Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ARCHITECTURE PORTFOLIO<br />
<strong>José</strong> <strong>Ribeiro</strong>
HELLO, THIS IS MY<br />
PORTFOLIO<br />
ABOUT ME<br />
NAME <strong>José</strong> Carlos Pereira <strong>Ribeiro</strong><br />
DOB 19/10/1989<br />
PHONE +35191238802<br />
SKYPE zedocarlos<br />
EMAIL j.carlos.ribeiro5@gmail.com<br />
CITY Braga<br />
COUNTRY Portugal<br />
FORMATION Master in <strong>Architecture</strong><br />
SOFTWARE SKILLS<br />
Autodesk AutoCAD 2014<br />
Autodesk 3ds Max 2014<br />
SketchUp 8<br />
Adobe Illustrator CS6<br />
Adobe Photoshop CS6<br />
Adobe Indesign CS6<br />
Adobe Lightroom 5.2<br />
Artlantis 5<br />
Lumion 3D<br />
Microsoft Office<br />
LEARNED LANGUAGES<br />
Portuguese<br />
English<br />
German
06. Ludotheke in the Historic Center, Guimarães<br />
“A Constructed Idea”<br />
32. Collective Unit of Livestock Farming Production<br />
“Quinta da Eira’s Case Study”<br />
60. Programatic Propagation, Viana do Castelo<br />
“A Vision between the Context and the Utopia”<br />
74. Unité d’Habitation Creixomil, Guimarães<br />
“The Rafts”
THEME AND OBJECTIVES<br />
The project – The “Ludo”. The Ludotheke<br />
of Guimarães historical center is a public<br />
equipment, which aims to articulate a<br />
complex programme with different scales of<br />
the project making.<br />
The student was supose to master the<br />
interdependence of the different aproach<br />
scales (including the most detailed); a critical<br />
interpretation of a complex programme,<br />
focused on aspects such as: public<br />
and private, adaptability and versatility,<br />
outdoor and indoor space, the association,<br />
space definitation and aggregation – the<br />
constructive system option; and the mastery<br />
of the project communication strategies.<br />
08 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
THE LUDOTHEKE MEANING<br />
The Ludotheke is an equipment with a<br />
recreational and educational character,<br />
suited for the children (age 3 to 10), a toys<br />
collection that can be used in the same place<br />
or borrowed. One could say that the toys are<br />
part of the ludotheke as a book is part of a<br />
library. The word “Ludotheke” comes from<br />
Latin ludus, which means toy, and from the<br />
greak théke, which means box or safety box.<br />
The student was supose to “brainstorm” the<br />
toy box , having to consider the articulation<br />
between the outdoor and indoor space, the<br />
public space (street) and the inside of the<br />
block, the programme containers and how<br />
they work with the light, the combination of<br />
formal and conceptual idea with the idea<br />
built.<br />
The programme is developed in two<br />
constraints áreas, with different ilumination<br />
and utility.<br />
PUBLIC AREA<br />
- Reception (square, bar, lown office)<br />
-Playground<br />
EMPLOYEES AREA<br />
- Dress room, storage and support room<br />
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
09
The Ludotheke is implanted in a<br />
free parcel of Guimarães Historical<br />
Center, between two gables of urban<br />
mesh from the historical center, in<br />
confrontation and articulation of the<br />
Martins Sarmento Lake (existent<br />
public space) and the interior of a<br />
private block, projecting.
A'<br />
B'<br />
A<br />
B<br />
A'<br />
B'<br />
0<br />
1 5<br />
01. ENTRANCE<br />
02. DEPOSITORY ROOM<br />
03. EQUIPAMENT ROOM<br />
04. WC<br />
05. CHEST OF DRAWERS<br />
06. CHANGING ROOM<br />
07. SUPPORT ROOM<br />
08. ELEVATOR<br />
09. COURTYARD<br />
10. PLASTIC EXPRESSION ROOM<br />
11. RECEPTION<br />
12. BAR<br />
13. LAVATORY<br />
14. PLAYGROUND<br />
B<br />
08.<br />
13.<br />
14.<br />
A<br />
08.<br />
07.<br />
03.<br />
C<br />
06.<br />
C<br />
C’<br />
12.<br />
11.<br />
C'<br />
05.<br />
09.<br />
01.<br />
04.<br />
01.<br />
04.<br />
03.<br />
10.<br />
02.<br />
GROUND FLOOR PLAN<br />
1ST FLOOR PLAN<br />
12 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
13
B<br />
A'<br />
B'<br />
A<br />
B<br />
A'<br />
B'<br />
A<br />
0<br />
1 5<br />
15. MUSIC ROOM<br />
16. LIBRARY/MEDIA<br />
17. RULES ROOM<br />
18. CONSTRUCTION ROOM<br />
19. BALCONY<br />
20. ELEVATOR<br />
20.<br />
20.<br />
C<br />
16.<br />
C<br />
18.<br />
C'<br />
C'<br />
19.<br />
15. 17.<br />
2ND FLOOR PLAN<br />
3RD FLOOR PLAN<br />
14 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
15
B<br />
A'<br />
B'<br />
A<br />
0<br />
1 5<br />
21. SIMULATION AND FABLE<br />
22. BALCONY<br />
23. ELEVATOR<br />
23.<br />
D<br />
21.<br />
D'<br />
21.<br />
22.<br />
4TH FLOOR PLAN<br />
16 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
17
0<br />
1 5<br />
The programmes of minor dimension<br />
were put in the top of the volumes,<br />
taking advantage of that lack of<br />
space to open skylines of zenith<br />
ilumination for the programmes with<br />
indirect light, that coincided with<br />
larger programs such as the library/<br />
media and the music room.<br />
ROOF PLAN<br />
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
19
0<br />
1 5<br />
STAIRS<br />
The solution to the vertical, spacial and organizational problem<br />
of this project was the stairs. The stairs system allowed the<br />
access and communication of the different floors, creating a<br />
logic, pragmatic and efficient distribution, solving the entire<br />
organization of the programmes of the building in just two<br />
vertical and narrow stairs in each main volume of the building.<br />
SECTION A<br />
20 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
22 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
ILLUMINATION<br />
0<br />
1 5<br />
The programmes of minor dimension<br />
were put in the top of the volumes,<br />
taking advantage of that lack of<br />
space to open skylines of zenith<br />
ilumination for the programmes with<br />
indirect light, that coincided with<br />
larger programs such as the library/<br />
media and the music room.<br />
SECTION B
0<br />
1 5<br />
The biggest challenge of this project<br />
was to focus in the realization of<br />
a very complex programme in a<br />
construction lot, quite strait and<br />
narrow. Judging by the morphology<br />
of the lot, it quickly became obvious<br />
that, spacially speaking, any project<br />
with a vertical construction would<br />
more easily fulfill the programme.<br />
SECTION C<br />
Ludotheke in the Historic Center, Guimarães “A constructed idea”<br />
25
Besides the complex and multifarious programme,<br />
there was another limitation, the lightning rules.<br />
Each program according to its characteristics, had a<br />
different lightning: indirect light (zenith), direct light<br />
(windows) or artificial light (light bulbs and lamps).<br />
RULES ROOM Ludotheke in the Historic Center, Guimarães “A constructed idea” 27
LIBRARY/MEDIA<br />
ENTRANCE<br />
28 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
In the end of the academic year, the Bang Organization invited<br />
our <strong>Architecture</strong> School to present the best projects of the entire<br />
year. This project was selected to represent the third year of the<br />
architecture course. There were many guests at the exposition,<br />
including Eduardo Souto Moura (Pritzker 2011), Carvalho Araújo,<br />
Carrilho da Graça and Cannatà & Fernandes Architects.<br />
30 Ludotheke in the Historic Center, Guimarães “A Constructed Idea”
34 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
This project is about agricultural<br />
farms of dairy cattle (Frisia Holstein<br />
breed), focusing on Quinta da Eira’s<br />
study case, in Mire de Tibães – Braga.<br />
It consists in the elaboration of a<br />
project with a new agricultural holding<br />
that takes into account the territorial<br />
caracteristics of the place where we<br />
are going to intervene and the existing<br />
Portugal’s agricultural activity.
