>g>the</str<strong>on</strong>g> JV.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit details <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
joint alloc<strong>at</strong>tees to <str<strong>on</strong>g>the</str<strong>on</strong>g> CCO quarterly.<br />
Asked to deposit BG within 15 days for<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> combined capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two<br />
blocks. The committee was diss<strong>at</strong>isfied<br />
with <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked<br />
to issue show‐cause notice for de‐<br />
alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
6 APGENCO Tadicher<br />
la‐I<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
06.12.05<br />
/Dec.08<br />
7 RINL Mahal 09.12.05/<br />
June.10<br />
Sl.<br />
No.<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Start coal<br />
producti<strong>on</strong> by<br />
Dec, 2012. (EUP)<br />
Power Proj. in<br />
Dec. 2012.<br />
13<br />
Remarks with Pending milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
All milest<strong>on</strong>es are pending except GR<br />
purchase & BG submissi<strong>on</strong>. APGENCO<br />
has signed an agreement with SCCL (as<br />
MDO) to develop <str<strong>on</strong>g>the</str<strong>on</strong>g> coal block. Some<br />
part <str<strong>on</strong>g>of</str<strong>on</strong>g> land is under reserved forest. Not<br />
serious regarding submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
quarterly progress report to CCO.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Asked to submit reports to CCO<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
No progress. Company applied to MOC<br />
through Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Steel for altern<strong>at</strong>ive<br />
block. No progress is seen.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Issue show‐cause notice for de‐<br />
alloc<strong>at</strong>i<strong>on</strong>.<br />
d) To Priv<strong>at</strong>e companies: 15 coal blocks (excluding Panchbahini coal block alloc<strong>at</strong>ed to<br />
M/s. Shri Radhe Industries Ltd. which was de‐alloc<strong>at</strong>ed)were alloc<strong>at</strong>ed to 13 priv<strong>at</strong>e<br />
companies. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>se, 2 blocks have started producti<strong>on</strong>. The performance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
companies in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> remaining 13 coal blocks is given below:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Jayaswal<br />
Neco Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Moitra<br />
(Coking<br />
coal)<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
13.05.05/<br />
Nov.08<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
No assurance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
producti<strong>on</strong>.<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
EMP cleared. FC, ML & LA are pending.<br />
Secretary (Env. & Forest), Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Jharkhand has written to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> India<br />
to take wholistic view in <str<strong>on</strong>g>the</str<strong>on</strong>g> m<strong>at</strong>ter <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
forest clearance. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> forest<br />
clearance in karanpura coal fields will be<br />
a gre<strong>at</strong> thre<strong>at</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Wild life. Company<br />
st<strong>at</strong>es th<strong>at</strong> forest clearance is pending<br />
with Secretary (Forest), GOJH. The St<strong>at</strong>e<br />
Govt. is awaiting reply <str<strong>on</strong>g>of</str<strong>on</strong>g> MOEF.<br />
Represent<strong>at</strong>ives asked to provide<br />
clarific<strong>at</strong>i<strong>on</strong> regarding change <str<strong>on</strong>g>of</str<strong>on</strong>g> loc<strong>at</strong>i<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUP.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Comment <str<strong>on</strong>g>of</str<strong>on</strong>g> CCO:‐
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
2‐4. Abhijeet<br />
Infrastructure<br />
Ltd.<br />
5. Domco Pvt.<br />
Ltd.<br />
6‐7. T<strong>at</strong>a Steel<br />
Ltd.<br />
8. Usha Martin<br />
Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
i.Brinda<br />
ii.Sasai<br />
iii.Meral<br />
Lalgarh<br />
North<br />
Kotre<br />
Basantpur<br />
&<br />
Panchmo<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
26.05.05/<br />
Nov.08<br />
08.07.05/<br />
Jan,09<br />
11.08.05/<br />
Feb., 09<br />
Lohari 24.08.05/<br />
Aug., 08<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured th<strong>at</strong><br />
within 3 m<strong>on</strong>ths<br />
after executi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
ML, it would be<br />
able to start<br />
producti<strong>on</strong><br />
14<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
It is c<strong>on</strong>firmed from <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>i<strong>on</strong> letter<br />
th<strong>at</strong> loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP is <strong>at</strong> Siltara,<br />
Chh<strong>at</strong>tisgarh.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML pending. FC is <strong>on</strong> progress, will be<br />
obtained by next 7/8 m<strong>on</strong>ths. ML is<br />
pending with st<strong>at</strong>e Govt. since 2006.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Chairman advised Secretary (Mines),<br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand to look into <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
m<strong>at</strong>ter urgently. Advisory to be issued.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
All activities are pending except<br />
purchase <str<strong>on</strong>g>of</str<strong>on</strong>g> GR, submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> MP & BG.<br />
The represent<strong>at</strong>ive <strong>on</strong> behalf <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company expressed <str<strong>on</strong>g>the</str<strong>on</strong>g> dispute in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
m<strong>at</strong>ter <str<strong>on</strong>g>of</str<strong>on</strong>g> share‐holding which is<br />
subjudice in Company Law Board. BG<br />
lapsed. Validity <str<strong>on</strong>g>of</str<strong>on</strong>g> BG to be checked.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company was advised to settle <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
dispute within three m<strong>on</strong>ths. Company<br />
was asked to withdraw <strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two<br />
Mining Plans within ten days time. BG<br />
has to be renewed within 15 days. To<br />
issue notice to fulfill <str<strong>on</strong>g>the</str<strong>on</strong>g>se c<strong>on</strong>diti<strong>on</strong>s,<br />
o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise<br />
alloc<strong>at</strong>i<strong>on</strong>.<br />
initi<strong>at</strong>e process for de‐<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
FC, ML and Land Acquisiti<strong>on</strong> pending.<br />
Represent<strong>at</strong>ive st<strong>at</strong>ed th<strong>at</strong> MP was<br />
approved for 5 MT. They have paid Rs.<br />
99.9 crore as compens<strong>at</strong>i<strong>on</strong> for land. ML<br />
applied in 2007. St<strong>at</strong>e Govt. has sent a<br />
letter asking for some clarific<strong>at</strong>i<strong>on</strong>. 66<br />
acres <str<strong>on</strong>g>of</str<strong>on</strong>g> land <str<strong>on</strong>g>of</str<strong>on</strong>g> DOMCO is overlapping<br />
with <str<strong>on</strong>g>the</str<strong>on</strong>g> block area. This issue has not<br />
been brought before <str<strong>on</strong>g>the</str<strong>on</strong>g> MOC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
St<strong>at</strong>e Govt. to look into <str<strong>on</strong>g>the</str<strong>on</strong>g> ML issue.<br />
The committee observed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company is delaying by bringing new<br />
issues now. The committee was<br />
diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
mine & asked to issue show‐cause<br />
notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
producti<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
ML & Land Acquisiti<strong>on</strong> pending. No<br />
forest land involved. Company requested<br />
for MOC’s interference to settle <str<strong>on</strong>g>the</str<strong>on</strong>g>
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
9. Corpor<strong>at</strong>e<br />
Isp<strong>at</strong> Ltd.<br />
10‐<br />
12.<br />
Shri<br />
Virangana<br />
Steels Ltd.<br />
13. MCL/ JSW<br />
/JPL/Jindal<br />
Stainless /<br />
Shyam DRI<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Chitorpur<br />
North<br />
Marki<br />
Mangli‐ II,<br />
III, IV<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
02.09.05/<br />
March, 09<br />
06.09.05/<br />
Mar. 09<br />
Utkal‐A 29.11.05<br />
/May,09<br />
Assurance made<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Coal producti<strong>on</strong><br />
will commence<br />
after 6‐8 m<strong>on</strong>ths<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> FC .<br />
Coal producti<strong>on</strong><br />
from two blocks<br />
after getting EMP<br />
clearance<br />
15<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
boundary dispute. Represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
CMPDIL informed th<strong>at</strong> area demarc<strong>at</strong>ed<br />
as per alloc<strong>at</strong>i<strong>on</strong> letter. If <str<strong>on</strong>g>the</str<strong>on</strong>g> same is not<br />
communic<strong>at</strong>ed, it is to be communic<strong>at</strong>ed<br />
by MOC. EUP is expected to come up<br />
within 3 m<strong>on</strong>ths. BG lapsed<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.BG<br />
to be renewed within 15 days.<br />
Remarks <strong>on</strong> progress:‐<br />
ML, FC & LA are pending. St<strong>at</strong>e‐I forest<br />
clearance is pending with St<strong>at</strong>e Govt.<br />
Forest clearance is <str<strong>on</strong>g>the</str<strong>on</strong>g> main issue. EUP‐<br />
0.75 MTPA Sp<strong>on</strong>ge Ir<strong>on</strong> plant <strong>at</strong> Birban,<br />
JH is coming up so<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Stage‐I FC, EMP, ML & LA are pending.<br />
For 163 acres <str<strong>on</strong>g>of</str<strong>on</strong>g> land purchased for<br />
compens<strong>at</strong>ory aforest<strong>at</strong>i<strong>on</strong>. Land<br />
acquisiti<strong>on</strong> for blocks has started<br />
through priv<strong>at</strong>e negoti<strong>at</strong>i<strong>on</strong>. Land<br />
acquired for Marki Mangli‐III. EUP<br />
existing.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
Explored Block. FC, EMP, & LA are<br />
pending. JVC formed <strong>on</strong>ly in 2008. As per<br />
forest right act, Gram sabha <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong><br />
17.2.10. Land acquisiti<strong>on</strong> is c<strong>on</strong>tinuing.<br />
EMP proposal moved to MOEF <strong>on</strong> 2.3.10.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit details <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
joint alloc<strong>at</strong>tees to <str<strong>on</strong>g>the</str<strong>on</strong>g> CCO quarterly.<br />
Asked to deposit BG within 15 days for<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> combined capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two<br />
blocks. The committee was diss<strong>at</strong>isfied<br />
with <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked<br />
to issue show‐cause notice for de‐<br />
alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
IV. Coal blocks allotted during 2006:<br />
Sl.<br />
No.<br />
a) Total 53 (32 to PSUs, 15 to Pvt. & 6 for UMPPs) coal blocks were allotted to 22 Govt.<br />
PSUs and 47 Pvt. Companies during 2006. However, <strong>on</strong>e coal block namely Jainagar<br />
allotted to GMDC has been cancelled <strong>on</strong> represent<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> M/s GMDC.<br />
b) To Govt. Companies: On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> PSUs (31 blocks) it was noted as<br />
follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal<br />
Block<br />
1‐2. MPSMCL Amelia, Amelia<br />
North<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
12.01.06/<br />
July,09<br />
3. TVNL/ DVC G<strong>on</strong>dulpara 13.01.06/<br />
July,09<br />
4‐9. NTPC Ch<strong>at</strong>tibari<strong>at</strong>u 25.01.06/<br />
July,09<br />
16<br />
Assurance<br />
made by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
i) For Amelia block FC, ML executi<strong>on</strong> &<br />
Land acquisiti<strong>on</strong> pending. 60% coal from<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block will be used in Sanjay Gandhi<br />
Thermal power project. Utiliz<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
40% balance coal will be determined by<br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> MP. JV partner for mining is<br />
Sainik mining company.<br />
ii) For Amelia (North) coal block, Stage‐I<br />
FC completed. Selected M/s. JP<br />
Associ<strong>at</strong>es as MDO. Coal will be utilized<br />
in 1320 MW pit head power project <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
MDO. C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Power Plant is in<br />
advance stages.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
MPSMCL was advised to provide details<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs linked to <str<strong>on</strong>g>the</str<strong>on</strong>g> blocks allotted for<br />
commercial mining such th<strong>at</strong> coal linkage<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs could be adjusted accordingly.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
ML, FC, EMP & LA are pending.BG<br />
submitted. ML applic<strong>at</strong>i<strong>on</strong> submitted in<br />
March.10. Two ML applic<strong>at</strong>i<strong>on</strong><br />
submitted (<strong>on</strong>e for forest area and<br />
ano<str<strong>on</strong>g>the</str<strong>on</strong>g>r for n<strong>on</strong>‐forest area).<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee expressed diss<strong>at</strong>isfacti<strong>on</strong><br />
over <str<strong>on</strong>g>the</str<strong>on</strong>g> progress as per <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
commitment made by <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>tees &<br />
asked to issue show‐cause notice for de‐<br />
alloc<strong>at</strong>i<strong>on</strong>.<br />
Assured to start<br />
producti<strong>on</strong> by<br />
March, 2012.<br />
Remarks <strong>on</strong> progress:‐<br />
FC & LA are pending. Land payment<br />
started. Coal evacu<strong>at</strong>i<strong>on</strong> problems are<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>re. Forest clearance is <str<strong>on</strong>g>the</str<strong>on</strong>g> main issue.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
10‐<br />
12.<br />
13‐<br />
14.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
JSMDC<br />
MSEB &<br />
GSEB<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Kerandari 25.01.06/<br />
July,09<br />
Talaipalli 25.01.06/<br />
Mar,12<br />
Dulunga 25.01.06/<br />
Sept,11<br />
Brahman<br />
Chichiro<br />
p<strong>at</strong>simal<br />
25.01.06/<br />
Oct,11<br />
17<br />
Assurance<br />
made by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Assured to start<br />
producti<strong>on</strong> by<br />
March, 2012.<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, & LA are pending. FC<br />
applic<strong>at</strong>i<strong>on</strong> is with MOEF. NOC from<br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> JH obtained.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Explor<strong>at</strong>i<strong>on</strong> completed. FC, EMP & LA are<br />
pending. Mine plan approved. Persuing<br />
with St<strong>at</strong>e Govt. for LA. NOC for FC is<br />
awaited from St<strong>at</strong>e Govt. Examining coal<br />
producti<strong>on</strong> though JV form<strong>at</strong>i<strong>on</strong> with<br />
NTPC‐SECL.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
FC, EMP & LA are pending. “No Go”<br />
forest area under c<strong>at</strong>egory‐A declared by<br />
MOEF. Explor<strong>at</strong>i<strong>on</strong> completed by MECL.<br />
Block boundary dispute between OPGC<br />
& NTPC is finalized. Applied for EMP.<br />
NTPC is planning to develop <str<strong>on</strong>g>the</str<strong>on</strong>g> block<br />
though NTPC‐SECL JV form<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
All milest<strong>on</strong>es pending. JVC not yet<br />
finalized. JVA signed in Oct. 09 <strong>on</strong> 50‐50<br />
sharing basis.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee expressed c<strong>on</strong>cern over <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal blocks. Due to failure <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
NTPC to develop blocks in time, <str<strong>on</strong>g>the</str<strong>on</strong>g> producti<strong>on</strong> target <str<strong>on</strong>g>of</str<strong>on</strong>g> MOC is in jeopardy. Decided to<br />
issue show cause notices. As <str<strong>on</strong>g>the</str<strong>on</strong>g> development in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> two blocks allotted<br />
jointly with CIL is almost negligible, <str<strong>on</strong>g>the</str<strong>on</strong>g> committee decided to recommend for de‐<br />
alloc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>se two blocks.<br />
Sugia Closed<br />
mine,<br />
Rauta Closed<br />
mine &<br />
Burakhap<br />
Small P<strong>at</strong>ch<br />
30.01.06<br />
/July 09<br />
30.01.06/<br />
Oct,11<br />
No<br />
commitment<br />
No<br />
commitment<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML and LA pending. Forest proposal<br />
forwarded to CCF (Central), by Forest<br />
Dept, GOJH. ML applic<strong>at</strong>i<strong>on</strong> is with<br />
