Speed Management and Safe Crossing on Dhaka-Sylhet Highway (N2) in Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• C<strong>on</strong>tractor would get their first payment after completi<strong>on</strong> of 30% total project<br />
activity, rest would be <strong>on</strong> dem<str<strong>on</strong>g>and</str<strong>on</strong>g><br />
• Prior to payment, the advisory board would visit all three locati<strong>on</strong>s for payment<br />
certificati<strong>on</strong>.<br />
• RHD should be the top supervisor <str<strong>on</strong>g>and</str<strong>on</strong>g> owner of the project. The project should be<br />
h<str<strong>on</strong>g>and</str<strong>on</strong>g>ed over to them after completi<strong>on</strong>.<br />
• Total project should be properly documented for future purpose.<br />
4.4 C<strong>on</strong>clud<strong>in</strong>g comments<br />
The chapter summarizes the progress of highway <strong>in</strong>terventi<strong>on</strong> for the whole project period.<br />
C<strong>on</strong>tractor was selected through tender<strong>in</strong>g. Site has been h<str<strong>on</strong>g>and</str<strong>on</strong>g>ed over <strong>in</strong> time. Necessary<br />
resource deployment <str<strong>on</strong>g>and</str<strong>on</strong>g> mobilizati<strong>on</strong> works were <strong>on</strong> time. Transportati<strong>on</strong>, logistics <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
procurement of the c<strong>on</strong>structi<strong>on</strong> materials were d<strong>on</strong>e <strong>in</strong> time. C<strong>on</strong>diti<strong>on</strong> survey, topographical<br />
survey <str<strong>on</strong>g>and</str<strong>on</strong>g> pre-secti<strong>on</strong>s survey works <strong>on</strong> the project were completed before c<strong>on</strong>structi<strong>on</strong>.<br />
Necessary material test were <strong>in</strong> regular progress for quality c<strong>on</strong>trol aspect. <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty precauti<strong>on</strong><br />
taken by the c<strong>on</strong>tractor was satisfactory. However due to weather c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> adverse<br />
socio -ec<strong>on</strong>omic c<strong>on</strong>diti<strong>on</strong>, the activity required more time than planned to be completed.<br />
Figure 4.3: Namapara af ter c<strong>on</strong>structi<strong>on</strong><br />
Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 30