Quinta da Eira’s constructions and relation with the territory<br />
Vacaria<br />
105<br />
A’<br />
100<br />
Fachada sul<br />
110<br />
Habitação<br />
110<br />
85<br />
105<br />
100<br />
100<br />
90<br />
95<br />
105<br />
110<br />
80<br />
Fachada sul e oeste<br />
A<br />
85<br />
115<br />
80<br />
Sequeiro - Armaz<br />
120<br />
125<br />
N<br />
130<br />
0 25 50 100 200m<br />
135<br />
Fachada sul<br />
140<br />
145<br />
150<br />
155<br />
160<br />
Corte AA’<br />
Campos agrícolas<br />
Zona de edíficado<br />
Campos agrícolas<br />
B’<br />
Quinta da<br />
Edificado d<br />
Projecto tes<br />
Análise<br />
Corte BB’<br />
Campos agrícolas<br />
Zona de edíficado<br />
Campos agrícolas<br />
Campos<br />
agrícolas<br />
Zona florestal<br />
Escala gráfica<br />
Fevereiro 201<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
35
Fotograf<br />
Fotograf<br />
Quinta da Eira’s old cow stable<br />
A<br />
B’<br />
Estábulo livre<br />
105<br />
Fotografi<br />
107<br />
103<br />
104<br />
102<br />
2<br />
3<br />
1<br />
Curral exterior<br />
4<br />
106<br />
6<br />
B<br />
8<br />
5<br />
7<br />
A’<br />
N<br />
0 10 5 25 50m<br />
Fotografi<br />
Percursos do estábulo ao exterior<br />
Corte AA’<br />
Quinta da Eira:<br />
Estábulo da vacaria<br />
Projecto tese<br />
Corte BB’<br />
Análise<br />
Escala gráfica<br />
Fevereiro 2014<br />
36 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
Abandoned<br />
Farming properties without farming<br />
activity. Lack of land maintenance<br />
transforming it in savage state and<br />
growing continualy until becoming a<br />
forest.<br />
Inactive<br />
Farming lands without any farming<br />
activity, only subject to regular<br />
maintenance by the owner or others.<br />
This maintenance is executed only to<br />
prevent the transformation of the land,<br />
avoiding it classification as abandoned<br />
Semi-active<br />
Farming properties with a bit of farming<br />
activities. Short farming periods, or just<br />
half year between May and September<br />
for corn planting. During the rest of the<br />
year the fields remain inactives, with or<br />
without maintenance depending on<br />
owners choices.<br />
Active<br />
Farming fields with intensive farming.<br />
This properties are constantly using the<br />
ground to diverse activities and cattle<br />
feeding. Generally the owners make<br />
farming activities their profissional<br />
activity and a financial sustenance.<br />
Pasture<br />
Farming properties exclusively to animal<br />
pasture. Rent parcel or pasture property<br />
to cattle feeding. This parcels are<br />
generally divided in smaller areas to<br />
make the field more profitable for animal<br />
grazing.
Farming parcels activity study<br />
Abandonado<br />
Propriedades agrícola<br />
Falta de manutenção<br />
selvagem do mesmo<br />
matas ou bouças.<br />
Inactivo<br />
Terrenos agrícolas s<br />
sujeito apenas a um<br />
proprietário ou outros<br />
não ocorrer a transf<br />
mata ou bouça, evitan<br />
abandonado.<br />
Semi-activo<br />
Propriedades agrícola<br />
cultivo muito curtos, ou<br />
para plantações de mi<br />
ano o campo fica in<br />
dependendo do proprie<br />
Activo<br />
Campos agrícolas com<br />
estão em constante us<br />
alimentação do gado. G<br />
agricultura como activi<br />
ro.<br />
Pasto<br />
Propriedades agrícolas<br />
Parcela alugada ou pro<br />
cavalos. Estas parce<br />
piquetes para tirar m<br />
animais. Os animais<br />
propriedades.<br />
Quinta da Eira e envolvente:<br />
Estudo da atividade das parcelas agrícolas<br />
0<br />
Projecto tese<br />
Levantamento<br />
Escala gráfica<br />
Fevereiro 2014<br />
Arquitectura<br />
Território<br />
Planta de estudo da atividade dos campos<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
39
Our methodology was based on a first analysis of the territory,<br />
followed by the search of the essential study cases to the<br />
understanding of the agricultural holding as a project. Then we<br />
made a geographic study to try to understand the limitations of<br />
the agricultural holdings and models applications in portuguese<br />
territory, which resulted in a projct strategy fit to the territorial<br />
context and agricultural holdings landscape.<br />
40 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
Vacas secas<br />
Vacas adultas<br />
Vacas gestantes<br />
Novilhas<br />
Vitelas<br />
Vitelas recém-nascidas<br />
Silos<br />
Rações<br />
Corredor<br />
Fossas<br />
Garagem<br />
0 5 10 25 50m<br />
0 5 10 25 50m<br />
0 5 10 25 50m<br />
Sala de ordenha<br />
Curral de espera<br />
Gestão empresarial<br />
1. Vitelas e vitelos (até 3 meses) 2. Vitelas e vitelos (3-10 meses) 3. Novilhas (10-18 meses)<br />
2<br />
4. Vaca gestante 5. Maternidade<br />
6. Vaca leiteira<br />
