Report <strong>on</strong><br />

<str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong><br />

<strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong><br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, The Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department, <strong>Bangladesh</strong><br />

r e s e a r c h c e n t r e<br />

Road Traffic Injury Research Centre<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 2


Report <strong>on</strong><br />

<str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong><br />

<strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

Editorial board<br />

Engr. Arif Udd<strong>in</strong><br />

Dr. Kamran ul Baset<br />

Mr. Jasper Vet<br />

Dr. Martijn Thierry<br />

Mr. Kazi Burhan Udd<strong>in</strong><br />

Engr. Mehedi Rabbil<br />

Dr. Salim Mahmud Chowdhury<br />

Advisory Board<br />

Prof. Dr. Md. Mazharul Hoque<br />

Prof. Dr. AKM Fazlur Rahman<br />

D<strong>on</strong>or<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, The Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Implementer<br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong> (CIPRB)<br />

Top supervisi<strong>on</strong><br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department, <strong>Bangladesh</strong> (RHD)<br />

Publicati<strong>on</strong> Year<br />

September 2016<br />

C<strong>on</strong>tact<br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong><br />

House- B/162, Lane- 23, New DOHS, Mohakhali, <strong>Dhaka</strong>-1206<br />

Ph<strong>on</strong>e: +880-2-58814988, Fax: +880-2-58814964<br />

Website: www.ciprb.org, E-mail: roadsafety@ciprb.org<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

3


Foreword<br />

Road traffic crashes are a major problem <strong>in</strong> low <str<strong>on</strong>g>and</str<strong>on</strong>g> middle-<strong>in</strong>come countries (LMICs). Over<br />

90 percent of the world’s road traffic deaths occur <strong>in</strong> LMICs. Low-<strong>in</strong>come countries (LICs)<br />

bear a disproporti<strong>on</strong>al risk; with <strong>on</strong>ly 1% of the world’s registered motorized vehicles,<br />

LICs have 12% of the world’s road traffic deaths. Around 60% of road traffic deaths <strong>in</strong><br />

LICs are vulnerable road users. Pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> cyclists are especially at risk of an <strong>in</strong>jury<br />

as a result of excessive vehicle speeds (WHO, 2013).<br />

<strong>Bangladesh</strong> has over 100 road traffic deaths per 10,000 motor vehicles, <strong>on</strong>e of the<br />

highest rates <strong>in</strong> the world. Many crashes occur at ‘black spots’, c<strong>on</strong>centrated areas with a<br />

high road crash burden <str<strong>on</strong>g>and</str<strong>on</strong>g> about 70% of crash fatalities occur <strong>in</strong> rural areas.<br />

This pilot dem<strong>on</strong>strati<strong>on</strong> project <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>N2</strong> <strong>Highway</strong> <strong>in</strong><br />

<strong>Bangladesh</strong>’ has been implemented at three locati<strong>on</strong>s (Nilkuthi, Namapara <str<strong>on</strong>g>and</str<strong>on</strong>g> Kunderpara)<br />

of <strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) highway of <strong>Bangladesh</strong>. This road has many black spots <str<strong>on</strong>g>and</str<strong>on</strong>g> a high<br />

number of pedestrian fatalities. The pilot is <strong>in</strong>novative <strong>in</strong> both the selecti<strong>on</strong> of implemented<br />

<strong>in</strong>terventi<strong>on</strong>s (a comb<strong>in</strong>ati<strong>on</strong> of effective <str<strong>on</strong>g>and</str<strong>on</strong>g> relatively low-cost measures) <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> the<br />

approach to m<strong>on</strong>itor pre- <str<strong>on</strong>g>and</str<strong>on</strong>g> post-<strong>in</strong>terventi<strong>on</strong> data.<br />

Our <strong>in</strong>terventi<strong>on</strong>s, which c<strong>on</strong>sisted of small scale <strong>in</strong>frastructural measures for traffic<br />

calm<strong>in</strong>g, educati<strong>on</strong> to vulnerable road users <str<strong>on</strong>g>and</str<strong>on</strong>g> an active community <strong>in</strong>volvement have<br />

resulted <strong>in</strong> a reducti<strong>on</strong> of more than 60% <strong>in</strong> road crashes, traffic fatalities <str<strong>on</strong>g>and</str<strong>on</strong>g> traffic<br />

<strong>in</strong>juries at the selected spots. Moreover, estimated social ec<strong>on</strong>omic return at 6000 % for<br />

this project which is tremendous.<br />

This program shows the enormous impact that can be made by <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> road safety.<br />

Achiev<strong>in</strong>g the target set by <strong>Bangladesh</strong> government to make the number of road fatalities<br />

half by 2020 is possible if the <strong>Bangladesh</strong> government acts now. The project has got an<br />

extensive coverage <strong>in</strong> lead<strong>in</strong>g both electr<strong>on</strong>ic <str<strong>on</strong>g>and</str<strong>on</strong>g> pr<strong>in</strong>t media. Moreover, its be<strong>in</strong>g presented<br />

<strong>in</strong> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, Brazil, Ch<strong>in</strong>a, where it’s be<strong>in</strong>g praised as a perfect dem<strong>on</strong>strati<strong>on</strong> of<br />

evidence based <strong>in</strong>terventi<strong>on</strong> project.<br />

We would like to acknowledge the M<strong>in</strong>istry of Road Transport <str<strong>on</strong>g>and</str<strong>on</strong>g> Bridges, Roads <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Highway</strong>s Department, Nars<strong>in</strong>gdi Roads Divisi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> other local stakeholders for the<br />

extensive support dur<strong>in</strong>g the implementati<strong>on</strong> of the project. We are very much look<strong>in</strong>g<br />

forward to work with <strong>Bangladesh</strong> government <strong>on</strong> a roll out of this successful program to<br />

other high-risk corridors with<strong>in</strong> the road network <strong>in</strong> <strong>Bangladesh</strong>.<br />

Prof. Dr. AKM Fazlur Rahman<br />

Executive Director, CIPRB<br />

Dr. Martijn Thierry<br />

Director, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 4


C<strong>on</strong>tents<br />

Title<br />

Page<br />

Abbreviati<strong>on</strong>............................................................................................................ 6<br />

Executive Summary.................................................................................................. 8<br />

Chapter 1: Introducti<strong>on</strong>........................................................................................... 9<br />

Chapter 2: Project <str<strong>on</strong>g>Management</str<strong>on</strong>g>............................................................................ 13<br />

2.1 MoU between <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB..................................................................................... 14<br />

2.2 Project team.............................................................................................................................................. 14<br />

2.3 RHD cooperati<strong>on</strong>.................................................................................................................................... 16<br />

Chapter 3: Impact Measurement............................................................................ 17<br />

3.1 Spot <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>terventi<strong>on</strong> selecti<strong>on</strong>........................................................................................................ 18<br />

3.2 Basel<strong>in</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> endl<strong>in</strong>e study.................................................................................................................. 20<br />

Chapter 4 : <strong>Highway</strong> Interventi<strong>on</strong> Program.......................................................... 23<br />

4.1 Salient features of the project.......................................................................................................... 24<br />

4.2 Activities .................................................................................................................................................. 25<br />

4.3 Summary of work progress of the project.................................................................................. 28<br />

4.4 C<strong>on</strong>clud<strong>in</strong>g comments............................................................................................................................ 30<br />

Chapter 5: Awareness, Communit y Involvement <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong> Program......... 31<br />

5.1 Road safety committee........................................................................................................................ 32<br />

5.2 Warn<strong>in</strong>g sticker stitch<strong>in</strong>g..................................................................................................................... 32<br />

5.3 Communicative materials (Leaflet).................................................................................................. 32<br />

5.4 <str<strong>on</strong>g>Safe</str<strong>on</strong>g> child pedestrian tra<strong>in</strong><strong>in</strong>g (SCPT)............................................................................................ 33<br />

5.5 Video show................................................................................................................................................ 33<br />

5.6 CNG drivers’ orientati<strong>on</strong>.................................................................................................................... 33<br />

5.7 <str<strong>on</strong>g>Safe</str<strong>on</strong>g> crosser.............................................................................................................................................. 34<br />

5.8 Challenges................................................................................................................................................. 34<br />

5.9 C<strong>on</strong>clud<strong>in</strong>g comments........................................................................................................................... 34<br />

Chapter 6: Project Outcomes.................................................................................. 35<br />

6.1 Travel speed.............................................................................................................................................. 36<br />

6.2 Crash reducti<strong>on</strong>...................................................................................................................................... 38<br />

6.3 C<strong>on</strong>flict observati<strong>on</strong> (DOCTOR) us<strong>in</strong>g video record<strong>in</strong>gs...................................................... 40<br />

6.4 Traffic count before <str<strong>on</strong>g>and</str<strong>on</strong>g> after.......................................................................................................... 41<br />

6.5 Hourly variati<strong>on</strong> of crash.................................................................................................................... 43<br />

6.6 Benefit cost ratio of the project....................................................................................................... 43<br />

Chapter 7: C<strong>on</strong>clusi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Recommendati<strong>on</strong>s................................................... 44<br />

Chapter 8: References............................................................................................ 46<br />

Annexure A: Gallery................................................................................................ 48<br />

Annexure B: ACE Tables.......................................................................................... 60<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 5


Abbreviati<strong>on</strong><br />

BHIS<br />

GoB<br />

GRSP<br />

LMIC<br />

MRTB<br />

LGED<br />

MoHFW<br />

NGO<br />

WHO<br />

ACE<br />

ARI<br />

BCC<br />

BR AC<br />

BRTA<br />

BUET<br />

CIPRB<br />

CNG<br />

DOCTOR<br />

HI<br />

KMPH<br />

<strong>Bangladesh</strong> Health <str<strong>on</strong>g>and</str<strong>on</strong>g> Injury Survey<br />

Government of <strong>Bangladesh</strong><br />

Global Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Partnership<br />

Low <str<strong>on</strong>g>and</str<strong>on</strong>g> Middle Income Country<br />

M<strong>in</strong>istry of Road Transport <str<strong>on</strong>g>and</str<strong>on</strong>g> Brigdes<br />

Local Government Eng<strong>in</strong>eer<strong>in</strong>g Department<br />

M<strong>in</strong>istry of Health <str<strong>on</strong>g>and</str<strong>on</strong>g> Family Welfare<br />

N<strong>on</strong> Government Organizati<strong>on</strong><br />

World Health Organizati<strong>on</strong><br />

Awareness, Community Involvement <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong><br />

Accident Research Institute<br />

Behavioral Change Communicati<strong>on</strong><br />

<strong>Bangladesh</strong> Rural Advancement Committee<br />

<strong>Bangladesh</strong> Road Transport Authority<br />

<strong>Bangladesh</strong> University of Eng<strong>in</strong>eer<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> Technology<br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong><br />

C<strong>on</strong>verted Natural Gas<br />

Dutch Objective C<strong>on</strong>flict Technique for Operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research<br />

<strong>Highway</strong> Interventi<strong>on</strong><br />

Kilo Meter Per Hour<br />

<strong>N2</strong> Nati<strong>on</strong>al <strong>Highway</strong> 2<br />

RHD<br />

RK<br />

RSC<br />

RTIRN<br />

ToT<br />

VDP<br />

DALY<br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department<br />

Record Keepers<br />

Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Committee<br />

Road Traffic Injury Research Network<br />

Tra<strong>in</strong><strong>in</strong>g of Tra<strong>in</strong>er<br />

Village Development Program<br />

Disability-Adjusted Life Year<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

6


List of tables<br />

Title<br />

Page<br />

Table 2.1: Advisory board <strong>Bangladesh</strong>……...……………………………………………….................... 15<br />

Table 2.2: Advisory board the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s…………………………………………………................. 15<br />

Table 2.3: CIPRB team………………………………………………………………………….............................. 15<br />

Table 2.4: <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team………………………………………………………………......................... 16<br />

Table 3.1: Locati<strong>on</strong> details………………………………………………………..…………….......................... 18<br />

Table 3.2: ACE detailed activity………………………………………………………………….................... 20<br />

Table 4.1: Salient feature of the project…………………………………………………….……............. 24<br />

Table 4.2: Work progress made by the c<strong>on</strong>tractor…………………………………………….......... 28<br />

Table 4.3: Test results of aggregates at site dur<strong>in</strong>g the c<strong>on</strong>structi<strong>on</strong> period…………… 29<br />

Table 6.1: Nilkuthi: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data…………………………………………………....... 37<br />

Table 6.2: Namapara: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data……………………………………………….... 37<br />

Table 6.3: Kunderpara: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data……………………………………………..... 37<br />

Table 6.4: Estimated reducti<strong>on</strong> <strong>in</strong> fatalities us<strong>in</strong>g formulas……………………………………...... 38<br />

Table 6.5: Number of crashes, <strong>in</strong>juries, <str<strong>on</strong>g>and</str<strong>on</strong>g> fatalities ……………………………...…………….... 38<br />

Table 6.6: Crash statistics for the three <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s comb<strong>in</strong>ed…….................. 39<br />

Table 6.7: Pedestrian count before-after ……................………................…................................... 41<br />

Table 6.8: Traffic count before-after (measured over 4.5 hours <strong>in</strong> daytime)................... 41<br />

List of figures<br />

Title<br />

Page<br />

Figure 2.1: Total project management………………………………………………………...................... 14<br />

Figure 2.2: Program open<strong>in</strong>g cerem<strong>on</strong>y……………………………………………………...................... 16<br />

Figure 3.1: Expert visit at project locati<strong>on</strong>………………………………………………………............. 18<br />

Figure 3.2: Expert visit at project locati<strong>on</strong> (<str<strong>on</strong>g>Speed</str<strong>on</strong>g> measurement)…………….………………. 19<br />

Figure 3.3: Overview of <strong>in</strong>frastructural measures at Nilkuthi…………………………………... 19<br />

Figure 3.4: DOCTOR tra<strong>in</strong><strong>in</strong>g…………………………………………………………………......................... 21<br />

Figure 3.5: Snap of traffic analysis video………………………………………………………............... 21<br />

Figure 3.6: Collect<strong>in</strong>g speed dur<strong>in</strong>g basel<strong>in</strong>e study…………………………………………............. 22<br />

Figure 3.7: Beneficiary survey data collecti<strong>on</strong>……………………………………...…........................ 22<br />

Figure 4.1: Preparati<strong>on</strong> of site for c<strong>on</strong>structi<strong>on</strong> activities <strong>in</strong> Kunderpara………………… 25<br />

Figure 4.2: <strong>Highway</strong> <strong>in</strong>terventi<strong>on</strong> activities schedule…………..……………………..................... 27<br />

Figure 4.3: Namapara after c<strong>on</strong>structi<strong>on</strong>…………………………………………………...................... 30<br />

Figure 6.1: Cumulative distributi<strong>on</strong>s of speed (km/h) for before <str<strong>on</strong>g>and</str<strong>on</strong>g> after……………… 36<br />

Figure 6.2: Relati<strong>on</strong> of speed with crash reducti<strong>on</strong> ……………………..………………….............. 38<br />

Figure 6.3: Total number of crashes, <strong>in</strong>juries <str<strong>on</strong>g>and</str<strong>on</strong>g> fatalities by m<strong>on</strong>th <str<strong>on</strong>g>and</str<strong>on</strong>g> before-after.. 39<br />

Figure 6.4: Nilkuthi <str<strong>on</strong>g>and</str<strong>on</strong>g> Kunderpara- total number of serious c<strong>on</strong>flicts before-after......... 40<br />

Figure 6.5: Hourly variati<strong>on</strong> of crashes ………………………………..…………………....................... 43<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 7


Executive Summary<br />

Around 90% of the world’s road traffic deaths occur <strong>in</strong> low <str<strong>on</strong>g>and</str<strong>on</strong>g> middle <strong>in</strong>come countries<br />

(LMIC). <strong>Bangladesh</strong> has over 100 road traffic deaths per 10,000 motor vehicles, <strong>on</strong>e of the<br />

highest rates <strong>in</strong> the world. Most of the crashes occurr<strong>in</strong>g at ‘black spots’ <str<strong>on</strong>g>and</str<strong>on</strong>g> about 70% of<br />

crash fatalities occur <strong>in</strong> rural areas. This pilot dem<strong>on</strong>strati<strong>on</strong> project has been implemented<br />

