Speed Management and Safe Crossing on Dhaka-Sylhet Highway (N2) in Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Impact Measurement<br />
3.1 Spot <str<strong>on</strong>g>and</str<strong>on</strong>g> Interventi<strong>on</strong> selecti<strong>on</strong><br />
Through detailed field study <str<strong>on</strong>g>and</str<strong>on</strong>g> crash record analysis, three spots have been selected <strong>on</strong><br />
<strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) <strong>Highway</strong>. The locati<strong>on</strong> details is be<strong>in</strong>g reflected <strong>on</strong> table 3.1.<br />
Table 3.1: Locati<strong>on</strong> details<br />
Name of Locati<strong>on</strong> Uni<strong>on</strong> Upazila District Cha<strong>in</strong>age<br />
Kunderpara Baghabo Shibpur Nars<strong>in</strong>gdi 61 km<br />
Nilkuthi Mirzapur Raipura Nars<strong>in</strong>gdi 80 km<br />
Namapara Mirzapur Raipura Nars<strong>in</strong>gdi 82 km<br />
The criteria for select<strong>in</strong>g these sites were: high risk of road crashes, high number of vulnerable<br />
road users, high speed of motorized traffic – often above 80 km/hr, absence of road safety<br />
measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> presence of a ma<strong>in</strong> ‘c<strong>on</strong>flict z<strong>on</strong>e’ between motorized traffic <str<strong>on</strong>g>and</str<strong>on</strong>g> vulnerable<br />
road users that is limited <strong>in</strong> space. Over 2,000 pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> 5,000 motorized vehicles pass<br />
through each of these black spots daily.<br />
The <strong>in</strong>itial c<strong>on</strong>centrati<strong>on</strong> was <strong>in</strong> the locati<strong>on</strong>s where first traffic mixed with slow traffic<br />
with significant road side development. After the analysis of crash data, previous black<br />
spot list, rigorous field visit, stakeholder analysis, road user <strong>in</strong>terview, the spots <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />
<strong>in</strong>terventi<strong>on</strong> were selected.<br />
Another ma<strong>in</strong> c<strong>on</strong>siderati<strong>on</strong><br />
dur<strong>in</strong>g <strong>in</strong>terventi<strong>on</strong> selecti<strong>on</strong><br />
was the dem<str<strong>on</strong>g>and</str<strong>on</strong>g> of local<br />
road user. The design<br />
was replicated <strong>in</strong> all three<br />
locati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated later<br />
with basel<strong>in</strong>e data.<br />
Two major parts of the<br />
<strong>in</strong>terventi<strong>on</strong> were<br />
1. <strong>Highway</strong> Interventi<strong>on</strong> (HI)<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g><br />
2. Awareness, Community<br />
Involvement <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong><br />
(ACE) Program<br />
Renowned road safety<br />
experts from home <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
Figure 3.1: Expert visit at project locati<strong>on</strong><br />
Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 18