7. Vaca seca<br />
6<br />
4<br />
6<br />
3<br />
3<br />
7<br />
6<br />
6<br />
5<br />
2<br />
2<br />
2<br />
7<br />
1<br />
5<br />
2<br />
6<br />
7<br />
2<br />
2 2<br />
1<br />
3<br />
1<br />
4<br />
5<br />
4<br />
2<br />
1<br />
3<br />
1 Ponto de recolha 2 Cisterna 3 Ordenha 4 Vacas de baixa produção 5 Vacas de alta produção 1 Sementes e suplementos 2 Silo vertical da ração 3 Palha 4 Silos horizontais de milho 5 Silos embalados de feno 1 Grade mecânica de 2 Grelha de recolha de excrementos<br />
recolha de excrementos<br />
Comportas de circulação<br />
Circuito da habitáculo - ordenha<br />
Circuito da ordenha - habitáculo<br />
Percurso do leite<br />
1<br />
2<br />
3<br />
4<br />
5<br />
5<br />
5<br />
4<br />
3<br />
4<br />
2<br />
1<br />
5<br />
4<br />
4<br />
4 4<br />
Circuito de mistura do produto alimentar<br />
Circuito de distribuição do alimento para o gado<br />
1<br />
3<br />
2<br />
2<br />
2<br />
1/3<br />
2<br />
2<br />
3<br />
4<br />
5<br />
2<br />
4<br />
4<br />
2<br />
5<br />
3<br />
Percurso do chorume<br />
Percurso do estrume<br />
Percurso da água suja<br />
3<br />
1<br />
1<br />
2<br />
2<br />
2<br />
4<br />
5<br />
5<br />
2<br />
2<br />
1<br />
5<br />
3<br />
3 Fossa de lavagem 4 Fossa de chorume 5 Depósito de estrume<br />
1<br />
1<br />
3<br />
4<br />
4<br />
2<br />
2<br />
Origem da construção 1ª Fase de ampliação 2ª Fase de ampliação 3ª Fase de ampliação<br />
Intensive models analysis - Center and north of Portugal<br />
EXPLORAÇÃO JOÃO CARLOS COSTA<br />
EXPLORAÇÃO DR. FERREIRA<br />
EXPLORAÇÃO FAMÍLIA MARQUES<br />
ORGANIZAÇÃO PROGRAMÁTICA<br />
FASES DO GADO ORDENHA TRATADOR EFLUENTES<br />
EXPANSÃO<br />
Vacas leiteiras Armazém de feno Sala da cisterna<br />
Síntese Programática:<br />
Modelos intensivos<br />
Projecto tese<br />
Arquitectura<br />
Casos de estudo<br />
Programas dos modelos agropecuários<br />
Escala gráfica<br />
Plantas esquemáticas<br />
Anexo<br />
6<br />
Fevereiro 2014<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
41
0 5 10 25 50m<br />
EXPLORAÇÃO PRONK AND DERKS<br />
4/7<br />
3 3<br />
1<br />
2<br />
5<br />
1 2 3 3<br />
6<br />
4/5<br />
ORGANIZAÇÃO PROGRAMÁTICA<br />
FASES DO GADO<br />
ORDENHA<br />
Vacas leiteiras Armazém de feno Sala da cisterna<br />
Vacas secas<br />
Silos<br />
Sala de ordenha<br />
1- Vitelas e vitelos (até 3 meses) 2- Vitelas e vitelos (3-10 meses) 3- Novilhas (10-18 meses)<br />
1- Ponto de recolha 2- Cisterna 3- Ordenha 4- Vacas de baixa produção 5- Vacas de alta produção<br />
Vacas adultas<br />
Rações<br />
Curral de espera<br />
Vacas gestantes<br />
Corredor<br />
Gestão empresarial<br />
Comportas de circulação<br />
Circuito da habitáculo - ordenha<br />
Novilhas<br />
Praça de alimentação<br />
Vitelas<br />
Tanques<br />
Circuito da ordenha - habitáculo<br />
Vitelas recém-nascidas<br />
Garagem<br />
Fossas<br />
4- Vaca gestante 5- Maternidade<br />
6- Vaca leiteira<br />
7- Vaca seca<br />
Percurso do leite<br />
42 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
0 100 200 500m<br />
Extensive model analysis - South of Portugal<br />
4<br />
3<br />
3<br />
4<br />
5<br />
4<br />
1<br />
3<br />
4<br />
3<br />
1<br />
1<br />
1<br />
2<br />
2<br />
TRATADOR EFLUENTES TERRITÓRIO<br />
Edíficios da<br />
exploração<br />
Área de<br />
Repouso<br />
Campo de<br />
pastagem 1<br />
(Vacas leiteiras)<br />
Campo de<br />
pastagem 2<br />
(Vacas leiteiras)<br />
Campo de<br />
pastagem 3<br />
(Vacas leiteiras)<br />
Campo de<br />
pastagem 3<br />
(Vacas secas)<br />
1- Sementes e suplementos 2- Silo vertical da ração 3- Palha 4- Silos horizontais de milho 5- Silos embalados de feno 1- Grelha e fossa de recolha 2- Grelha e fossa de<br />
de excrementos (Manjedouras)<br />
limpeza<br />
recolha de excrementos e<br />
(Curral)<br />
3- Forragem animal Zona de repouso<br />
Depósito de estrume<br />
Síntese Programática:<br />
Modelo extensivo<br />
Anexo<br />
Circuito de mistura do produto alimentar<br />
Circuito de distribuição do alimento para o gado<br />
Projecto tese<br />
Casos de estudo<br />
Escala gráfica<br />
Fevereiro 2014<br />
Arquitectura<br />
Programas dos modelos agropecuários<br />
Plantas esquemáticas<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
7<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
43
The understanding of the territory<br />
where we are going to intervene is<br />
of significant importance, due to its<br />
appliances and caracteristics, that<br />
allows us to gain a vast knowledge<br />
about the stockbreeding and the<br />
current landscape of its holdings.<br />
We intend to analise all of the ideas,<br />
problems and possible solutions, so<br />
that we can create a new insight into<br />
the agricultural activity, through a<br />
solid project solution.