<strong>on</strong> the <strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) highway of <strong>Bangladesh</strong>. This road has many black spots <str<strong>on</strong>g>and</str<strong>on</strong>g> a high<br />

number of pedestrian fatalities. The pilot is <strong>in</strong>novative <strong>in</strong> both the selecti<strong>on</strong> of implemented<br />

<strong>in</strong>terventi<strong>on</strong>s (a comb<strong>in</strong>ati<strong>on</strong> of effective <str<strong>on</strong>g>and</str<strong>on</strong>g> relatively low-cost measures) <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> the approach<br />

to m<strong>on</strong>itor pre- <str<strong>on</strong>g>and</str<strong>on</strong>g> post-<strong>in</strong>terventi<strong>on</strong> data.<br />

The <strong>in</strong>terventi<strong>on</strong> program comb<strong>in</strong>es small-scale <strong>in</strong>frastructural measures for traffic calm<strong>in</strong>g<br />

(e.g., us<strong>in</strong>g speed humps, signs, <str<strong>on</strong>g>and</str<strong>on</strong>g> mark<strong>in</strong>g) with practical tra<strong>in</strong><strong>in</strong>g (e.g., to school children)<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> active community <strong>in</strong>volvement. Three methods are used for m<strong>on</strong>itor<strong>in</strong>g: development of<br />

own crash database with local record keepers, speed analysis, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>flict observati<strong>on</strong> study<br />

us<strong>in</strong>g video (DOCTOR).<br />

The dem<strong>on</strong>strati<strong>on</strong> project reveals some new knowledge <str<strong>on</strong>g>and</str<strong>on</strong>g> the precise causes of crashes <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>flicts. Buses are <strong>in</strong>volved <strong>in</strong> 71% of dangerous road situati<strong>on</strong>s. <str<strong>on</strong>g>Speed</str<strong>on</strong>g><strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> overtak<strong>in</strong>g<br />

are the ma<strong>in</strong> risk-enhanc<strong>in</strong>g factors. The project has been fruitful <strong>in</strong> reduc<strong>in</strong>g excessive speed<br />

of the vehicles to moderate <strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> hence improv<strong>in</strong>g overall crash situati<strong>on</strong><br />

After implementati<strong>on</strong> of the pilot, the crash database showed a 63% reducti<strong>on</strong> <strong>in</strong> the number<br />

of crashes <str<strong>on</strong>g>and</str<strong>on</strong>g> a reducti<strong>on</strong> of over 70% <strong>in</strong> the number of people killed <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>jured.<br />

An additi<strong>on</strong>al advantage of the <strong>in</strong>tegrated speed management program is that it can be<br />

implemented relatively quickly (<strong>in</strong> 6 to 12 m<strong>on</strong>ths) <str<strong>on</strong>g>and</str<strong>on</strong>g> that the cost-effectiveness is very high.<br />

Moreover, estimated social ec<strong>on</strong>omic return at 6000 % for this project which is tremendous.<br />

It’s clear from the study f<strong>in</strong>d<strong>in</strong>gs that speed management <strong>in</strong>terventi<strong>on</strong>s can be effectively<br />

implemented <strong>on</strong> exist<strong>in</strong>g dangerous roads <strong>in</strong> <strong>Bangladesh</strong> to improve road safety. Furthermore,<br />

the c<strong>on</strong>cept should also be an <strong>in</strong>tegral part of the design of new <strong>in</strong>frastructure. This speed<br />

management project can be implemented <strong>in</strong> many more risky locati<strong>on</strong>s al<strong>on</strong>g the highway,<br />

both <strong>in</strong> rural sett<strong>in</strong>gs as well <strong>in</strong> urban areas. Invest<strong>in</strong>g <strong>in</strong> effective, low cost speed management<br />

programs will significantly reduce the number of crashes <str<strong>on</strong>g>and</str<strong>on</strong>g> makes the roads much safer<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> therefore we recommend the Government to <strong>in</strong>vest more <strong>in</strong> these programs. We str<strong>on</strong>gly<br />

recommend that the respective government agencies act now with decisive acti<strong>on</strong>s <strong>in</strong> order to<br />

reduce the death <strong>in</strong> road by 50% with<strong>in</strong> 2020.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

8


Chapter 1:<br />

Introducti<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Introducti<strong>on</strong><br />

Road traffic crashes - the lead<strong>in</strong>g cause of death by <strong>in</strong>jury <str<strong>on</strong>g>and</str<strong>on</strong>g> the tenth lead<strong>in</strong>g cause of all<br />

deaths globally - now make up a surpris<strong>in</strong>gly significant porti<strong>on</strong> of the worldwide burden of<br />

ill health. Eighty eight countries have reduced the number of deaths <strong>on</strong> their roads – but the<br />

total number of road traffic deaths rema<strong>in</strong>s unacceptably high at 1.24 milli<strong>on</strong> per year (WHO,<br />

2013). The fatality rate is c<strong>on</strong>siderably <strong>in</strong>creas<strong>in</strong>g <strong>in</strong> develop<strong>in</strong>g countries than the developed<br />

countries. And, if present trends c<strong>on</strong>t<strong>in</strong>ue, road traffic <strong>in</strong>juries are predicted to be the fifth -<br />

lead<strong>in</strong>g c<strong>on</strong>tributor to the global burden of disease <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>jury by 2030 (WHO, 2013).<br />

Road Traffic Injury (RTI) is <strong>on</strong>e of the lead<strong>in</strong>g health burdens for children aged over<br />

five years <strong>in</strong> LMICs. Every year, around 80,000 children aged 5-14 <strong>in</strong> LMICs lose their<br />

right to educati<strong>on</strong> for a s<strong>in</strong>gle tragic reas<strong>on</strong>, that of RTIs <str<strong>on</strong>g>and</str<strong>on</strong>g> it is the lead<strong>in</strong>g cause<br />

of death for young people aged 15–29. However, <strong>Bangladesh</strong> still has a very<br />

low level of motorizati<strong>on</strong> compared to other neighbor<strong>in</strong>g countries but its RTI<br />

rate is high, almost 100 times greater than Norway <str<strong>on</strong>g>and</str<strong>on</strong>g> Sweden.<br />

In ec<strong>on</strong>omic terms, the cost of road crash <strong>in</strong>juries is also estimated at roughly 1% of gross<br />

nati<strong>on</strong>al product <strong>in</strong> low <strong>in</strong>come countries, 1.5% <strong>in</strong> middle <strong>in</strong>come countries <str<strong>on</strong>g>and</str<strong>on</strong>g> 2% <strong>in</strong><br />

high-<strong>in</strong>come countries (WHO, 2004). This shows that RTIs are not limited to develop<strong>in</strong>g<br />

nati<strong>on</strong>s but are also universal phenomena. Globally, the annual ec<strong>on</strong>omic burden of RTI is<br />

estimated to be approximately US$ 518 billi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the total annual cost of RTIs for LMICs<br />

is estimated to be approximately US$ 65 billi<strong>on</strong>, which is more than the amount received<br />

through developmental assistance. In <strong>Bangladesh</strong>, annual cost of RTIs is estimated to be<br />

approximately BDT 45 billi<strong>on</strong> (US$ 76 milli<strong>on</strong>).<br />

Accord<strong>in</strong>g to official police statistics 3,160 road traffic deaths were reported <strong>in</strong> 2003 while<br />

BHIS reported a number of 13,000. In 2015 the reported number by the police (2012) was<br />

2,538 while WHO estimated the number of road traffic deaths to be 21,316. Underreport<strong>in</strong>g<br />

by the police happens due to poor data collecti<strong>on</strong> system <str<strong>on</strong>g>and</str<strong>on</strong>g> because the police ma<strong>in</strong>ly records<br />

cases where legal acti<strong>on</strong> is required. Terrible losses of these lives <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>juries with c<strong>on</strong>sequent<br />

property damages result<strong>in</strong>g from road traffic crashes have now emerged as serious issues <strong>in</strong><br />

<strong>Bangladesh</strong> affect<strong>in</strong>g the community pers<strong>on</strong>ally, socially <str<strong>on</strong>g>and</str<strong>on</strong>g> ec<strong>on</strong>omically.<br />

Investigati<strong>on</strong> reveals that significant numbers of crashes are highly c<strong>on</strong>centrated at few<br />

locati<strong>on</strong>s. Such locati<strong>on</strong>s with abnormally high c<strong>on</strong>centrati<strong>on</strong> of road crashes are identified as<br />

‘Hazardous Road Locati<strong>on</strong>s’ (HRL). About 43 percent of nati<strong>on</strong>al highway crashes c<strong>on</strong>centrated<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 10


<strong>on</strong> 5 percent of the total length, dem<strong>on</strong>strat<strong>in</strong>g that crashes are highly clustered at few secti<strong>on</strong>s<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> they are amenable to targeted <str<strong>on</strong>g>and</str<strong>on</strong>g> site specific treatments (Hoque, 2006).<br />

This road safety dem<strong>on</strong>strati<strong>on</strong> project is <strong>on</strong>e of the first to c<strong>on</strong>sider small-scale measures<br />

for traffic calm<strong>in</strong>g <strong>in</strong> rural areas of a LMIC. In high-<strong>in</strong>come countries, traffic calm<strong>in</strong>g measures<br />

that reduce vehicle speeds <strong>in</strong> areas with c<strong>on</strong>centrated numbers of pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> cyclists<br />

are proven effective <strong>in</strong> reduc<strong>in</strong>g road traffic <strong>in</strong>juries (WHO (2013)). Especially vulnerable<br />

road users (VRUs) can survive a crash with motorized traffic more likely when the impact<br />

speed is reduced (Rósen et al., 2011). The C<strong>on</strong>chrane review <strong>in</strong> 2007 (Perel et al. (2007))<br />

found no road safety trials <strong>in</strong> LMICs <strong>on</strong> traffic calm<strong>in</strong>g by <strong>in</strong>frastructural measures. S<strong>in</strong>ce<br />

then a few studies have been published. Afukaar (2008) evaluates the use of traffic calm<strong>in</strong>g<br />

<strong>in</strong>terventi<strong>on</strong>s <strong>in</strong> at black spots al<strong>on</strong>g truck roads <strong>in</strong> Ghana that pass through settlement<br />

areas. He c<strong>on</strong>cludes that traffic calm<strong>in</strong>g is an effective measure for most of the treated black<br />

spots. Hyden <str<strong>on</strong>g>and</str<strong>on</strong>g> Svenss<strong>on</strong> (2009) have d<strong>on</strong>e a before-study <strong>on</strong> the possibilities of traffic<br />

calm<strong>in</strong>g <strong>in</strong> an urban sett<strong>in</strong>g <strong>in</strong> India <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated the use of speed humps. He recommends<br />

<strong>in</strong>troduc<strong>in</strong>g st<str<strong>on</strong>g>and</str<strong>on</strong>g>ardized traffic calm<strong>in</strong>g measures that ensure low speeds <str<strong>on</strong>g>and</str<strong>on</strong>g> organized<br />

traffic at <strong>in</strong>tersecti<strong>on</strong>s.<br />

Specific focus was <strong>on</strong> small-scale <strong>in</strong>frastructural adaptati<strong>on</strong>s for traffic calm<strong>in</strong>g that are<br />

low cost <str<strong>on</strong>g>and</str<strong>on</strong>g> can be implemented <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated locally relatively quickly <strong>in</strong> a local sett<strong>in</strong>g.<br />

In terms of the evaluati<strong>on</strong> methodology, ma<strong>in</strong> focus is <strong>on</strong> observati<strong>on</strong>al methods with which<br />

traffic measures can be evaluated quickly at relatively low cost.<br />

Supported by lead<strong>in</strong>g expert <strong>in</strong> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Bangladesh</strong>, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, the<br />

Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong> (CIPRB) have<br />

developed this <strong>in</strong>tegrated approach that could be implemented <strong>on</strong> the ma<strong>in</strong> roads <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

will improve the safety situati<strong>on</strong> without hamper<strong>in</strong>g the ma<strong>in</strong> role of the road i.e. efficient<br />

transportati<strong>on</strong> <strong>on</strong> the road.<br />

To <strong>in</strong>troduce the collaborati<strong>on</strong> <strong>in</strong> short, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s is a charity registered <strong>in</strong> The<br />

Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s with the objective to improve road safety <strong>in</strong> low <str<strong>on</strong>g>and</str<strong>on</strong>g> middle <strong>in</strong>come countries.<br />

CIPRB is a N<strong>on</strong>-Government Organizati<strong>on</strong> (NGO) <strong>in</strong> <strong>Bangladesh</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> is work<strong>in</strong>g <strong>in</strong> the field<br />

of <strong>in</strong>jury preventi<strong>on</strong> s<strong>in</strong>ce 2005.<br />

For the pilot, <strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) highway had been chosen. Three busy juncti<strong>on</strong>s <strong>in</strong> Nars<strong>in</strong>gdi,<br />

al<strong>on</strong>g this highway were selected up<strong>on</strong> verify<strong>in</strong>g certa<strong>in</strong> criteria.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 11


The selecti<strong>on</strong> of the <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s happened <strong>in</strong> the follow<strong>in</strong>g way. The team (<str<strong>on</strong>g>Safe</str<strong>on</strong>g><br />

<str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB) had heard from people <strong>in</strong> <strong>Bangladesh</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> also read <strong>in</strong> an article <strong>in</strong><br />

the newspaper the Guardian (Kelly, 2012) that the <strong>N2</strong> highway had a poor reputati<strong>on</strong> <strong>in</strong><br />

terms of road safety. In the first m<strong>on</strong>ths of 2014 team went <strong>on</strong> a trip by car <strong>on</strong> the highway,<br />

start<strong>in</strong>g from <strong>Dhaka</strong>. At that time, the team did not possess any quantitative <strong>in</strong>formati<strong>on</strong> <strong>on</strong><br />

the number <str<strong>on</strong>g>and</str<strong>on</strong>g> severity of road crashes at any of the <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s. Dur<strong>in</strong>g this trip<br />

team stopped at sites where there was an absence of road safety measures, a village with a<br />

school nearby, <str<strong>on</strong>g>and</str<strong>on</strong>g> a presence of a ma<strong>in</strong> ‘c<strong>on</strong>flict z<strong>on</strong>e’ between motorized traffic <str<strong>on</strong>g>and</str<strong>on</strong>g> VRUs<br />

that is limited <strong>in</strong> space.<br />

Pedestrians were the ma<strong>in</strong> focus because they accounted for 63% of all fatalities <strong>in</strong> the<br />

Before Period. For all road users comb<strong>in</strong>ed, prior to <strong>in</strong>stall<strong>in</strong>g the <strong>in</strong>terventi<strong>on</strong>s, the three<br />

<strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s comb<strong>in</strong>ed had, <strong>on</strong> average, per year: 110 serious crashes, 12 deaths,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> 240 <strong>in</strong>jured people. The program did not <strong>on</strong>ly reduce the number of fatalities for<br />

vulnerable road users but also for other road users. The number of fatalities as a result of<br />

head-<strong>on</strong>-collisi<strong>on</strong>s has been decreased significantly. Thus, the program <strong>in</strong>creased the road<br />

safety for all road users.<br />

A comprehensive plan <strong>in</strong>clud<strong>in</strong>g low cost eng<strong>in</strong>eer<strong>in</strong>g measures, tra<strong>in</strong><strong>in</strong>g, educati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

community engagement process had been designed for these locati<strong>on</strong>s. A comprehensive beforeafter<br />

study was d<strong>on</strong>e us<strong>in</strong>g three methods with 3 c<strong>on</strong>trol locati<strong>on</strong>s for speed measurement.<br />

Firstly, a st<str<strong>on</strong>g>and</str<strong>on</strong>g>ardized method for c<strong>on</strong>flict observati<strong>on</strong> called DOCTOR was used. Sec<strong>on</strong>dly,<br />

the speed of pass<strong>in</strong>g motorized traffic was measured. Us<strong>in</strong>g known relati<strong>on</strong>ships, the results<br />

were translated <strong>in</strong>to a predicted improvement <strong>in</strong> road safety. Thirdly, we created our own<br />

crash database to m<strong>on</strong>itor the number of crashes, traffic fatalities <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>juries.<br />