Secretary, Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> JH.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. No visible progress.<br />
Represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> JH informed<br />
th<strong>at</strong> JV will be formed by 12‐15 days. JVC<br />
will start rest <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> developmental<br />
activities.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee asked <str<strong>on</strong>g>the</str<strong>on</strong>g> represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand to expedite <str<strong>on</strong>g>the</str<strong>on</strong>g> m<strong>at</strong>ter.<br />
Moreover, it was decided th<strong>at</strong> blocks alloc<strong>at</strong>ed to PSUs in Jharkhand will be reviewed<br />
separ<strong>at</strong>ely. Show cause notice may be issued.<br />
Mahanadi &<br />
Machak<strong>at</strong>a<br />
06.02.06/<br />
Dec, 11<br />
Prod. by 2013‐<br />
14.<br />
Explor<strong>at</strong>i<strong>on</strong> for<br />
Mahanadi block<br />
by Dec.10.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. MP<br />
approved. Forest applic<strong>at</strong>i<strong>on</strong> will be<br />
submitted so<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal<br />
Block<br />
15. CMDC Gare Palma<br />
Sec‐I<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
02.08.06/<br />
May, 12<br />
16. CSEB Parsa 02.08.06/<br />
May, 12<br />
17. GMDC Morga II 02.08.06<br />
May, 12<br />
18.<br />
MPSMCL Morga‐I<br />
19. MSMCL Marki Jari<br />
Jamini Adhkoli<br />
20. TNEB &<br />
MSMCL<br />
Gare Palma<br />
Sec‐II<br />
02.08.06/<br />
May, 12<br />
02.08.06/<br />
June, 13<br />
02.08.06/<br />
May, 12<br />
Assurance<br />
made by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Detailed<br />
explor<strong>at</strong>i<strong>on</strong> by<br />
Oct. 11 and GR<br />
will be ready by<br />
March.12.<br />
GR will be<br />
ready by 2011<br />
GR will be<br />
ready by July,<br />
2011.<br />
18<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
MOC to intervene regarding <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
payment issue involving communic<strong>at</strong>i<strong>on</strong><br />
from PAO to CMPDIL (for purchase <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
copy <str<strong>on</strong>g>of</str<strong>on</strong>g> GR). Advise to expedite progress.<br />
Remarks <strong>on</strong> progress:‐<br />
Regi<strong>on</strong>ally Explored Block. PL deed<br />
executed <strong>on</strong> 16.11.09. Drilling started by<br />
MECL. 113 boreholes drilling completed<br />
by MECL. Requested CMPDIL to prepare<br />
Mining Plan.<br />
Remarks <strong>on</strong> progress:‐<br />
All milest<strong>on</strong>es are pending. “No Go”<br />
Forest area under c<strong>at</strong>egory “A” declared<br />
by MOEF. PL will be issued after<br />
obtaining Forest clearance from MOEF.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Show cause notice may be issued for de‐<br />
alloc<strong>at</strong>i<strong>on</strong> for no progress.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
RE Block. “No Go” Forest area under<br />
c<strong>at</strong>egory “A” declared by MOEF.<br />
Company represent<strong>at</strong>ive intim<strong>at</strong>ed th<strong>at</strong><br />
explor<strong>at</strong>i<strong>on</strong> work order awarded. FC is<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> main hurdle to development <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block. Requested to MOC for<br />
No assurance<br />
arrangement <str<strong>on</strong>g>of</str<strong>on</strong>g> altern<strong>at</strong>ive block.<br />
EUP:‐1750 MW power plant to be put up<br />
by M/s KSK Mahanadi Power company<br />
Ltd. in Chh<strong>at</strong>tisgarh.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. All milest<strong>on</strong>es are pending<br />
Now under subjudice.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Letter to St<strong>at</strong>e Govt. to resolve <str<strong>on</strong>g>the</str<strong>on</strong>g> issue<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Unexplored. FC, EMP, MP Ml & LA are<br />
pending. MSMCL has 51% share and<br />
Sunil Hightech. c<strong>on</strong>tains 49% share.<br />
GR completed in Dec.09. Mining plan<br />
prepar<strong>at</strong>i<strong>on</strong> work awarded. Forest<br />
clearance is expected to get within 2<br />
m<strong>on</strong>ths. No assurance <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong><br />
committed.<br />
Remarks <strong>on</strong> progress:‐<br />
RE Block. PL is not yet granted by CG<br />
Govt. Explor<strong>at</strong>i<strong>on</strong> yet to commence.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal<br />
Block<br />
21. BRKBNL Saria<br />
Khoy<strong>at</strong>and<br />
22‐<br />
23.<br />
JSMDCL<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
02.08.06/<br />
May, 12<br />
L<strong>at</strong>ehar 02.08.06/<br />
May, 12<br />
Pindra Debipur 02.08.06/<br />
Khoy<strong>at</strong>and May, 12<br />
24. TVNL Rajbar E & D 02.08.06/<br />
May, 12<br />
25. Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> NCT<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> Delhi &<br />
HPGCL<br />
Mara II Mahan 02.08.06/<br />
May, 12<br />
26. MPSMCL D<strong>on</strong>geri Tal II 02.08.06/<br />
May, 12<br />
27. OMC & APMC Nuaga<strong>on</strong><br />
Telisahi<br />
02.08.06/<br />
May, 12<br />
19<br />
Assurance<br />
made by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
No assurance<br />
MDO will develop <str<strong>on</strong>g>the</str<strong>on</strong>g> power project.<br />
MDO not yet decided.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Show cause notice may be issued for de‐<br />
alloc<strong>at</strong>i<strong>on</strong> for no progress.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. No progress. Regarding<br />
No assurance<br />
selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> MDO litig<strong>at</strong>i<strong>on</strong> started.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to dispose <str<strong>on</strong>g>the</str<strong>on</strong>g> court m<strong>at</strong>ter<br />
immedi<strong>at</strong>ely or PSU may surrender <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block. Show cause notice may be issued<br />
for de‐alloc<strong>at</strong>i<strong>on</strong> for no progress.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. All milest<strong>on</strong>es are pending.<br />
No assurance Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Unexplored. Explor<strong>at</strong>i<strong>on</strong> will be carried<br />
out by CMPDIL. CMPDIL informed th<strong>at</strong><br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>re are L&O problems <strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> mine site.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Start<br />
producti<strong>on</strong> by<br />
Feb.12<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. “No Go” Forest area Under<br />
c<strong>at</strong>egory “A” declared by MOEF. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
PL is pending with St<strong>at</strong>e Govt. Drilling<br />
agency is MECL. As such no progress has<br />
been made by <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>tees.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
Unexplored. “No Go” Forest area Under<br />
c<strong>at</strong>egory “A” declared by MOEF. PL<br />
granted by Govt <str<strong>on</strong>g>of</str<strong>on</strong>g> MP. Explor<strong>at</strong>i<strong>on</strong> will<br />
be d<strong>on</strong>e by M/s. J.P.Associ<strong>at</strong>es Ltd<br />
through form<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> JVC.<br />
Coal Prod.<br />
June, 14.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. All activities are pending.<br />
MECL started drilling & completed by<br />
March, 10. ML applic<strong>at</strong>i<strong>on</strong> will be made<br />
shortly. Socio‐ec<strong>on</strong>omic survey d<strong>on</strong>e.<br />
Amount paid for GR copy.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
28‐<br />
29.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal<br />
Block<br />
WBMTDCL Ichapur &<br />
Kulti<br />
30. MMTC Gomia (deep<br />
UG)<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
02.08.06/<br />
May, 12<br />
02.08.06/<br />
May, 13<br />
31. JSEB Banhardih 02.08.06/<br />
May, 12<br />
20<br />
Assurance<br />
made by <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
GR by May,<br />
2011 &<br />
Producti<strong>on</strong> by<br />
Dec., 13<br />
Report to MOC<br />
within 6<br />
m<strong>on</strong>ths,<br />
whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r want<br />
to keep <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block.<br />
Remarks with Pending Milest<strong>on</strong>es/<br />
Decisi<strong>on</strong>s<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. Represent<strong>at</strong>ive informed<br />
th<strong>at</strong> drilling oper<strong>at</strong>i<strong>on</strong> suspended due to<br />
withdrawal <str<strong>on</strong>g>of</str<strong>on</strong>g> MECL. A new Chinese<br />
company engaged in explor<strong>at</strong>i<strong>on</strong> work.<br />
Coal will be utilized to <str<strong>on</strong>g>the</str<strong>on</strong>g> upcoming<br />
steel plant in WB.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
A letter to <str<strong>on</strong>g>the</str<strong>on</strong>g> company & <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e<br />
Govt. to expedite.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. PL not granted.<br />
Prefeasibility study not yet completed.<br />
Explor<strong>at</strong>i<strong>on</strong> not yet started. Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> JH<br />
represent<strong>at</strong>ive viewed th<strong>at</strong> MMTC have<br />
to sign PL deed first. MMTC has not kept<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> commitment made in <str<strong>on</strong>g>the</str<strong>on</strong>g> past to<br />
come up whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>the</str<strong>on</strong>g>y want to keep <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block. Company assured to come up<br />
within 6 m<strong>on</strong>ths.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee observed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company has been given enough time to<br />
develop <str<strong>on</strong>g>the</str<strong>on</strong>g> block & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Unexplored. Applic<strong>at</strong>i<strong>on</strong> submitted for PL<br />
to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand. All activities are<br />
pending. Represent<strong>at</strong>ive reported th<strong>at</strong><br />
JVC form<strong>at</strong>i<strong>on</strong> to be completed with<br />
NTPC Ltd. NTPC will develop <str<strong>on</strong>g>the</str<strong>on</strong>g> power<br />
plant also. St<strong>at</strong>e Govt. (GOJH) to decide<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> form<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> JVC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
c) To Priv<strong>at</strong>e Companies: During 2006, 15 coal blocks were alloc<strong>at</strong>ed to different Pvt.<br />
companies mostly through JV route. On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> priv<strong>at</strong>e (block<br />
alloc<strong>at</strong>tee) companies it was noted th<strong>at</strong>:
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Bhusan<br />
Power & Steel<br />
Ltd. +<br />
Mahabir<br />
Ferro alloys<br />
2. Jayaswal<br />
Neco Ltd.<br />
3. JSPL & Nalwa<br />
Sp<strong>on</strong>ge Ir<strong>on</strong><br />
Ltd.<br />
4. Madanpur<br />
South Coal<br />
Company Ltd.<br />
(JVC <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Hindustan<br />
Zinc Ltd. &<br />
O<str<strong>on</strong>g>the</str<strong>on</strong>g>rs)<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Bijahan<br />
(unexplored<br />
block)<br />
Gare Palma<br />
IV/8<br />
Gare Palma<br />
IV/6<br />
Madanpur<br />
South<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
13.01.06/<br />
Nov, 10<br />
13.01.06/<br />
Jan, 10<br />
13.01.06/<br />
July, 09<br />
13.01.06/<br />
July, 09<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Prior approval <str<strong>on</strong>g>of</str<strong>on</strong>g> ML, FC, EMP, & LA are<br />
pending. FC applic<strong>at</strong>i<strong>on</strong> has been<br />
forwarded to PCCF (Nodal),<br />
No assurance<br />
Bhubaneswar. EMP report submitted to<br />
MOEF for EC. For LA notific<strong>at</strong>i<strong>on</strong> under<br />
Sec.6 (1) is under process with Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Orissa.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
No visible progress, show cause notice<br />
may be issued for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Previous approvals, ML, LA are pending.<br />
Stage‐I FC obtained in 2009 and Stage‐II<br />
forest clearance is pending with MOEF.<br />
ML for prior approval to MOC from St<strong>at</strong>e<br />
Govt. recently.<br />
High Court ordered <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt. not<br />
to allow any expansi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> existing<br />
sp<strong>on</strong>ge ir<strong>on</strong> project in Siltara, CG.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
No visible progress, show cause notice<br />
may be issued for de‐alloc<strong>at</strong>i<strong>on</strong>. The<br />
company was asked to appraise MOC<br />
regarding court order.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
FC, ML and LA are pending. For LA<br />
applic<strong>at</strong>i<strong>on</strong> made to Collector, Raigarh.<br />
Boundary dispute for 50 hectors <str<strong>on</strong>g>of</str<strong>on</strong>g> land<br />
with Gare‐Palma IV/7, resolved &<br />
CMPDIL intim<strong>at</strong>ed th<strong>at</strong> block area <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Gare Palma IV/7 is more than wh<strong>at</strong> was<br />
allotted earlier. Gare Palma IV/7 block<br />
allottee to surrender ML for deleti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
excess area from ML.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee asked Gare Palma IV/7<br />
block allottee to surrender <str<strong>on</strong>g>the</str<strong>on</strong>g> ML for<br />
fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r acti<strong>on</strong>. BG amount to be<br />
renewed and pay to CCO within 15 days.<br />
As such progress is not s<strong>at</strong>isfactory, may<br />
issue advisory.<br />
Assured coal<br />
producti<strong>on</strong> since<br />
18 th m<strong>on</strong>ths from<br />
FC.<br />
21<br />
Remarks <strong>on</strong> progress:‐<br />
MP approved. All o<str<strong>on</strong>g>the</str<strong>on</strong>g>r subsequent<br />
milest<strong>on</strong>es pending. No Go Forest area<br />
under c<strong>at</strong>egory “A” declared by MOEF.<br />
FAC did not recommend <str<strong>on</strong>g>the</str<strong>on</strong>g> proposal <strong>on</strong><br />
FC in Arand Hasdeo regi<strong>on</strong>. EUP<br />
oper<strong>at</strong>ive.<br />
Decisi<strong>on</strong>/Advise/Comment:‐
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
5‐6. Chh<strong>at</strong>tisgarh<br />
Captive Coal<br />
company Ltd.<br />
(JVC <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Isp<strong>at</strong><br />
Godavari &<br />
O<str<strong>on</strong>g>the</str<strong>on</strong>g>rs)<br />
7. Ultr<strong>at</strong>ech &<br />
O<str<strong>on</strong>g>the</str<strong>on</strong>g>rs<br />
8. Electrosteel<br />
Castings &<br />
o<str<strong>on</strong>g>the</str<strong>on</strong>g>rs<br />
9. Neelachal<br />
Ir<strong>on</strong> &<br />
Bajrang Isp<strong>at</strong><br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Nakia I & II 13.01.06<br />
Re‐fixed<br />
to<br />
31.05.07/<br />
Nov, 10<br />
Madan<br />
‐pur North<br />
North<br />
Dhadu<br />
Dumri<br />
(Explored)<br />
13.01.06/<br />
July, 09<br />
13.01.06/<br />
July, 09<br />
13.01.06/<br />
July, 09<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
FC, ML, EMP & LA are pending. No Go<br />
Forest area Under c<strong>at</strong>egory “A” declared<br />
by MOEF. FAC did not recommend <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
proposal <strong>on</strong> FC in Arand Hasdeo regi<strong>on</strong>.<br />
Zero d<strong>at</strong>e for development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal block<br />
has been re‐fixed to 31.05.07. EUPs are<br />
oper<strong>at</strong>ive.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. No Go<br />
Forest area Under c<strong>at</strong>egory “A” declared<br />
by MOEF. FAC did not recommend <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
proposal <strong>on</strong> FC in Arand Hasdeo regi<strong>on</strong>.<br />
EUP oper<strong>at</strong>ive. Company represent<strong>at</strong>ive<br />
requested to c<strong>on</strong>tinue coal linkage.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Joint venture company is required to<br />
submit <str<strong>on</strong>g>the</str<strong>on</strong>g> st<strong>at</strong>us report <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
individual alloc<strong>at</strong>es to CCO by 5 th <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
every quarter ending period.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
FC, EMP, MP, ML & LA are pending. Fire<br />
clay areas involved in <str<strong>on</strong>g>the</str<strong>on</strong>g> block lease<br />
hold area. EUP details <str<strong>on</strong>g>of</str<strong>on</strong>g> Adhunik Alloys<br />
not being submitted by <str<strong>on</strong>g>the</str<strong>on</strong>g> JVC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Advised to settle <str<strong>on</strong>g>the</str<strong>on</strong>g> fire clay issue in ML<br />
holds area with <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt. Secretary<br />
(Mines), GoJH would facilit<strong>at</strong>e. To submit<br />
st<strong>at</strong>us report in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Adhunik Alloys Ltd. to CCO. The<br />
No assurance.<br />
committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML, EMP & LA are still pending. FC<br />
applic<strong>at</strong>i<strong>on</strong> filed with <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt.<br />
pending with Secretary (forest) Compen‐<br />
s<strong>at</strong>ory land purchased. ML is pending<br />
with DGM, GoJH for final executi<strong>on</strong>.<br />
22
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
10. Gupta<br />
Metallics &<br />
Gupta<br />
Washeries<br />
11. Bhusan Steel<br />
and Strips<br />
Ltd. & Othrs<br />
12. T<strong>at</strong>a Sp<strong>on</strong>ge<br />
& o<str<strong>on</strong>g>the</str<strong>on</strong>g>rs<br />
13. Essar Power<br />
& Hindalco<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Neerad<br />
Malega<strong>on</strong><br />
New<br />
P<strong>at</strong>rapara<br />
Radhikapur<br />
East<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
13.01.06/<br />
Jan., 10<br />
13.01.06/<br />
July, 09<br />
07.02.06/<br />
Aug., 09<br />
Mahan 12.04.06/<br />
Oct., 09<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Assured coal<br />
producti<strong>on</strong> by 2011‐<br />
12 (August, 2011)<br />
23<br />
Remarks with Pending milest<strong>on</strong>es<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> Previous approvals, EMP, ML<br />
are pending. No forest land involved.<br />
Renewed BG submitted <strong>on</strong> 15.06.10<br />
after 6 m<strong>on</strong>ths <str<strong>on</strong>g>the</str<strong>on</strong>g> BG was lapsed. In last<br />
meeting, assured to produce by April, 10.<br />
However, MP has been approved in<br />
April, 10. Slow progress.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
No significant progress. Show cause<br />
notice to be issued for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
‐ Remarks <strong>on</strong> progress:‐<br />
All activities are pending. M<strong>at</strong>ter is sub‐<br />
judice before Orissa High Court.<br />
However, developmental work <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block can c<strong>on</strong>tinue by <str<strong>on</strong>g>the</str<strong>on</strong>g> leader.<br />
Represent<strong>at</strong>ives informed th<strong>at</strong> in a week<br />
time <str<strong>on</strong>g>the</str<strong>on</strong>g>y will resolve <str<strong>on</strong>g>the</str<strong>on</strong>g> issue by<br />
mutual understanding.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee observed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> leader<br />
is not developing <str<strong>on</strong>g>the</str<strong>on</strong>g> block as per <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
time‐line. Show cause notice to be<br />
issued to <str<strong>on</strong>g>the</str<strong>on</strong>g> leader for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Coal producti<strong>on</strong> has<br />
been assured 4 th<br />
quarter <str<strong>on</strong>g>of</str<strong>on</strong>g> 2012‐13<br />
Assured producti<strong>on</strong><br />
by April, 2011<br />
Remarks <strong>on</strong> progress:‐<br />
EMP, FC, ML and LA are pending. R&R<br />
col<strong>on</strong>y area demarc<strong>at</strong>i<strong>on</strong> is complete.<br />
4(1) notific<strong>at</strong>i<strong>on</strong> for LA is complete.<br />
Compens<strong>at</strong>i<strong>on</strong> paid to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Orissa.<br />
Gram sabha c<strong>on</strong>ducted in 3 villages. In<br />
last meeting, assured to produce by last<br />
quarter <str<strong>on</strong>g>of</str<strong>on</strong>g> 10‐11, but no progress made<br />
since last meeting. Still <str<strong>on</strong>g>the</str<strong>on</strong>g> progress far<br />
from s<strong>at</strong>isfactory & very unlikely to start<br />
producti<strong>on</strong> as committed.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
No progress since last meeting. The<br />
committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
FC,ML & LA pending. No Go forest area<br />
under c<strong>at</strong>egory “A” declared by MOEF.<br />
Land for compens<strong>at</strong>ory afforest<strong>at</strong>i<strong>on</strong><br />
identified.<br />
Decisi<strong>on</strong>/Advise/Comment:‐
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
14. Rungta Mines<br />
Ltd.& O<str<strong>on</strong>g>the</str<strong>on</strong>g>rs<br />
15. Rungta Mines<br />
Ltd.<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Radhikapur<br />
West<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
25.04.06<br />
21.12.09<br />
(re‐<br />
alloc<strong>at</strong>ed)/<br />
June, 13<br />
Bundu 25.04.06/<br />
Oct., 09<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g> Remarks with Pending milest<strong>on</strong>es<br />
meeting<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
All pending. Court case lifted. Zero d<strong>at</strong>e<br />
for development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal block has been<br />
rescheduled from 21.12.09. BG was<br />
submitted as l<strong>at</strong>e as July, 2010. No<br />
progress.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. No Go<br />
Forest area under c<strong>at</strong>egory “A” declared<br />
by MOEF. Maximum area <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block is<br />
covered with forest land.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
d) To UMPPs/Tariff Based Bidding: A total <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 blocks have been alloc<strong>at</strong>ed to two SPVs <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Power Finance Corpor<strong>at</strong>i<strong>on</strong> (PFC) cre<strong>at</strong>ed for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> setting up two UMPPs in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
St<strong>at</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> MP and Orissa. The M/s Sasan Power Ltd. (SPV <str<strong>on</strong>g>of</str<strong>on</strong>g> PFC for MP UMPP) has since<br />
been transferred to M/s Reliance Power Ltd. & zero d<strong>at</strong>e for <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block<br />
has since been revised as August, 2007. On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance it was as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1‐3. M/s Sasan<br />
Power Ltd.<br />
(an SPV <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
PFC for MP<br />
UMPP) has<br />
since been<br />
transferred to<br />
M/s Reliance<br />
Power Ltd.<br />
4‐6. Power<br />
Finance<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Moher &<br />
Moher<br />
Amlori<br />
Extn.<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
13.09.06<br />
(“0” d<strong>at</strong>e ‐<br />
Feb. 07)<br />
/Mar. 10<br />
Ch<strong>at</strong>rasal 26.10.06<br />
(“0” d<strong>at</strong>e ‐<br />
Feb. 07)/<br />
Mar. 10<br />
Meenakshi 13.09.06<br />
/Mar.10<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Producti<strong>on</strong><br />
schedule.<br />
By 2011<br />
as per<br />
24<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
ML and LA pending. Stage‐II FC approved<br />
in May, 10. Revised mining plan for 20<br />
MTPA approved.<br />
By 2012 Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. Stage‐I<br />
forest clearance has not yet granted.<br />
Company represent<strong>at</strong>ive informed th<strong>at</strong><br />
producti<strong>on</strong> to be started as per schedule.<br />
No assurances. Remarks <strong>on</strong> progress:‐<br />
Meenakshi‐ Explored. Meenakshi‐B &
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Corpor<strong>at</strong>i<strong>on</strong><br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Meenakshi<br />
B, Deep<br />
side‐Meen‐<br />
akshi<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
13.09.06<br />
/Mar.10<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
No assurances. Deep‐side Meenakshi‐ Unexplored<br />
blocks. Bidding for selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> developer<br />
not yet been completed due to No go<br />
forest area criteria.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee asked to take up with <str<strong>on</strong>g>the</str<strong>on</strong>g> Min <str<strong>on</strong>g>of</str<strong>on</strong>g> Power to release <str<strong>on</strong>g>the</str<strong>on</strong>g> block, as four year<br />
has passed & still <str<strong>on</strong>g>the</str<strong>on</strong>g> project is not awarded.<br />
25
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
V. Coal blocks allotted during 2007:<br />
Sl.<br />
No.<br />
a) During <str<strong>on</strong>g>the</str<strong>on</strong>g> year a total <str<strong>on</strong>g>of</str<strong>on</strong>g> 52 coal blocks, 34 to PSUs, 17 to priv<strong>at</strong>e companies and <strong>on</strong>e<br />
block for Jharkhand UMPP, were allotted. However, <strong>on</strong>e coal block, namely, Agarzari,<br />
allotted to MSMDCL has been de‐alloc<strong>at</strong>ted.<br />
b) To Govt. Companies: 33 coal blocks allotted (<strong>on</strong>e block de‐alloc<strong>at</strong>ted) to Govt.<br />
companies during 2007. On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> PSUs it was as follows:‐<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
1‐3. APGENCO i)<br />
Anes<strong>at</strong>ta‐<br />
palli<br />
ii)<br />
Punukula<br />
Chilka<br />
iii)<br />
Pengadap<br />
pa<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
20.02.07/<br />
Aug. 10<br />
20.02.07/<br />
Aug. 10<br />
29.05.07/<br />
Nov. 10<br />
4. SAIL Sitanala 09.04.07/<br />
April 11<br />
5‐6. Rajasthan<br />
Rajya Vidyut<br />
Kanta<br />
Basan<br />
Parsa East<br />
7. DVC Saharpur<br />
Jamar‐pani<br />
19.05.07/<br />
Sept., 12<br />
25.06.07/<br />
Sept., 12<br />
25.07.07/<br />
April 13<br />
Assurance made<br />
by company in Remarks with Pending milest<strong>on</strong>es<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
All activities are pending except<br />
submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> BG. The represent<strong>at</strong>ive<br />
st<strong>at</strong>ed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> block is 100% forest area<br />
(falls under Singreni Wildlife Sanctuary) &<br />
it is an underground mine. SCCL will<br />
develop <str<strong>on</strong>g>the</str<strong>on</strong>g> block though form<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
SCCL‐APGENCO JVC. APGENCO is not<br />
submitting <str<strong>on</strong>g>the</str<strong>on</strong>g> quarterly progress report<br />
to CCO. No significant progress since last<br />
meeting.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Advised to submit <str<strong>on</strong>g>the</str<strong>on</strong>g> progress report to<br />
CCO by 5 th <str<strong>on</strong>g>of</str<strong>on</strong>g> every quarter ending period.<br />
The company was again asked to<br />
surrender <str<strong>on</strong>g>the</str<strong>on</strong>g> blocks if <str<strong>on</strong>g>the</str<strong>on</strong>g> blocks are not<br />
viable. Asked to issue show cause notice.<br />
Coal Producti<strong>on</strong><br />
by Nov., 2011<br />
EUP Power Plant<br />
is advance stage<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g><br />
commencement<br />
& to be<br />
completed <strong>at</strong> end<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> 11 th plan<br />
period.<br />
26<br />
Remarks <strong>on</strong> progress:‐<br />
EMP, ML & LA are pending. No forest land<br />
involved. EMP is expected by Aug. 10. ML<br />
submitted to DMO, Bokaro. MDO to be<br />
finalized by Oct. 10. 35 Ha land is to be<br />
transferred from BCCL to SAIL.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked company represent<strong>at</strong>ive to follow<br />
up EMP and ML for early disposal.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. PCCF<br />
forwarded <str<strong>on</strong>g>the</str<strong>on</strong>g> forest proposal to Principal<br />
Secy (Forest) in March. 10. No Go Forest<br />
area Under c<strong>at</strong>egory “A” declared by<br />
MOEF. Land acquisiti<strong>on</strong> is in progress.<br />
Represent<strong>at</strong>ive informed th<strong>at</strong> Adani<br />
Power is <str<strong>on</strong>g>the</str<strong>on</strong>g> MDO.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
Unexplored. BG submitted. PL applied <strong>on</strong><br />
16.10.07. PL pending with St<strong>at</strong>e Govt.<br />
level. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> PL is expected by end <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Aug.10. MECL is awarded for explor<strong>at</strong>ory
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
8‐9. NMDC Shahpur<br />
(W)<br />
10. GMDC &<br />
PIPDICL<br />
11. JSEB &<br />
BSMDC<br />
12‐<br />
17.<br />
MPSMCL<br />
Sharpur (E)<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
25.07.07/<br />
April 14<br />
Naini 25.07.07/<br />
April 13<br />
Umra<br />
Paharitola<br />
25.07.07/<br />
April 13<br />
Morga‐III 25.07.07/<br />
April 13<br />
Morga‐IV 25.07.07/<br />
April 13<br />
Assurance made<br />
by company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured to start<br />
producti<strong>on</strong> by<br />
norm<strong>at</strong>ive time<br />
limit.<br />
27<br />
Remarks with Pending milest<strong>on</strong>es<br />
drilling. No progress in last 3 years.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Unexplored. GR purchased in March.10.<br />
No forest land involved. Zero d<strong>at</strong>e will be<br />
revised based <strong>on</strong> final GR prepar<strong>at</strong>i<strong>on</strong>.<br />
EUP‐ Represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
menti<strong>on</strong>ed th<strong>at</strong> coal to be utilized first in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>ir Sp<strong>on</strong>ge Ir<strong>on</strong> Plant and middlings in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>ir captive power plant. Remaining coal<br />
is planned to be used commercially.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to give details <str<strong>on</strong>g>of</str<strong>on</strong>g> utiliz<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> coal<br />
to MOC & CCO.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
RE block. JVC formed. Drilling not yet<br />
completed. MDO for drilling selected. PL<br />
obtained. Company wants to prepare GR<br />
based <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> available d<strong>at</strong>a & sought<br />
advice in this regard.<br />
EUP‐ GMDC will supply coal to Adani<br />
Power and Torrent Power Ltd. in Gujr<strong>at</strong>.<br />
Pit head power plant <str<strong>on</strong>g>of</str<strong>on</strong>g> PIPDCL.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
CMPDIL was asked to advice regarding<br />
GR. Asked to give details <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs to CCO.<br />
BG within 15<br />
days.<br />
Drilling will get<br />
over by Sept,<br />
2010 and<br />
GR will be ready<br />
by Nov.10.<br />
Remarks <strong>on</strong> progress:‐<br />
RE block. JVC not formed. PL not<br />
obtained. No BG submitted by <str<strong>on</strong>g>the</str<strong>on</strong>g> JVC,<br />
however, individual BG submitted. No<br />
interest by allottees to develop <str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company to submit request for<br />
return <str<strong>on</strong>g>of</str<strong>on</strong>g> individual BG within 7 days &<br />
JVC to submit BG within 15 days. May<br />
issue show cause notice to de‐alloc<strong>at</strong>e.<br />
Remarks <strong>on</strong> progress:‐<br />
PL Granted. GR to be ready by Nov, 10.<br />
BG submitted. JV partner is M/s. M<strong>on</strong>net<br />
Isp<strong>at</strong> Ltd (as MDO). Prospecting is going<br />
<strong>on</strong>. No Go Forest area Under c<strong>at</strong>egory “A”<br />
declared by MOEF. Coal will be utilized to<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> upcoming power st<strong>at</strong>i<strong>on</strong>.<br />
‐ Remarks <strong>on</strong> progress:‐<br />
RE Block. PL is pending with St<strong>at</strong>e Govt.<br />
BG submitted. JV partner is ACC Ltd. as<br />
MDO. No Go Forest area Under c<strong>at</strong>egory
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
“A” declared by MOEF. Central Team <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
MOEF visited area.<br />
Marki 25.07.07/ Drilling by Sept. Remarks <strong>on</strong> progress:‐<br />
Barka April 14 10 and GR by RE Block.PL granted. JV partner is ACC Ltd.<br />
Nov. 10. MP will as MDO. Company assured th<strong>at</strong> GR will be<br />
be submitted by completed within 10 weeks after<br />
Jan‐Feb, 2010. completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> prospecting.<br />
Bicharpur 25.07.07/<br />
‐ Remarks <strong>on</strong> progress:‐<br />
April 14<br />
RE block. PL granted. JV partner is ACC Ltd<br />
as MDO. No drilling has been allowed in<br />
forest area.<br />
Mandla 25.07.07/ No assurance. Remarks <strong>on</strong> progress:‐<br />
South Jan. 12<br />
FC, EMP, ML, LA & MP approval are<br />
pending. MP submitted. JV partner is M/s.<br />
Jaiprakash Associ<strong>at</strong>es Ltd. Represent<strong>at</strong>ive<br />
informed th<strong>at</strong> Block area is within <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
corridor <str<strong>on</strong>g>of</str<strong>on</strong>g> Pench Tiger Reserve Project.<br />
Semaria/ 25.7.07/ No assurance. Remarks <strong>on</strong> progress:‐<br />
Piparia Jan 12<br />
ML, MP, EMP FC & LA are pending. MP<br />
submitted. JV partner is ACC Ltd as MDO.<br />
No Go Forest area Under c<strong>at</strong>egory “A”<br />
declared by MOEF. Block is under Tiger<br />
reserve forest buffer z<strong>on</strong>e area. No<br />
assurance about forest clearance.<br />
Decisi<strong>on</strong>/Advise/Comment: Company is lagging behind <str<strong>on</strong>g>the</str<strong>on</strong>g> norm<strong>at</strong>ive time schedule <str<strong>on</strong>g>of</str<strong>on</strong>g> development.<br />
Progress <str<strong>on</strong>g>of</str<strong>on</strong>g> explored blocks Mandla South & Semaria/Piparia is very poor. Advisory may be issued.<br />
18. Assam St<strong>at</strong>e Mandakini 25.07.07/ Coal producti<strong>on</strong> Remarks <strong>on</strong> progress:‐<br />