50<br />
60<br />
70<br />
80<br />
90<br />
100<br />
110<br />
N<br />
120<br />
130<br />
140<br />
Farming and forest parcels definition<br />
Parcela florestal<br />
Grupo 2<br />
Grupo 1<br />
Grupo 3<br />
Área de repouso<br />
Parcela 1<br />
Parcela 2<br />
Parcela 3<br />
Parcela 4<br />
Parcela 5<br />
Parcela 6<br />
Parcela A<br />
Parcela B<br />
Parcela C<br />
Parcela D<br />
Área: 36.000 m2 (3,5 Hectares)<br />
Área: 30.000 m2 (3 Hectares)<br />
Área: 40.000 m2 (4 Hectares)<br />
Área: 17.500 m2 (1,8 Hectares)<br />
Área: 11.700 m2 (1,2 Hectares)<br />
Área: 20.000 m2 (2 Hectares)<br />
Área: 30.000 m2 (3 Hectares)<br />
Área: 25.000 m2 (2,5 Hectares)<br />
Área: 30.000 m2 (3 Hectares)<br />
Área: 24.000 m2 (2,4 Hectares)<br />
Área: 8.000 m2 (0,8 Hectares)<br />
Área: 10.000 m2 (1 Hectares)<br />
Área: 4.000 m2 (0,4 Hectares)<br />
Área: 10.000 m2 (1 Hectares)<br />
Área: 18.500 m2 (1,8 Hectares)<br />
Função: Núcleo de produção<br />
Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Ponto de junção das<br />
reses, zona de conforto.<br />
Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto Função: Produção agrícola e pasto<br />
Parcelas agricolas<br />
Áreas agricolas divididas pré-existentes no local, após a análise a estas parcelas isoladas foi possível planear um agrupamento das<br />
parcelas para uma melhor gestão do território.<br />
Grupo 1<br />
(Agrupamento de parcelas)<br />
Grupo 2<br />
(Agrupamento de parcelas)<br />
Grupo 3<br />
(Agrupamento de parcelas)<br />
Área de repouso<br />
Parcela florestal<br />
(Núcleo de produção)<br />
Parcelas da Quinta da Eira<br />
(para o Núcleo de produção)<br />
Parcela 1<br />
0 50<br />
100<br />
200m<br />
Parcela 2<br />
Parcelas adjuntas<br />
Áreas agrícolas que não vão fazer parte do pastoreio rotativo do gado. Estas parcelas fazem parte da produção de alimento para a época<br />
de regime de abrigo. Após a colheira do alimento, fácilmente acedem à parcela florestal (Núcleo de produção) onde podem descarregar<br />
a produção (alimento) nos silos.<br />
Limite da Quinta da Eira<br />
Parcela 3<br />
Parcela 4<br />
Parcela 5<br />
Parcela 6<br />
Parcelas da Quinta da Eira<br />
(para o Núcleo de criação)<br />
Parcela A<br />
Parcela B<br />
Parcela C<br />
UCPRA:<br />
Aceção das parcelas agrícolas e florestais<br />
Projecto tese<br />
Arquitectura<br />
Estratégia<br />
Território<br />
Escala gráfica<br />
Planta síntese da gestão dos parcelamentos<br />
Anexo<br />
9<br />
Parcela D<br />
Fevereiro 2014<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
45
Corte AA’ Corte BB’ Corte CC’ Corte DD’ Corte EE’<br />
Curso hídrico de impotável<br />
Tanque 8<br />
Planta de reestruturação da rede hídrica escala 1:2000<br />
Corte FF’<br />
F G<br />
F’<br />
Depósito 1<br />
50<br />
60<br />
Curso Hídrico potável<br />
Depósito 2 Tanque 7 Tanque 4 Tanque 5<br />
Tanque 6<br />
G’<br />
Lagoa<br />
B<br />
B’<br />
70<br />
Regadios<br />
C<br />
H’<br />
80<br />
C’<br />
H<br />
Corte GG’ Corte HH’ Corte II’ Corte JJ’<br />
90<br />
I<br />
100<br />
D’<br />
Tanque 3 Tanque 2 Tanque 1<br />
D<br />
I’<br />
110<br />
120<br />
130<br />
Reestruturação da rede hídrica<br />
Projecto tese<br />
Projecto<br />
J<br />
Escala 1:2000 e 1:350<br />
Fevereiro 2014<br />
140<br />
E’<br />
Território<br />
Arquitectura<br />
Plantas e cortes da rede hídrica<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
E<br />
N<br />
0 25 50 100m<br />
Depósitos<br />
Tanques<br />
J’<br />
Anexo<br />
Hydric supply network reorganization<br />
A A’<br />
UCPRA:<br />
8<br />
46 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
Núcleo de criação<br />
Parcela B<br />
Parcela C<br />
Parcela A<br />
Parcela D<br />
Área de repouso<br />
Grupo 2 Grupo 3<br />
Grupo 1<br />
Parcela 1<br />
Parcela 2<br />
Parcela 1<br />
Betão pré-fabricado 10cm<br />
Núcleo de criação<br />
Parcela 2 Parcela 3 Parcela 4<br />
Curso hídrico impotável<br />
Betão pré-fabricado 8cm<br />
Tela<br />
Camada de assentamento<br />
N<br />
Peça 1 - Muro (1m)<br />
(Sistema de distribuíção do agregado)<br />
0<br />
25<br />
Peça 2 - Cursos hídricos (1m)<br />
(Curso hídrico potável e impotável)<br />
50<br />
Estratégia<br />
100m<br />
Escala 1:350 e escala gráfica<br />
Fevereiro 2014<br />
Parcela 5<br />
Território<br />
Parcela 6<br />
Planta e cortes síntese da gestão dos parcelamentos<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
Aggregate distribution system<br />
Planta do sistema de distribuição do agregado<br />
Núcleo de produção<br />
UCPRA:<br />
Anexo<br />
Sistema de distribuição do agregado<br />
Projecto tese<br />
Arquitectura<br />
10<br />
Cortes do sistema de distribuição do agragado escala 1:350<br />
Pormenor constructivo do sistema de distribuição do agregado escala 1:20<br />
Pormenor constructivo 3D das peças do sistema de distribuição do agregado<br />
48 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
50<br />
60<br />
70<br />
80<br />
90<br />
100<br />
110<br />
120<br />
130<br />
140<br />
Rotative grazing and pasture order<br />
A<br />
B<br />
C<br />
D<br />
2<br />
3<br />
1<br />
4<br />
5<br />
6<br />
N<br />
0 50 100<br />
200m<br />
Pastoreio rotativo - Núcleo de produção<br />
Pastoreio rotativo - Núcleo de criação<br />
Grupo 1<br />
Grupo 2<br />
Parcela 1<br />
Parcela 3<br />
Parcela 2<br />
Parcela 4<br />
Parcela A<br />
Parcela B<br />
UCPRA:<br />
Pastoreio rotativo e ordem das pastagens<br />
Anexo<br />
Grupo 3<br />
Parcela 5 Parcela 6<br />
Parcela C<br />
Parcela D<br />
Projecto tese<br />
Estratégia<br />
Escala gráfica<br />
Fevereiro 2014<br />
Arquitectura<br />
Território<br />
Planta e esquema síntese da rotação da pastagem<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
11<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
51
Vacas leiteiras<br />
Vacas secas e adultas<br />
Vacas gestantes<br />
Novilhas<br />
65<br />
65<br />
Vitelas<br />
66<br />
Vitelas recém-nascidas<br />
Laboratório<br />
Sistema de distribuição do agregado<br />
Quarentena/matadouro<br />
100<br />
70,6<br />
64<br />
