Speed Management and Safe Crossing on Dhaka-Sylhet Highway (N2) in Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
Speed-Management-and-Safe-Crossing-An-Experience-in-Dhaka-Sylhet-Highway-N2-in-Bangladesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project <str<strong>on</strong>g>Management</str<strong>on</strong>g><br />
The project is a jo<strong>in</strong>t effort of CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s with the c<strong>on</strong>t<strong>in</strong>uous support from<br />
M<strong>in</strong>istry of Road Transport <str<strong>on</strong>g>and</str<strong>on</strong>g> Bridges <str<strong>on</strong>g>and</str<strong>on</strong>g> NGO affairs bureau. Experts from <strong>Bangladesh</strong><br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s played key role with all sorts of technical expertise. Project officials<br />
from different professi<strong>on</strong>al sector were recruited prior to start<strong>in</strong>g the activities. After gett<strong>in</strong>g<br />
necessary permissi<strong>on</strong> from Government of <strong>Bangladesh</strong>, the project was <strong>in</strong>itiated <strong>in</strong> field with<br />
crash record<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> basel<strong>in</strong>e survey. Through rigorous field visit by experts <str<strong>on</strong>g>and</str<strong>on</strong>g> project team<br />
<strong>on</strong> site, the <strong>in</strong>terventi<strong>on</strong> plan was developed <str<strong>on</strong>g>and</str<strong>on</strong>g> implemented <strong>in</strong> field. Follow<strong>in</strong>g figure 2.1<br />
illustrates the total project management <strong>in</strong> brief.<br />
2.1. MoU bet ween <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB<br />
Internati<strong>on</strong>al<br />
Experts<br />
Technical<br />
Advisory Group<br />
Figure 2.1 : Total project management<br />
An MoU between CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s was signed <strong>on</strong><br />
02 June 2014 <strong>in</strong> CIPRB Office.<br />
The objective of this MoU was<br />
to formalize a n<strong>on</strong>-exclusive<br />
framework of cooperati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> to<br />
facilitate collaborati<strong>on</strong> between<br />
<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB to<br />
promote the road safety program<br />
that would save lives <str<strong>on</strong>g>and</str<strong>on</strong>g> generate<br />
wider community benefits, both <strong>in</strong><br />
the area of health <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> the area<br />
of ec<strong>on</strong>omic development. The<br />
<strong>in</strong>itial focus of the program is <strong>on</strong><br />
the <strong>N2</strong> highway between <strong>Dhaka</strong><br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Sylhet</strong>. The program may subsequently be implemented <strong>on</strong> other <strong>Highway</strong>s of <strong>Bangladesh</strong> if<br />
both parties agree to do so.<br />
For this pilot project, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s provided all necessary funds al<strong>on</strong>g with technical expertise<br />
while CIPRB arranged all the activities to implement the program. The activities <strong>in</strong>cluded<br />
tender<strong>in</strong>g, c<strong>on</strong>tractor selecti<strong>on</strong>, provid<strong>in</strong>g assistance <strong>in</strong> c<strong>on</strong>structi<strong>on</strong> supervisi<strong>on</strong>, quality c<strong>on</strong>trol<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> quality acceptance of materials <str<strong>on</strong>g>and</str<strong>on</strong>g> management works for highway <strong>in</strong>terventi<strong>on</strong> program<br />
<str<strong>on</strong>g>and</str<strong>on</strong>g> arrang<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> educati<strong>on</strong> program, ACE <strong>in</strong> short for creat<strong>in</strong>g safe road user.<br />
2.2 Project team<br />
The team was guided by <strong>in</strong>dependent advisory board <strong>in</strong>clud<strong>in</strong>g nati<strong>on</strong>ally <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>ternati<strong>on</strong>ally<br />
renowned road safety experts <str<strong>on</strong>g>and</str<strong>on</strong>g> researchers. Both CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team acted<br />
as partner dur<strong>in</strong>g plann<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> implementati<strong>on</strong> of the activity. Team members are as follows.<br />
2.2.1 Advisory board<br />
The follow<strong>in</strong>g Experts are voluntarily help<strong>in</strong>g the project through provid<strong>in</strong>g all sorts of<br />
technical support.<br />
<str<strong>on</strong>g>Safe</str<strong>on</strong>g><br />
<str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />
Implementati<strong>on</strong><br />
partner<br />
CIPRB<br />
Roads <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
<strong>Highway</strong>s<br />
Department (RHD)<br />
Research<br />
Support Team<br />
Internati<strong>on</strong>al<br />
Experts<br />
Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 14