Mineral Dev ‐B April 13 by 2013. RE Block. BG submitted. JVC formed.<br />
Corp. Ltd.,<br />
Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> PL is pending with Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Meghalaya<br />
Orissa. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 board meeting 3 have<br />
St<strong>at</strong>e Mineral<br />
been adjourned.<br />
Dev Corp.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Ltd.,<br />
Chairman expressed diss<strong>at</strong>isfacti<strong>on</strong> with<br />
Tamil Nadu<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> overall progress <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Electricity<br />
Chairman asked to verify whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r BG is<br />
Board and<br />
submitted by JVC to CCO. Chairman also<br />
Orissa Mining<br />
advised to surrender <str<strong>on</strong>g>the</str<strong>on</strong>g> block if JV is not<br />
Corp.<br />
workable. May issue show cause notice<br />
for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Comment <str<strong>on</strong>g>of</str<strong>on</strong>g> CCO:<br />
JVC has submitted BG.<br />
28
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
20‐<br />
21.<br />
22‐<br />
23.<br />
24‐<br />
25.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
WBMDCL Jagan<strong>at</strong>hpur<br />
A<br />
Jagan<strong>at</strong>hpur‐<br />
B<br />
UPRVNL,<br />
CMDC,<br />
MPGCL,<br />
JSMDCL<br />
Chendipada<br />
&<br />
Chendipada‐<br />
II<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
20.07.07/<br />
Dec .14<br />
25.7.07/<br />
Jan 11<br />
(Chendipada<br />
&<br />
Apr,13<br />
(Chendipada<br />
‐II)<br />
P<strong>at</strong>rartu 20.07.07/<br />
April 13<br />
Robodih<br />
OCP<br />
26. APMDC Suliyari<br />
Belwar.<br />
27‐<br />
28.<br />
CMDC<br />
25.7.07/<br />
Jan. 11<br />
Assurance made<br />
by company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured coal<br />
producti<strong>on</strong><br />
Dec.12<br />
Assured to<br />
comply target<br />
d<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> coal<br />
producti<strong>on</strong>.<br />
BG will be<br />
submitted within<br />
15 days.<br />
29<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
All milest<strong>on</strong>es pending except submissi<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> BG & grant <str<strong>on</strong>g>of</str<strong>on</strong>g> PL. Drilling work going<br />
<strong>on</strong>. Represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB<br />
informed th<strong>at</strong> blocks are linked with<br />
Jaibalaji Industries Ltd.(Sp<strong>on</strong>ge Ir<strong>on</strong> Proj).<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
WBMDTCL to furnish coal utiliz<strong>at</strong>i<strong>on</strong>/or to<br />
whom coal will be supplied to CCO within<br />
15 days. Advisory may be issued.<br />
Remarks <strong>on</strong> progress:‐<br />
Chendipada is explored block and<br />
Chendipada‐II is RE. JVC formed. MP for<br />
Chendipada block submitted. RFP (Rapid<br />
forest proposal) is in final stage. No visible<br />
progress. Some party filed case <strong>at</strong><br />
Lucknow bench. Slow progress.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to expedite <str<strong>on</strong>g>the</str<strong>on</strong>g> progress.<br />
Remarks <strong>on</strong> progress:‐<br />
P<strong>at</strong>r<strong>at</strong>u‐RE Block. PL applic<strong>at</strong>i<strong>on</strong><br />
submitted. PL not yet granted by St<strong>at</strong>e<br />
Govt.<br />
Robodih OCP‐ All pending except GR.<br />
BG is not yet submitted. Since last two<br />
meetings giving assurance to submit BG.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit BG within 15 days. The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Shankarpur<br />
(bh<strong>at</strong>ga<strong>on</strong>II<br />
& Extn.)<br />
20.07.07/<br />
April 14<br />
25.07.07/<br />
Jan. 11<br />
S<strong>on</strong>diha 25.07.07/<br />
Apr 13<br />
GR by May, 2011. Remarks <strong>on</strong> progress:‐<br />
BG submitted, RE Block. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> PL is<br />
pending with Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> MP. Forest<br />
clearance for explor<strong>at</strong>ory drilling not<br />
granted. Socio ec<strong>on</strong>omic survey in 7<br />
villages completed.<br />
MECL is selected for drilling. MDO<br />
appointment not decided.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Coal Producti<strong>on</strong><br />
by March 11.<br />
GR by Aug.10.<br />
Coal producti<strong>on</strong><br />
by March 12<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. MP<br />
approved. FC proposal is with MOEF for<br />
c<strong>on</strong>sider<strong>at</strong>i<strong>on</strong>. R & R Plan submitted to<br />
St<strong>at</strong>e Govt. in April, 10.<br />
Remarks <strong>on</strong> progress:‐<br />
Un‐Explored. Detailed explor<strong>at</strong>i<strong>on</strong><br />
completed. Mining lease applic<strong>at</strong>i<strong>on</strong><br />
submitted. MP approval, FC, EMP, ML &
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
29. GPCL, KSEB,<br />
OHPCL<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Baitarani<br />
West<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
25.07.07/<br />
Jan. 11<br />
30. MSMDCL Warora 20.07.07/<br />
Jan. 12<br />
31‐<br />
32.<br />
OPGCL<br />
Manoharpur<br />
Dip side <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
M<strong>on</strong>oharpur<br />
33. NTPC Ch<strong>at</strong>ti<br />
Bari<strong>at</strong>u (S)<br />
25.07.07/<br />
Jan 11<br />
25.07.07/<br />
Apr.13<br />
25.07.07/<br />
Jan 11<br />
34 WBMDTCL Sitarampur 27.12.07/<br />
Sept, 14<br />
Assurance made<br />
by company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
LA are pending.<br />
Coal producti<strong>on</strong> Remarks <strong>on</strong> progress:‐<br />
as per schedule. FC, EMP, ML & LA are pending. ML is<br />
10 m<strong>on</strong>ths after being processed. Socio Ec<strong>on</strong>omic survey<br />
grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML. d<strong>on</strong>e. Selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> MDO in next two<br />
(Prod. by 2013). m<strong>on</strong>ths. Approval for 4(1) notific<strong>at</strong>i<strong>on</strong> is<br />
expected shortly.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit details <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> EUPs to <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
CCO. Advisory may be issued.<br />
GR to be ready by Remarks <strong>on</strong> progress:‐<br />
Dec.10.<br />
UG mine, Partly explored. MP approval,<br />
EMP, ML & LA are pending. No forest land<br />
involved. BG Lapsed. Represent<strong>at</strong>ive<br />
Coal Producti<strong>on</strong><br />
assured th<strong>at</strong> Explor<strong>at</strong>i<strong>on</strong> to be completed<br />
by Aug.10. GR will be ready by Dec.10.<br />
Land acquisiti<strong>on</strong> is going <strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
BG to be renewed within 15 days.<br />
Remarks <strong>on</strong> progress:‐<br />
as per schedule GR purchased, BG submitted. MP<br />
depends <strong>on</strong> approved. FC applic<strong>at</strong>i<strong>on</strong> made. Prior<br />
forest clearance. approval <str<strong>on</strong>g>of</str<strong>on</strong>g> ML, FC, EMP, ML & LA are<br />
pending. Forest clearance proposal is<br />
pending with CCF (Nodal), Bhubaneswar.<br />
Secti<strong>on</strong> 4(1) notific<strong>at</strong>i<strong>on</strong> for LA published.<br />
No Go Forest area under c<strong>at</strong>egory “A”<br />
declared by MOEF.<br />
Remarks <strong>on</strong> progress:‐<br />
PL applic<strong>at</strong>i<strong>on</strong> made, now forwarded to<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> Dept. <str<strong>on</strong>g>of</str<strong>on</strong>g> Steel & Mines, Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Orissa. FC granted.<br />
EUP: Banharpalli Power project is<br />
No assurance.<br />
expected to be commissi<strong>on</strong>ed Phase‐I<br />
(2x660 MW) ‐6/2014 and Phase‐II (2x660<br />
MW) ‐ 11/2014. Investment ~ 208 Crores.<br />
Remarks <strong>on</strong> progress:‐<br />
GR report procured from CMPDIL in<br />
Feb.2010. NTPC requested MOC through<br />
MOP to integr<strong>at</strong>e Chh<strong>at</strong>i Bari<strong>at</strong>u & Chh<strong>at</strong>i<br />
Bari<strong>at</strong>u South block into <strong>on</strong>e block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
As per <str<strong>on</strong>g>the</str<strong>on</strong>g> decisi<strong>on</strong> taken in o<str<strong>on</strong>g>the</str<strong>on</strong>g>r blocks<br />
allotted to NTPC.<br />
Assured GR Remarks <strong>on</strong> progress:‐<br />
prepar<strong>at</strong>i<strong>on</strong> by RE block. BG submitted, PL granted. MECL<br />
June, 11 and coal started drilling. Informed about <str<strong>on</strong>g>the</str<strong>on</strong>g> boun‐<br />
30
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by company in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
producti<strong>on</strong> by<br />
Dec. 2013.<br />
Power Plant <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
JSW Steel by Dec.<br />
2014.<br />
31<br />
Remarks with Pending milest<strong>on</strong>es<br />
dary dispute as some part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block<br />
area is with BCCL. Coal will be utilized for<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> power plant <str<strong>on</strong>g>of</str<strong>on</strong>g> JSW Steel Ltd.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB to sent a reference regarding<br />
boundary issue to MOC. CMPDIL to settle<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> issue.<br />
c) To Priv<strong>at</strong>e Companies: 17 coal blocks allotted to priv<strong>at</strong>e companies during 2007. On<br />
Sl.<br />
No.<br />
reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> priv<strong>at</strong>e alloc<strong>at</strong>tees it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Chaman<br />
Metallicks<br />
Ltd.<br />
2. Bh<strong>at</strong>ia<br />
Intern<strong>at</strong>i<strong>on</strong>al<br />
LTD.<br />
3. Bankura DRI<br />
Mining<br />
Manufacturi<br />
ng Pvt. Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Kosar<br />
D<strong>on</strong>ger<br />
ga<strong>on</strong><br />
Warora<br />
West<br />
Bihari<br />
N<strong>at</strong>h<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ Target<br />
prod. d<strong>at</strong>e<br />
20.02.07/<br />
Feb. 11<br />
20.02.07/<br />
Aug. 11<br />
20.02.07/<br />
Feb. 11<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured to start<br />
producti<strong>on</strong><br />
within <strong>on</strong>e year<br />
from grant <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
ML.<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
UG Mine, EMP, ML & LA are pending. No<br />
forest land in <str<strong>on</strong>g>the</str<strong>on</strong>g> block area. PRC as per<br />
MP is 0.3 MTPA. Company requested<br />
MOC to intervene for early grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML<br />
from St<strong>at</strong>e Govt.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
Explored block. BG submitted and GR<br />
purchased. FC, EMP, ML & LA pending<br />
with St<strong>at</strong>e Govt. Sent ML applic<strong>at</strong>i<strong>on</strong> to<br />
MOC for previous approval. 25 acres <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
land purchased directly. Company is<br />
very much reluctant to submit st<strong>at</strong>us <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
end use project report. On asking, <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company represent<strong>at</strong>ive informed <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
company in process to acquire a EUP for<br />
use <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> coal from this block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Coal producti<strong>on</strong><br />
will start by<br />
Aug. 11<br />
Remarks <strong>on</strong> progress:‐<br />
GR not yet purchased. BG submitted. ML<br />
applic<strong>at</strong>i<strong>on</strong> submitted to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> West<br />
Bengal. Block area also allotted to GEECL<br />
by MOP&N for CBM. Represent<strong>at</strong>ive<br />
informed th<strong>at</strong> MOEF has delisted for EC<br />
for coal project due to dual Mining lease<br />
applic<strong>at</strong>i<strong>on</strong>. 42 acres <str<strong>on</strong>g>of</str<strong>on</strong>g> land lost by<br />
alloc<strong>at</strong>e. 180 crs already spent. Alloc<strong>at</strong>ee<br />
requested for MOC’s interventi<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
m<strong>at</strong>ter.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
To wait for <str<strong>on</strong>g>the</str<strong>on</strong>g> detailed guidelines to be
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ Target<br />
prod. d<strong>at</strong>e<br />
4. JSPL Jitpur 20.02.07/<br />
Aug. 10<br />
5. Essar Power<br />
Ltd.<br />
6. Prism<br />
Cement Ltd.<br />
7. SKS Isp<strong>at</strong><br />
Ltd.<br />
8. Hindalco &<br />
T<strong>at</strong>a Power<br />
Ltd.<br />
Chakla 20.02.07/<br />
Aug.10<br />
Sail<br />
Ghogri<br />
Rawanvara<br />
North<br />
29.05.07/<br />
May 11<br />
29.05.07/<br />
Nov. 11<br />
Tubed 01.08.07/<br />
Feb. 11<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
issued in this regard<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
Explored. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> prior approval, Forest<br />
Clearance, ML & LA are pending. LA<br />
notific<strong>at</strong>i<strong>on</strong> under 4(1) is awaited. Stage‐<br />
I FC reached to St<strong>at</strong>e Govt. from MOEF<br />
recently. LA will take <strong>on</strong>e year time. The<br />
company changed <str<strong>on</strong>g>the</str<strong>on</strong>g> site <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> EUP<br />
without informing MOC. Now m<strong>at</strong>ter is<br />
under examin<strong>at</strong>i<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry. No<br />
progress since last meeting.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee expressed diss<strong>at</strong>isfacti<strong>on</strong><br />
<strong>on</strong> overall progress <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block as well<br />
as EUP. Show cause notice to be issued.<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted. FC, EMP,<br />
ML & LA are pending. No Go Forest area<br />
under c<strong>at</strong>egory “A” declared by MOEF.<br />
Progress delayed due to delay in<br />
Coal Producti<strong>on</strong><br />
surrender by CCL. ML applic<strong>at</strong>i<strong>on</strong> is<br />
pending with DM, L<strong>at</strong>ehar.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Advisory may be issued.<br />
Remarks <strong>on</strong> progress:‐<br />
by Feb. 12 is Explored. GR obtained, BG submitted.<br />
assured. UG mine. FC (Stage‐II), EMP, ML & LA are<br />
pending. Stage‐I clearance for FC<br />
EUP by<br />
obtained. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML is pending for FC.<br />
Stage‐II FC is expected by Aug. 10. ML<br />
within a m<strong>on</strong>th <str<strong>on</strong>g>of</str<strong>on</strong>g> forest clearance.<br />
Remarks <strong>on</strong> progress:‐<br />
Nov.2010. UG Mine. FC, EMP, ML & LA are pending.<br />
Mining plan approved in July, 2010. ML<br />
applic<strong>at</strong>i<strong>on</strong> submitted to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> MP.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Company is lagging behind <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
schedule. The committee was<br />
EMP by Sept. 10.<br />
diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
mine & asked to issue show‐cause<br />
notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
Coal prod. by FC, EMP,ML, LA are pending. ML is<br />
March 12. expected in next 3 to 4 m<strong>on</strong>ths. 4(1)<br />
PRC 6 MTPA notific<strong>at</strong>i<strong>on</strong> under LA Act within 3‐4<br />
within 3‐4 years. m<strong>on</strong>ths. Public hearing for EMP<br />
completed in July, 10. Stage‐I FC by Dec.<br />
10 is expected. R & R acti<strong>on</strong> plan<br />
submitted to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> JH. River flowing<br />
across <str<strong>on</strong>g>the</str<strong>on</strong>g> block. Proposal for shifting <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
32
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
9. Pushpa<br />
Industries<br />
10. Jayprakash<br />
Associ<strong>at</strong>es<br />
Ltd.<br />
11. Essar Power<br />
Ltd.<br />
12. Bhushan<br />
Power and<br />
Steel Ltd.<br />
13. AES<br />
Chh<strong>at</strong>tisgarh<br />
Energy Pvt.<br />
14. DB Power<br />
Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Brahm<br />
puri<br />
Mandla<br />
(N)<br />
Ashok<br />
Kark<strong>at</strong>a<br />
Central<br />
P<strong>at</strong>al<br />
East<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ Target<br />
prod. d<strong>at</strong>e<br />
01.08.07/<br />
July 11<br />
17.09.07 /<br />
March 12<br />
06.11.07/<br />
Aug. 13<br />
06.11.07/<br />
Aug. 13<br />
Sayang 06.11.07/<br />
Aug. 13<br />
Durgapur<br />
II/ Sariya<br />
06.11.07/M<br />
ay 11<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
river submitted.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company was cauti<strong>on</strong>ed th<strong>at</strong><br />
_<br />
transfer <str<strong>on</strong>g>of</str<strong>on</strong>g> coal to any o<str<strong>on</strong>g>the</str<strong>on</strong>g>r plant will<br />
not be allowed. Coal should be utilized<br />
for <str<strong>on</strong>g>the</str<strong>on</strong>g> specified EUP.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted. Applied for<br />
ML, EMP and FC. Company<br />
represent<strong>at</strong>ive informed th<strong>at</strong> MOEF<br />
referred <str<strong>on</strong>g>the</str<strong>on</strong>g> coal project to N<strong>at</strong>i<strong>on</strong>al<br />