105<br />
66<br />
70<br />
106<br />
Fardos de feno<br />
Silos<br />
Rações<br />
108,5<br />
107<br />
70,6<br />
69,6<br />
Corredor de alimentação<br />
109,5<br />
74,5<br />
66<br />
75<br />
80<br />
78<br />
Sala da cisterna<br />
Sala de ordenha<br />
Curral de entrada<br />
Curral de saída<br />
0 10 25 50m<br />
78<br />
Gestão empresarial<br />
85<br />
81<br />
81<br />
0 10 25 50m<br />
Corredor dos efluentes<br />
Fossas<br />
Chorume<br />
Depósito 2<br />
65<br />
65<br />
66<br />
100<br />
105<br />
70,6<br />
64<br />
66<br />
3<br />
70<br />
106<br />
5<br />
6<br />
2<br />
0 10 25 50m<br />
1. Vitelas e vitelos (até 3 meses) 2. Vitelas e vitelos (3-10 meses) 3. Novilhas (10-18 meses) 4. Vaca adulta 5. Maternidade<br />
6. Vaca leiteira<br />
7. Vaca seca<br />
108,5<br />
1<br />
107<br />
70,6<br />
69,6<br />
109,5<br />
4/7<br />
74,5<br />
66<br />
75<br />
80<br />
78<br />
0 10 25 50m<br />
78<br />
85<br />
81<br />
81<br />
65<br />
65<br />
66<br />
1. Ponto de recolha 2. Cisterna 3. Ordenha 4. Vacas em produção<br />
100<br />
70,6<br />
64<br />
105<br />
70<br />
66<br />
4<br />
106<br />
108,5<br />
107<br />
70,6<br />
69,6<br />
74,5<br />
109,5<br />
75<br />
66<br />
3<br />
80<br />
78<br />
0 10 25 50m<br />
78<br />
2<br />
85<br />
1<br />
81<br />
81<br />
0 10 25 50m<br />
Circuito Células/Campos - Curral de entrada<br />
Circuito Curral de saída - Células/Campos<br />
Percurso da ordenha<br />
Percurso do leite<br />
65<br />
65<br />
1. Sementes e suplementos 2. Silo vertical da<br />
NÚCLEO DE CRIAÇÃO<br />
NÚCLEO DE PRODUÇÃO<br />
ORGANIZAÇÃO PROGRAMÁTICA<br />
FASES DO GADO<br />
ORDENHA<br />
ALIMENTAÇÃO<br />
52 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
ação<br />
66<br />
2<br />
4<br />
4<br />
5<br />
4<br />
1<br />
100<br />
4<br />
70,6<br />
64<br />
105<br />
70<br />
3. Palha 4. Silos horizontais de milho<br />
66<br />
3<br />
106<br />
108,5<br />
107<br />
70,6<br />
69,6<br />
109,5<br />
74,5<br />
4<br />
66<br />
75<br />
80<br />
78<br />
5. Silos embalados de feno<br />
0 10 25 50m<br />
78<br />
85<br />
81<br />
81<br />
0 10 25 50m<br />
Circuito de mistura do produto alimentar<br />
Circuito de distribuição do alimento para o gado<br />
Circuito de alimentação do gado<br />
65<br />
65<br />
1. Grade mecânica de<br />
recolha de excrementos<br />
2. Grelha de recolha de excrementos<br />
3<br />
66<br />
3. Canal de transporte de efluentes<br />
6<br />
70,6<br />
64<br />
100<br />
70<br />
4<br />
105<br />
5<br />
1<br />
3<br />
3<br />
2<br />
5<br />
66<br />
5<br />
106<br />
5<br />
70,6<br />
69,6<br />
108,5<br />
107<br />
6<br />
1<br />
74,5<br />
4. Fossa do corredor de alimentação 5. Fossa das células 6. Depósito de estrume<br />
3<br />
109,5<br />
75<br />
66<br />
80<br />
78<br />
78<br />
0 10 25 50m<br />
85<br />
81<br />
81<br />
0 10 25 50m<br />
Percurso do chorume<br />
Percurso do estrume<br />
Estrume transportado para o Núcleo de produção<br />
65<br />
65<br />
66<br />
100<br />
70,6<br />
64<br />
70<br />
105<br />
66<br />
106<br />
70,6<br />
0 10 25 50m<br />
1. Curso hidríco potável 2. Muro (Curso hídrico potável) 3. Bebedouros das células 4. Depósito 2<br />
108,5<br />
107<br />
69,6<br />
74,5<br />
109,5<br />
75<br />
66<br />
80<br />
78<br />
78<br />
0 10 25 50m<br />
85<br />
81<br />
81<br />
65<br />
Escala gráfica<br />
100<br />
70<br />
105<br />
75<br />
80<br />
0 10 25 50m<br />
85<br />
0 10 25 50m<br />
0 50 100<br />
200m<br />
Project Synthesis<br />
Edifício principal<br />
Silo e armazém<br />
Zona de gestão Zona de abrigo Zona de produção<br />
Núcleo de produção<br />
Núcleo de criação<br />
EFLUENTES<br />
Síntese Programática:<br />
Unidade Coletiva de Produção e Reintegração Agropecuária<br />
Anexo<br />
Projecto tese<br />
UCPRA<br />
Fevereiro 2014<br />
Arquitectura<br />
Programas do projecto<br />
Plantas síntese<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
12<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
53
Corte AA’<br />
0<br />
66<br />
Corte BB’<br />
Corte GG’<br />
Corte CC’<br />
Corte DD’<br />
Corte FF’<br />
68,8<br />
Corte EE’<br />
Corte HH’<br />
25<br />
64<br />
50<br />
70,6<br />
66<br />
70,6<br />
70,6<br />
100m<br />
70,6<br />
69,6<br />
74,5<br />
78<br />
70,6<br />
81<br />
77<br />
78<br />
78<br />
78<br />
Planta de coberturas<br />
81<br />
66<br />
0<br />
81<br />
25<br />
65<br />
66<br />
50<br />
E<br />
67<br />
1<br />
D<br />
100m<br />
3<br />
G<br />
3<br />
6<br />
69<br />
4<br />
70<br />
15<br />
5<br />
71<br />
2<br />
B<br />
H<br />
C<br />
72<br />
68<br />
73<br />
16<br />
74<br />
17<br />
78<br />
75<br />
76<br />
79<br />
11<br />
77<br />
80<br />
13<br />
81<br />
9<br />
8<br />
82<br />
Implantação<br />
Escala gráfica<br />
Fevereiro 2014<br />
83<br />
84<br />
85<br />
1 - Entrada norte (Praça) 7 - Entrada sul (Praça)<br />
11 - Sistema de distribuição do agregado 15 - Células vacas leiteiras<br />
2 - Corredor de alimentação 8 - Área técnica<br />
12 - Curral de entrada<br />
16 - Célula vacas secas e<br />
adultas<br />
3 - Silos e armazéns 9 - Área de ordenha<br />
13 - Curral de saída<br />
4 - Corredor dos efluentes 10 - Gestão empresarial/ponto de venda 14 - “Basic curved System”<br />
17 - Depósito 2<br />
5 - Fossas<br />
6 - Chorume<br />
10<br />
12<br />
14<br />
A’<br />
7<br />
F<br />
G’<br />
N<br />
Núcleo de Produção<br />
H’<br />
Planta de coberturas e cortes transversais<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
0 50 100<br />
200m<br />
Production nucleus<br />
A<br />
F’<br />
E’<br />
D’<br />
C’<br />
B’<br />
All this process allowed us to organize<br />
a new way of thinking and applying<br />
the agricultural model, by making a<br />
territorial management and edifying<br />
action of the agricultural activity and<br />
agricultural parcels of the community,<br />
which resulted in a collective farm<br />
and community inclusion of small<br />
agricultural holdings as an alternative<br />
to the unbalanced social and<br />
economical context of agricultural<br />