The predicted pattern was that traffic calm<strong>in</strong>g would reduce the speed of motorized traffic.<br />

This <strong>in</strong> turn would reduce the number <str<strong>on</strong>g>and</str<strong>on</strong>g> severity of c<strong>on</strong>flicts <str<strong>on</strong>g>and</str<strong>on</strong>g> crashes. Us<strong>in</strong>g the models<br />

of Elvik (2009) <str<strong>on</strong>g>and</str<strong>on</strong>g> Nilss<strong>on</strong> (1982), we can translate a reducti<strong>on</strong> <strong>in</strong> the measured c<strong>on</strong>flicts<br />

<strong>in</strong>to reducti<strong>on</strong>s of fatal crashes <str<strong>on</strong>g>and</str<strong>on</strong>g> crashes with severe <strong>in</strong>juries. Assum<strong>in</strong>g a reducti<strong>on</strong><br />

<strong>in</strong> average speed from 70 km/hr to 50 km/hr, the models of Elvik <str<strong>on</strong>g>and</str<strong>on</strong>g> Nilss<strong>on</strong> predict a<br />

reducti<strong>on</strong> <strong>in</strong> fatal crashes of 75%.<br />

The results may well affect the health <str<strong>on</strong>g>and</str<strong>on</strong>g> transport policy <strong>in</strong> <strong>Bangladesh</strong>. Tak<strong>in</strong>g <strong>in</strong>to account<br />

the positive results of this study, the logical next step would be to implement a similar program<br />

across <strong>Bangladesh</strong>.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 12


Chapter 2:<br />

Project M anagement<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Project <str<strong>on</strong>g>Management</str<strong>on</strong>g><br />

The project is a jo<strong>in</strong>t effort of CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s with the c<strong>on</strong>t<strong>in</strong>uous support from<br />

M<strong>in</strong>istry of Road Transport <str<strong>on</strong>g>and</str<strong>on</strong>g> Bridges <str<strong>on</strong>g>and</str<strong>on</strong>g> NGO affairs bureau. Experts from <strong>Bangladesh</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s played key role with all sorts of technical expertise. Project officials<br />

from different professi<strong>on</strong>al sector were recruited prior to start<strong>in</strong>g the activities. After gett<strong>in</strong>g<br />

necessary permissi<strong>on</strong> from Government of <strong>Bangladesh</strong>, the project was <strong>in</strong>itiated <strong>in</strong> field with<br />

crash record<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> basel<strong>in</strong>e survey. Through rigorous field visit by experts <str<strong>on</strong>g>and</str<strong>on</strong>g> project team<br />

<strong>on</strong> site, the <strong>in</strong>terventi<strong>on</strong> plan was developed <str<strong>on</strong>g>and</str<strong>on</strong>g> implemented <strong>in</strong> field. Follow<strong>in</strong>g figure 2.1<br />

illustrates the total project management <strong>in</strong> brief.<br />

2.1. MoU bet ween <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB<br />

Internati<strong>on</strong>al<br />

Experts<br />

Technical<br />

Advisory Group<br />

Figure 2.1 : Total project management<br />

An MoU between CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s was signed <strong>on</strong><br />

02 June 2014 <strong>in</strong> CIPRB Office.<br />

The objective of this MoU was<br />

to formalize a n<strong>on</strong>-exclusive<br />

framework of cooperati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> to<br />

facilitate collaborati<strong>on</strong> between<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB to<br />

promote the road safety program<br />

that would save lives <str<strong>on</strong>g>and</str<strong>on</strong>g> generate<br />

wider community benefits, both <strong>in</strong><br />

the area of health <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> the area<br />

of ec<strong>on</strong>omic development. The<br />

<strong>in</strong>itial focus of the program is <strong>on</strong><br />

the <strong>N2</strong> highway between <strong>Dhaka</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Sylhet</strong>. The program may subsequently be implemented <strong>on</strong> other <strong>Highway</strong>s of <strong>Bangladesh</strong> if<br />

both parties agree to do so.<br />

For this pilot project, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s provided all necessary funds al<strong>on</strong>g with technical expertise<br />

while CIPRB arranged all the activities to implement the program. The activities <strong>in</strong>cluded<br />

tender<strong>in</strong>g, c<strong>on</strong>tractor selecti<strong>on</strong>, provid<strong>in</strong>g assistance <strong>in</strong> c<strong>on</strong>structi<strong>on</strong> supervisi<strong>on</strong>, quality c<strong>on</strong>trol<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> quality acceptance of materials <str<strong>on</strong>g>and</str<strong>on</strong>g> management works for highway <strong>in</strong>terventi<strong>on</strong> program<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> arrang<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> educati<strong>on</strong> program, ACE <strong>in</strong> short for creat<strong>in</strong>g safe road user.<br />

2.2 Project team<br />

The team was guided by <strong>in</strong>dependent advisory board <strong>in</strong>clud<strong>in</strong>g nati<strong>on</strong>ally <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>ternati<strong>on</strong>ally<br />

renowned road safety experts <str<strong>on</strong>g>and</str<strong>on</strong>g> researchers. Both CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team acted<br />

as partner dur<strong>in</strong>g plann<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> implementati<strong>on</strong> of the activity. Team members are as follows.<br />

2.2.1 Advisory board<br />

The follow<strong>in</strong>g Experts are voluntarily help<strong>in</strong>g the project through provid<strong>in</strong>g all sorts of<br />

technical support.<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g><br />

<str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />

Implementati<strong>on</strong><br />

partner<br />

CIPRB<br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Highway</strong>s<br />

Department (RHD)<br />

Research<br />

Support Team<br />

Internati<strong>on</strong>al<br />

Experts<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 14


Table 2.1: Advisory board <strong>Bangladesh</strong><br />

Sl. No Name of advisor Pers<strong>on</strong>al descripti<strong>on</strong><br />

1 Prof. Dr. Md. Mazharul Hoque<br />

Dean, Faculty of Civil Eng<strong>in</strong>eer<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Professor, Dept. of Civil Eng<strong>in</strong>eer<strong>in</strong>g, BUET<br />

2 Engr. Kazi Muhiuzzaman Ex. Advisor, World Bank<br />

3 Engr. Habibur Rahman Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Specialist, Ex. SE, RHD<br />

4 Engr. Zakir Hossa<strong>in</strong> Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Specialist, Ex. ACE, RHD<br />

Table 2.2: Advisory board the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Sl. No Name of advisor Pers<strong>on</strong>al descripti<strong>on</strong><br />

1 Prof. Dr. Fred Wegman<br />

Professor, Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty, Delft University<br />

of Technology; Advisor, World Bank<br />

2 Drs Peter Blom CEO, Triodos Bank<br />

2.2.2. CIPRB team<br />

The follow<strong>in</strong>g Pers<strong>on</strong>nel are engaged for the project for whole project durati<strong>on</strong> from CIPRB side.<br />

Table 2.3: CIPRB team<br />

Sl. No. Name of pers<strong>on</strong>nel Designati<strong>on</strong><br />

1 Prof. Dr. AKM Fazlur Rahman Executive Director<br />

2 Dr. Kamran ul Baset Team Leader<br />

3 Engr. Arif Udd<strong>in</strong> Deputy Team Leader<br />

4 Mr. Kazi Burhan Udd<strong>in</strong> Manager, ACE<br />

5 Engr. Mehedi Rabbil Assistant Eng<strong>in</strong>eer<br />

6 Md. Anwarul Islam Tra<strong>in</strong>er, Awareness <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong><br />

7 Mr. Abdul Hai Supervisor, Awareness <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 15


2.2.3 <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team<br />

The follow<strong>in</strong>g Pers<strong>on</strong>nel are engaged from <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team. They are provid<strong>in</strong>g all sorts<br />

of f<strong>in</strong>ancial <str<strong>on</strong>g>and</str<strong>on</strong>g> technical support where required.<br />

Table 2.4: <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s team<br />

Sl. No. Name of pers<strong>on</strong>nel Designati<strong>on</strong><br />

1 Dr. Martijn Thierry Founder <str<strong>on</strong>g>and</str<strong>on</strong>g> Director<br />

2 Mr. Jasper Vet Founder <str<strong>on</strong>g>and</str<strong>on</strong>g> Director<br />

3 Mr. Siem<strong>on</strong> van den Berg Director<br />

4 Mrs. Sylvie Kroef Market<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> Communicati<strong>on</strong><br />

2.3 RHD cooperati<strong>on</strong><br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department (RHD) actively supported <str<strong>on</strong>g>and</str<strong>on</strong>g> helped <strong>in</strong> all aspects of project<br />

activities. Technical services w<strong>in</strong>g of RHD m<strong>on</strong>itored all activities <str<strong>on</strong>g>and</str<strong>on</strong>g> provided necessary<br />

technical support dur<strong>in</strong>g the implementati<strong>on</strong>. Nars<strong>in</strong>gdi Roads Divisi<strong>on</strong> acted as a top supervisor<br />

<strong>in</strong> all al<strong>on</strong>g the activities. Their active role <str<strong>on</strong>g>and</str<strong>on</strong>g> extreme support <strong>in</strong> quality c<strong>on</strong>trol aspect <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong><br />

local <strong>in</strong>volvement really made a significant difference positively <strong>in</strong> project implementati<strong>on</strong>.<br />

Figure 2.2: Program open<strong>in</strong>g cerem<strong>on</strong>y<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong><br />

16


Chapter 3:<br />

impact measurement<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Impact Measurement<br />

3.1 Spot <str<strong>on</strong>g>and</str<strong>on</strong>g> Interventi<strong>on</strong> selecti<strong>on</strong><br />

Through detailed field study <str<strong>on</strong>g>and</str<strong>on</strong>g> crash record analysis, three spots have been selected <strong>on</strong><br />

<strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) <strong>Highway</strong>. The locati<strong>on</strong> details is be<strong>in</strong>g reflected <strong>on</strong> table 3.1.<br />

Table 3.1: Locati<strong>on</strong> details<br />

Name of Locati<strong>on</strong> Uni<strong>on</strong> Upazila District Cha<strong>in</strong>age<br />

Kunderpara Baghabo Shibpur Nars<strong>in</strong>gdi 61 km<br />

Nilkuthi Mirzapur Raipura Nars<strong>in</strong>gdi 80 km<br />

Namapara Mirzapur Raipura Nars<strong>in</strong>gdi 82 km<br />

The criteria for select<strong>in</strong>g these sites were: high risk of road crashes, high number of vulnerable<br />

road users, high speed of motorized traffic – often above 80 km/hr, absence of road safety<br />

measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> presence of a ma<strong>in</strong> ‘c<strong>on</strong>flict z<strong>on</strong>e’ between motorized traffic <str<strong>on</strong>g>and</str<strong>on</strong>g> vulnerable<br />

road users that is limited <strong>in</strong> space. Over 2,000 pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> 5,000 motorized vehicles pass<br />

through each of these black spots daily.<br />

The <strong>in</strong>itial c<strong>on</strong>centrati<strong>on</strong> was <strong>in</strong> the locati<strong>on</strong>s where first traffic mixed with slow traffic<br />

with significant road side development. After the analysis of crash data, previous black<br />

spot list, rigorous field visit, stakeholder analysis, road user <strong>in</strong>terview, the spots <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

<strong>in</strong>terventi<strong>on</strong> were selected.<br />

Another ma<strong>in</strong> c<strong>on</strong>siderati<strong>on</strong><br />

dur<strong>in</strong>g <strong>in</strong>terventi<strong>on</strong> selecti<strong>on</strong><br />

was the dem<str<strong>on</strong>g>and</str<strong>on</strong>g> of local<br />

road user. The design<br />

was replicated <strong>in</strong> all three<br />

locati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated later<br />

with basel<strong>in</strong>e data.<br />

Two major parts of the<br />

<strong>in</strong>terventi<strong>on</strong> were<br />

1. <strong>Highway</strong> Interventi<strong>on</strong> (HI)<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

2. Awareness, Community<br />

Involvement <str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong><br />

(ACE) Program<br />

Renowned road safety<br />

experts from home <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Figure 3.1: Expert visit at project locati<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 18


Figure 3.2: Expert visit at project locati<strong>on</strong><br />

(<str<strong>on</strong>g>Speed</str<strong>on</strong>g> measurement)<br />

abroad c<strong>on</strong>tributed highly <strong>in</strong><br />

all al<strong>on</strong>g the process.<br />

The <strong>in</strong>frastructural measures<br />

for speed management were<br />

designed follow<strong>in</strong>g Dutch<br />

road design guidel<strong>in</strong>es,<br />

applied to the specific<br />

situati<strong>on</strong> of the locati<strong>on</strong>s <strong>in</strong><br />

<strong>Bangladesh</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> have been<br />

validated by road safety<br />

experts <strong>in</strong> <strong>Bangladesh</strong>. Figure<br />

3.3 shows the measures<br />

for Nilkuthi, <strong>on</strong>e of the<br />

3 <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s.<br />

The measures <strong>in</strong> all three<br />

<strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s are<br />

similar <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>clude: speed<br />

humps that reduce speed<br />

of motorized traffic to an<br />

expected 50 km/h, lateral rumble strips, <strong>on</strong>e or two pedestrian cross<strong>in</strong>gs, signs <str<strong>on</strong>g>and</str<strong>on</strong>g> l<strong>in</strong><strong>in</strong>g,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> a bus bay <strong>on</strong> both side of the road.<br />

Figure 3.3: Overview of <strong>in</strong>frastructural measures at Nilkuthi<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 19


The <strong>in</strong>terventi<strong>on</strong> for ACE activities will be as the follow<strong>in</strong>g table 3.2.<br />

Table 3.2: ACE detailed activit y<br />

Activit y<br />

Educati<strong>on</strong><br />

Awareness build<strong>in</strong>g<br />

Enforcement<br />

Community <strong>in</strong>volvement<br />

Sub activit y<br />

Practical tra<strong>in</strong><strong>in</strong>g for school children <strong>on</strong> road safety<br />

Provide orientati<strong>on</strong> to:<br />

• CNG drivers<br />

• Community leaders<br />

Leaflet distributi<strong>on</strong> to:<br />

• Bus passengers <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

• Pedestrians<br />

Provide awareness through video show to:<br />

• School children<br />

• General people<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> Crossers help to vulnerable road users <str<strong>on</strong>g>and</str<strong>on</strong>g> manage<br />

traffic system<br />

Road safety committee acts as community platform for<br />

road safety soluti<strong>on</strong><br />

3.2 Basel<strong>in</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> endl<strong>in</strong>e study<br />

To measure the impact of the <strong>in</strong>terventi<strong>on</strong> <strong>in</strong> improv<strong>in</strong>g overall road safety situati<strong>on</strong>s <strong>on</strong> these<br />

area, a detailed before-after study was designed prior to start the project. The detailed study<br />

c<strong>on</strong>sisted of crash data record<strong>in</strong>g, analysis of near crash (DOCTOR), speed measurement <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

beneficiary survey. The before study (basel<strong>in</strong>e) d<strong>on</strong>e approximately 1 m<strong>on</strong>th before the start of<br />

the small-scale traffic calm<strong>in</strong>g program at the site. The basel<strong>in</strong>e was the official kick off of this<br />

project <strong>in</strong> <strong>Bangladesh</strong>. It took nearly 2 m<strong>on</strong>ths to f<strong>in</strong>ish all the basel<strong>in</strong>e activity. The after study<br />