Tiger Reserve Authority for <str<strong>on</strong>g>the</str<strong>on</strong>g>ir<br />
c<strong>on</strong>currence.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Assured<br />
commissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
EUP (HP) by<br />
01/2011.<br />
33<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted. Prior<br />
approval, ML, LA, FC & EMP are pending.<br />
Inspecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> forest area completed.<br />
Represent<strong>at</strong>ive informed proximity to<br />
two tiger projects (S<strong>at</strong>pura Tiger Project<br />
and Pench Tiger Project). Committee<br />
formed for wild life inspecti<strong>on</strong>.<br />
No commitment Remarks <strong>on</strong> progress:‐<br />
RE block. PL applic<strong>at</strong>i<strong>on</strong> submitted to<br />
St<strong>at</strong>e Govt. MOC has redefined new<br />
block boundary in Feb. 10. No Go Forest<br />
area under c<strong>at</strong>egory “A” declared by<br />
MOEF.<br />
No assurance. Remarks <strong>on</strong> progress:‐<br />
RE Block. MECL is <str<strong>on</strong>g>the</str<strong>on</strong>g> drilling agency.<br />
GoJH principally agreed to grant PL.<br />
Forest proposal is in final stage. Drilling<br />
not started. The block overlaps with CBM<br />
block allotted to ONGC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Advisory to be issued.<br />
Assured<br />
Financial Closure<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUP by Sept.<br />
2010.<br />
EUP phase‐I by<br />
2011‐12.<br />
Remarks <strong>on</strong> progress:‐<br />
RE Block. BG submitted. Applied for PL<br />
<strong>on</strong> Nov. 08. No Go Forest area under<br />
c<strong>at</strong>egory “A” declared by MOEF. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
PL is pending for forest clearance.<br />
EUP: ‐ LA going <strong>on</strong>. DPR ready and tied<br />
up with Chinese company.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Advisory to be issued.<br />
Remarks <strong>on</strong> progress:‐<br />
MP approved, Prior approval, FC, EMP,
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
15. BALCO Durgapur<br />
II/<br />
Taraimar<br />
16. Adani Power<br />
Ltd.<br />
17. Sova Isp<strong>at</strong><br />
Ltd. & Jai<br />
Balaji<br />
Sp<strong>on</strong>ge Ltd.<br />
Lohara<br />
West<br />
Extn.<br />
Ardha<br />
gram<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ Target<br />
prod. d<strong>at</strong>e<br />
06.11.07/<br />
May 11<br />
06.11.07/<br />
May 11<br />
06.12.07/<br />
June 11<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured<br />
producti<strong>on</strong> as<br />
per schedule<br />
EUP 1 st unit by<br />
June, 2011.<br />
Assured<br />
producti<strong>on</strong> as<br />
per schedule.<br />
34<br />
Remarks with Pending milest<strong>on</strong>es<br />
ML & LA are pending. Forest proposal<br />
lying with DFO. Public hearing<br />
completed.<br />
EUP: Loc<strong>at</strong>i<strong>on</strong> & capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> Power plant<br />
changed. Under examin<strong>at</strong>i<strong>on</strong> with MOC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Change <str<strong>on</strong>g>of</str<strong>on</strong>g> loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP is not<br />
permitted as blocks are allotted for<br />
specified end uses.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted and MP<br />
approved. ML, FC & LA EMP are pending.<br />
St‐I forest clearance obtained.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, ML & LA are pending. No Go<br />
Forest area under c<strong>at</strong>egory “A” declared<br />
by MOEF. Wild life c<strong>on</strong>serv<strong>at</strong>i<strong>on</strong> plan<br />
submitted to PCCF which was rejected<br />
for proximity to Tiger reserve. MOEF<br />
decided not to c<strong>on</strong>sider <str<strong>on</strong>g>the</str<strong>on</strong>g> project for<br />
Envir<strong>on</strong>ment clearance. Company<br />
represent<strong>at</strong>ive requested to allot<br />
altern<strong>at</strong>ive block.<br />
Remarks <strong>on</strong> progress:‐<br />
FC, ML and LA are pending. ML<br />
applic<strong>at</strong>i<strong>on</strong> submitted to Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB.<br />
Stage‐I forest clearance is pending. Socio<br />
ec<strong>on</strong>omic survey d<strong>on</strong>e.<br />
Company represent<strong>at</strong>ive intim<strong>at</strong>ed th<strong>at</strong><br />
ECL may give c<strong>on</strong>sent for OC project. No<br />
<strong>on</strong>e was present from ECL & it could not<br />
be discussed fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Chairman advised th<strong>at</strong> grant <str<strong>on</strong>g>of</str<strong>on</strong>g> ML to be<br />
sorted out with <str<strong>on</strong>g>the</str<strong>on</strong>g> Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> WB.<br />
d) To UMPPs/Tariff Based Bidding: During <str<strong>on</strong>g>the</str<strong>on</strong>g> year <strong>on</strong>e block has been alloc<strong>at</strong>ed to SPV <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Sl.<br />
No.<br />
Power Finance Corpor<strong>at</strong>i<strong>on</strong> (PFC) cre<strong>at</strong>ed for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> setting up UMPP in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
St<strong>at</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand. The SPV has since been transferred to M/s Reliance Power Ltd. &<br />
zero d<strong>at</strong>e for <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block has since been revised as 7 th August, 2009.<br />
On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. An SPV <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Power<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Kirandari<br />
BC<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
20.07.07<br />
Zero d<strong>at</strong>e<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured to submit<br />
BG within 7‐8<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
Reliance Power Ltd selected as SPV. GR
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Finance<br />
Corp. for JH<br />
UMPP<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
revised as<br />
07.08.09<br />
Feb 14<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
days. ML<br />
applic<strong>at</strong>i<strong>on</strong> by<br />
July, 10.<br />
35<br />
Remarks with Pending milest<strong>on</strong>es<br />
purchased. MP submitted to MOC for<br />
approval. Company assured to submit<br />
BG amount within 7‐8 days.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
VI. Coal block alloc<strong>at</strong>ed during 2008:<br />
Sl.<br />
No.<br />
a) 24 coal blocks alloc<strong>at</strong>ed during <str<strong>on</strong>g>the</str<strong>on</strong>g> year 2008 – 3 to PSUs, 19 to priv<strong>at</strong>e companies and 1 block<br />
under Tariff based bidding. However, two coal blocks, namely, Lohara (East) allotted to M/s<br />
Murli Industries & M/s Grace Industries and D<strong>at</strong>ima allotted to M/s Binani Cement Ltd., have<br />
been de‐alloc<strong>at</strong>ted.<br />
b) To Govt. Companies: Three coal blocks were allotted to Govt. company during 2008. On<br />
reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> PSUs <str<strong>on</strong>g>the</str<strong>on</strong>g> st<strong>at</strong>us is as follow:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
1. JSMDCLtd. Jogeswar &<br />
Khas<br />
Jogeswar<br />
2. Rastriya Isp<strong>at</strong><br />
Nigam Ltd.<br />
3. Goa Industrial<br />
Development<br />
Corpor<strong>at</strong>i<strong>on</strong><br />
Sl.<br />
No.<br />
Tenugh<strong>at</strong><br />
Jhirki<br />
Gare<br />
Palma<br />
Sector‐III<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
11.04.08/<br />
Oct 11<br />
10.09.08<br />
June, 15<br />
12.11.08,<br />
May, 12<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
BG not submitted. GR purchased. FC,<br />
MP, EMP ML & LA are pending. No Go<br />
Forest area Under c<strong>at</strong>egory “A” declared<br />
by MOEF.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
_ Remarks <strong>on</strong> progress:‐<br />
UG Mine. BG not submitted. All activities<br />
are pending. The Company is not<br />
interested in this block & requested for<br />
altern<strong>at</strong>ive OC block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
May issue show cause notice for de‐<br />
alloc<strong>at</strong>i<strong>on</strong>.<br />
Assured to coal<br />
prod. May, 2012.<br />
EUP by April,<br />
2011<br />
36<br />
Remarks <strong>on</strong> progress:‐<br />
GR Purchased, BG submitted. MP<br />
approved. O<str<strong>on</strong>g>the</str<strong>on</strong>g>r activities like FC, EMP<br />
ML LA are pending. LA applic<strong>at</strong>i<strong>on</strong><br />
submitted. No Go Forest area Under<br />
c<strong>at</strong>egory “A” declared by MOEF.<br />
c) To Priv<strong>at</strong>e Companies: The performance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> priv<strong>at</strong>e companies who were alloc<strong>at</strong>ed 18 coal<br />
blocks (two coal blocks de‐alloc<strong>at</strong>ed) during 2008 was noted as follows:‐<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. M<strong>on</strong>net Isp<strong>at</strong><br />
& Energy Ltd.,<br />
T<strong>at</strong>a Power<br />
and Jindal<br />
Photo Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Mandakini<br />
‐A<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
prod. d<strong>at</strong>e<br />
09.01.08/<br />
Jul,11<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Mining to be<br />
started by June,<br />
2011.<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
FC, EMP, LA & ML are pending. JVC<br />
formed as Mandakini Coal Co. Ltd. MP<br />
approved. ML applic<strong>at</strong>i<strong>on</strong> forwarded to<br />
Secretary (Mines), GoO. . Final EMP is<br />
expected to be submitted after Aug.10.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
2. Arcelor Mittal<br />
India Ltd. &<br />
GVK Powers<br />
(G. Sahib)<br />
3. CESC Ltd. &<br />
JAS<br />
Infrastructure<br />
4. JSPL & Gagan<br />
Sp<strong>on</strong>ge Ir<strong>on</strong><br />
Ltd.<br />
5‐6. Sterlite Energy,<br />
GMR Energy,<br />
Arcelor Mittal<br />
India Ltd. ,<br />
Lanco Group,<br />
Navbhar<strong>at</strong><br />
Power (IPP),<br />
Reliance Energy<br />
7. JLD Yav<strong>at</strong>mal<br />
Energy,<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
prod. d<strong>at</strong>e<br />
Seregarha 09.01.08/<br />
Oct 13<br />
Mahuagar<br />
hi<br />
Amark<strong>on</strong>da‐<br />
Murgadanga<br />
l<br />
Rampia &<br />
Dip Side<br />
Rampia<br />
F<strong>at</strong>ehpur<br />
East<br />
09.01.08/<br />
Oct 13<br />
17.01.08/<br />
Oct 13<br />
17.01.08/<br />
Oct 13<br />
23.01.08/<br />
Oct 13<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
GR will be ready<br />
by July, 11<br />
37<br />
‐<br />
Assured<br />
completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
explor<strong>at</strong>i<strong>on</strong> by<br />
Nov. 10 & GR be<br />
ready by 15<br />
m<strong>on</strong>ths<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>reafter. Coal<br />
producti<strong>on</strong> as<br />
per schedule.<br />
GR by Oct. 10.<br />
MP submissi<strong>on</strong><br />
Remarks with Pending milest<strong>on</strong>es<br />
Secti<strong>on</strong> 4(1) notific<strong>at</strong>i<strong>on</strong> for LA<br />
completed. Land for n<strong>on</strong> forest area<br />
acquired by Oct. 10. Assured th<strong>at</strong> stage‐I<br />
FC within a m<strong>on</strong>th.<br />
EUP: M<strong>on</strong>net’s Power project is to be<br />
commissi<strong>on</strong>ed by Oct. 12. DPR prepared.<br />
T<strong>at</strong>a Power Ltd st<strong>at</strong>ed th<strong>at</strong> its 1 st Unit for<br />
which <str<strong>on</strong>g>the</str<strong>on</strong>g> block is alloc<strong>at</strong>ed will be<br />
commissi<strong>on</strong>ed by Oct. 10 and 2 nd unit by<br />
July, 12. JPL progress is s<strong>at</strong>isfactory as<br />
Financial closure achieved.<br />
Coal Evacu<strong>at</strong>i<strong>on</strong> problem exits<br />
Remarks <strong>on</strong> progress:‐<br />
RE Block. JVC formed. Grant <str<strong>on</strong>g>of</str<strong>on</strong>g> PL is<br />
pending for forest clearance. Forest<br />
clearance proposal is processed with<br />
DFO. No progress since last meeting.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed, BG submitted.PL granted <strong>on</strong><br />
April, 10. M/s. JAS Infrastructure<br />
informed th<strong>at</strong> Company is planning to<br />
shift <str<strong>on</strong>g>the</str<strong>on</strong>g> EUP site from WB to Banka,<br />
Bihar due to land acquisiti<strong>on</strong> problem.<br />
790 acres <str<strong>on</strong>g>of</str<strong>on</strong>g> land acquired. EMP shortly.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Progress ok, but behind schedule.<br />
Remarks <strong>on</strong> progress:‐<br />
RE block, JVC formed. PL granted. Drilling<br />
not yet started due to L&O problem.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit progress report <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs<br />
timely to CCO by 5 th <str<strong>on</strong>g>of</str<strong>on</strong>g> every quarter.<br />
Remarks <strong>on</strong> progress:‐<br />
RE block. GR purchased. BG submitted.<br />
Complete area survey <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block is<br />
d<strong>on</strong>e. PL applied and JVC formed, Grant<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> PL is pending with St<strong>at</strong>e Govt. Assured<br />
to complete explor<strong>at</strong>i<strong>on</strong> by Nov. 10.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Informed th<strong>at</strong> JVC is resp<strong>on</strong>sible to<br />
submit <str<strong>on</strong>g>the</str<strong>on</strong>g> quarterly st<strong>at</strong>us report <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g> all <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>tees to CCO. No<br />
progress since last meeting, may issue<br />
show cause notice.<br />
Remarks <strong>on</strong> progress:‐<br />
RE block. PL applied, JVC formed. BG
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
RKM<br />
Powergen,<br />
Vandana<br />
Vidyut,<br />
Visa Power,<br />
Green<br />
Infrastructure<br />
8. SKS Isp<strong>at</strong> &<br />
Power Ltd. &<br />
Prakash<br />
Industries<br />
9. Rungta Mines<br />
Ltd. & Sunflag<br />
Ir<strong>on</strong> & Steel<br />
Ltd.<br />
10. JSW Steel Ltd.<br />
Bhushan<br />
Steel &<br />
Power, Jai<br />
Balaji Ind.<br />
11. Bihar Sp<strong>on</strong>ge<br />
Ir<strong>on</strong> Co. Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
prod. d<strong>at</strong>e<br />
F<strong>at</strong>ehpur 06.02.08/<br />
Nov 13<br />
Choritand<br />
Tailaya<br />
14.05.08/<br />
Nov,11<br />
Rohne 05.06.08/<br />
Dec.11<br />
Macherkund<br />
a<br />
05.08.08/<br />
Feb,13<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
by Oct. 10 submitted. PL granted by St<strong>at</strong>e Govt. in<br />
March 10. No Go Forest area under<br />
c<strong>at</strong>egory “A” declared by MOEF. Drilling<br />
completed in 10 sq. Km area under<br />
Phase‐I and in 5 Sq. Km area under<br />
Phase‐II. Most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> milest<strong>on</strong>es are<br />
ahead <str<strong>on</strong>g>of</str<strong>on</strong>g> schedule.<br />
EUP: JLD Y<strong>at</strong>mal informed th<strong>at</strong> he has<br />
made a request for change <str<strong>on</strong>g>of</str<strong>on</strong>g> loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
EUP. RKM Power Green‐ Unit‐I by June,<br />
11 & Unit‐II Sept. 11 and III/IV units after<br />
3 m<strong>on</strong>ths <str<strong>on</strong>g>the</str<strong>on</strong>g>reafter. Visa Power‐ 1 st<br />
phase by March, 14. Vandana Vidyut‐ 1 st<br />
phase by April, 11.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee observed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
alloc<strong>at</strong>i<strong>on</strong> was made <strong>on</strong> certain<br />
c<strong>on</strong>diti<strong>on</strong>s regarding <str<strong>on</strong>g>the</str<strong>on</strong>g> loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> EUP<br />
& it can’t be changed now.<br />
Assured to<br />
submit BG by<br />
15 th Aug. 10.<br />
Coal Producti<strong>on</strong><br />
by Nov. 11<br />
38<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed. RE Block. BG not yet<br />
submitted. Company represent<strong>at</strong>ive<br />
informed th<strong>at</strong> Court case disposed <str<strong>on</strong>g>of</str<strong>on</strong>g>f.<br />
No Go Forest area Under c<strong>at</strong>egory “A”<br />
declared by MOEF.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>. BG<br />
to be submitted within 15 days.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted.<br />
FC, EMP, ML & LA are pending. JVC is<br />
formed. ML applic<strong>at</strong>i<strong>on</strong> submitted in<br />
June, 2009.<br />
No Assurance Remarks <strong>on</strong> progress:‐<br />
GR purchased and JVC formed. EMP, FC,<br />
ML & LA are pending. ML pending <strong>at</strong><br />
St<strong>at</strong>e Govt. level. FC is under<br />
_<br />
c<strong>on</strong>sider<strong>at</strong>i<strong>on</strong> <strong>at</strong> Secy., Forest level. EAC<br />
recommended EC. No Go Forest area<br />
under c<strong>at</strong>egory “A” declared by MOEF.<br />
No go criteria is <str<strong>on</strong>g>the</str<strong>on</strong>g> main c<strong>on</strong>cern <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block alloc<strong>at</strong>e.<br />
Remarks <strong>on</strong> progress:‐<br />
MP, ML, LA, FC & EMP are pending.<br />
Company represent<strong>at</strong>ive intim<strong>at</strong>ed th<strong>at</strong><br />
coal area is under buffer z<strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> tiger<br />
project. Represent<strong>at</strong>ives informed th<strong>at</strong><br />
Land schedule not prepared due to
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
12. MESCO STEEL Tandsi III &<br />
Tandsi III<br />
Extn.<br />
13. R<strong>at</strong>hi Udyog<br />
Ltd.<br />