activity in the north of Portugal.<br />
UCPRA:<br />
Núcleo de produção<br />
Anexo<br />
Projecto tese<br />
Arquitectura<br />
13<br />
54 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
74<br />
73<br />
72<br />
72<br />
71<br />
71<br />
69,6<br />
71<br />
71<br />
70 69 68 67 66<br />
66<br />
1 - Praça 2 - Corredor de distribuição do gado para as manjedouras 3 - Corredor de distribuição para as manjedouras 4 - Entrada<br />
Betão armado<br />
Tela de drenagem e geotextil<br />
Betão armado<br />
Betão pré-fabricado (Grelha<br />
de recolha de excrementos)<br />
Canal de efluentes<br />
Betão armado<br />
Camada de regularização<br />
Tela de drenagem e geotextil<br />
Camada de regularização<br />
N<br />
68,8<br />
68,5<br />
69,5<br />
70,6<br />
0 10 25 50m<br />
Feed corridor zone<br />
B’<br />
C’<br />
A<br />
A’<br />
1<br />
Corte BB’<br />
B<br />
C<br />
70 69 68 67 66<br />
Planta de coderturas<br />
B’<br />
C’<br />
Corte CC’<br />
2<br />
A<br />
3<br />
A’<br />
2<br />
1 4<br />
B<br />
C<br />
Planta piso 1<br />
Núcleo de produção:<br />
Zona de produção - Corredor de alimentação<br />
Anexo<br />
Corte AA’<br />
Pormenor construtivos escala 1:20<br />
Projecto tese<br />
Projecto<br />
Escala 1:200<br />
Fevereiro 2014<br />
Arquitectura<br />
Núcleo de Produção<br />
Plantas e cortes transversais<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
14<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
55
68,8<br />
68,5<br />
69,5<br />
71<br />
71<br />
72<br />
73<br />
70,6<br />
70<br />
70<br />
69<br />
69<br />
1 - Camas do gado 2 - Corredor de distribuição 3 - Muro 4 - Rampa de acesso às manjedouras<br />
68<br />
68<br />
N<br />
Projecto<br />
Escala 1:200<br />
Fevereiro 2014<br />
Canal para o curso hídrico<br />
Pingadeira<br />
Chapa de alumínio zipada<br />
Ligações metálicas (asna)<br />
Perfil metálico em L<br />
Betão armado<br />
Perfil metálico circular<br />
Tela<br />
Tout venant<br />
Canal dos efluentes<br />
Tout venant<br />
Tela<br />
Camada de regularização<br />
Núcleo de Produção<br />
Plantas e cortes transversais<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
0 10 25 50m<br />
Stable zone<br />
C’<br />
B’<br />
A’<br />
Corte DD’<br />
F’ E’ D’<br />
Corte EE’<br />
C<br />
B<br />
A<br />
F<br />
E<br />
D<br />
Corte FF’<br />
Planta de coberturas<br />
C’<br />
B’<br />
A’<br />
1<br />
F’ E’ D’<br />
1<br />
4<br />
C<br />
1<br />
1 1 1<br />
B<br />
2<br />
A<br />
3<br />
F<br />
E<br />
D<br />
Planta piso 0<br />
Pormenores constructivos escala 1:20<br />
Corte AA’<br />
Corte BB’<br />
Núcleo de produção:<br />
Anexo<br />
Zona de abrigo<br />
Projecto tese<br />
Arquitectura<br />
16<br />
Corte CC’<br />
56 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
73<br />
Planta Piso 0 Planta piso 1 Planta de coberturas<br />
Corte AA’<br />
Corte BB’<br />
78<br />
E<br />
79<br />
74<br />
80<br />
D<br />
1 - Praça de entrada 5 - Sala de reuniões 9 - Wc’s e balneários(funcionários) 13 - Curral de entrada<br />
2 - Estacionamento 6 - Wc’s (visitas)<br />
10 - Sala da cisterna<br />
14 - Curral de saída<br />
3 - Ponto de recolha 7 - Sala de quarentena e abate 11- Sala de ordenha<br />
15 - “Basic curved system”<br />
4 - Ponto de venda 8 - Laboratório<br />
12 - Sala técnica (ordenha) 16 - Sistema de<br />
distribuição do agregado<br />
75<br />
11<br />
B<br />
76<br />
C’<br />
C<br />
14<br />
78<br />
16<br />
79<br />
77<br />
B’<br />
12<br />
78<br />
80<br />
78<br />
15<br />
13<br />
A’<br />
A<br />
78<br />
81<br />
E’<br />
D’<br />
73<br />
78<br />
79<br />
E<br />
74<br />
80<br />
81<br />
D<br />
82<br />
5<br />
6<br />
11<br />
76<br />
75<br />
B<br />
7<br />
8<br />
4<br />
Corte DD’<br />
Corte CC’<br />
C’<br />
C<br />
14<br />
2<br />
9 9 9<br />
78<br />
16<br />
79<br />
77<br />
B’<br />
3<br />
10<br />
80<br />
1<br />
15<br />
13<br />
A’<br />
A<br />
78<br />
78<br />
E’<br />
D’<br />
81<br />
73<br />
Corte EE’<br />
78<br />
79<br />
E<br />
74<br />
80<br />
81<br />
D<br />
82<br />
76<br />
75<br />
B<br />
81<br />
C’<br />
C<br />
14<br />
16<br />
78<br />
Geotextil e tela<br />
Jogas<br />
Madeira<br />
Geotextil<br />
Isolamento<br />
Tela<br />
Tout venant<br />
Tela<br />
Pormenor constructivo escala 1:20<br />
79<br />
77<br />
B’ A’<br />
80<br />
83<br />
1<br />
15<br />
13<br />
A<br />
Tela<br />
Isolamento<br />
Caixilharia<br />
Caixilho de aço<br />
Betão armado<br />
Isolamento<br />
Bloco de cimento<br />
Brita fina<br />
Geotextil<br />
Brita grossa<br />
Tela<br />
Camada de regularização<br />
N<br />
Zona de gestão<br />
Projecto tese<br />
Projecto<br />
Escala 1:200<br />
Fevereiro 2014<br />
Núcleo de Produção<br />
E’<br />
Plantas e cortes transversais<br />
Arquitectura<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
D’<br />
0 10 25 50m<br />
Anexo<br />
Management zone<br />
Núcleo de produção:<br />
17<br />
Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”<br />
57
106,2 106,7<br />
106,5<br />
106,5<br />
106,2 106,7<br />
106,2<br />
106,2<br />
106,7<br />
106,7<br />
106,7<br />
106,7<br />
106,2 106,7<br />
A<br />
92<br />
C<br />
96<br />
94<br />
93<br />
97<br />
106<br />
107<br />
108<br />
106<br />
104<br />
103<br />
102<br />
101<br />
98<br />
99<br />
A<br />
Escala gráfica<br />
N<br />
Breeding nucleus<br />
G F E<br />
B’<br />
6<br />
C’<br />
Corte AA’<br />
D’<br />
7<br />
1<br />
105<br />
8<br />
4<br />
4<br />
1/5<br />
Corte BB’<br />
E’<br />
B<br />
3<br />
D<br />
2<br />
105<br />
F’<br />
100<br />
Corte CC’<br />
95<br />
G’<br />
Planta de coberturas<br />
1 - Abrigo 2 - Armazém de feno 3 - Silo 4 - Curral 5 - Veterinária 6 - Habitação da quinta 7 - Praça 8 - Armazém e sequeiro<br />
0 10 25 50m<br />
Corte DD’<br />
Corte EE’<br />
Corte FF’<br />
0 50 100<br />
200m<br />
UCPRA:<br />
Anexo<br />
Núcleo de Criação<br />
Projecto tese<br />
Implantação<br />
Arquitectura<br />
Núcleo de Produção<br />
18<br />
Corte GG’<br />
0 10 25 50m<br />
Fevereiro 2014<br />
Planta de coberturas e cortes transversais<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877<br />
