4.2 Activities<br />

4.2.1 Approval from m<strong>in</strong>istry<br />

The Project has got approval from the m<strong>in</strong>istry of road transport <str<strong>on</strong>g>and</str<strong>on</strong>g> bridges <strong>on</strong> 26th May<br />

2014. Prior to that approval there were several meet<strong>in</strong>gs held <strong>in</strong> RHD Technical service w<strong>in</strong>g<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> m<strong>in</strong>istry for discuss<strong>in</strong>g the design <str<strong>on</strong>g>and</str<strong>on</strong>g> other aspects of the project. The meet<strong>in</strong>g participants<br />

checked the feasibility of the design <str<strong>on</strong>g>and</str<strong>on</strong>g> effectiveness <strong>in</strong> the highway. All of the participants<br />

were made assured by local <str<strong>on</strong>g>and</str<strong>on</strong>g> foreign expert that the project would be highly beneficial for<br />

the country. The m<strong>in</strong>istry gave the f<strong>in</strong>al c<strong>on</strong>firmati<strong>on</strong> with a c<strong>on</strong>diti<strong>on</strong> of not us<strong>in</strong>g any name of<br />

CIPRB or <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <strong>in</strong> project locati<strong>on</strong>s which was followed very strictly later <strong>on</strong>.<br />

4.2.2 Mobilizati<strong>on</strong><br />

The c<strong>on</strong>tractor was awarded of the c<strong>on</strong>tract <strong>on</strong> 11th September 2014 <str<strong>on</strong>g>and</str<strong>on</strong>g> the c<strong>on</strong>tractor<br />

has started preparatory works for mobilizati<strong>on</strong> of their resources. Significant progress <strong>in</strong> the<br />

procurement of materials <str<strong>on</strong>g>and</str<strong>on</strong>g> hir<strong>in</strong>g equipment was be<strong>in</strong>g made <strong>in</strong> time. Road Side unauthorized<br />

shop were be<strong>in</strong>g removed with the help of RHD <strong>on</strong> 16th September 2014. All site was be<strong>in</strong>g<br />

cleared <str<strong>on</strong>g>and</str<strong>on</strong>g> made ready for <strong>in</strong>terventi<strong>on</strong>. Required Equipment’s (viz. excavator, soil compactor,<br />

Figure 4.1: Preparati<strong>on</strong> of site for c<strong>on</strong>structi<strong>on</strong> activities <strong>in</strong> Kunderpara<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 25