14. Birla<br />
Corpor<strong>at</strong>i<strong>on</strong><br />
Ltd.<br />
15. Mukund Ltd.<br />
Vini Ir<strong>on</strong> &<br />
Steel Udyog<br />
Ltd.<br />
16. Electro<str<strong>on</strong>g>the</str<strong>on</strong>g>rm<br />
(India) Ltd.,<br />
Grasim<br />
Industries<br />
17. Maharashtra<br />
Seamless Ltd.,<br />
Kesla<br />
North<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
prod. d<strong>at</strong>e<br />
05.08.08/<br />
Feb,13<br />
05.08.08/<br />
Feb,13<br />
Bikram 12.08.08/<br />
Feb. 13<br />
Rajhara<br />
North<br />
(Central &<br />
Eastern)<br />
Bhaskarpar<br />
a<br />
20.11.08/<br />
Nov. 11<br />
21.11.08/<br />
May 12<br />
G<strong>on</strong>dkhari 21.11.08/<br />
Nov. 12<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
No<br />
represent<strong>at</strong>ive<br />
<strong>at</strong>tended.<br />
2013 (as per<br />
schedule)<br />
Start before<br />
schedule<br />
Pre‐mining<br />
activities will be<br />
completed<br />
before time<br />
schedule.<br />
No<br />
represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Vini Ir<strong>on</strong>& Steel<br />
Ltd was present.<br />
Assured to start<br />
prod. On time.<br />
39<br />
Remarks with Pending milest<strong>on</strong>es<br />
which Mining Plan not submitted. Land<br />
acquired by CCL not yet settled.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee expressed diss<strong>at</strong>isfacti<strong>on</strong><br />
over <str<strong>on</strong>g>the</str<strong>on</strong>g> progress & advised to surrender<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block if not interested to develop.<br />
May issue show cause notice.<br />
Remarks <strong>on</strong> progress:‐<br />
BG submitted. FC, EMP ML & LA are<br />
pending. FC is under c<strong>on</strong>sider<strong>at</strong>i<strong>on</strong> <strong>at</strong><br />
PCCF. Compens<strong>at</strong>ory land has been<br />
purchased in Chindwara. ML applic<strong>at</strong>i<strong>on</strong><br />
submitted.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG and MP submitted. FC,<br />
EMP, ML & LA are pending. ML is <strong>at</strong> Secy,<br />
Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> CG. FC applic<strong>at</strong>i<strong>on</strong> made. Asked<br />
to submit <str<strong>on</strong>g>the</str<strong>on</strong>g> change <str<strong>on</strong>g>of</str<strong>on</strong>g> company’s<br />
name to MOC for record.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Slow progress & behind schedule.<br />
Remarks <strong>on</strong> progress:‐<br />
BG submitted. GR purchased. MP<br />
approval, FC, EMP, ML & LA are pending.<br />
Land acquisiti<strong>on</strong> is under process.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Slow progress & behind schedule.<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed. BG submitted. GR<br />
purchased. ML applied <strong>on</strong> 18/12/08. No<br />
forest land involved. ML applied to St<strong>at</strong>e<br />
Govt. No surface right and mineral right<br />
transferred by CCL. No represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Central Coalfields Ltd <strong>at</strong>tended <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting. CIL represent<strong>at</strong>ives could not<br />
reflect <strong>on</strong> this issue.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
MOC will sort out <str<strong>on</strong>g>the</str<strong>on</strong>g> problem regarding<br />
transfer <str<strong>on</strong>g>of</str<strong>on</strong>g> mineral right from CCL to <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
alloc<strong>at</strong>ee company.<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed. BG submitted. GR Purchased<br />
and MP approved. EMP & FC, ML & LA<br />
are pending. EUPs are in oper<strong>at</strong>i<strong>on</strong><br />
Remarks <strong>on</strong> progress:‐<br />
JVC is formed. GR Purchased. BG
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Dhariwal<br />
Infra. Ltd. &<br />
Kesoram<br />
Industries<br />
18. Kamal Sp<strong>on</strong>ge<br />
steel &<br />
power, Rev<strong>at</strong>i<br />
Cement<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Thesgera/<br />
Rudrapani<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
prod. d<strong>at</strong>e<br />
21.11.08/<br />
Nov. 12<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Nov. 2012 ‐Coal<br />
Producti<strong>on</strong><br />
40<br />
Remarks with Pending milest<strong>on</strong>es<br />
submitted. MP approved. EMP, ML & LA<br />
are pending. No forest land involved.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted, ML<br />
applied. MP approval, FC, EMP, ML & LA<br />
are pending. ML is with st<strong>at</strong>e Govt. 25<br />
acres <str<strong>on</strong>g>of</str<strong>on</strong>g> land purchased directly.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Slow progress & behind schedule.<br />
d) To UMPPs/Tariff Based Bidding: During <str<strong>on</strong>g>the</str<strong>on</strong>g> year <strong>on</strong>e block has been alloc<strong>at</strong>ed to SPV <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
MAHAGENCO cre<strong>at</strong>ed for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> setting up a power plant <strong>on</strong> tariff based bidding in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
St<strong>at</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Maharashtra. The tariff based bidding has not been invited yet, hence <str<strong>on</strong>g>the</str<strong>on</strong>g> zero d<strong>at</strong>e for<br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block is not yet finalized and <str<strong>on</strong>g>the</str<strong>on</strong>g> BG has also not been submitted. The<br />
details are as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. SPV <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
MAHAGENCO<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Bhivkund 17.07.08/<br />
April 14<br />
Assurance made by<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> company in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting<br />
No represent<strong>at</strong>ive<br />
present.<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
Partial explored. BG not submitted.<br />
Drilling agency is M/s. Mahesari<br />
Mining Pvt. Ltd. Forest clearance for<br />
explor<strong>at</strong>i<strong>on</strong> obtained.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The company & <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt. may<br />
be issued advisory.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
VII. Coal block alloc<strong>at</strong>ed during 2009:<br />
Sl.<br />
No.<br />
a) 16 coal blocks were alloc<strong>at</strong>ed during <str<strong>on</strong>g>the</str<strong>on</strong>g> year 2009 – 1 to PSU, 12 to priv<strong>at</strong>e companies and 3<br />
blocks for UMPP/Tariff based bidding.<br />
b) To Govt. Companies: One coal block was allotted to Govt. company during 2009. On reviewing<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> PSUs <str<strong>on</strong>g>the</str<strong>on</strong>g> st<strong>at</strong>us is as follow:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal Block<br />
1. WBPDCLtd. East <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Damagoria<br />
(kalyanashw<br />
ary)<br />
Sl.<br />
No.<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
27.02.09/<br />
Aug. 12<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
To take decisi<strong>on</strong><br />
regarding<br />
surrendering <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
block within a<br />
m<strong>on</strong>th.<br />
41<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
GR not yet purchased. BG not<br />
submittedNo forest land involved.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Asked to submit BG within 15 days.<br />
c) To Pvt. Companies: 13 coal blocks were allotted to Priv<strong>at</strong>e Company during 2009. On<br />
reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> companies, it was noted as follow:‐<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Jindal Steel &<br />
Power Ltd.<br />
2. Str<strong>at</strong>egic<br />
Energy Tech.<br />
System Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Ram‐<br />
chandi<br />
Promo‐<br />
ti<strong>on</strong>al<br />
Block<br />
North <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Akrapal<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
27.02.09/<br />
Nov. 14<br />
27.02.09/<br />
Nov. 14<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es<br />
No assurance Remarks <strong>on</strong> progress:‐<br />
RE Block. Drilling not yet started.<br />
Company informed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>re is a<br />
boundary dispute. MOU will be signed by<br />
Sept.2010 with <str<strong>on</strong>g>the</str<strong>on</strong>g> Orissa Govt.<br />
regarding EUP. Informed th<strong>at</strong> MOC<br />
c<strong>on</strong>vened a meeting <strong>on</strong> 26.07.2010<br />
regarding boundary issue.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
MP by Oct.10.<br />
Assured to start<br />
mine as per<br />
schedule.<br />
Remarks <strong>on</strong> progress:‐<br />
RE Block. Drilling not yet started.<br />
Company intim<strong>at</strong>ed th<strong>at</strong> final PL to be<br />
obtained within 2 m<strong>on</strong>ths. Company also<br />
informed th<strong>at</strong> <strong>on</strong>ce <str<strong>on</strong>g>the</str<strong>on</strong>g> mine will reach<br />
PRC, <str<strong>on</strong>g>the</str<strong>on</strong>g>n CTL project will come in<br />
oper<strong>at</strong>i<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
3. Rungta Mines Mednirai 28.05.09/ Remarks <strong>on</strong> progress:‐
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Ltd., Kohinoor<br />
Steel Ltd.<br />
4. T<strong>at</strong>a Steel Ltd.<br />
& Adhunik<br />
Thermal Energy<br />
Ltd.<br />
5. AMR Ir<strong>on</strong> &<br />
Steel Ltd.,<br />
Century Textile<br />
& Ind. and JK<br />
cements Ltd<br />
6. Sunflag Ir<strong>on</strong> &<br />
Steel Ltd. and<br />
Dalmia Cements<br />
7. M<strong>on</strong>net Isp<strong>at</strong><br />
& Energy Ltd.<br />
&<br />
Topworth Steel<br />
Ltd.<br />
8. IST Steel &<br />
Power,<br />
Gujar<strong>at</strong> Ambuja<br />
Cements,<br />
Lafarg India Ltd<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Ganespur 28.05.09/<br />
Nov. 13<br />
Bander 29.05.09<br />
/Nov. 13<br />
Khappa<br />
Extn.<br />
Rajgamar<br />
Dipside<br />
(South <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Phulakdih<br />
nalla)<br />
Dahega<strong>on</strong><br />
Makardh<br />
okra<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
42<br />
Remarks with Pending milest<strong>on</strong>es<br />
Nov. 12 All milest<strong>on</strong>es are pending except<br />
purchase <str<strong>on</strong>g>of</str<strong>on</strong>g> GR and BG submissi<strong>on</strong>. JVC<br />
formed. ML applic<strong>at</strong>i<strong>on</strong> submitted. MP is<br />
not yet prepared. No seriousness is<br />
observed in LA process. EUP for <str<strong>on</strong>g>the</str<strong>on</strong>g> both<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> companies are running.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
29.05.09/<br />
Nov. 13<br />
3.6.09/<br />
Dec.13<br />
17.06.09/<br />
Dec. 13<br />
EUP <str<strong>on</strong>g>of</str<strong>on</strong>g> T<strong>at</strong>a Steel<br />
within 2 m<strong>on</strong>ths‐<br />
assured.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased. All o<str<strong>on</strong>g>the</str<strong>on</strong>g>r milest<strong>on</strong>es are<br />
pending. Land details are with CCL. No<br />
represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> CCL <strong>at</strong>tended <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting. BG lapsed. 120 MW CPP <str<strong>on</strong>g>of</str<strong>on</strong>g> T<strong>at</strong>a<br />
Steel within 2 m<strong>on</strong>ths is expected.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>. BG<br />
to be renewed in 15 days. MOC to look<br />
into issues with CCL.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased. MP and ML applic<strong>at</strong>i<strong>on</strong><br />
submitted. JVC formed. Company<br />
informed th<strong>at</strong> block is outside <str<strong>on</strong>g>the</str<strong>on</strong>g> buffer<br />
z<strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> tiger reserve.<br />
_ Remarks <strong>on</strong> progress:‐<br />
GR purchased. MP, FC and ML<br />
applic<strong>at</strong>i<strong>on</strong> submitted. JVC formed.<br />
MP submissi<strong>on</strong><br />
within 10 days<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased. BG submitted. All o<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />
milest<strong>on</strong>es are pending. TDS issue exits<br />
with CMPDIL & Block alloc<strong>at</strong>ee. MP not<br />
yet submitted.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
_ Remarks <strong>on</strong> progress:‐<br />
GR purchased. BG submitted. JVC<br />
formed. MP not yet submitted.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Asked to submit <str<strong>on</strong>g>the</str<strong>on</strong>g> progress report<br />
both for blocks and EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g> individual<br />
alloc<strong>at</strong>ees to <str<strong>on</strong>g>the</str<strong>on</strong>g> CCO by 5 th <str<strong>on</strong>g>of</str<strong>on</strong>g> every<br />
quarter ending period. The committee<br />
was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g> development<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue show‐cause<br />
notice for de‐alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
9. Bhusan Steel<br />
Ltd., Jai Balaji<br />
Ind. & Rashmi<br />
Cement Ltd.<br />
10. Himachal EMTA<br />
Power Ltd. &<br />
JSW Steel<br />
11. Ramswarup<br />
Lohh Udyog,<br />
Adhunik Corp,<br />
Uttam Galva<br />
Steel & Howrah<br />
Gases, Vikas<br />
Metals & Power<br />
and ACC<br />
12. JSPL ,<br />
M<strong>on</strong>net Isp<strong>at</strong> &<br />
Energy Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Andal<br />
East<br />
Gourang‐<br />
dih ABC<br />
Moira<br />
Madhu‐<br />
jore<br />
Urtan<br />
North<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
03.07.09/<br />
April 15<br />
10.07.09/<br />
Jan13.<br />
06.10.09/<br />
April,13<br />
12.10.09/<br />
April, 14<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Explor<strong>at</strong>i<strong>on</strong> by<br />
May, 11 and GR<br />
will be ready by<br />
Sept, 11.<br />
43<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
RE block. JVC formed. BG submitted. PL<br />
granted. No forest land is involved.<br />
_ Remarks <strong>on</strong> progress:‐<br />
JVC formed, BG not submitted. All o<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />
milest<strong>on</strong>es are pending. Company<br />
informed th<strong>at</strong> ECL is performing<br />
extensive mining activity in two<br />
p<strong>at</strong>ches (namely Kairabad &<br />
Gourangdih OCP) within this coal<br />
block. No represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> ECL<br />
<strong>at</strong>tended <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting. It was<br />
_<br />
informed th<strong>at</strong> to mine coal by JV<br />
company, no notific<strong>at</strong>i<strong>on</strong> is needed.<br />
CMPDIL informed th<strong>at</strong> boundary has<br />
been defined & Khairabad is outside<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Asked to submit BG within 15 days & to<br />
submit progress report for both coal<br />
block and EUPs to CCO <strong>on</strong> time.<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed BG submitted. Overlapping<br />
with aerotropolis area <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> block.<br />
Airport project inside <str<strong>on</strong>g>the</str<strong>on</strong>g> block area.<br />
Assured to<br />
submit MP<br />
shortly.<br />
Remarks <strong>on</strong> progress:‐<br />
JVC formed. BG submitted.<br />
d) To UMPPs/Tariff Based Bidding: During <str<strong>on</strong>g>the</str<strong>on</strong>g> year, <strong>on</strong>e block has been alloc<strong>at</strong>ed to M/s<br />
Sl.<br />
No.<br />
Karanpura Energy Ltd. an SPV <str<strong>on</strong>g>of</str<strong>on</strong>g> Power Finance Corpor<strong>at</strong>i<strong>on</strong> (PFC) cre<strong>at</strong>ed for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
setting up a power plant <strong>on</strong> tariff based bidding in <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand. Two blocks has been<br />
alloc<strong>at</strong>ed to M/s Akaltara Power Ltd. an SPV <str<strong>on</strong>g>of</str<strong>on</strong>g> PFC cre<strong>at</strong>ed for <str<strong>on</strong>g>the</str<strong>on</strong>g> purpose <str<strong>on</strong>g>of</str<strong>on</strong>g> setting up UMPP<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>es <str<strong>on</strong>g>of</str<strong>on</strong>g> Chh<strong>at</strong>tisgarh. On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance, it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Remarks with Pending milest<strong>on</strong>es
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
1. Karanpura<br />
Energy Ltd.<br />
2‐3. Akaltara<br />
Power Ltd.<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Coal<br />
Block<br />
Mourya<br />
OC<br />
Pindrakhi<br />
&<br />
Puta<br />
Parogia<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./target<br />
dt.<str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
26.06.09/<br />
Dec. 12<br />
09.09.09/<br />
March13<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company Remarks with Pending milest<strong>on</strong>es<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
_ Remarks <strong>on</strong> progress:‐<br />
Selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> bidder is finalized. Loc<strong>at</strong>i<strong>on</strong><br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> EUP in JH not yet finalized. GR not<br />
purchased. BG submissi<strong>on</strong> is pending.<br />
Progress is not s<strong>at</strong>isfactory.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