58 Collective Unit of Livestock Farming Production ”Quinta da Eira’s Case Study”
105<br />
N 0 10 25 50m<br />
Main building<br />
107<br />
108<br />
106<br />
107<br />
C’<br />
D’<br />
E’<br />
106,2<br />
Corte AA’<br />
106<br />
A<br />
A’<br />
105<br />
C D E<br />
1 - Vitelas recém-nascidas<br />
B<br />
B’<br />
2 - Vitelas<br />
3 - Novilhas<br />
104<br />
4 - Vacas gestantes<br />
Corte BB’<br />
5 - Parto/veterinária<br />
103<br />
6 - Curral<br />
101<br />
102<br />
7 - Praça<br />
Planta de coberturas<br />
107<br />
106,2<br />
106,7<br />
106,5<br />
Chapa de alumínio zipada<br />
106<br />
Estrutura de metal<br />
C’<br />
D’<br />
E’<br />
107<br />
Corte CC’<br />
Chapas de aço<br />
Betão armado<br />
4<br />
6<br />
5<br />
1<br />
7<br />
106<br />
6<br />
106,2<br />
106,7<br />
A<br />
A’<br />
3 2<br />
105<br />
Corte DD’<br />
B<br />
C D E<br />
B’<br />
Tela<br />
Brita/Tout venant<br />
104<br />
105<br />
Camada de regularização<br />
Núcleo de criação<br />
Anexo<br />
Edifício principal<br />
101<br />
102<br />
103<br />
106,2<br />
106,7<br />
Projecto tese<br />
Projecto<br />
Núcleo de criação<br />
Arquitectura<br />
19<br />
Planta piso 0<br />
Corte EE’<br />
Escala 1:200<br />
Fevereiro 2014<br />
Plantas e cortes transversais<br />
<strong>José</strong> Carlos Pereira <strong>Ribeiro</strong> nº52877
OBJECTIVE<br />
The challenge of this project was<br />
making a composicion for an idea<br />
without any programatic restrictions<br />
or imposition of a place, having<br />
a huge liberty to intervene in the<br />
delimeted area of Viana do Castelo<br />
city center.<br />
CONCEPT<br />
The chosen place for the intervention<br />
was the Gago Coutinho Street, one of<br />
the most important and proxim streets<br />
of the city center, due to the facades<br />
set that it presents. On the north side<br />
there’s the Palácio das Malheiras<br />
facade and on the south área there’s<br />
another facade set that is typically<br />
portuguese.<br />
In analysis, the Gago Coutinho street<br />
is an interesting case with regard to<br />
the dimension, because although<br />
it’s a simple crossing street, it’s<br />
dimension is very wide, enough to<br />
be caracterized as a square/street.<br />
Based on all this, our idea was born, a<br />
programatic diffusion along the street,<br />
an installation of several programmes<br />
that stimulates the entire space,<br />
simultaneously providing a set of<br />
facades that reflect and blend.<br />
62 Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”
COMPOSITE PICTURE<br />
COMPOSITIVE PICTURE<br />
64 Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”
IDEA<br />
The project is born from the will to<br />
create a visual game using one of<br />
the facades that composes the Gago<br />
Coutinho Street. A peculiar facade<br />
that presents itself with different<br />
hierarchies and typologies from one<br />
floor to the other. This game consists<br />
on showing or covering, through<br />
different programatic volumes, the<br />
hierarchies caused by the assembly<br />
itself of the preexisting façade. This<br />
generates different identities as well<br />
as the positioning of the façade and<br />
materiality of volumes.<br />
MATERIAL<br />
The material of these objects is a<br />
decisive factor and it will dictate<br />
what the observer is going to see.<br />
The material executes different<br />
visual plans, such as: transparency,<br />
reflection and stability. The glass<br />
is the solution to all the local<br />
compositional possibilities, because<br />
it is the most versatile material in the<br />
plans system.
2 5 10<br />
0<br />
WORKSHOP ROOM 01.<br />
DARKROOM + STAIR 02.<br />
CRAFT ROOM 03.<br />
PUBLIC SQUARE 04.<br />
PUBLIC SEAT AND STAGE 05.<br />
EXPOSITION CORRIDOR 06.<br />
WC + LAVATORY 07.<br />
BAR + STAIR 08.<br />
AUDITORIUM 09.<br />
INFORMATION POINT + STAIR10.<br />
PUBLIC SEAT11.<br />
1ST FLOOR PLAN<br />
66 Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”
A B C<br />
08.<br />
05.<br />
07.<br />
A’ B’<br />
10.<br />
11.<br />
C’<br />
02.<br />
GROUND FLOOR PLAN<br />
STRUCTURE<br />
The structure that will make possible this<br />
programatuc machine is a forest of pillars that<br />
always prevails in the public space. Because of this<br />
public coldness passing, I decided to use steel as<br />
a cold and disconnected material from the site and<br />
surrounding, just like a true forest would be in this<br />
location. This material allows to use various circular<br />
base dimensions and length as a real forest.<br />
Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”<br />
67
0<br />
2 5 10<br />
SECTION A SECTION B SECTION C<br />
Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”<br />
69
REAL SCALE MODEL<br />
70 Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”
CONSTRUCTIVE DETAIL<br />
Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”<br />
71
EXPOSITION<br />
In the end of the academic year the class and the<br />
comissar architect Paulo Araújo Carvalho, organized<br />
an exposition in Viana do Castelo (Portugal) to show<br />
the diferents interventions to the community and<br />
the autarchy. After this we were invited to a new<br />
exposition in the Coruña’s architecture univertsity<br />
(Spain) to show the diferents ways of intervene with<br />
architecture ideas and make them executables.<br />
72 Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”
Programatic Propagation, Viana do Castelo “A Vision between the Context and the Utopia”<br />
73
76 Unité d’Habitation Creixomil, Guimarães “The Rafts”
OBJECTIVE<br />
The exercise was based on a<br />
recreation of the Unité d’Habitation –<br />
Marselha executed by Le Corbusier.<br />
The objective was to realize the same<br />
aproximation in diferent scales of<br />
intervention as Le Corbusier projected<br />
in that time, following the same<br />
modelar rules, programatics and the<br />
relations between the diferent scales<br />
of intervention.