(endl<strong>in</strong>e) d<strong>on</strong>e m<strong>on</strong>ths after completi<strong>on</strong> of the small-scale traffic calm<strong>in</strong>g program. For c<strong>on</strong>trol<br />

purposes, we measured the speed of pass<strong>in</strong>g motorized traffic at 3 c<strong>on</strong>trol locati<strong>on</strong>s. Given the<br />

logistical complexity, <str<strong>on</strong>g>and</str<strong>on</strong>g> cost <strong>in</strong>volved, we will not record c<strong>on</strong>flicts or analyze behavior <strong>in</strong> the<br />

c<strong>on</strong>trol locati<strong>on</strong>s.<br />

3.2.1 Crash record<strong>in</strong>g<br />

One of the major challenges <strong>in</strong> road safety is the less availability of proper crash data,<br />

whereas most of the crash record are be<strong>in</strong>g underreported at large marg<strong>in</strong>. To develop road<br />

crashes database as well as to check road crash pattern <strong>in</strong> the project locati<strong>on</strong>s, six record<br />

keepers (RK) has been appo<strong>in</strong>ted from June 2013 till date. The keepers are those local people<br />

who have bus<strong>in</strong>ess close to the road. Before that, a comprehensive checklist, highlight<strong>in</strong>g<br />

some key variables, was developed <str<strong>on</strong>g>and</str<strong>on</strong>g> provided to the RKs for this purpose. Orientati<strong>on</strong><br />

sessi<strong>on</strong> has been arranged <strong>on</strong> process for fill<strong>in</strong>g the checklist <str<strong>on</strong>g>and</str<strong>on</strong>g> other related issues for all<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 20


the record keepers prior to<br />

crash record<strong>in</strong>g. Data<br />

is be<strong>in</strong>g collected <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

entered to the computer <strong>on</strong><br />

m<strong>on</strong>thly basis.<br />

3.2.2 DOCTOR<br />

observati<strong>on</strong><br />

Field observati<strong>on</strong> had been<br />

d<strong>on</strong>e <strong>on</strong> the spots by two<br />

tra<strong>in</strong>ed human observers,<br />

backed-up by unobtrusive<br />

video record<strong>in</strong>g. The total<br />

observati<strong>on</strong> per black spot<br />

were at least 18 hours,<br />

divided <strong>in</strong>to 6 blocks of 3<br />

hours. This is a st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Figure 3.4 : DOCTOR tra<strong>in</strong><strong>in</strong>g<br />

period for DOCTOR. The 6<br />

blocks <strong>in</strong>cluded 3 blocks with busy traffic <str<strong>on</strong>g>and</str<strong>on</strong>g> many <strong>in</strong>teracti<strong>on</strong>s with VRUs, <str<strong>on</strong>g>and</str<strong>on</strong>g> 3 blocks with<br />

limited traffic <str<strong>on</strong>g>and</str<strong>on</strong>g> relatively few <strong>in</strong>teracti<strong>on</strong>s with VRUs. The video record<strong>in</strong>g a total of 9 days<br />

(day + night). This helped to also analyze periods <str<strong>on</strong>g>and</str<strong>on</strong>g> events that had not been captured by<br />

human observers. For all measur<strong>in</strong>g periods, Representative traffic counts has been c<strong>on</strong>ducted<br />

to analyze the data from the recorded video.<br />

3.2.3 <str<strong>on</strong>g>Speed</str<strong>on</strong>g> measurement<br />

The speed distributi<strong>on</strong> of each<br />

type of motorized traffic was<br />

be<strong>in</strong>g measured (buses, trucks,<br />

cars, m<strong>in</strong>ivans, motorcycles),<br />

when they entered the<br />

‘cross<strong>in</strong>g c<strong>on</strong>flict z<strong>on</strong>e’, i.e.,<br />

where most pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

other vulnerable road users<br />

cross. Only the speed of freerid<strong>in</strong>g<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> pass<strong>in</strong>g traffic<br />

was measured. For each<br />

type of motorized traffic<br />

at least 200 objects were<br />

recorded. As measurement<br />

tools, a laser gun, backed-up<br />

by speed measurements from<br />

video was used.<br />

Figure 3.5 : Snap of traf fic analysis video<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 21


Dur<strong>in</strong>g the speed<br />

measurement, it was<br />

c<strong>on</strong>firmed that the<br />

approach<strong>in</strong>g vehicles<br />

were not notic<strong>in</strong>g the<br />

record<strong>in</strong>g as it seemed<br />

they tend to reduce<br />

speed after gett<strong>in</strong>g<br />

<strong>in</strong>formed about speed<br />

record<strong>in</strong>g. Careful<br />

attenti<strong>on</strong> was given<br />

<strong>in</strong> plac<strong>in</strong>g the speed<br />

gun as it might cause<br />

error <strong>on</strong> recod<strong>in</strong>g it<br />

stays too far from the<br />

approach<strong>in</strong>g vehicle.<br />

Figure 3.6: Collect<strong>in</strong>g speed dur<strong>in</strong>g basel<strong>in</strong>e study<br />

3.2.4 Beneficiary survey<br />

To know the exist<strong>in</strong>g road crash situati<strong>on</strong> of the project locati<strong>on</strong>s, percepti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> recommendati<strong>on</strong><br />

of the community stakeholders, beneficiary survey was c<strong>on</strong>ducted <strong>in</strong> all the project locati<strong>on</strong>. A<br />

detailed questi<strong>on</strong>naire,<br />

developed by the<br />

renowned expert<br />

used <strong>in</strong> this survey.<br />

Experienced program<br />

pers<strong>on</strong>nel c<strong>on</strong>ducted<br />

this <strong>in</strong> three days (<strong>on</strong>e<br />

day <strong>in</strong> each area) The<br />

<strong>in</strong>terviewee was picked<br />

r<str<strong>on</strong>g>and</str<strong>on</strong>g>omly from local<br />

pedestrian. Proper<br />

c<strong>on</strong>sent was taken from<br />

them prior to <strong>in</strong>terview.<br />

The participant was<br />

found so enthusiastic <strong>in</strong><br />

answer<strong>in</strong>g all questi<strong>on</strong>s.<br />

Figure 3.7: Beneficiary survey data collecti<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 22


Chapter 4:<br />

<strong>Highway</strong> Interventi<strong>on</strong><br />

Progr a m<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


<strong>Highway</strong> Interventi<strong>on</strong> Program<br />

The traffic calm<strong>in</strong>g adaptati<strong>on</strong>s were based <strong>on</strong> best-practices, applied to the specific situati<strong>on</strong> of<br />

the black spots <strong>in</strong> <strong>Bangladesh</strong>. After c<strong>on</strong>sultati<strong>on</strong> with <strong>in</strong>ternati<strong>on</strong>al experts it was c<strong>on</strong>cluded that<br />

the first priority was to significantly reduce the speed of fast-mov<strong>in</strong>g motorized traffic. To achieve<br />

this goal, the selected measures <strong>in</strong> the program (speed humps, rumble strips, supplemented by signs<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> mark<strong>in</strong>gs) were the most effective measures that are at the same time relatively low-cost <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

susta<strong>in</strong>able. Install<strong>in</strong>g a footbridge for example would have been quite costly <str<strong>on</strong>g>and</str<strong>on</strong>g> it is questi<strong>on</strong>able<br />

how many pedestrians would have used the foot over bridge.<br />

The design of the small-scale <strong>in</strong>frastructural measures was made by lead<strong>in</strong>g road safety experts <strong>in</strong><br />

<strong>Bangladesh</strong> with the help of Gr<strong>on</strong>tmij, a lead<strong>in</strong>g eng<strong>in</strong>eer<strong>in</strong>g company <strong>in</strong> the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s.<br />

4.1 Salient features of the project<br />

The summarized project activities are as follows <strong>in</strong> table 4.1<br />

Table 4.1: Salient feature of the project<br />

SI no Particulars Descripti<strong>on</strong><br />

1 Name of the project<br />

2 Employer of the project<br />

3 Procur<strong>in</strong>g entry name<br />

Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Dem<strong>on</strong>strati<strong>on</strong> Project: <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>N2</strong> <strong>Highway</strong>s<br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research,<br />

<strong>Bangladesh</strong> (CIPRB)<br />

Executive Director, Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Research, <strong>Bangladesh</strong> (CIPRB)<br />

4 Eng<strong>in</strong>eer of the project Project Coord<strong>in</strong>ator, Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty, CIPRB<br />

5 Name of the c<strong>on</strong>tractor M/S Taher Enterprise.<br />

6 F<strong>in</strong>ance of the project <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

7<br />

Length of the<br />

<strong>in</strong>terventi<strong>on</strong> area<br />

1500 m. ( 500 m each locati<strong>on</strong>)<br />

8 C<strong>on</strong>tract value TK. 60,43,277.60<br />

9 Date of award 11th September 2014<br />

10 Date of commencement 29th September 2014<br />

11 Defects liability period 3 M<strong>on</strong>ths<br />

12 Date of completi<strong>on</strong> 15th May 2015<br />

13 Project liability ended 15th August 2015<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 24


4.2 Activities<br />

4.2.1 Approval from m<strong>in</strong>istry<br />

The Project has got approval from the m<strong>in</strong>istry of road transport <str<strong>on</strong>g>and</str<strong>on</strong>g> bridges <strong>on</strong> 26th May<br />

2014. Prior to that approval there were several meet<strong>in</strong>gs held <strong>in</strong> RHD Technical service w<strong>in</strong>g<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> m<strong>in</strong>istry for discuss<strong>in</strong>g the design <str<strong>on</strong>g>and</str<strong>on</strong>g> other aspects of the project. The meet<strong>in</strong>g participants<br />

checked the feasibility of the design <str<strong>on</strong>g>and</str<strong>on</strong>g> effectiveness <strong>in</strong> the highway. All of the participants<br />

were made assured by local <str<strong>on</strong>g>and</str<strong>on</strong>g> foreign expert that the project would be highly beneficial for<br />

the country. The m<strong>in</strong>istry gave the f<strong>in</strong>al c<strong>on</strong>firmati<strong>on</strong> with a c<strong>on</strong>diti<strong>on</strong> of not us<strong>in</strong>g any name of<br />

CIPRB or <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <strong>in</strong> project locati<strong>on</strong>s which was followed very strictly later <strong>on</strong>.<br />

4.2.2 Mobilizati<strong>on</strong><br />

The c<strong>on</strong>tractor was awarded of the c<strong>on</strong>tract <strong>on</strong> 11th September 2014 <str<strong>on</strong>g>and</str<strong>on</strong>g> the c<strong>on</strong>tractor<br />

has started preparatory works for mobilizati<strong>on</strong> of their resources. Significant progress <strong>in</strong> the<br />

procurement of materials <str<strong>on</strong>g>and</str<strong>on</strong>g> hir<strong>in</strong>g equipment was be<strong>in</strong>g made <strong>in</strong> time. Road Side unauthorized<br />

shop were be<strong>in</strong>g removed with the help of RHD <strong>on</strong> 16th September 2014. All site was be<strong>in</strong>g<br />

cleared <str<strong>on</strong>g>and</str<strong>on</strong>g> made ready for <strong>in</strong>terventi<strong>on</strong>. Required Equipment’s (viz. excavator, soil compactor,<br />

Figure 4.1: Preparati<strong>on</strong> of site for c<strong>on</strong>structi<strong>on</strong> activities <strong>in</strong> Kunderpara<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 25


oller) were be<strong>in</strong>g arranged <strong>on</strong> site. All c<strong>on</strong>structi<strong>on</strong> materials (viz. S<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Brick) <str<strong>on</strong>g>and</str<strong>on</strong>g> for test <strong>in</strong><br />

LGED lab prior to use <strong>on</strong> site. Palacid<strong>in</strong>g <strong>in</strong> Namapara f<strong>in</strong>ished by 01st October, 2014.<br />

4.2.3. Physical work plan by c<strong>on</strong>tractor<br />

M/S Taher Enterprise, the c<strong>on</strong>tractor submitted a work schedule for the project before<br />

start<strong>in</strong>g c<strong>on</strong>structi<strong>on</strong>. Necessary preparati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> deployment of resources for the ensu<strong>in</strong>g<br />

best c<strong>on</strong>structi<strong>on</strong> organized prior to c<strong>on</strong>structi<strong>on</strong>.<br />

4.2.4 Road <strong>in</strong>specti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> survey<br />

For better C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> project susta<strong>in</strong>ability, several road <strong>in</strong>specti<strong>on</strong>s d<strong>on</strong>e with the<br />

help of RHD, local <str<strong>on</strong>g>and</str<strong>on</strong>g> foreign expert.<br />

4.2.4.1 Survey by CIPRB & RHD<br />

For proper estimati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> quality c<strong>on</strong>trol, a survey was c<strong>on</strong>ducted with the help of Nars<strong>in</strong>gdi<br />

RHD <strong>in</strong> all project locati<strong>on</strong> through level mach<strong>in</strong>e. The c<strong>on</strong>structi<strong>on</strong> estimati<strong>on</strong> was made<br />

based <strong>on</strong> this survey report.<br />

4.2.4.2 Road <strong>in</strong>specti<strong>on</strong> by CIPRB & <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />

For road c<strong>on</strong>diti<strong>on</strong> survey, a two days exclusive road side <strong>in</strong>specti<strong>on</strong> survey was d<strong>on</strong>e with<br />

the presence of representative of <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> CIPRB representative. It helped to get<br />

proper underst<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>in</strong>g of local feature <str<strong>on</strong>g>and</str<strong>on</strong>g> required acti<strong>on</strong> to make safer road for traffic.<br />

4.2.4.3 Design layout mark<strong>in</strong>g by CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> Taher Enterprise<br />

After complet<strong>in</strong>g all pre-requisite activities for c<strong>on</strong>tractor selecti<strong>on</strong>, layout of the proposed<br />

design was be<strong>in</strong>g established <strong>in</strong> all three locati<strong>on</strong>s with the associati<strong>on</strong> of representative<br />

from Taher Enterprise. It was helpful to get proper underst<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>in</strong>g of the <strong>in</strong>terventi<strong>on</strong> items.<br />

4.2.5 Top supervisi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> m<strong>on</strong>itor<strong>in</strong>g by RHD<br />

Accord<strong>in</strong>g to project management plan, Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department (RHD) acted as a<br />

top supervisor. They were actively <strong>in</strong>volved <strong>in</strong> design verificati<strong>on</strong>, <strong>in</strong>terventi<strong>on</strong> modificati<strong>on</strong>,<br />

field survey, quality c<strong>on</strong>trol of c<strong>on</strong>structi<strong>on</strong>, cooperati<strong>on</strong> <strong>in</strong> community <strong>in</strong>volvement <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> safety assurance.<br />

Their overall participati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> str<strong>on</strong>g support <strong>in</strong> all phase of implementati<strong>on</strong> ensured better<br />

site management <str<strong>on</strong>g>and</str<strong>on</strong>g> ownership creati<strong>on</strong> am<strong>on</strong>g the stake holders. The c<strong>on</strong>tributi<strong>on</strong> for RHD,<br />

especially from Nars<strong>in</strong>gdi Roads Divisi<strong>on</strong> is highly appreciat<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> a pi<strong>on</strong>eer role from a<br />

government agency.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 26


4.2.6 Progress of highway <strong>in</strong>terventi<strong>on</strong><br />

The plan for the achieved task d<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> shown <strong>in</strong> Figure 4.2<br />

Time period (M<strong>on</strong>th)<br />

Activities<br />

Sep<br />

14<br />

Oct<br />

14<br />

Nov<br />

14<br />

Dec<br />

14<br />

Jan<br />

15<br />

Feb<br />

15<br />

Mar<br />

15<br />

Apr<br />

15<br />

May<br />

15<br />

Jun<br />

15<br />

Jul<br />

15<br />

Aug<br />

15<br />

Bus bay palacid<strong>in</strong>g<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Rumble strip<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

<str<strong>on</strong>g>Speed</str<strong>on</strong>g> hump<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Bus bay<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Road sign <strong>in</strong>stallati<strong>on</strong><br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Road pa<strong>in</strong>t<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Project liability period<br />

Nilkuthi<br />

Namapara<br />

Kunderpara<br />

Figure 4.2: <strong>Highway</strong> Interventi<strong>on</strong> activities schedule<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 27


4.3 Summary of work progress of the project<br />

4.3.1 Progress by the c<strong>on</strong>tractor<br />

The work progress made by the C<strong>on</strong>tractor is summarized as follows <strong>in</strong> Table 4.2<br />

Table 4.2 Work progress made by the c<strong>on</strong>tractor<br />

Sl. no. Descripti<strong>on</strong> of activities Locati<strong>on</strong> Remarks<br />