A letter to Min <str<strong>on</strong>g>of</str<strong>on</strong>g> Power to finalise <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
power plant bidder.<br />
Selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
developer by<br />
Sept.10.<br />
VIII. Coal block alloc<strong>at</strong>ed during 2010 (upto June,2010):<br />
44<br />
Remarks <strong>on</strong> progress:‐<br />
BG not submitted. Selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> developer<br />
for development <str<strong>on</strong>g>of</str<strong>on</strong>g> coal block as well as<br />
UMPP project not yet been decided. No<br />
Go forest area under c<strong>at</strong>egory A.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
A letter to Min <str<strong>on</strong>g>of</str<strong>on</strong>g> Power to finalise <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
power plant bidder.<br />
a) Till June, 2010, <strong>on</strong>e block namely Bankhui was alloc<strong>at</strong>ed to Ms/. Sakshigopal Integr<strong>at</strong>ed Power<br />
Company Ltd. (an SPV for 1 st additi<strong>on</strong>al Orissa UMPP). Block alloc<strong>at</strong>ed recently.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Lignite Blocks:<br />
The st<strong>at</strong>us <str<strong>on</strong>g>of</str<strong>on</strong>g> progress in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> lignite blocks and associ<strong>at</strong>ed end use projects was<br />
reviewed. Till d<strong>at</strong>e, a total <str<strong>on</strong>g>of</str<strong>on</strong>g> 29 lignite blocks have been alloc<strong>at</strong>ed. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>se, 20<br />
blocks have been alloc<strong>at</strong>ed to government companies and 9 blocks to priv<strong>at</strong>e<br />
companies. However, <strong>on</strong>e lignite block, namely South <str<strong>on</strong>g>of</str<strong>on</strong>g> Vellar, allotted to TICAPCO was<br />
de‐alloc<strong>at</strong>ed.<br />
a) Producti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> lignite started in 9 blocks allotted to government companies and <strong>at</strong> 2<br />
blocks <str<strong>on</strong>g>of</str<strong>on</strong>g> priv<strong>at</strong>e company. Total lignite producti<strong>on</strong> from captive blocks during <str<strong>on</strong>g>the</str<strong>on</strong>g> year<br />
2009‐10 is 11.74 MT (excluding nominal producti<strong>on</strong> from Gurha East). The details <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
producing blocks are as menti<strong>on</strong>ed below:<br />
Sl. Name <str<strong>on</strong>g>of</str<strong>on</strong>g> alloc<strong>at</strong>tee Allotment year Name <str<strong>on</strong>g>of</str<strong>on</strong>g> No. <str<strong>on</strong>g>of</str<strong>on</strong>g> Year <str<strong>on</strong>g>of</str<strong>on</strong>g> Starting<br />
No /JV<br />
blocks blocks producti<strong>on</strong><br />
Public<br />
1 Rajasthan St<strong>at</strong>e 1994 (Lease granted) Giral 1 1995<br />
2<br />
Mines & Mineral Ltd.<br />
(RSMML)<br />
RSMML 26.07.2002 (Lease granted) M<strong>at</strong>asukh 1 2003 (suspended<br />
3 Gujr<strong>at</strong> Mineral Dev. 16/05/2001 (Lease granted for M<strong>at</strong>a‐No‐ 1<br />
prod. from Jan, 2010)<br />
2002<br />
Corp. Ltd. (GMDCL) 1314 Hec.) & 31/05/2006 Madh<br />
4 GMDCL<br />
(Lease granted for 437 Hectre)<br />
21/07/1973 (Lease granted for Panandhro 1 1973<br />
1151 Hec.) & 26/06/1988<br />
5 GMDCL<br />
(Lease granted for 568 Hectre)<br />
5/12/2001 Tadkeswar 1 2006<br />
6 GMDCL 5/12/2001 Surka<br />
(North)<br />
1 14/12/2008<br />
7 GMDCL 5/12/2001 Rajpardih (G‐<br />
19 & G‐19<br />
extensi<strong>on</strong>) or<br />
Amod<br />
2 January, 2008<br />
8 Gujar<strong>at</strong> Industries July,1996 (Lease granted) Vastan 1 March, 2000<br />
Power Company<br />
Ltd. (GIPCL)<br />
Priv<strong>at</strong>e<br />
9 GHCL Not available Khadsaliya 1 Not available<br />
10 V. S. Lignite Power<br />
Pvt. Ltd.<br />
01.07.2005 Gurha East 1 09.02.2010<br />
Total 11<br />
45
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No<br />
1‐<br />
3.<br />
b) To Govt. companies: On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> remaining 11 lignite blocks<br />
allotted to different Govt. companies, it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
GIPCL<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Lignite<br />
Block<br />
M<strong>on</strong>grol<br />
Valia<br />
Khadsaliya<br />
II &<br />
Surka III<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ target<br />
dt. <str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
46<br />
Remarks with Pending milest<strong>on</strong>es<br />
09.03.00 No<br />
Remarks <strong>on</strong> progress:‐<br />
06.09.05<br />
4. GMDC Akrimota Not<br />
available<br />
5‐<br />
11<br />
RSMML<br />
represent<strong>at</strong>ives<br />
<strong>at</strong>tended <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting.<br />
All milest<strong>on</strong>es completed. St<strong>at</strong>ed to<br />
be producing, but no inform<strong>at</strong>i<strong>on</strong><br />
available to CCO. 1st phase <str<strong>on</strong>g>of</str<strong>on</strong>g> PRC <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
1.8 MTPA started. Commercial<br />
producti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Unit‐3 power project<br />
started. Presently running power<br />
plant 250 MW.<br />
Remarks <strong>on</strong> progress:‐<br />
For Khadsaliya II‐ Mine plan<br />
approved. Prior approval <str<strong>on</strong>g>of</str<strong>on</strong>g> ML is<br />
awaited. TOR for EMP is awaited.<br />
For Surka III‐ All activities kept <strong>on</strong><br />
hold for small reserve <str<strong>on</strong>g>of</str<strong>on</strong>g> lignite.<br />
_ Remarks <strong>on</strong> progress:‐<br />
All o<str<strong>on</strong>g>the</str<strong>on</strong>g>r activities are pending. Held<br />
up for Supreme Court's order<br />
dt.16.02.00, However GMDC has<br />
made an appeal in <str<strong>on</strong>g>the</str<strong>on</strong>g> Supreme<br />
Court for processing <str<strong>on</strong>g>the</str<strong>on</strong>g> mining<br />
lease. Tiger sanctuary covers within<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> block area and urged to allot<br />
ano<str<strong>on</strong>g>the</str<strong>on</strong>g>r block to GMDC from NLC Ltd.<br />
Mokhala 14.07.03 Remarks <strong>on</strong> progress:‐<br />
Could not proceed fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r due to<br />
adverse ground w<strong>at</strong>er c<strong>on</strong>diti<strong>on</strong>.<br />
Small block reserve is <strong>on</strong>ly 20 MT.<br />
S<strong>on</strong>eri 28.08.04 Assured to start<br />
producti<strong>on</strong> in 3‐4<br />
m<strong>on</strong>ths period.<br />
Gurha<br />
West<br />
Kapurdih,<br />
Jalipa<br />
Shivkar<br />
Kurla,<br />
Sacha<br />
Remarks <strong>on</strong> progress:‐<br />
ML and LA are pending LA process is<br />
in advance stage. Hope to get<br />
possessi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> land by June, 2010.<br />
01.07.05 Remarks <strong>on</strong> progress:‐<br />
EMP, ML & LA pending. MP<br />
approved. EAC recommended TOR.<br />
ML will be after EMP clearance. Stay<br />
in LA given by Rajasthan High Court.<br />
13.11.06 Assured to start<br />
Producti<strong>on</strong> within<br />
3‐4 m<strong>on</strong>ths.<br />
13.11.06 Assured<br />
producti<strong>on</strong> by<br />
June, 11.<br />
Remarks <strong>on</strong> progress:‐<br />
FC & LA pending for Kapurdih block<br />
and for Jalipa block ML, EMP, FC & LA<br />
are pending. ML for Kapurdih block<br />
obtained.<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased. ML LA & EMP are<br />
pending. MP submitted for approval.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No<br />
Sl.<br />
No<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Lignite<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ target<br />
dt. <str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
47<br />
Remarks with Pending milest<strong>on</strong>es<br />
Sauda Power Project to be commenced by<br />
January, 2013 linked with Shivkar<br />
Kurla.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
Progress is very poor, advisory may be issued for Gurha (west), Jalipa, Shivkar Kurla &<br />
Sacha Sauda.<br />
c) To Priv<strong>at</strong>e companies: On reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> performance <str<strong>on</strong>g>of</str<strong>on</strong>g> remaining 6 lignite blocks<br />
allotted to different Govt. companies, it was noted as follows:<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Lignite<br />
Block<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ target<br />
dt. <str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
1. VS Lignite Lunsara 07.02.07 Producti<strong>on</strong><br />
assured in 09‐<br />
10.<br />
2. Indure<br />
Pvt. Ltd<br />
3. NSL<br />
Power &<br />
Infr<strong>at</strong>ech<br />
4. Nandlal<br />
Enterprize<br />
M<strong>on</strong>dal<br />
Charan<br />
Merta<br />
Road<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
GR purchased, BG submitted, MP, EMP,<br />
ML & LA are pending. TOR obtained from<br />
MOEF. W<strong>at</strong>er logging in <str<strong>on</strong>g>the</str<strong>on</strong>g> block area is<br />
main problem.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
No progress since last meeting, show<br />
cause notice may be issued.<br />
07.02.2007 Remarks <strong>on</strong> progress:‐<br />
The block is not viable for <str<strong>on</strong>g>the</str<strong>on</strong>g> company in<br />
all respect & requested for o<str<strong>on</strong>g>the</str<strong>on</strong>g>r block.<br />
They have already reported to MOC<br />
which in turn has called report from to<br />
NLC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
MOC to take a decisi<strong>on</strong> <strong>on</strong> file.<br />
07.02.2007 Remarks <strong>on</strong> progress:‐<br />
Company intim<strong>at</strong>ed th<strong>at</strong> deline<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
mine boundary in <str<strong>on</strong>g>the</str<strong>on</strong>g> Merta Road lignite<br />
block is a serious problem. Dept. <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Geology & Mines <str<strong>on</strong>g>of</str<strong>on</strong>g> st<strong>at</strong>e govt. will help<br />
to sort out <str<strong>on</strong>g>the</str<strong>on</strong>g> boundary issue.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
Indawar 07.02.2007 _ Remarks <strong>on</strong> progress:‐<br />
ML, LA and EMP grant are pending.<br />
Company represent<strong>at</strong>ive requested to<br />
reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> amount <str<strong>on</strong>g>of</str<strong>on</strong>g> BG as <str<strong>on</strong>g>the</str<strong>on</strong>g> present<br />
mine capacity is lower than earlier PRC.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
MOC to examine <strong>on</strong> file immedi<strong>at</strong>ely.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Sl.<br />
No<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Alloc<strong>at</strong>ee<br />
5. DCM<br />
Shriram<br />
C<strong>on</strong>solid<strong>at</strong><br />
ed Ltd<br />
6. Binani<br />
Cement<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Lignite<br />
Block<br />
Kapri<strong>on</strong> ki<br />
dhani<br />
Nimbri<br />
Chandrab<br />
adan<br />
Alloc<strong>at</strong>i<strong>on</strong><br />
dt./ target<br />
dt. <str<strong>on</strong>g>of</str<strong>on</strong>g> prod.<br />
07.02.07/<br />
Feb 10<br />
Assurance made<br />
by <str<strong>on</strong>g>the</str<strong>on</strong>g> company<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting<br />
Assured to<br />
start Lignite<br />
producti<strong>on</strong> by<br />
2 nd quarter <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
2012.<br />
48<br />
Remarks with Pending milest<strong>on</strong>es<br />
Remarks <strong>on</strong> progress:‐<br />
All pending except GR and BG. TOR for<br />
EMP received. MP approved. LA through<br />
direct negoti<strong>at</strong>i<strong>on</strong>. Company assured th<strong>at</strong><br />
EMP by Aug.2010. Out <str<strong>on</strong>g>of</str<strong>on</strong>g> 900 acres 517<br />
acres land acquired.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
07.02.07 ‐ Remarks <strong>on</strong> progress:‐<br />
GR and BG d<strong>on</strong>e. MP approval is awaited.<br />
LA through direct negoti<strong>at</strong>i<strong>on</strong>.<br />
Decisi<strong>on</strong>/Advise/Comment:‐<br />
The committee was diss<strong>at</strong>isfied with <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
development <str<strong>on</strong>g>of</str<strong>on</strong>g> mine & asked to issue<br />
show‐cause notice for de‐alloc<strong>at</strong>i<strong>on</strong>.
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
During <str<strong>on</strong>g>the</str<strong>on</strong>g> course <str<strong>on</strong>g>of</str<strong>on</strong>g> reviewing <str<strong>on</strong>g>the</str<strong>on</strong>g> progress <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> coal & lignite block some decisi<strong>on</strong>s were<br />
taken applicable to <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>cerned alloc<strong>at</strong>tees are as given below:<br />
� Show cause notices to be issued to alloc<strong>at</strong>tees who did not <strong>at</strong>tend <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting.<br />
� All <str<strong>on</strong>g>the</str<strong>on</strong>g> Govt. companies, who have been alloc<strong>at</strong>ed blocks under commercial mining to<br />
provide details <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs linked to <str<strong>on</strong>g>the</str<strong>on</strong>g> blocks so th<strong>at</strong> coal linkage <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs could be<br />
adjusted accordingly.<br />
� All <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>tees, who are getting <str<strong>on</strong>g>the</str<strong>on</strong>g> block mined through MDO or under a JV<br />
agreement to submit <str<strong>on</strong>g>the</str<strong>on</strong>g> necessary details to CCO immedi<strong>at</strong>ely.<br />
� As <str<strong>on</strong>g>the</str<strong>on</strong>g> block alloc<strong>at</strong>tees in <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand are facing a number <str<strong>on</strong>g>of</str<strong>on</strong>g> problems <strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
St<strong>at</strong>e level, <str<strong>on</strong>g>the</str<strong>on</strong>g> represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e was requested to look into <str<strong>on</strong>g>the</str<strong>on</strong>g> m<strong>at</strong>ter. It was<br />
also decided to review <str<strong>on</strong>g>the</str<strong>on</strong>g> blocks alloc<strong>at</strong>ed in <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e separ<strong>at</strong>ely with <str<strong>on</strong>g>the</str<strong>on</strong>g> St<strong>at</strong>e Govt..<br />
� Regarding <str<strong>on</strong>g>the</str<strong>on</strong>g> request <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> block alloc<strong>at</strong>tees for c<strong>on</strong>tinu<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> linkage whose blocks<br />
are in <str<strong>on</strong>g>the</str<strong>on</strong>g> forest areas for which MOEF is not recommending forest clearance, <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
alloc<strong>at</strong>tees were advised to approach <str<strong>on</strong>g>the</str<strong>on</strong>g> Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g> Coal (CPD secti<strong>on</strong>).<br />
� Joint Venture Companies formed by <str<strong>on</strong>g>the</str<strong>on</strong>g> joint alloc<strong>at</strong>tees are required to submit a<br />
complied st<strong>at</strong>us report <str<strong>on</strong>g>of</str<strong>on</strong>g> EUPs <str<strong>on</strong>g>of</str<strong>on</strong>g> individual alloc<strong>at</strong>tee to CCO by 5 th <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> next m<strong>on</strong>th<br />
after every quarter.<br />
� All alloc<strong>at</strong>tees were informed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> BG deducti<strong>on</strong>s shall be made as per <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
c<strong>on</strong>diti<strong>on</strong>s incorpor<strong>at</strong>ed in <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>i<strong>on</strong> letter in case <str<strong>on</strong>g>of</str<strong>on</strong>g> failure to achieve progress as<br />
per mile st<strong>on</strong>es outlined in <str<strong>on</strong>g>the</str<strong>on</strong>g> alloc<strong>at</strong>i<strong>on</strong> letter.<br />
� A number <str<strong>on</strong>g>of</str<strong>on</strong>g> companies have failed to submit BG & in few cases <str<strong>on</strong>g>the</str<strong>on</strong>g> BG submitted has<br />
lapsed. All such companies were advised to submit <str<strong>on</strong>g>the</str<strong>on</strong>g> BG/renew <str<strong>on</strong>g>the</str<strong>on</strong>g> BG by 15 th August,<br />
2010, o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise acti<strong>on</strong> shall be initi<strong>at</strong>ed for de‐alloc<strong>at</strong>i<strong>on</strong>.<br />
During <str<strong>on</strong>g>the</str<strong>on</strong>g> course <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting it was felt th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> represent<strong>at</strong>ives <str<strong>on</strong>g>of</str<strong>on</strong>g> coal companies are<br />
required <strong>at</strong> all time and it was observed th<strong>at</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g>re was no represent<strong>at</strong>i<strong>on</strong> from <str<strong>on</strong>g>the</str<strong>on</strong>g> subsidiaries<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> CIL. The represent<strong>at</strong>ive <str<strong>on</strong>g>of</str<strong>on</strong>g> CIL was not able to reply to <str<strong>on</strong>g>the</str<strong>on</strong>g> queries rel<strong>at</strong>ed to subsidiaries and<br />
