Speed Management and Safe Crossing on Dhaka-Sylhet Highway (N2) in Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
oller) were be<strong>in</strong>g arranged <strong>on</strong> site. All c<strong>on</strong>structi<strong>on</strong> materials (viz. S<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Brick) <str<strong>on</strong>g>and</str<strong>on</strong>g> for test <strong>in</strong><br />
LGED lab prior to use <strong>on</strong> site. Palacid<strong>in</strong>g <strong>in</strong> Namapara f<strong>in</strong>ished by 01st October, 2014.<br />
4.2.3. Physical work plan by c<strong>on</strong>tractor<br />
M/S Taher Enterprise, the c<strong>on</strong>tractor submitted a work schedule for the project before<br />
start<strong>in</strong>g c<strong>on</strong>structi<strong>on</strong>. Necessary preparati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> deployment of resources for the ensu<strong>in</strong>g<br />
best c<strong>on</strong>structi<strong>on</strong> organized prior to c<strong>on</strong>structi<strong>on</strong>.<br />
4.2.4 Road <strong>in</strong>specti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> survey<br />
For better C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> project susta<strong>in</strong>ability, several road <strong>in</strong>specti<strong>on</strong>s d<strong>on</strong>e with the<br />
help of RHD, local <str<strong>on</strong>g>and</str<strong>on</strong>g> foreign expert.<br />
4.2.4.1 Survey by CIPRB & RHD<br />
For proper estimati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> quality c<strong>on</strong>trol, a survey was c<strong>on</strong>ducted with the help of Nars<strong>in</strong>gdi<br />
RHD <strong>in</strong> all project locati<strong>on</strong> through level mach<strong>in</strong>e. The c<strong>on</strong>structi<strong>on</strong> estimati<strong>on</strong> was made<br />
based <strong>on</strong> this survey report.<br />
4.2.4.2 Road <strong>in</strong>specti<strong>on</strong> by CIPRB & <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />
For road c<strong>on</strong>diti<strong>on</strong> survey, a two days exclusive road side <strong>in</strong>specti<strong>on</strong> survey was d<strong>on</strong>e with<br />
the presence of representative of <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB representative. It helped to get<br />
proper underst<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>in</strong>g of local feature <str<strong>on</strong>g>and</str<strong>on</strong>g> required acti<strong>on</strong> to make safer road for traffic.<br />
4.2.4.3 Design layout mark<strong>in</strong>g by CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> Taher Enterprise<br />
After complet<strong>in</strong>g all pre-requisite activities for c<strong>on</strong>tractor selecti<strong>on</strong>, layout of the proposed<br />
design was be<strong>in</strong>g established <strong>in</strong> all three locati<strong>on</strong>s with the associati<strong>on</strong> of representative<br />
from Taher Enterprise. It was helpful to get proper underst<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>in</strong>g of the <strong>in</strong>terventi<strong>on</strong> items.<br />
4.2.5 Top supervisi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> m<strong>on</strong>itor<strong>in</strong>g by RHD<br />
Accord<strong>in</strong>g to project management plan, Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department (RHD) acted as a<br />
top supervisor. They were actively <strong>in</strong>volved <strong>in</strong> design verificati<strong>on</strong>, <strong>in</strong>terventi<strong>on</strong> modificati<strong>on</strong>,<br />
field survey, quality c<strong>on</strong>trol of c<strong>on</strong>structi<strong>on</strong>, cooperati<strong>on</strong> <strong>in</strong> community <strong>in</strong>volvement <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
c<strong>on</strong>structi<strong>on</strong> safety assurance.<br />
Their overall participati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> str<strong>on</strong>g support <strong>in</strong> all phase of implementati<strong>on</strong> ensured better<br />
site management <str<strong>on</strong>g>and</str<strong>on</strong>g> ownership creati<strong>on</strong> am<strong>on</strong>g the stake holders. The c<strong>on</strong>tributi<strong>on</strong> for RHD,<br />
especially from Nars<strong>in</strong>gdi Roads Divisi<strong>on</strong> is highly appreciat<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> a pi<strong>on</strong>eer role from a<br />
government agency.<br />
Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 26