Speed Management and Safe Crossing on Dhaka-Sylhet Highway (N2) in Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Highway</strong> Interventi<strong>on</strong> Program<br />
The traffic calm<strong>in</strong>g adaptati<strong>on</strong>s were based <strong>on</strong> best-practices, applied to the specific situati<strong>on</strong> of<br />
the black spots <strong>in</strong> <strong>Bangladesh</strong>. After c<strong>on</strong>sultati<strong>on</strong> with <strong>in</strong>ternati<strong>on</strong>al experts it was c<strong>on</strong>cluded that<br />
the first priority was to significantly reduce the speed of fast-mov<strong>in</strong>g motorized traffic. To achieve<br />
this goal, the selected measures <strong>in</strong> the program (speed humps, rumble strips, supplemented by signs<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> mark<strong>in</strong>gs) were the most effective measures that are at the same time relatively low-cost <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
susta<strong>in</strong>able. Install<strong>in</strong>g a footbridge for example would have been quite costly <str<strong>on</strong>g>and</str<strong>on</strong>g> it is questi<strong>on</strong>able<br />
how many pedestrians would have used the foot over bridge.<br />
The design of the small-scale <strong>in</strong>frastructural measures was made by lead<strong>in</strong>g road safety experts <strong>in</strong><br />
<strong>Bangladesh</strong> with the help of Gr<strong>on</strong>tmij, a lead<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g company <strong>in</strong> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s.<br />
4.1 Salient features of the project<br />
The summarized project activities are as follows <strong>in</strong> table 4.1<br />
Table 4.1: Salient feature of the project<br />
SI no Particulars Descripti<strong>on</strong><br />
1 Name of the project<br />
2 Employer of the project<br />
3 Procur<strong>in</strong>g entry name<br />
Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Dem<strong>on</strong>strati<strong>on</strong> Project: <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g><br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>N2</strong> <strong>Highway</strong>s<br />
Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research,<br />
<strong>Bangladesh</strong> (CIPRB)<br />
Executive Director, Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
Research, <strong>Bangladesh</strong> (CIPRB)<br />
4 Eng<strong>in</strong>eer of the project Project Coord<strong>in</strong>ator, Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty, CIPRB<br />
5 Name of the c<strong>on</strong>tractor M/S Taher Enterprise.<br />
6 F<strong>in</strong>ance of the project <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />
7<br />
Length of the<br />
<strong>in</strong>terventi<strong>on</strong> area<br />
1500 m. ( 500 m each locati<strong>on</strong>)<br />
8 C<strong>on</strong>tract value TK. 60,43,277.60<br />
9 Date of award 11th September 2014<br />
10 Date of commencement 29th September 2014<br />
11 Defects liability period 3 M<strong>on</strong>ths<br />
12 Date of completi<strong>on</strong> 15th May 2015<br />
13 Project liability ended 15th August 2015<br />
Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 24