1 C<strong>on</strong>tractors accommodati<strong>on</strong> All Completed<br />

2<br />

a) Excavator<br />

b) Steel vibrat<strong>in</strong>g roller<br />

c) Soil compactor<br />

All<br />

Mobilized <str<strong>on</strong>g>and</str<strong>on</strong>g> worked properly<br />

<strong>in</strong> the project locati<strong>on</strong><br />

3<br />

Bus bay c<strong>on</strong>structi<strong>on</strong><br />

a) Improved sub grade<br />

b) Sub base layer<br />

c) Base layer<br />

d) Dense bitum<strong>in</strong>ous surface<br />

All<br />

All were completed <strong>in</strong> time with<br />

proper quality<br />

4<br />

Survey works<br />

Cha<strong>in</strong>ages mark<strong>in</strong>gs <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

design layout al<strong>on</strong>g the length<br />

of the exist<strong>in</strong>g highway <strong>on</strong><br />

both sides<br />

Adjacent<br />

<strong>Highway</strong> <strong>in</strong><br />

all locati<strong>on</strong><br />

Completed<br />

5<br />

Procurement of materials<br />

Brick (picket) <str<strong>on</strong>g>and</str<strong>on</strong>g> S<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Project<br />

locati<strong>on</strong><br />

Bought <str<strong>on</strong>g>and</str<strong>on</strong>g> sent to test prior to<br />

c<strong>on</strong>structi<strong>on</strong><br />

6<br />

Laboratory test<br />

FM, Gradati<strong>on</strong>, ACV Test, CBR.<br />

LGED<br />

Laboratory<br />

Tests were c<strong>on</strong>ducted for<br />

source approval<br />

4.3.2 Implement<strong>in</strong>g partner activities<br />

The implement<strong>in</strong>g partner has c<strong>on</strong>ducted the follow<strong>in</strong>g activities:<br />

• Regular <strong>in</strong>specti<strong>on</strong> visits<br />

• Observed that the c<strong>on</strong>tractor crushed brick aggregate <str<strong>on</strong>g>and</str<strong>on</strong>g> s<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> their site locati<strong>on</strong>.<br />

• M<strong>on</strong>thly review meet<strong>in</strong>g <strong>in</strong> CIPRB office <strong>in</strong> <strong>Dhaka</strong>.<br />

• Gradati<strong>on</strong>, CBR, ACV, FM for S<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Brick were c<strong>on</strong>ducted by CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> TE for<br />

source approval <strong>in</strong> LGED Lab.<br />

• A safety workshop <strong>on</strong> “C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty” held <strong>on</strong> October 22 <strong>in</strong> the Nars<strong>in</strong>gdi<br />

RHD rest house <strong>in</strong> presence of RHD, CIPRB, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s, TE representative al<strong>on</strong>g<br />

with c<strong>on</strong>structi<strong>on</strong> workers <str<strong>on</strong>g>and</str<strong>on</strong>g> supervisors.<br />

• Pre-secti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> road side <strong>in</strong>specti<strong>on</strong> survey work had been completed.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 28


4.3.3 Source approval<br />

Sample of brick aggregate <str<strong>on</strong>g>and</str<strong>on</strong>g> local s<str<strong>on</strong>g>and</str<strong>on</strong>g> sent to Nars<strong>in</strong>gdi LGED lab <strong>in</strong> presence of representative<br />

of CIPRB, <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Taher Enterprise for test<strong>in</strong>g. Source was approved for up to DBS<br />

layer c<strong>on</strong>structi<strong>on</strong> of bus bay up<strong>on</strong> satisfactory result from test.<br />

4.3.4 Materials test results<br />

S<strong>in</strong>ce the mobilizati<strong>on</strong> of the materials at site, a number of tests had been carried out <strong>on</strong> the<br />

LGED laboratory as per directi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> recommendati<strong>on</strong> of the CIPRB team. For the purpose<br />

of ascerta<strong>in</strong> the design requirements of asphalt c<strong>on</strong>crete, test results <strong>on</strong> material properties<br />

are summarized <strong>in</strong> Table 4.3<br />

Table 4.3: Test results of aggregati<strong>on</strong> at site dur<strong>in</strong>g the c<strong>on</strong>structi<strong>on</strong> period<br />

Sl no Materials Test<br />

Test<br />

designati<strong>on</strong><br />

No<br />

of test<br />

Remarks/Limit<br />

1 Picket CBR 1 No For Bus bay, result was satisfactory<br />

2 Picket ACB 2 Nos For Bus bay, result was satisfactory<br />

3 Picket Gradati<strong>on</strong> ASTM C127 2 Nos For Bus bay, result was satisfactory<br />

4 S<str<strong>on</strong>g>and</str<strong>on</strong>g> FM ASTM C128 1 No For Bus bay, result was satisfactory<br />

4.3.5 M<strong>on</strong>thly review meet<strong>in</strong>gs<br />

Several m<strong>on</strong>thly review meet<strong>in</strong>gs for m<strong>on</strong>itor<strong>in</strong>g the progress of the project were held<br />

at CIPRB head office. The advisory board, CIPRB team <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tractor were present <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

discussed different aspects of the Project <str<strong>on</strong>g>and</str<strong>on</strong>g> the progress of the c<strong>on</strong>structi<strong>on</strong> activities.<br />

4.3.6 Important corresp<strong>on</strong>dences<br />

Exchange of important corresp<strong>on</strong>dences between CIPRB, MRTB, RHD, TE are attached to<br />

Appendix- A.<br />

4.3.7 Important discussi<strong>on</strong>s regard<strong>in</strong>g the work progress<br />

Key decisi<strong>on</strong> dur<strong>in</strong>g the work<strong>in</strong>g time was as follows:<br />

• Limited tender<strong>in</strong>g method used to f<strong>in</strong>d the appropriate c<strong>on</strong>tract for this<br />

dem<strong>on</strong>strati<strong>on</strong> project.<br />

• Project liability period would be three m<strong>on</strong>ths after completi<strong>on</strong>.<br />

• Total C<strong>on</strong>structi<strong>on</strong> safety should be assured by selected c<strong>on</strong>tractor.<br />

• C<strong>on</strong>structi<strong>on</strong> material would be tested <strong>in</strong> local LGED lab <strong>in</strong> Nars<strong>in</strong>gdi<br />

• Local s<str<strong>on</strong>g>and</str<strong>on</strong>g>, brick <str<strong>on</strong>g>and</str<strong>on</strong>g> boulder st<strong>on</strong>e, 60-70 grade bitumen would be used for the<br />

c<strong>on</strong>structi<strong>on</strong> activities.<br />

• The road mark<strong>in</strong>g should be retro reflective thermoplastic pa<strong>in</strong>t <str<strong>on</strong>g>and</str<strong>on</strong>g> road sign should<br />

be retro reflective.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 29


• C<strong>on</strong>tractor would get their first payment after completi<strong>on</strong> of 30% total project<br />

activity, rest would be <strong>on</strong> dem<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

• Prior to payment, the advisory board would visit all three locati<strong>on</strong>s for payment<br />

certificati<strong>on</strong>.<br />

• RHD should be the top supervisor <str<strong>on</strong>g>and</str<strong>on</strong>g> owner of the project. The project should be<br />

h<str<strong>on</strong>g>and</str<strong>on</strong>g>ed over to them after completi<strong>on</strong>.<br />

• Total project should be properly documented for future purpose.<br />

4.4 C<strong>on</strong>clud<strong>in</strong>g comments<br />

The chapter summarizes the progress of highway <strong>in</strong>terventi<strong>on</strong> for the whole project period.<br />

C<strong>on</strong>tractor was selected through tender<strong>in</strong>g. Site has been h<str<strong>on</strong>g>and</str<strong>on</strong>g>ed over <strong>in</strong> time. Necessary<br />

resource deployment <str<strong>on</strong>g>and</str<strong>on</strong>g> mobilizati<strong>on</strong> works were <strong>on</strong> time. Transportati<strong>on</strong>, logistics <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

procurement of the c<strong>on</strong>structi<strong>on</strong> materials were d<strong>on</strong>e <strong>in</strong> time. C<strong>on</strong>diti<strong>on</strong> survey, topographical<br />

survey <str<strong>on</strong>g>and</str<strong>on</strong>g> pre-secti<strong>on</strong>s survey works <strong>on</strong> the project were completed before c<strong>on</strong>structi<strong>on</strong>.<br />

Necessary material test were <strong>in</strong> regular progress for quality c<strong>on</strong>trol aspect. <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty precauti<strong>on</strong><br />

taken by the c<strong>on</strong>tractor was satisfactory. However due to weather c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> adverse<br />

socio -ec<strong>on</strong>omic c<strong>on</strong>diti<strong>on</strong>, the activity required more time than planned to be completed.<br />

Figure 4.3: Namapara af ter c<strong>on</strong>structi<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 30


Chapter 5:<br />

Awareness, Communit y<br />

Involvement <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Educati<strong>on</strong> Progr a m<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Awareness, Communit y Involvement<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Educati<strong>on</strong> Program<br />

ACE Program is the best tools to create safe road user <str<strong>on</strong>g>and</str<strong>on</strong>g> to c<strong>on</strong>firm project susta<strong>in</strong>ability<br />

through creat<strong>in</strong>g str<strong>on</strong>g local ownership <str<strong>on</strong>g>and</str<strong>on</strong>g> commitment from local stakeholders. It has been<br />

observed that without community <strong>in</strong>volvement <str<strong>on</strong>g>and</str<strong>on</strong>g> proper tra<strong>in</strong><strong>in</strong>g of road user, eng<strong>in</strong>eer<strong>in</strong>g<br />

<strong>in</strong>terventi<strong>on</strong> did not perform at its best. Hence, with the jo<strong>in</strong>t participati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tributi<strong>on</strong><br />

from the expert of home <str<strong>on</strong>g>and</str<strong>on</strong>g> abroad, this comprehensive plan has been prepared <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

implemented. The key activities will be highlighted <strong>in</strong> this chapter.<br />

5.1 Road safet y committee<br />

Formati<strong>on</strong> of Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Committee was <strong>on</strong>e of the major comp<strong>on</strong>ents of the project that<br />

<strong>in</strong>volved local community <strong>in</strong> all steps of the program. The committees are resp<strong>on</strong>sible for<br />

ensur<strong>in</strong>g proper utilizati<strong>on</strong> of the project <strong>in</strong>terventi<strong>on</strong> by the road users as well as to provide<br />

overall help <strong>in</strong> any aspect related to the project.<br />

The committee was c<strong>on</strong>sist<strong>in</strong>g of 11 key members of the local community. Chairman of the local<br />

uni<strong>on</strong> parishad is chairpers<strong>on</strong> of the committee, where record keepers, other local government<br />

representatives, school teacher, local market committee member, religious leader, member of<br />

local CNG driver associati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> other <strong>in</strong>fluential community are also act<strong>in</strong>g as general member.<br />

Rout<strong>in</strong>e meet<strong>in</strong>g is <strong>on</strong>go<strong>in</strong>g <strong>on</strong> some prefixed agenda such as updat<strong>in</strong>g of project activities,<br />

upcom<strong>in</strong>g activities, resp<strong>on</strong>sibilities of the committee members, their behaviour <strong>on</strong> road,<br />

issues the committee members faced from the community <str<strong>on</strong>g>and</str<strong>on</strong>g> look for soluti<strong>on</strong>s etc. S<strong>in</strong>ce<br />

formati<strong>on</strong>, 11 meet<strong>in</strong>gs <strong>in</strong> Nilkuthi <str<strong>on</strong>g>and</str<strong>on</strong>g> 10 each <strong>in</strong> Namapara <str<strong>on</strong>g>and</str<strong>on</strong>g> Kunderpara have been<br />

c<strong>on</strong>ducted. However, it will be c<strong>on</strong>t<strong>in</strong>ued till next October, 2016.<br />

5.2 Warn<strong>in</strong>g sticker stitch<strong>in</strong>g<br />

To ensure safety of the passengers, pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> workers, comprehensive<br />

precauti<strong>on</strong>ary measures were taken before start<strong>in</strong>g of c<strong>on</strong>structi<strong>on</strong> activities that <strong>in</strong>cludes<br />

attach<strong>in</strong>g sticker <strong>on</strong> high speedy buses <strong>in</strong> larger bus st<str<strong>on</strong>g>and</str<strong>on</strong>g>s at <strong>Dhaka</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> central bus st<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong><br />

Bairab. Sticker was stitched <strong>on</strong> buses before 7-10 days of start<strong>in</strong>g c<strong>on</strong>structi<strong>on</strong> work.<br />

Al<strong>on</strong>g with the sticker, letters were issued to the owner of the major bus companies. Sticker<br />

was stitched <strong>in</strong> two phases. 250 <strong>in</strong> the first phase <str<strong>on</strong>g>and</str<strong>on</strong>g> 160 <strong>in</strong> sec<strong>on</strong>d phase. After completi<strong>on</strong><br />

of first phase, a short assessment was c<strong>on</strong>ducted <str<strong>on</strong>g>and</str<strong>on</strong>g> based <strong>on</strong> that assessment, sec<strong>on</strong>d<br />

phase was completed.<br />

5.3 Communicative materials (Leaflet)<br />

To make community people aware <strong>on</strong> road safety, leaflet with six key pictorial messages<br />

were distributed to the local stakeholders. Proper messages were selected <str<strong>on</strong>g>and</str<strong>on</strong>g> illustrated,<br />

c<strong>on</strong>sider<strong>in</strong>g the simplicity <str<strong>on</strong>g>and</str<strong>on</strong>g> visit<strong>in</strong>g the project locati<strong>on</strong>s. Leaflet were distributed to all<br />

road users from pers<strong>on</strong> to pers<strong>on</strong> <strong>in</strong> the project area. For better underst<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>in</strong>g, the officials<br />

helped the villagers to make them underst<str<strong>on</strong>g>and</str<strong>on</strong>g> the messages.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 32


5.4 <str<strong>on</strong>g>Safe</str<strong>on</strong>g> child pedestrian tra<strong>in</strong><strong>in</strong>g (SCPT)<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> child pedestrian tra<strong>in</strong><strong>in</strong>g is a practical tra<strong>in</strong><strong>in</strong>g for the young children for us<strong>in</strong>g road<br />

safely. Tra<strong>in</strong><strong>in</strong>g was c<strong>on</strong>ducted for grade I <str<strong>on</strong>g>and</str<strong>on</strong>g> II students <strong>in</strong> some selected primary schools,<br />

close to the project locati<strong>on</strong>s.<br />

Tra<strong>in</strong><strong>in</strong>g was c<strong>on</strong>ducted by volunteer teachers. Tra<strong>in</strong><strong>in</strong>g was c<strong>on</strong>ducted <strong>in</strong> two major parts. First<br />

<strong>on</strong>e was 10-15 m<strong>in</strong>utes classroom discussi<strong>on</strong> <strong>on</strong> flip chart <str<strong>on</strong>g>and</str<strong>on</strong>g> then 15-20 m<strong>in</strong>utes practical<br />

dem<strong>on</strong>strati<strong>on</strong> <strong>on</strong> road. A batch of four children was formed by the tra<strong>in</strong>er. At least four sessi<strong>on</strong>s<br />

were c<strong>on</strong>ducted with each batch for mak<strong>in</strong>g the tra<strong>in</strong>ee children graduate. C<strong>on</strong>sider<strong>in</strong>g the<br />

challenge <str<strong>on</strong>g>and</str<strong>on</strong>g> risk of tra<strong>in</strong><strong>in</strong>g <strong>on</strong> the highway, village road was used for practical dem<strong>on</strong>strati<strong>on</strong><br />

with demo zebra cross<strong>in</strong>g.<br />

Day l<strong>on</strong>g tra<strong>in</strong><strong>in</strong>g of tra<strong>in</strong>ers (ToT) was organized for the volunteer teachers. Necessary<br />

materials <str<strong>on</strong>g>and</str<strong>on</strong>g> logistics like flip chart, tra<strong>in</strong><strong>in</strong>g manual, safety vest for teachers <str<strong>on</strong>g>and</str<strong>on</strong>g> students<br />

were distributed before start<strong>in</strong>g the tra<strong>in</strong><strong>in</strong>g. This activity was c<strong>on</strong>ducted <strong>on</strong> May-June<br />