CHALLENGE<br />
The main purpose of this project was to consolidate the diferent<br />
intervation scales and it consists in three main scales: the city<br />
scale, implantation of the unité’s on the construction site; the<br />
unité’s scale, to approach the building modules and program,<br />
organizing the public and private space; and the apartment<br />
scale, that involves the comunication between diferent spaces<br />
inside and outside of the apartment.<br />
THE BLOCKS<br />
The concept illustrats the arrival of a rafts group floating down<br />
the river and crashing on the highway barrier, that is the main<br />
concept for the position and variation between the buildings<br />
blocks. The construction site was molded as an ocean motion<br />
according to the concept, so it was possible to redraw some of<br />
the field lines to compose the project illustration.<br />
To access the blocks (unité’s) it was designed a quay as a<br />
second element on the project, this element is isolated from<br />
the blocks but it’s like a quay for a boat, it is a single element<br />
but crucial to access the boat. The quay is the planner element<br />
between the blocks (rafts), its orthogonal design offers a metrical<br />
logic to make the access to the rafts, the most simple and easy<br />
process as possible. The project has three main axis of 8 meters<br />
and other six of 6 meters, this allows to create a hierarchy<br />
between accesses.<br />
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
79
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
81
82 Unité d’Habitation Creixomil, Guimarães “The Rafts”
0 20 40 100<br />
01.<br />
02.<br />
04.<br />
06.<br />
01. NATIONAL ROUTE<br />
02. ACESS ROUTES<br />
03. ACESS RAMPS<br />
04. APARTMENTS (UNITÉ’S)<br />
05. HIGHWAY<br />
06. CREEK<br />
03.<br />
05.<br />
PROJECT PLAN<br />
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
83
THE UNITÉ<br />
The building works like a raft, the<br />
apartments are making themselfs<br />
the raft base for a walking and public<br />
space above it. The spaces on top<br />
of the apartments can be use as<br />
courtyards for the residents and as a<br />
public space for the visitors/residents.<br />
The entrance in the apartments and<br />
building block is always transversal.<br />
It works like cracks on the building<br />
that allows to enter between the<br />
programms. It was designed a logic<br />
hierarchy for the cracks, the biggest<br />
cracks consist in the entrance for<br />
public spaces and programms. On<br />
the other hand, the small ones consist<br />
in the apartments with a small and<br />
confortable measure for a private<br />
space.<br />
TRADITIONAL RAFT PLAN<br />
84 Unité d’Habitation Creixomil, Guimarães “The Rafts”
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
85
86 Unité d’Habitation Creixomil, Guimarães “The Rafts”
0 4 10 20<br />
09.<br />
07.<br />
05.<br />
08.<br />
04.<br />
01.<br />
03.<br />
01. APARTMENT ENTRANCE<br />
02. APARTMENT<br />
03. GARAGE<br />
04. COURTYARD<br />
05. PUBLIC TERRACE ENTRANCE<br />
06. PUBLIC TERRACE<br />
07. GYM/KINDERGARTEN/SUPERMARKET<br />
08. HOTEL/POST OFFICE/STORES<br />
09. MACHINES ROOM<br />
UNITÉ MODEL - GROUND FLOOR PLAN<br />
04.<br />
07.<br />
08.<br />
02.<br />
UNITÉ MODEL - 1ST FLOOR PLAN<br />
04.<br />
04.<br />
08.<br />
06.<br />
UNITÉ MODEL - PUBLIC TERRACE FLOOR PLAN<br />
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
87
0 4 10 20<br />
TRANSVERSAL SECTIONS<br />
ENTRANCE FACADE<br />
88 Unité d’Habitation Creixomil, Guimarães “The Rafts”
LONGITUDINAL 3D SECTIONS<br />
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
89
THE APARTMENT<br />
The apartments work arround a<br />
common courtyard (or private<br />
courtyard in some situations). The<br />
courtyard allows the light to enter<br />
in some of the apartment areas.<br />
The apartments work also as an<br />
articulation piece that allows the<br />
comunication between the private<br />
and public spaces. It has two<br />
entrances, one from the garage space<br />
and another one from above the<br />
apartment, in the public space.<br />
In the garage we have access to a<br />
laundry, courtyard and stairs to the<br />
first floor (home area). From the first<br />
floor we have access to a second<br />
courtyard and public space on the<br />
apartment roof. The home area shares<br />
three main divisions: the living/kitchen<br />
room with toilet on the front; the study<br />
room opened to the courtyard on the<br />
middle; and the two bedrooms with<br />
toilet in the backs.<br />
LONGITUDINAL SECTIONS<br />
90 Unité d’Habitation Creixomil, Guimarães “The Rafts”
0<br />
1 5<br />
ENTRANCE 01.<br />
GARAGE 02.<br />
PANTRY 03.<br />
LAUNDRY 04.<br />
COURTYARD 05.<br />
HALL 06.<br />
BALCONY 07.<br />
KITCHNETTE 08.<br />
STUDY ROOM 09.<br />
BEDROOM 10.<br />
TOILET 11.<br />
CORRIDOR 12.<br />
PUBLIC TERRACE 13.<br />
MACHINES ROOM 14.<br />
10.<br />
10.<br />
11.<br />
14.<br />
12.<br />
05.<br />
04.<br />
05. 05. 05.<br />
09.<br />
03.<br />
01.<br />
01.<br />
11.<br />
06.<br />
02.<br />
01.<br />
01.<br />
13.<br />
08.<br />
07.<br />
01.<br />
APARTMENT GROUND FLOOR PLAN<br />
APARTMENT 1ST FLOOR PLAN<br />
APARTMENT PUBLIC TERRACE FLOOR PLAN<br />
Unité d’Habitation Creixomil, Guimarães “The Rafts”<br />
91
ARQUITECTURE PORTFOLIO <strong>José</strong> <strong>Ribeiro</strong>