4.3 Summary of work progress of the project<br />

4.3.1 Progress by the c<strong>on</strong>tractor<br />

The work progress made by the C<strong>on</strong>tractor is summarized as follows <strong>in</strong> Table 4.2<br />

Table 4.2 Work progress made by the c<strong>on</strong>tractor<br />

Sl. no. Descripti<strong>on</strong> of activities Locati<strong>on</strong> Remarks<br />

1 C<strong>on</strong>tractors accommodati<strong>on</strong> All Completed<br />

2<br />

a) Excavator<br />

b) Steel vibrat<strong>in</strong>g roller<br />

c) Soil compactor<br />

All<br />

Mobilized <str<strong>on</strong>g>and</str<strong>on</strong>g> worked properly<br />

<strong>in</strong> the project locati<strong>on</strong><br />

3<br />

Bus bay c<strong>on</strong>structi<strong>on</strong><br />

a) Improved sub grade<br />

b) Sub base layer<br />

c) Base layer<br />

d) Dense bitum<strong>in</strong>ous surface<br />

All<br />

All were completed <strong>in</strong> time with<br />

proper quality<br />

4<br />

Survey works<br />

Cha<strong>in</strong>ages mark<strong>in</strong>gs <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

design layout al<strong>on</strong>g the length<br />

of the exist<strong>in</strong>g highway <strong>on</strong><br />

both sides<br />

Adjacent<br />

<strong>Highway</strong> <strong>in</strong><br />

all locati<strong>on</strong><br />

Completed<br />

5<br />

Procurement of materials<br />

Brick (picket) <str<strong>on</strong>g>and</str<strong>on</strong>g> S<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Project<br />

locati<strong>on</strong><br />

Bought <str<strong>on</strong>g>and</str<strong>on</strong>g> sent to test prior to<br />

c<strong>on</strong>structi<strong>on</strong><br />

6<br />

Laboratory test<br />

FM, Gradati<strong>on</strong>, ACV Test, CBR.<br />

LGED<br />

Laboratory<br />

Tests were c<strong>on</strong>ducted for<br />

source approval<br />

4.3.2 Implement<strong>in</strong>g partner activities<br />

The implement<strong>in</strong>g partner has c<strong>on</strong>ducted the follow<strong>in</strong>g activities:<br />

• Regular <strong>in</strong>specti<strong>on</strong> visits<br />

• Observed that the c<strong>on</strong>tractor crushed brick aggregate <str<strong>on</strong>g>and</str<strong>on</strong>g> s<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> their site locati<strong>on</strong>.<br />

• M<strong>on</strong>thly review meet<strong>in</strong>g <strong>in</strong> CIPRB office <strong>in</strong> <strong>Dhaka</strong>.<br />

• Gradati<strong>on</strong>, CBR, ACV, FM for S<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Brick were c<strong>on</strong>ducted by CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> TE for<br />

source approval <strong>in</strong> LGED Lab.<br />

• A safety workshop <strong>on</strong> “C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty” held <strong>on</strong> October 22 <strong>in</strong> the Nars<strong>in</strong>gdi<br />

RHD rest house <strong>in</strong> presence of RHD, CIPRB, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, TE representative al<strong>on</strong>g<br />

with c<strong>on</strong>structi<strong>on</strong> workers <str<strong>on</strong>g>and</str<strong>on</strong>g> supervisors.<br />

• Pre-secti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> road side <strong>in</strong>specti<strong>on</strong> survey work had been completed.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!