also about CIL. The Chairman directed th<strong>at</strong> a proper represent<strong>at</strong>i<strong>on</strong> should be <str<strong>on</strong>g>the</str<strong>on</strong>g>re in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
review meeting from CIL and its subsidiaries.<br />
JS (Coal) thanked all <str<strong>on</strong>g>the</str<strong>on</strong>g> members <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> committee for <str<strong>on</strong>g>the</str<strong>on</strong>g>ir active particip<strong>at</strong>i<strong>on</strong> in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
meeting.<br />
49
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
***<br />
50
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Officers/ Executives particip<strong>at</strong>ing in <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> taken by<br />
Additi<strong>on</strong>al Secretary (Coal) <strong>on</strong> 20.07.2010 and <strong>21.07.2010</strong> <strong>at</strong> 10.00 AM in <strong>Scope</strong><br />
Minar, Laxmi Nagar District Centre, Delhi -110092.<br />
……………………………………………………………………………………………<br />
……<br />
GOVERNMENT – 20.07.2010<br />
Sl.No. Name / Organis<strong>at</strong>i<strong>on</strong><br />
1. Sh. Sharad m Varshney, Dy. Dir, Central Electricity Authority.<br />
2. Shri C.P. Jain, Asstt. Director, Central Electricity Authority<br />
3/ Dr. S.S. Tak, Dy. Advisor, Minsitry <str<strong>on</strong>g>of</str<strong>on</strong>g> Steel.<br />
4. Shir K. Radhu, GM(Mines), RINL/ Vizag Steel Plant.<br />
5. Dr. Durga V Prasad, RO, SCCL.<br />
6. Smt. N.J. Roy, Dy. Director<br />
7. Shri A.K. Biswas, DDG, CCO, Kolk<strong>at</strong>a<br />
8. Shri N.N. Sinha, Secretary, Mines , Government <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand.<br />
9. Shri A.K.Wahi, CGM Explor<strong>at</strong>i<strong>on</strong>, CMPDI<br />
10. Shri Gautam Dhar, CGM (Corpor<strong>at</strong>e Planning), CIL (HQ).<br />
11. Dr. Subir Majumder, Dy. Ch <str<strong>on</strong>g>of</str<strong>on</strong>g> Geology,CIL HQ, Kolk<strong>at</strong>a.<br />
12. Dr. Krishna Gupta, MD, Power Development Corp., West Bengal.<br />
13. Shri B. Manoria, EE, GE(PRG CSPGG) Raipur.<br />
14. Shri M. S<strong>at</strong>yanarayan, SP (Resident Commisi<strong>on</strong>er), Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Orssa.<br />
15. Shri Bhaskar Khulbe, Adv (WB), Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> West Bengal.<br />
16. Shri Manish Jain, MD, WBMDTCL.<br />
51
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Priv<strong>at</strong>e- 20.07.2010<br />
Sl.No. Name / Organis<strong>at</strong>i<strong>on</strong><br />
1. Shri V. Ravikumar, V.P. RPG - ICML<br />
2. Shri B.K.Sinha, GM, SAIL-ISP<br />
3. Shri D.K.Sahni<br />
4. Shri Anand Goel,Jt. MD, M/s Jindal Steel & Power Ltd.<br />
5. Shri D.N. Abrol, ED, M/s Jindal Steel & Power Ltd.<br />
Shri Rajesh Sharma, DGM, M/s Jindal Steel & Power Ltd.<br />
6. Shri M.B. M<strong>at</strong>hur, Advisor, M/s Jayaswal Neco Ltd.<br />
7. Shri S.K.Swani, President, M/s Jayaswal Neco Ltd.<br />
8. Shri G.K.Chhanghani, Executive Director, Sarda Energy (Formerly Raipur Alloys).<br />
9. Shri Ashok K Tulley, Director, EMTA<br />
10. Shir Amarjit , Director<br />
11. Shri Bikash Mukherjee, Director<br />
12. Shir BCK Reddy, VP (Proj. Dev), GVK Power (GS) Ltd. Tokisud &<br />
Seregarh<br />
13. Shri S. Roychoudhry,Arcelor Mittal<br />
14. Shri D.K.Singh, Coal Advisor, TVNL<br />
15. Shri A.K.Das, Chief Engineer (Fuel), Damodar Valley Corpor<strong>at</strong>i<strong>on</strong>.<br />
16. Shri P.S. Upadhyaya, Director, M/s Field Mining & Isp<strong>at</strong> Ltd.<br />
17. Shir P.S. Yadav, GM(Mines), M/s CMDC<br />
18. Shri R.K. Kapur, President Business Dev, M/s Usha Martin Limited.<br />
19. Shri Amitabl S. Mudgal, Sr.VP , M/s M<strong>on</strong>net Isp<strong>at</strong> Limited.<br />
20. Shri M.K.Sinha, President, M/s M<strong>on</strong>net Isp<strong>at</strong> Limited<br />
21. Shri Shri Shital S. Mann, Manager, M/s M<strong>on</strong>net Isp<strong>at</strong> Limited.<br />
22. Shri T. Sannappa Resident Engineer, KPCL<br />
23. Shri Ashish Agarwal, JT. MD, M/s B.S. Isp<strong>at</strong> Limited<br />
M/s G<strong>on</strong>dwana Isp<strong>at</strong> Ltd.<br />
24. Shri Chankya Chaudhry, CEO, T<strong>at</strong>a.<br />
25. Shri K. Viyayanand, MD APGENCO<br />
26. Shri T. Prabhakar Rao, ED, APGENCO.<br />
27. Shri R.P. Goyal, Director, M/s Bhushan Power & Steel<br />
28. Shri T…… VC, M/s Shree Badyan<strong>at</strong>h Ayurved<br />
29. Shir Kailash Ch. Sarangi, OMC Ltd.<br />
30. Shri P.K. Padhi, Director(P&T), NALCO<br />
31. Shri Soumya P. P<strong>at</strong>naik, GM(UECB), NALCO<br />
32. Dr. V.N. Choudhary, GM(Geology), M/s Sunflag Ir<strong>on</strong> & Steel Co. Ltd.<br />
33. Shri S.K. Gupta, Director, M/s Sunflag Ir<strong>on</strong> & Steel Co. Ltd.<br />
34. Shri K.K. Sharma, ED/CM, NTPC.<br />
35. Shri S. Mirani, AGM-Electorsteel Casting Ltd.<br />
36. Shri Ashok Sharma, Advisor ECL , M/s Domco Pvt. Limted<br />
37. Shri Malay Kar , VP (Mnes), M/s Abhijeet Infrstructure Limited.<br />
38. Shri Vishal Prakash, M/s Domco Smokeloss Fuel Pvt. Limited<br />
39. Shri A.Kumar, CGM, MCL<br />
40. Shri P.L Vyas, CGM, MCL<br />
41. Shri Vinod K Verma, AGM, Corpor<strong>at</strong>e Affairs, HINDALCO.<br />
42. Shri Harshad Pophali GM, Mining , M/s Corpor<strong>at</strong>e Isp<strong>at</strong> Alloys Ltd.<br />
43. Shri S.K. Sharma, Director, M/s Shri Virangana Streels Pvt. Limited.<br />
44. Shri S.Anand, M/s Essar Power Limited.<br />
52
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
45. Shrilok Jha, M/s Shyam DRI<br />
46. Shri P.K.Mittal, M/s Bh<strong>at</strong>ia Intern<strong>at</strong>i<strong>on</strong>al.<br />
47. Shri O.P.Dhawan, MD, M/s Pavanjay Steel & Power Ltd.<br />
48. Shri Sanjay Pr<strong>at</strong>ap, President ,M/s Adhunik Alloys & Power Ltd.<br />
49. Shri Abishek Rungta, M/s Jharkhand Isp<strong>at</strong> (P)Ltd<br />
50. Shri V.K. Gupta, Jharkhand Isp<strong>at</strong> (P)Ltd.<br />
51 Shri Manish Agarwal, M/s MSP Steel & Power Limited<br />
52. General Manager, M/sHindustan Zinc Limited<br />
53. Shri A.K.Giri, Sr. Managar, Chh<strong>at</strong>tisgarh Steel & Power and Akshay Isp<strong>at</strong> (P) Ltd.<br />
54. Shri G.K.Chhighini, Ex. Director, Sarda Energy & Minerals Limited.<br />
55. Shri K.K. Shrivastava, EU, (Nakia I & II)CCCML<br />
56. Shri S.K. Goyal, Director, Shri Bajrang Power & Isp<strong>at</strong> Ltd.<br />
56. Shri R.K. Agarwal, Shree Nakoda Isp<strong>at</strong> Ltd.<br />
57. Shri P.K. Ch<strong>at</strong>urvedi, GM, CCCML<br />
58. Shri J.K. Pahwa, M/s VP Corpor<strong>at</strong>i<strong>on</strong> Limited.<br />
59. Shri M.Sahoo, VP, M/s Sree Metalicks Limited.<br />
60. Shri ashok Surana, Advior, M/s Electro Steel Casting Limited.<br />
61. Shri R. Agarwal, VP – Comm., M/s Bhushan Steel Ltd.<br />
62. Shri R.B. M<strong>at</strong>hur, Director, MJSJ Coal Co. Ltd.<br />
63. Shri Sanjay Pr<strong>at</strong>ap, President, M/s Adhunik Metaliks Ltd.<br />
64. Shri S.K. Ghosh, GM, M/s Orissa Sp<strong>on</strong>ge Ir<strong>on</strong> & Steel Ltd.<br />
65. Shri Ram Rao, MD,<br />
66. Shri A.K. Ch<strong>at</strong>urvedi, CMD, Madanpur (N) Coal Co. Pvt. Ltd.<br />
67. Shri Anand , M/s Ultr<strong>at</strong>ech Cement.<br />
68. Dr. V.N.Choudhary, M/s Sunflag Ir<strong>on</strong> & Steel Co. Ltd.<br />
69. Shri A.K. Mukherjee, M/s Nilachal Isp<strong>at</strong> & Power.<br />
70. Shri J.K.Bicharia, Director (Tech.), M/s Nerad Malega<strong>on</strong> Coal Project.<br />
71. Shri S.K. Goyal, Shri Bajraj Power & Isp<strong>at</strong> Ltd.<br />
72. Shri C. Mishra, M/s Jharkhand St<strong>at</strong>e Mineral Dev. Corpor<strong>at</strong>i<strong>on</strong>.<br />
73. Shri U. Chh<strong>at</strong>terjee, GM, M/s T<strong>at</strong>a Sp<strong>on</strong>ge<br />
74. Shri Hemant Dhasmana, RR, M/s Narbhraram Power &Steel Limited &<br />
SCAW<br />
75. Shri Anil Jain, VP Comm M/s SPS Steel & Power Ltd.<br />
76. Shri R.L. M<strong>at</strong>oo, MGCL,<br />
77. Shri M. Seth, MGCL<br />
78. Shr Yadav, MGCL<br />
79. Shri Pankaj Bharadwaj, MGCL<br />
80. Shri PS Boolia, GM (Bander )<br />
81. Shri S. Raha, Sr. GM, Bander coal block<br />
82. Shri Dayal Chand, GM<br />
83. Shri Gopal , AGM<br />
84. Shri P. S. Boolia, (Radhikapur (W)<br />
85. Shri S. Raha,<br />
86. Shir A.K. Ch<strong>at</strong>urvedi, M/s Ocean Isp<strong>at</strong><br />
87. Shri B.K. Aggarwal, M/s OCL.<br />
88. Shri P.K. S<strong>on</strong>i, GM, GMDC<br />
89. Shri Rajiv Chopra, CGM, MMTC<br />
90. Shri Phool Singh, Pr. Secretary, Mine & Geology, Bihar<br />
91. Shri P.N. Singh,CE (Project), JSEB, Ranchi.<br />
92. Shri R.S.Bh<strong>at</strong>ti, CE/ TS, HPGCL<br />
93. Shri R.K. Guar, MD/ IPGCL<br />
53
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
94. Shri P.Y. Tembhare , GM (O) MSMCL<br />
95. Shri K.C. Sarangi, P.O. OMC Ltd.<br />
96 Shri K. Partha Saranji, OSO, APMDCL.<br />
97. Shri A.Sharma, GM, PFC<br />
98. Shri Partho Chaudhuri, DGM/ Sasan Power Limited.<br />
99. Shri Manish Agarwal, Director, M/s Chaman Metalicks Ltd.<br />
100. M/s Bankura DRI Mining P Limited.<br />
101. Shri Rama Krishan Rao, VP(F), SKS Isp<strong>at</strong><br />
102. Shir R.L. Srivastav,<br />
103. Shri D.K.Singh, Jt. GM, M/s Prism Cement<br />
104. Shri U.K.Das, Mines (Adv.)<br />
54
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Name <str<strong>on</strong>g>of</str<strong>on</strong>g> Officers/ Executives particip<strong>at</strong>ing in <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> taken by<br />
Additi<strong>on</strong>al Secretary (Coal) <strong>on</strong> 20.07.2010 and <strong>21.07.2010</strong> <strong>at</strong> 10.00 AM in <strong>Scope</strong><br />
Minar, Laxmi Nagar District Centre, Delhi -110092.<br />
……………………………………………………………………………………………<br />
……<br />
GOVERNMENT – <strong>21.07.2010</strong><br />
Sl.No. Name / Organis<strong>at</strong>i<strong>on</strong><br />
1. Shri N.N. Sinha, Secretary, Mines , Government <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand.<br />
2. R.N. Prasad, Deputry Director, Mines, Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Jharkhand.<br />
3. Dr. S.S. Tak, Dy. Advisor, Minsitry <str<strong>on</strong>g>of</str<strong>on</strong>g> Steel.<br />
4. Shir K. Radhu, GM(Mines), RINL/ Vizag Steel Plant.<br />
5. Shri Sunil Kumar Sr. geologist, DMG, Rajasthan, Director<strong>at</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> Mines & Geology,<br />
Govt.<str<strong>on</strong>g>of</str<strong>on</strong>g> Rajasthan.<br />
6. Shri C.P. Jain, Asstt. Director, Central Electricity Authority.<br />
7. Smt. N.J. Roy, Dy. Director<br />
8. Dr. Durgavara Prasad, RO, SCCL.<br />
9. Shri A.K.Wahi, CGM Explor<strong>at</strong>i<strong>on</strong>, CMPDI<br />
10. Shri Gautam Dhar, CGM (Corpor<strong>at</strong>e Planning), CIL (HQ).<br />
11. Shri A.K.Biswas, DDG, CCO, Kolk<strong>at</strong>a<br />
12. Dr. Subir Majumder, Dy. Ch <str<strong>on</strong>g>of</str<strong>on</strong>g> Geology, CIL HQ, Kolk<strong>at</strong>a.<br />
13. Dr. M. S<strong>at</strong>yanarayan, SP (Resident Commisi<strong>on</strong>er), Govt. <str<strong>on</strong>g>of</str<strong>on</strong>g> Orssa<br />
55
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
Priv<strong>at</strong>e- <strong>21.07.2010</strong><br />
Sl.No. Name / Organis<strong>at</strong>i<strong>on</strong><br />
1. Shri Mukesh Chandra, C.E, UPRVUNL<br />
2. Shri R.K. Yadav, GM, Mahagenco<br />
3. Shri G.Sreenivasan, Resident Engineer, Kerela St<strong>at</strong>e Electricity Board.<br />
4. Shri V.K. Jain, Resident Manager, TNEB.<br />
5. Shri K.C.Sarangi, Project Officer, OMC Ltd.<br />
6. Shri S.P. R<strong>at</strong>h, CEO, BWCCL, Orissa.<br />
7. Shri Nihar Ranjan Nayak, manager, OPGC, Orissa.<br />
8. Dr. Kshirod Brahma, GM(Mines), OPGC, BBSR Orissa<br />
9. Shri Phool Singh, Principal Secy, Mines & Geology, Bihar, P<strong>at</strong>na.<br />
10. Shri A.L. Thakur, GMDC. LTD.<br />
11. Shri K. Partha S APMDC Limited.<br />
12. Shri S.S. Goyal, RVUNL<br />
13. Shri S.C. Agarwal, RVUNL.<br />
14. Shri R.L. M<strong>at</strong>to, RVUNL<br />
15. Shri Pankaj Bhardwaj, RVUNL<br />
16. Shri R.L.M<strong>at</strong>too, M/s Adani Power Limited<br />
17. Shri Pankaj Bhawaday, M/s Adani Power Limited.<br />
18. Shri S.K. Mandal, MP St<strong>at</strong>e Mining Corpor<strong>at</strong>i<strong>on</strong> (M.P.)<br />
19. Shri S.K. Dube, GM (Opwer<strong>at</strong>i<strong>on</strong>), MP St<strong>at</strong>e Mining Corpor<strong>at</strong>i<strong>on</strong> (M.P.).<br />
20. Shri Arun Kumar Shukla, Project Manager (Coal Div.), NMDC Ltd.<br />
Hyderabad<br />
21. Dr. R. Reddy, Advisor (Coal), NDDC<br />
22. Shri P.Y. Tembhare, GM(O )<br />
23. Shri M.S.M.C. Nagpr MSMCL<br />
24. Shri M.J.S. Ashok, Project Manager, PIPDLC & Director, M/s Naini coal<br />
Comp. Ltd.<br />
25. Shri P.N. Singh, TNEB, Ranchi.<br />
26. Shri Atul Jain, Director, M/s Pushp Steels & Mining Co. Pvt. Limited<br />
27. Shri V.R. Kochhar, Sr. Advisor, T<strong>at</strong>a Power<br />
28. Shri Tehmt<strong>on</strong> Tookey, Head Proj. Coord., T<strong>at</strong>a Power<br />
29. Shri Vinod K Verma DY. GM, HINDALCO.<br />
30. Shri M.N. Jha, Adviser(Coal),<br />
31. Shri V.s. Bajaj, President<br />
32. Shri Sukhbir Singh, VP, M/s DB Power Ltd.<br />
33. Shri M.M. Ojha, Avp (Mining ), M/s DB Power Ltd.<br />
34. Shri I.K. Singh, AES India<br />
35. Shri P.K. Gupta, Adviosr, M/s Sova Isp<strong>at</strong> Limited.<br />
36. Shri P. Mukherjee, Project Officer, M/s Sova Isp<strong>at</strong> Limited<br />
37. Shri Sanjay Kumar Jain, Advisor (P), BALCO.<br />
38. Shri R.K. N<strong>at</strong>ta, Advisor, CESC Ltd.<br />
39. Shri B. D. Garg, BSIL<br />
40. Shri Sunil Gupta, BSIL<br />
41. Shri A.K. Srivastava, M/s ICPL<br />
42. Shri R.P. Gupta, M/s Nandlal Enterprises.<br />
43. Shri Punnit Gupta, M/s Jindal Photo Ltd.<br />
44. Shri P. Girish, JITPL<br />
45. Shr V.R. Kochar, Sr. Fuel Advisor, M/s T<strong>at</strong>a Power Co. Ltd.<br />
56
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
46. Shri T.N. Tooley, Head Proj. Dev. M/s T<strong>at</strong>a Power Co. Ltd.<br />
47. Shri Anjul Dayal, Proj. Dev. M/s T<strong>at</strong>a Power Co. Ltd.<br />
48. Shri Nandita Singh, Exe. Prog. Dev M/s T<strong>at</strong>a Power Co. Ltd.<br />
49. Shri Anil Kumar Sajia, Proj. Dv, M/s T<strong>at</strong>a Power Co. Ltd.<br />
50. Shri Shital S. Mann, Manager, M<strong>on</strong>net Isp<strong>at</strong><br />
51. Shri Anand Goel,Jt. MD ( Amark<strong>on</strong>d Ramchandi coal block )<br />
52. Shri D.N. Abrol, ED( Amark<strong>on</strong>d Ramchandi coal block )<br />
53. Shri R.B. M<strong>at</strong>hur, President, M/s JSW<br />
54. Shri S.C. Wahi, GM, BPSL<br />
55. Shri PS Boomlia, RMC<br />
56. Shri S.K. Agarwal, RMC<br />
57. Dr. V.N. Choudhary, M/s Sunflag<br />
58. Shri Dayal Chand,<br />
59. Shri Prasanna, M/ Kohinoor<br />
60. Shri S. Rehan<br />
61. Shri Amitabh Ch<strong>at</strong>terjee, M/s Jai Balaji Industries Ltd.<br />
62. Shri Venkumar, AVP, M/s GMR.<br />
63. Shri Venukumar, AVP, GMR<br />
64 Shri Sanjaye, Executive, GMR<br />
65. Dr. V. Mani, GM, Lanco.<br />
66. Shri P. Mairv, VP, Lanco.<br />
67. Shri Partho chaudhuri, DGM, Reliance Energy<br />
68. Shri Molay Moitra, Exe- CR, GMR<br />
69. Shri KVR Raju, VP(Fin) & Comp. Secretary, Navbhar<strong>at</strong><br />
70. Shri S. Anand, Essar<br />
71. Shri S.N. Mohanty, GM, Fuel, GMR<br />
72. Shri R. V. Ma<str<strong>on</strong>g>the</str<strong>on</strong>g>, GM, Coal,Vandana Vidyut Limited.<br />
73. Shri J.K. Moitra, President, JLD Yav<strong>at</strong>mal Energy Limited<br />
74. Shri M.M.S. Khadni, VP, A<str<strong>on</strong>g>the</str<strong>on</strong>g>na Chh<strong>at</strong>tisgarh Power.<br />
75. Shri R. Srinivasan, VP corpor<strong>at</strong>e, A<str<strong>on</strong>g>the</str<strong>on</strong>g>na Energy Venture (P) Ltd.<br />
76. Shri Viyay Kumar, Manager, Visa Power<br />
77. Shri O.P. Verma, Executive, RKM Power<br />
78. Shri R.K. Agha, VP<br />
79. Shri AK Ch<strong>at</strong>urvedi, Director, Prakash Industries Limited<br />
80. Shri R.K. Shrivastava<br />
81. Shri Udit R<strong>at</strong>hi, CEO<br />
82. Shri Vijay Surjan, GM (Comm)<br />
83. Shri S.S. Dand, VP, Bikram coal block.<br />
84. Shri A.D. Naik, MD, Goa IDC<br />
85. Shri Arvind Pujan, Revti Cement (P) Ltd.<br />
86. Shri Agarwal, Kamal Sp<strong>on</strong>ge<br />
87. Shri U.K. Mittal, G<strong>on</strong>dkhari Coal Ltd.<br />
88. Shri P.R.Sharma, G<strong>on</strong>dkhari Coal Ltd.<br />
89. Shri A.K. Gupta, G<strong>on</strong>dkhari Coal Ltd.<br />
90. Shri Viren Mital , Mukund Ltd.<br />
91. Shri C.S. Mourthi, Vini Mukund<br />
92. Shri A. Singh, Bhaskarpara Coal Block.<br />
93. Shri M. Rave Shankar<br />
94. Shri sunil Babbar<br />
85. Shri A.K. Shrivastanve, Dir, AMR<br />
86. Shri Sanjeev Garg, JK Cement Limited<br />
87. Shri Atul Kumar Kedia, Century Textile & India Limited<br />
57
<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Review <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 20 th & 21 st July, 2010<br />
88. Shri Gaurav Gupta, Ex- Director, IST Steel Limited<br />
89. Shri Kamlesh Sharma, Sr. Vice President (CA), Ambuja Cement<br />
90. Shri Alok Gupta, Lafarge India Pvt. Limited.<br />
91. Shri A.K. Mudga Director<br />
92. Shri P.N. Singh, Karnpara Energy Ltd.<br />
93. Shri Ashok Tooley, Director, EMTA<br />
94. Shri Bikash Mukherjee, Director, EMTA<br />
95. Shri R.B. M<strong>at</strong>hur, JSW<br />
96. Shri Subhash Agarwal , Moira Madhurjora Coal Ltd.<br />
97. Shri Manish Agarwal Howrah Gases Ltd.<br />
98. Shri Sanjay Kumpaw<strong>at</strong>, Adhunik corpor<strong>at</strong>i<strong>on</strong> Limited<br />
99. Shri David Jain, Uttam Steel Limited<br />
100. Shri K.M. Gupta, ACC Ltd.<br />
101 Shri Anand Mallick, Vikash Metal & Power Limited.<br />
Lignite:<br />
1. Shri L.S. R<strong>at</strong>hore, Group Gen, RSMML<br />
2. Shri Harsha Varshan, Dy. GM, RSMML<br />
3. Shri K.P. Agarwal, Advisor, Kapurdi- Jalipa Lignite Project<br />
4. Shri P.s. Upadhyaya, Director<br />
5. Shri A.L. Thakur, GM, GMDC Blocks.<br />
6. Shri Deepak Lal, Ex. Dir, Mangla Charan<br />
7. Shri N.K. Anand, C<strong>on</strong>sultant, NSLNagap<strong>at</strong>nam Ltd.<br />
8. Shri Prem Das, Vice President, DSCL, Kote.<br />
9. Shri R. K. Shastry, DSCL, Kote<br />
58