2015. Total eligible children were 181 <strong>in</strong> all the selected schools <str<strong>on</strong>g>and</str<strong>on</strong>g> am<strong>on</strong>g them, 116<br />

(64% overall) were completed the tra<strong>in</strong><strong>in</strong>g successfully.<br />

5.5 Video show<br />

As an <strong>in</strong>dispensable part of awareness <str<strong>on</strong>g>and</str<strong>on</strong>g> educati<strong>on</strong> program, <strong>in</strong>teractive popular theatre (video<br />

show) was c<strong>on</strong>ducted for the school children. Focus<strong>in</strong>g some key road safety messages, a 20 m<strong>in</strong>utes<br />

video clip was developed. This is a very effective method for provid<strong>in</strong>g messages <str<strong>on</strong>g>and</str<strong>on</strong>g> mak<strong>in</strong>g the<br />

young children aware to be a safe road user. Students of grade IV-VIII were the target group.<br />

Around project locati<strong>on</strong>s, there are 7 primary <str<strong>on</strong>g>and</str<strong>on</strong>g> 1 comb<strong>in</strong>ed (primary <str<strong>on</strong>g>and</str<strong>on</strong>g> sec<strong>on</strong>dary) schools.<br />

Around 1200 students are enrolled <strong>in</strong> those school. Through c<strong>on</strong>ducted 20 number of shows, all<br />

the targeted students were covered. Us<strong>in</strong>g multimedia projector <str<strong>on</strong>g>and</str<strong>on</strong>g> digital sound system, shows<br />

were c<strong>on</strong>ducted <strong>in</strong> the classroom while generator ensured un<strong>in</strong>terrupted power supply.<br />

Introductory discussi<strong>on</strong>, knowledge assessment through pre- <str<strong>on</strong>g>and</str<strong>on</strong>g> post-test, display<strong>in</strong>g of<br />

show <str<strong>on</strong>g>and</str<strong>on</strong>g> post show discussi<strong>on</strong> was the major activities of the video show.<br />

5.6 CNG drivers’ orientati<strong>on</strong><br />

Basel<strong>in</strong>e f<strong>in</strong>d<strong>in</strong>gs revealed that CNGs are directly <strong>in</strong>volved with more than half of total road<br />

crashes <strong>in</strong> the project locati<strong>on</strong>s. Based <strong>on</strong> this f<strong>in</strong>d<strong>in</strong>gs, project organized orientati<strong>on</strong> for the<br />

CNG drivers. The events <strong>in</strong>cluded display<strong>in</strong>g pictures <str<strong>on</strong>g>and</str<strong>on</strong>g> videos of some crashes <str<strong>on</strong>g>and</str<strong>on</strong>g> near<br />

crashes <str<strong>on</strong>g>and</str<strong>on</strong>g> participatory discussi<strong>on</strong> <strong>on</strong> 10 basic safe less<strong>on</strong>s <strong>on</strong> road safety.<br />

CNG drivers were identified from the drivers’ associati<strong>on</strong>s close to project locati<strong>on</strong>s who were<br />

selected by the secretary of the associati<strong>on</strong>. 120 Drivers were r<str<strong>on</strong>g>and</str<strong>on</strong>g>omly selected from different<br />

four associati<strong>on</strong>s (Nilkuthi, Taluk K<str<strong>on</strong>g>and</str<strong>on</strong>g>i, Baroicha <str<strong>on</strong>g>and</str<strong>on</strong>g> Narayanpur). Current drivers who were<br />

runn<strong>in</strong>g their CNG were participated <strong>in</strong> the orientati<strong>on</strong>. Each group c<strong>on</strong>sisted of 10 members.<br />

The event c<strong>on</strong>ducted <strong>in</strong> two phase. In the first phase, some pictures <str<strong>on</strong>g>and</str<strong>on</strong>g> videos of crashes <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

near crash' were illustrated. Mak<strong>in</strong>g pledge by the drivers for become a safe driver was the topic<br />

of sec<strong>on</strong>d phase.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 33


5.7 <str<strong>on</strong>g>Safe</str<strong>on</strong>g> crosser<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> crossers are <strong>on</strong>e of the effective comp<strong>on</strong>ents of the project. They were help<strong>in</strong>g<br />

vulnerable road users dur<strong>in</strong>g cross<strong>in</strong>g the road. For better road capacity, they were also<br />

resp<strong>on</strong>sible for manag<strong>in</strong>g traffic, close to the cross<strong>in</strong>g.<br />

After completi<strong>on</strong> of <strong>in</strong>terventi<strong>on</strong> <strong>on</strong> road, comprehensive observati<strong>on</strong> directed appo<strong>in</strong>t<strong>in</strong>g<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g> Crossers for better traffic management. They briefed the road users about safe<br />

behaviour <str<strong>on</strong>g>and</str<strong>on</strong>g> proper utilizati<strong>on</strong> of the provided <strong>in</strong>terventi<strong>on</strong>. Twelve members of Ansar<br />

VDP was deployed for this purpose. Four pers<strong>on</strong>s <strong>in</strong> each locati<strong>on</strong> were provid<strong>in</strong>g duty <strong>in</strong><br />

shift basis. Two pers<strong>on</strong>s were <strong>in</strong> each shift where shift divided by day <str<strong>on</strong>g>and</str<strong>on</strong>g> even<strong>in</strong>g. Day shift<br />

started from 6 am to 2 pm <str<strong>on</strong>g>and</str<strong>on</strong>g> even<strong>in</strong>g shift was up to 10 pm from 2 pm.<br />

Major activities of safe crossers are to <strong>in</strong>struct bus drivers for us<strong>in</strong>g the bay, not to park<br />

vehicles <strong>on</strong> road <str<strong>on</strong>g>and</str<strong>on</strong>g> close to cross<strong>in</strong>g, ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g discipl<strong>in</strong>e <strong>on</strong> the <strong>in</strong>tersecti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> help<br />

vulnerable road users to cross the road etc.<br />

5.8 Challenges<br />

Some challenges were be<strong>in</strong>g faced by project pers<strong>on</strong>nel to manage this cost effective awareness<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> educati<strong>on</strong> activities <strong>in</strong> rural sett<strong>in</strong>gs. The challenges are as follows:<br />

Regard<strong>in</strong>g village road safety committee, at <strong>in</strong>itial stage, there was a plan for c<strong>on</strong>duct<strong>in</strong>g<br />

committee meet<strong>in</strong>g twice a m<strong>on</strong>th but it was not possible. Less attend<strong>in</strong>g tendency by the<br />

members, members' bus<strong>in</strong>ess with their own job <str<strong>on</strong>g>and</str<strong>on</strong>g> country's political situati<strong>on</strong> are the ma<strong>in</strong><br />

obstacles <strong>in</strong> this regard.<br />

Regard<strong>in</strong>g sticker attach<strong>in</strong>g, sometimes bus companies were refused to stick the messages<br />

for fear of damag<strong>in</strong>g vehicle colour.<br />

Regard<strong>in</strong>g Leaflet distributi<strong>on</strong>, literacy rate <str<strong>on</strong>g>and</str<strong>on</strong>g> level of educati<strong>on</strong> of the general people<br />

varies. Sometimes uneducated villagers were unwill<strong>in</strong>g to learn <str<strong>on</strong>g>and</str<strong>on</strong>g> project staff managed<br />

them by describ<strong>in</strong>g the messages which was time c<strong>on</strong>sum<strong>in</strong>g.<br />

Regard<strong>in</strong>g school educati<strong>on</strong> program, rout<strong>in</strong>e exam<strong>in</strong>ati<strong>on</strong> <strong>in</strong> the schools, teachers’ assignment<br />

with regular school activities, special holidays <str<strong>on</strong>g>and</str<strong>on</strong>g> country's unrest political situati<strong>on</strong> were<br />

the ma<strong>in</strong> challenges for tra<strong>in</strong><strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> video show.<br />

In CNG orientati<strong>on</strong>, Drivers were busy <strong>on</strong> driv<strong>in</strong>g CNG then attend<strong>in</strong>g the program. Hence,<br />

mak<strong>in</strong>g them c<strong>on</strong>venient with their preferable time <str<strong>on</strong>g>and</str<strong>on</strong>g> locati<strong>on</strong> were challeng<strong>in</strong>g.<br />

Regard<strong>in</strong>g <str<strong>on</strong>g>Safe</str<strong>on</strong>g> Crosser, the major difficulties faced <strong>on</strong> that time were: less resp<strong>on</strong>se <strong>on</strong> <strong>in</strong>structi<strong>on</strong>s<br />

of supervisor, unnecessary quarrel with drivers <str<strong>on</strong>g>and</str<strong>on</strong>g> negligence <strong>on</strong> duty at less supervisi<strong>on</strong>,<br />

unwill<strong>in</strong>gness <strong>on</strong> wear<strong>in</strong>g reflective safety vest; risky road cross<strong>in</strong>g attitudes from newly recruited<br />

pers<strong>on</strong>s etc. were the ma<strong>in</strong> challenges. Moreover, local people were creat<strong>in</strong>g pressures to recruit<br />

themselves as safe crosser were also the menti<strong>on</strong>able challenge from the community.<br />

5.9 C<strong>on</strong>clud<strong>in</strong>g comments<br />

In additi<strong>on</strong> to the eng<strong>in</strong>eer<strong>in</strong>g activities, the program c<strong>on</strong>sisted of educati<strong>on</strong> activities <str<strong>on</strong>g>and</str<strong>on</strong>g> activities<br />

to <strong>in</strong>volve the local community. It has been the comb<strong>in</strong>ati<strong>on</strong> of all three activities that has caused the<br />

success of the program.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 34


Chapter 6:<br />

Project Outcomes<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Project Outcomes<br />

The project has been fruitful <strong>in</strong> reduc<strong>in</strong>g excessive speed of the vehicle to moderate <strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

hence improv<strong>in</strong>g overall crash situati<strong>on</strong>. The follow<strong>in</strong>g secti<strong>on</strong> will highlight the achievements of<br />

the project <strong>in</strong> brief.<br />

6.1 Travel speed<br />

Dur<strong>in</strong>g basel<strong>in</strong>e survey <str<strong>on</strong>g>and</str<strong>on</strong>g> previous crash pattern analysis, it has been proved that <strong>in</strong>ter <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>in</strong>tra district Bus, Car <str<strong>on</strong>g>and</str<strong>on</strong>g> Truck were the ma<strong>in</strong> causes of crash whereas slow <str<strong>on</strong>g>and</str<strong>on</strong>g> vulnerable road<br />

user like pedestrians <str<strong>on</strong>g>and</str<strong>on</strong>g> slow motorized vehicles are the worst victims of these killer vehicles.<br />

Reducti<strong>on</strong> of operat<strong>in</strong>g speed <strong>in</strong> the project areas are illustrated <strong>in</strong> follow<strong>in</strong>g figures 6.1.<br />

Figure 6.1: Cumulative distributi<strong>on</strong>s of speed (km/h) for before <str<strong>on</strong>g>and</str<strong>on</strong>g> af ter<br />

Figure 6.1 Cumulative distributi<strong>on</strong>s of speed (km/h) for the three <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s<br />

before <str<strong>on</strong>g>and</str<strong>on</strong>g> after by type of road user (bus, truck <str<strong>on</strong>g>and</str<strong>on</strong>g> car) - relates to speed measurements<br />

<strong>on</strong> endl<strong>in</strong>e (November 2015)<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 36


The detailed speed difference is be<strong>in</strong>g presented <strong>in</strong> the follow<strong>in</strong>g tables for each locati<strong>on</strong>s <strong>in</strong><br />

Table 6.1, 6.2, 6.3 respectively which are show<strong>in</strong>g good example of speed calm<strong>in</strong>g without<br />

hamper<strong>in</strong>g the major functi<strong>on</strong> of the road<br />

Table 6.1: Nilkuthi: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data<br />

Nilkuthi Basel<strong>in</strong>e <str<strong>on</strong>g>Speed</str<strong>on</strong>g> (km/h) End l<strong>in</strong>e(km/h) Dif ference(km/h)<br />

Bus 68.7 54.6 14.0<br />

Truck 53.8 40.3 13.5<br />

Car 75.3 55.3 20.0<br />

Comb<strong>in</strong>ed 65.9 50.1 15.9<br />

Table 6.2: Namapara: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data<br />

Namapara Basel<strong>in</strong>e speed (km/h) Endl<strong>in</strong>e (km/h) Dif ference (km/h)<br />

Bus 67.3 55.4 12.0<br />

Truck 50.6 40.4 10.2<br />

Car 70.4 55.3 15.1<br />

Comb<strong>in</strong>ed 62.8 50.4 12.4<br />

Table 6.3: Kunderpara: before <str<strong>on</strong>g>and</str<strong>on</strong>g> after speed data<br />

Kunderpara Basel<strong>in</strong>e <str<strong>on</strong>g>Speed</str<strong>on</strong>g> (km/h) End l<strong>in</strong>e(km/h) Dif ference(km/h)<br />

Bus 72.3 58.5 13.7<br />

Truck 53.2 39.3 13.9<br />

Car 75.7 54.6 21.1<br />

Comb<strong>in</strong>ed 67.1 50.8 16.2<br />

It is accepted practice <strong>in</strong> the scientific community to select c<strong>on</strong>trol areas <strong>in</strong> order to correct<br />

for any <strong>in</strong>fluenc<strong>in</strong>g factors that have noth<strong>in</strong>g to do with the road safety program but can<br />

affect the outcome of the study.<br />

Gabtoli Bus st<str<strong>on</strong>g>and</str<strong>on</strong>g>, the c<strong>on</strong>trol locati<strong>on</strong> of Nilkuthi <str<strong>on</strong>g>and</str<strong>on</strong>g> Gashirdia, the c<strong>on</strong>trol locati<strong>on</strong> of<br />

Kunderpara showed nearly same traffic behaviour as before which proved the success of<br />

the <strong>in</strong>terventi<strong>on</strong> <strong>in</strong> reduc<strong>in</strong>g the speed of heavy vehicles <strong>on</strong> the pilot locati<strong>on</strong>s.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 37


Based <strong>on</strong> the reducti<strong>on</strong><br />

<strong>in</strong> speed reducti<strong>on</strong><br />

after c<strong>on</strong>structi<strong>on</strong>, the<br />

estimated reducti<strong>on</strong> <strong>in</strong><br />

fatalities us<strong>in</strong>g Nilss<strong>on</strong>’s<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Elvik’s formula’s<br />

comb<strong>in</strong><strong>in</strong>g two locati<strong>on</strong>s<br />

comb<strong>in</strong>ed, the average<br />

estimated reducti<strong>on</strong><br />

<strong>in</strong> fatalities is 59%<br />

us<strong>in</strong>g Nilss<strong>on</strong>’s formula<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> 60% us<strong>in</strong>g Elvik’s<br />

formula ( Table 6.4 <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Figure 6.2 )<br />

Figure 6.2: Relati<strong>on</strong> of speed with crash reducti<strong>on</strong><br />

Table 6.4: Estimated fatalities reducti<strong>on</strong> us<strong>in</strong>g Nilss<strong>on</strong>’s (1982) <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Elvik’s (2009) formulas<br />

Estimated reducti<strong>on</strong> <strong>in</strong> fatalities Nilss<strong>on</strong>’s formula Elvik’s formula<br />

Nilkuthi 57% 58%<br />

Kunderpara 61% 62%<br />

Average for 2 locati<strong>on</strong>s 59% 60%<br />

6. 2 Crash reducti<strong>on</strong><br />

The Crash data collected <strong>in</strong> all three locati<strong>on</strong>s dur<strong>in</strong>g before c<strong>on</strong>structi<strong>on</strong> period ranges<br />

from June 1st 2013 to December 31st 2014 (19 m<strong>on</strong>ths) <str<strong>on</strong>g>and</str<strong>on</strong>g> the after c<strong>on</strong>structi<strong>on</strong> period<br />

from May 1st 2015 to January 31st 2016 (9 m<strong>on</strong>ths). Table 6.5 shows the total number of<br />

crashes, <strong>in</strong>juries, <str<strong>on</strong>g>and</str<strong>on</strong>g> fatalities <strong>in</strong> the before <str<strong>on</strong>g>and</str<strong>on</strong>g> after periods. The numbers shown are the<br />

comb<strong>in</strong>ed totals for the 3 <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s.<br />

Table 6.5: Number of crashes, <strong>in</strong>juries, <str<strong>on</strong>g>and</str<strong>on</strong>g> fatalities <strong>in</strong> before <str<strong>on</strong>g>and</str<strong>on</strong>g> af ter period<br />

Total for period<br />

(3 locati<strong>on</strong>s comb<strong>in</strong>ed)<br />

Before<br />

(19 m<strong>on</strong>ths)<br />

Af ter<br />

(9 m<strong>on</strong>ths)<br />

Number of crashes 175 28<br />

Number of <strong>in</strong>juries 377 48<br />

Number of fatalities 19 3<br />

Analysis shows the fatalities <strong>in</strong> the before period <strong>in</strong> all three <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s, categorized<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 38


y type of road crash. Pedestrians account for 63% of all <str<strong>on</strong>g>and</str<strong>on</strong>g> motorbikes for 16% where buspedestrian<br />

crashes accounted for relative most fatalities.<br />

S<strong>in</strong>ce the completi<strong>on</strong> of the speed hump, there have been 3 fatalities <strong>in</strong> the <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s<br />

till March 2016. All three fatalities resulted from a bus-passenger crash. In the first fatality<br />

(August 2015), an adult man jumped off a bus that was still driv<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> his clothes got caught<br />

under the wheels of the bus. In the sec<strong>on</strong>d fatality (October 2015), a bus hit young boy who<br />

was cross<strong>in</strong>g the highway. In the third fatality, a bus hit an adult who was cross<strong>in</strong>g the highway<br />

(November 2015).<br />

Figure 6.3 shows the m<strong>on</strong>thly totals for the number of crashes, the number of <strong>in</strong>juries, <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

number of fatalities respectively. We have excluded the numbers for the m<strong>on</strong>ths dur<strong>in</strong>g which the<br />

speed humps were <strong>in</strong>stalled (Jan 2015 – April 2015).<br />

Before-After comparis<strong>on</strong> (all locati<strong>on</strong>s)<br />

C<strong>on</strong>structi<strong>on</strong> period<br />

Figure 6.3: Total number of crashes, <strong>in</strong>juries <str<strong>on</strong>g>and</str<strong>on</strong>g> fatalities per m<strong>on</strong>th before-after<br />

Table 6.6 is represent<strong>in</strong>g the percentage of reducti<strong>on</strong> <strong>in</strong> crash, mortality <str<strong>on</strong>g>and</str<strong>on</strong>g> morbidity<br />

compar<strong>in</strong>g before –after data.<br />

Table 6.6: Crash statistics for the three <strong>in</strong>terventi<strong>on</strong> locati<strong>on</strong>s comb<strong>in</strong>ed<br />

No of crash<br />

per m<strong>on</strong>th<br />

No of people died<br />

per m<strong>on</strong>th<br />

No of people <strong>in</strong>jured<br />

per m<strong>on</strong>th<br />

Before <strong>in</strong>terventi<strong>on</strong>s 9.2 1.0 19.8<br />

After <strong>in</strong>terventi<strong>on</strong>s 3.1 0.3 5.3<br />

Reducti<strong>on</strong> (absolute) 6.1 0.7 14.5<br />

Reducti<strong>on</strong> % 66% 67% 73%<br />

Level of significance p< 0.01 p < 0.10 p < 0.01<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 39


Compar<strong>in</strong>g the average numbers per m<strong>on</strong>th for the before <str<strong>on</strong>g>and</str<strong>on</strong>g> after period. The table<br />

shows an average reducti<strong>on</strong> <strong>in</strong> the number of crashes of 66%, <strong>in</strong> the number of people killed<br />

of 67% <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong> the number of <strong>in</strong>juries of 73%. For pedestrians, comparis<strong>on</strong> between before<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> after period reveals a reducti<strong>on</strong> <strong>in</strong> the average number of crashes of 65% while the<br />

average number of pedestrian <strong>in</strong>juries decl<strong>in</strong>ed by 81%.<br />

6.3 C<strong>on</strong>flict observati<strong>on</strong> (DOCTOR) us<strong>in</strong>g video record<strong>in</strong>gs<br />

Dur<strong>in</strong>g the project, <strong>on</strong>e of the major comp<strong>on</strong>ents was analys<strong>in</strong>g the c<strong>on</strong>flicts (near crash)<br />

through DOCTOR (Dutch objective of c<strong>on</strong>flict technique observati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> research) techniques.<br />

For analys<strong>in</strong>g the traffic behaviour, the DOCTOR method requires a total c<strong>on</strong>flict observati<strong>on</strong><br />

period of 18 hours. For the sampl<strong>in</strong>g of the record<strong>in</strong>g for each locati<strong>on</strong>, 3 days with specific time<br />

block (4.5 hours each <strong>in</strong> Before-After per locati<strong>on</strong>) were selected to analyse the data. As we<br />

analysed these videos it became clear that slight c<strong>on</strong>flicts accord<strong>in</strong>g to the DOCTOR technique<br />

(severity category 1-2) are c<strong>on</strong>sidered as more or less normal behaviour <strong>in</strong> the <strong>Bangladesh</strong><br />

sett<strong>in</strong>g compar<strong>in</strong>g with developed world. Therefore, we decided to focus our analysis <strong>on</strong> the<br />

severe c<strong>on</strong>flicts (severity category 3-5) <strong>on</strong>ly.<br />

In Nilkuthi, 4.5h period analyses revealed that the number of serious c<strong>on</strong>flicts was reduced<br />

from 56 <strong>in</strong> the before period to 38 <strong>in</strong> the after period (Figure 6.4). In additi<strong>on</strong>, this also<br />

<strong>in</strong>dicates a shift to the left <strong>in</strong> c<strong>on</strong>flict severity, imply<strong>in</strong>g that the c<strong>on</strong>flicts <strong>in</strong> the after period are<br />

less severe than <strong>in</strong> the before period with no c<strong>on</strong>flicts of the highest level 5 anymore. C<strong>on</strong>flicts<br />

with severity 5 represented 12.5% of serious c<strong>on</strong>flicts <strong>in</strong> the before period.<br />

In Kunderpara the number of serious c<strong>on</strong>flicts was reduced from 73 to 22 <strong>in</strong> the after period<br />

(Figure 6.4), a larger reducti<strong>on</strong> than <strong>in</strong> Nilkuthi. When we take the road user volumes <strong>in</strong>to<br />

account by the number of c<strong>on</strong>flicts/volume, we see a reducti<strong>on</strong> <strong>in</strong> c<strong>on</strong>flict risks of 67%<br />

(22/5.645 After versus 73/5.724 Before).<br />

<br />

Like <strong>in</strong> Nilkuthi, Figure 6.4 shows a shift to the left <strong>in</strong> c<strong>on</strong>flict severity, imply<strong>in</strong>g that the<br />

c<strong>on</strong>flicts <strong>in</strong> the After period are less severe than <strong>in</strong> the Before period with no c<strong>on</strong>flicts <strong>in</strong> the<br />

most severe category anymore. This effect <strong>in</strong> Kunderpara was also str<strong>on</strong>ger than <strong>in</strong> Nilkuthi.<br />

Severity of c<strong>on</strong>flict<br />

Figure 6.4: Nilkuthi <str<strong>on</strong>g>and</str<strong>on</strong>g> Kunderpara total number of serious c<strong>on</strong>flicts before-after<br />

(per severity)<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 40


Analysis shows that, <strong>in</strong> Nilkuthi, buses represent the largest proporti<strong>on</strong> <strong>in</strong>volvement (34%<br />

Before, 30% After), followed by CNGs <str<strong>on</strong>g>and</str<strong>on</strong>g> cars. Pedestrians are represented <strong>in</strong> 6% <str<strong>on</strong>g>and</str<strong>on</strong>g> 8%<br />

of serious c<strong>on</strong>flicts <strong>in</strong> the before <str<strong>on</strong>g>and</str<strong>on</strong>g> after period, respectively.<br />

Analysis shows that <strong>in</strong> Kunderpara, buses represent the largest proporti<strong>on</strong> <strong>in</strong>volvement <strong>in</strong> the<br />

After period (40.5% versus 25% <strong>in</strong> the Before period), followed by cars/microbuses with around<br />

25%. CNGs have a lower share <strong>in</strong> serious c<strong>on</strong>flicts than <strong>in</strong> Nilkuthi. Pedestrians are represented<br />

<strong>in</strong> 6.5% <str<strong>on</strong>g>and</str<strong>on</strong>g> 12% of the serious c<strong>on</strong>flicts <strong>in</strong> the before <str<strong>on</strong>g>and</str<strong>on</strong>g> after period, respectively.<br />

For the 2 locati<strong>on</strong>s together, the total number of serious c<strong>on</strong>flicts (<strong>on</strong>ly DOCTOR scores 3, 4,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> 5) was significantly reduced from 65 serious c<strong>on</strong>flicts per locati<strong>on</strong> <strong>in</strong> a 4.5 hour period<br />

before to 30 serious c<strong>on</strong>flicts <strong>in</strong> the after period, Besides, no c<strong>on</strong>flicts of the highest severity<br />

category occurred <strong>in</strong> the after period.<br />

Table 6.7: Pedestrian count before-af ter<br />

Before Af ter Dif ference Dif ference (%)<br />

Nilkuthi 1495 1389 -106 -7%<br />

Kunderpara 2238 2372 134 6%<br />

Namapara 1274 1590 316 25%<br />

Total 5007 5351 344 7%<br />

6.4 Traf fic count before <str<strong>on</strong>g>and</str<strong>on</strong>g> af ter<br />

The table below shows the traffic count <strong>in</strong> the before <str<strong>on</strong>g>and</str<strong>on</strong>g> after situati<strong>on</strong> for all types of<br />

traffic, measured over a period of 4.5 hours <strong>in</strong> the daytime. The data for the pedestrian<br />

numbers <strong>in</strong> the 3 locati<strong>on</strong>s is as follows:<br />

Table 6.8: Traf fic count before – af ter (measured over 4.5 hours <strong>in</strong> daytime)<br />

Locati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

vehicle t ype<br />

Nilkuthi<br />

Before (4.5 h) Af ter (4.5 h)<br />

Number Percent Number Percent<br />

Bus 458 7.6 488 8.7 30<br />

Truck 328 5.4 380 6.8 52<br />

Pick up/m<strong>in</strong>i truck 289 4.8 391 7.0 102<br />

Car/Microbus 591 9.8 655 11.7 64<br />

CNG 2257 37.4 1502 26.8 -755<br />

Motorbike 293 4.9 278 5.0 -15<br />

Pickshaw/bicycle 320 5.3 523 9.3 203<br />

Pedestrian 1495 24.8 1389 24.8 -106<br />

Comb<strong>in</strong>ed 6031 100 5606 100 -425<br />

Dif ference<br />

(Number)<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 41


Table 6.8: Traf fic count before – after (measured over 4.5 hours <strong>in</strong> daytime) c<strong>on</strong>td.<br />

Locati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

vehicle t ype<br />

Before (4.5 h) Af ter (4.5 h)<br />

Number Percent Number Percent<br />

Dif ference<br />

(Number)<br />

Kunderpara<br />

Bus 455 7.9 517 9.2 62<br />

Truck 428 7.5 385 6.8 -43<br />

Pick up/m<strong>in</strong>i truck 153 2.7 426 7.5 273<br />

Car/Microbus 713 12.5 727 12.9 14<br />

CNG 798 13.9 490 8.7 -308<br />

Motorbike 294 5.1 349 6.2 55<br />

Pickshaw/bicycle 645 11.3 379 6.7 -266<br />

Pedestrian 2238 39.1 2372 42.0 134<br />

Comb<strong>in</strong>ed 5724 100.0 5645 9.2 -79<br />

Namapara<br />

Bus 523 8.8 539 9.0 16<br />

Truck 423 7.1 391 6.6 -32<br />

Pick up/m<strong>in</strong>i truck 273 4.6 447 7.5 174<br />

Car/Microbus 710 11.9 709 11.9 -1<br />

CNG 2173 35.8 1326 22.2 -811<br />

Motorbike 243 4.1 291 4.9 48<br />

Pickshaw/bicycle 383 6.4 671 11.3 288<br />

Pedestrian 1274 21.4 1590 26.7 316<br />

Comb<strong>in</strong>ed 5966 100 5964 100 -2<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 42


6.5 Hourly variati<strong>on</strong> of crash<br />

After analyz<strong>in</strong>g total crash record, recorded by local record keepers, showed that nearly<br />

86% of crashes happened between 10:00 to 20:00. The plotted crash variati<strong>on</strong> is be<strong>in</strong>g<br />

represented <strong>in</strong> figure 6.5.<br />

Percent of crashes by hour<br />

Figure 6.5: Hourly variati<strong>on</strong> of crashes<br />

6.6 Benefit cost ratio of the project<br />

Estimated social ec<strong>on</strong>omic return at 6000% for this project which is tremendous. The<br />

total benefit of the project is <strong>in</strong> the order of Taka 780 Milli<strong>on</strong> due to avoided health cost,<br />

c<strong>on</strong>gesti<strong>on</strong>, damage, producti<strong>on</strong> loss etc. Measured <strong>in</strong> another way, the ‘cost per DALY<br />

saved’ is below USD 100 which is also highly cos-effective.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 43


Chapter 7:<br />

C<strong>on</strong>clusi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Recommendati<strong>on</strong>s<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


C<strong>on</strong>clusi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Recommendati<strong>on</strong>s<br />

The <strong>in</strong>tegrated program of speed reduc<strong>in</strong>g measures <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> (<strong>N2</strong>) highway that<br />

passes through villages, comb<strong>in</strong>ed with active community <strong>in</strong>volvement <str<strong>on</strong>g>and</str<strong>on</strong>g> road user educati<strong>on</strong><br />

has shown a reducti<strong>on</strong> <strong>in</strong> travell<strong>in</strong>g speeds <strong>in</strong> the villages <str<strong>on</strong>g>and</str<strong>on</strong>g> as a result a reducti<strong>on</strong> <strong>in</strong> road<br />

traffic fatalities <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>juries of at least 60%. The result is prov<strong>in</strong>g the effectiveness of the<br />

program. An additi<strong>on</strong>al advantage of the <strong>in</strong>tegrated speed management program is that it<br />

can be implemented relatively quickly (<strong>in</strong> 6 to 12 m<strong>on</strong>ths) <str<strong>on</strong>g>and</str<strong>on</strong>g> that the cost-effectiveness is<br />

very high. Analysis suggests that a ‘cost per DALY saved’ of below USD 100.<br />

Active <str<strong>on</strong>g>and</str<strong>on</strong>g> prompt support of RHD <strong>in</strong> all aspect of project activity is highly appreciated.<br />

Efficient participati<strong>on</strong> of local community <str<strong>on</strong>g>and</str<strong>on</strong>g> government agencies has made the project<br />

a perfect example of local ownership <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>volvement, which paved the implementati<strong>on</strong> <strong>in</strong><br />

various aspect.<br />

Dur<strong>in</strong>g the project, a perfect dem<strong>on</strong>strati<strong>on</strong> of c<strong>on</strong>structi<strong>on</strong> safety had been showed as there<br />

is no s<strong>in</strong>gle crash or <strong>in</strong>jury all al<strong>on</strong>g the work<strong>in</strong>g days, which is highly appreciated by all. The<br />

str<strong>on</strong>g commitment of the c<strong>on</strong>tractor to safety greatly c<strong>on</strong>tributed <strong>in</strong> this aspect. Moreover,<br />

the project <strong>in</strong>troduces some new <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>novative low cost <strong>in</strong>terventi<strong>on</strong> such as village road<br />

safety committee, crash record keep<strong>in</strong>g at relatively faster <str<strong>on</strong>g>and</str<strong>on</strong>g> accurately, placement of<br />

road sign with better visibility, safe crosser <strong>on</strong> the highway etc.<br />

The project can be implemented <strong>in</strong> much more risky locati<strong>on</strong>s al<strong>on</strong>g the highway, even <strong>in</strong> the<br />

urban areas. Active <str<strong>on</strong>g>and</str<strong>on</strong>g> jo<strong>in</strong>t effort of the respective government agencies can make the<br />

highway much safer to reduce the death <strong>in</strong> road by 50% with<strong>in</strong> 2020. We highly recommend<br />

the Government of <strong>Bangladesh</strong> to replicate this speed management project across the country.<br />

This can be d<strong>on</strong>e both <strong>on</strong> exist<strong>in</strong>g highways <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>cluded <strong>in</strong> the design of new highways. This<br />

project has clearly dem<strong>on</strong>strated that <strong>in</strong>vest<strong>in</strong>g <strong>in</strong> road safety results <strong>in</strong> social, health <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

ec<strong>on</strong>omic benefits for the country.<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 45


Chapter 8<br />

References<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


References<br />

Vet, J. Thierry, M. C. Horst, A. R. A. V.D, Rahman, A.K.M. F. (2016). Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty <strong>in</strong> Five<br />

C<strong>on</strong>t<strong>in</strong>ent: The first <strong>in</strong>tegrated speed management program benefit<strong>in</strong>g VRUs <strong>in</strong> <strong>Bangladesh</strong>:<br />

Results <str<strong>on</strong>g>and</str<strong>on</strong>g> implicati<strong>on</strong>s for LMI; Rio de Jenerio, Brazil (May 18, 2016)<br />

Afukaar, F.G. (2008). Evaluat<strong>in</strong>g Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Interventi<strong>on</strong>s: The Case of Ghana. Symposium<br />

<strong>on</strong> Evaluat<strong>in</strong>g Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Interventi<strong>on</strong>s for Health Outcomes (May7-8, 2008). RTIRN<br />

Bunn F, Collier T, Frost C, Ker K, Ste<strong>in</strong>bach R, Roberts I, Wentz R; Published Onl<strong>in</strong>e: October<br />

7, 2009, Cochrane Review<br />

Elvik, R. (2009). The Power Model of the relati<strong>on</strong>ship between speed <str<strong>on</strong>g>and</str<strong>on</strong>g> road safety: update<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> new analyses. TØI Report 1034/2009. Institute of Transport Ec<strong>on</strong>omics TØI, Oslo.<br />

Hoque, Md M. (2013). Pedestrian <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty: The <strong>Bangladesh</strong> C<strong>on</strong>text. Workshop <strong>on</strong> Effective<br />

Eng<strong>in</strong>eer<strong>in</strong>g Treatment to improve Pedestrian <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty. April 2-4 2013. GRSP/iRAP<br />

Horst, A.R.A. van der (2013). Manual C<strong>on</strong>flict Observati<strong>on</strong> Technique DOCTOR (Dutch<br />

Objective C<strong>on</strong>flict Technique for Operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research. (Report RSFA 13-001). Voorburg:<br />

Foundati<strong>on</strong> Road <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty for All. (English translati<strong>on</strong> of Kraay, van der Horst & Oppe, 1986).<br />

Hyden, C., Svenss<strong>on</strong>, A. (2009). Traffic Calm<strong>in</strong>g <strong>in</strong> India Report <strong>on</strong> the theory of Traffic<br />

Calm<strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> empirical trials <strong>in</strong> the city of Jaipur. Lund Institute of Technology<br />

Kraay, J.H., Horst, A.R.A. van der, Oppe, S. (1986). H<str<strong>on</strong>g>and</str<strong>on</strong>g>leid<strong>in</strong>g C<strong>on</strong>flictobservatietechniek<br />

DOCTOR (Rapport IZF 1986 C-6). Leidschendam: SWOV; Soesterberg: TNO.<br />

Nantulya, V.M., Reich, M.R. (2003). Equity dimensi<strong>on</strong>s of road traffic <strong>in</strong>juries <strong>in</strong> low- <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

middle- <strong>in</strong>come countries. Injury C<strong>on</strong>trol <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty Promoti<strong>on</strong>. Vol 10. No 1-2. Pp13-20<br />

Nilss<strong>on</strong>, G. (1982). The effects of speed limits <strong>on</strong> traffic accidents <strong>in</strong> Sweden. In: Proceed<strong>in</strong>gs<br />

of the <strong>in</strong>ternati<strong>on</strong>al symposium <strong>on</strong> the effects of speed limits <strong>on</strong> traffic accidents <str<strong>on</strong>g>and</str<strong>on</strong>g> transport<br />

energy use, 6-8 October 1981, Dubl<strong>in</strong>. OECD, Paris, p. 1-8.82<br />

Perel, P., Ker, K., Ivers, R., & Blackhall, K. (2007). Road safety <strong>in</strong> low- <str<strong>on</strong>g>and</str<strong>on</strong>g> middle-<strong>in</strong>come<br />

countries: A neglected research area. Injury Preventi<strong>on</strong>, 13(4), 227. doi:10.1136/<br />

ip.2007.016527<br />

Rosén, E., Stigs<strong>on</strong>, H. & S<str<strong>on</strong>g>and</str<strong>on</strong>g>er, U. (2011). Literature review of pedestrian fatality risk as<br />

a functi<strong>on</strong> of car impact speed. In: Accident Analysis <str<strong>on</strong>g>and</str<strong>on</strong>g> Preventi<strong>on</strong>, vol. 43, nr. 1, 25-33.<br />

WHO (2013). Global status report <strong>on</strong> road safety 2013: support<strong>in</strong>g a decade of acti<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 47


Annexure A:<br />

Gallery<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Project meet<strong>in</strong>g<br />

Rout<strong>in</strong>e meet<strong>in</strong>gs with m<strong>in</strong>istry, advisory board <str<strong>on</strong>g>and</str<strong>on</strong>g> other stakeholders were held<br />

dur<strong>in</strong>g the project with the participants from <strong>Bangladesh</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> abroad<br />

Policy meet<strong>in</strong>g <strong>in</strong> m<strong>in</strong>istry<br />

Project presentati<strong>on</strong> <strong>in</strong> secretariat<br />

Rout<strong>in</strong>e advisory meet<strong>in</strong>g<br />

Meet<strong>in</strong>g with partners <str<strong>on</strong>g>and</str<strong>on</strong>g> stakeholder<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 49


Partnership buildup<br />

Prior to the start of the project partners were selected for a successful implementati<strong>on</strong><br />

Design discussi<strong>on</strong> withTechnical Service W<strong>in</strong>g, RHD<br />

MoU between CIPRB <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g>s<br />

C<strong>on</strong>tract sign<strong>in</strong>g with c<strong>on</strong>tractor<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 50


Active participati<strong>on</strong> by RHD<br />

Roads <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Highway</strong>s Department was actively <strong>in</strong>volved <strong>in</strong> all project activities from the<br />

plann<strong>in</strong>g to the implementati<strong>on</strong> <strong>in</strong>clud<strong>in</strong>g Design, C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluati<strong>on</strong> phase.<br />

Project <strong>in</strong>augurati<strong>on</strong> by Chief Eng<strong>in</strong>eer, RHD<br />

On site design explanati<strong>on</strong><br />

C<strong>on</strong>structi<strong>on</strong> supervisi<strong>on</strong><br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 51


C<strong>on</strong>structi<strong>on</strong> safet y<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty of both road users <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> workers was a ma<strong>in</strong> focus dur<strong>in</strong>g c<strong>on</strong>structi<strong>on</strong>.<br />

<str<strong>on</strong>g>Safe</str<strong>on</strong>g>ty workshops <str<strong>on</strong>g>and</str<strong>on</strong>g> daily safety drills were held before <str<strong>on</strong>g>and</str<strong>on</strong>g> dur<strong>in</strong>g the project<br />

Rout<strong>in</strong>e safety brief<br />

Workshop <strong>on</strong> c<strong>on</strong>structi<strong>on</strong> safety<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 52


Bus bay c<strong>on</strong>structi<strong>on</strong><br />

Bus bays were <strong>in</strong>stalled to ensure better visibility <str<strong>on</strong>g>and</str<strong>on</strong>g> reduce overtak<strong>in</strong>g at the selected cross<strong>in</strong>gs.<br />

Palacid<strong>in</strong>g work<br />

Excavati<strong>on</strong> <strong>on</strong> site<br />

Lay<strong>in</strong>g asphalt of base layer<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 53


Install<strong>in</strong>g speed management devices<br />

Rumble strips <str<strong>on</strong>g>and</str<strong>on</strong>g> speed humps were <strong>in</strong>stalled as speed management devices whereas rumble<br />

strip form a warn<strong>in</strong>g for the drivers <str<strong>on</strong>g>and</str<strong>on</strong>g> speed humps reduce the speed of these drivers.<br />

Mark<strong>in</strong>g rumble strip<br />

Install<strong>in</strong>g rumble strip<br />

Install<strong>in</strong>g speed hump<br />

Seal<strong>in</strong>g speed hump<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 54


Install<strong>in</strong>g road sign <str<strong>on</strong>g>and</str<strong>on</strong>g> mark<strong>in</strong>gs<br />

To make the project visible at both day <str<strong>on</strong>g>and</str<strong>on</strong>g> night , retro-reflective road signs <str<strong>on</strong>g>and</str<strong>on</strong>g> mark<strong>in</strong>gs<br />

were <strong>in</strong>stalled.<br />

Install<strong>in</strong>g attenti<strong>on</strong> l<strong>in</strong>e<br />

Retro-reflective signs<br />

Install<strong>in</strong>g hump mark<strong>in</strong>gs<br />

Zebra cross<strong>in</strong>gs<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 55


Active communit y <strong>in</strong>volvement<br />

The local communities were actively <strong>in</strong>volved <strong>in</strong> the project through village road safety<br />

committees, road safety tra<strong>in</strong><strong>in</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> various social events <strong>in</strong> the project locati<strong>on</strong>s.<br />

ToT for SCPT<br />

Celebrati<strong>on</strong> of UN road safety week<br />

Rout<strong>in</strong>e RSC meet<strong>in</strong>g<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 56


Awareness <str<strong>on</strong>g>and</str<strong>on</strong>g> educati<strong>on</strong> program<br />

Road safety tra<strong>in</strong><strong>in</strong>g was provided to school children, CNG drivers <str<strong>on</strong>g>and</str<strong>on</strong>g> local road users.<br />

Class room video show<br />

Illustrat<strong>in</strong>g leaflet messages<br />

Real time road side tra<strong>in</strong><strong>in</strong>g<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 57


Project presentati<strong>on</strong><br />

The Project f<strong>in</strong>d<strong>in</strong>gs have been presented <strong>in</strong> various prestigious <strong>in</strong>ternati<strong>on</strong>al events <strong>in</strong> the<br />

Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, Brazil, Ch<strong>in</strong>a <str<strong>on</strong>g>and</str<strong>on</strong>g> the Philipp<strong>in</strong>es. It has also been presented <strong>in</strong> RHD technical<br />

services w<strong>in</strong>gs.<br />

Presentati<strong>on</strong> <strong>in</strong> Beij<strong>in</strong>g, Ch<strong>in</strong>a<br />

Presentati<strong>on</strong> <strong>in</strong> Rio-de-Jenerio, Brazil<br />

Presentati<strong>on</strong> <strong>in</strong> Delft, the Netherl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Presentati<strong>on</strong> <strong>in</strong> ADB head quarter, Manila, Philipp<strong>in</strong>es<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 58


Extensive media coverage<br />

The project has been featured <strong>in</strong> various nati<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>in</strong>ternati<strong>on</strong>al media, <strong>in</strong>clud<strong>in</strong>g The<br />

Guardian (UK) <str<strong>on</strong>g>and</str<strong>on</strong>g> BBC Bangla.<br />

ATN Bangla <strong>on</strong> 10 May 2015<br />

<strong>Dhaka</strong> Tribune <strong>on</strong> 15 May 2016<br />

Nars<strong>in</strong>gdir bani <strong>on</strong> 14 May 2015<br />

BBC Bangla <strong>on</strong> 06 August 2015<br />

Theguardian, UK <strong>on</strong> 23 September 2016<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 59


Annexure B:<br />

ACE Tables<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong>


Annexure- B: ACE Tables<br />

Table- Annex B1: Status of road safet y committee meet<strong>in</strong>gs<br />

Activities<br />

Project locati<strong>on</strong>s<br />

Nilkuthi Namapara Kunderpara<br />

Number of meet<strong>in</strong>gs c<strong>on</strong>ducted 11 10 10<br />

Average participants 8 10 8<br />

Table- Annex B2: Details of sticker stitch<strong>in</strong>g<br />

Sl no.<br />

Name of Bus company<br />

Number of sticker<br />

stitch<strong>in</strong>g (1st phase)<br />

Number of<br />

sticker stitch<strong>in</strong>g<br />

(2nd phase)<br />

Total<br />

Distributi<strong>on</strong><br />

(Cumulative)<br />

01 ENA Transport 0 20 20<br />

02 UNIQUE 0 7 7<br />

03 Hanif 7 0 7<br />

04 Shohag 3 6 9<br />

05 Shyamoli 11 1 12<br />

06 Tisha Group 7 9 16<br />

07 Royal Coach 5 14 19<br />

08 Al- Mubaraka 8 0 8<br />

09 Diganta 5 1 6<br />

10 Mitali 5 7 12<br />

11 Bismillah 4 1 5<br />

12 Green L<strong>in</strong>e 0 6 6<br />

13 Agradut 11 1 12<br />

14 Mamun 13 2 15<br />

15 BRTC 10 8 18<br />

16 Badsha 22 11 33<br />

17 Chalanbil 15 8 23<br />

18 Ananna 14 9 23<br />

19 Akota 3 0 3<br />

20 Jatayat 10 5 15<br />

21 Hour Express 10 2 12<br />

22 Taj 4 2 6<br />

23 Uttara 14 7 21<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 61


Table- Annex B2: Details of sticker stitch<strong>in</strong>g (C<strong>on</strong>td..)<br />

Sl no.<br />

Name of Bus company<br />

Number of sticker<br />

stitch<strong>in</strong>g (1st phase)<br />

Number of<br />

sticker stitch<strong>in</strong>g<br />

(2nd phase)<br />

Total<br />

Distributi<strong>on</strong><br />

(Cumulative)<br />

24 Kajol Poribahan 6 1 7<br />

25 Ishakha 9 15 24<br />

26 Meghaloy 7 4 11<br />

27 Jamuna 2 0 2<br />

28 NP Paribahan 3 2 5<br />

29 Ahmed Paribahan 2 0 2<br />

30 Others 39 11 50<br />

Total 249 160 409<br />

Table- Annex B3: Details of leaflet distributi<strong>on</strong><br />

Project locati<strong>on</strong> Distributi<strong>on</strong> date Number of leaflet distributed<br />

21-Mar-15 500<br />

Nilkuthi<br />

22-Mar-15 500<br />

23-Mar-15 500<br />

24-Mar-15 500<br />

31-Mar-15 500<br />

Namapara<br />

1-Apr-15 500<br />

2-Apr-15 500<br />

9-Apr-15 300<br />

10-Apr-15 400<br />

Kunderpara<br />

12-Apr-15 500<br />

13-Apr-15 500<br />

15-Apr-15 300<br />

Total 5000<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 62


Table- Annex B4: Status of <str<strong>on</strong>g>Safe</str<strong>on</strong>g> Child Pedestrian Tra<strong>in</strong><strong>in</strong>g (SCPT)<br />

Activities<br />

Name of schools<br />

Razu<br />

School<br />

Mamdabad<br />

School<br />

Mach<strong>in</strong>eghar<br />

School<br />

Kunderpara<br />

School<br />

Total<br />

Number of eligible students 27 43 49 62 181<br />

Number of students<br />

completed tra<strong>in</strong><strong>in</strong>g<br />

00 36 32 48 116<br />

% achievement 0 83.7 65.3 77.4 64.1<br />

Table- Annex B5: Status of video show<br />

Show<br />

no<br />

School name<br />

C<strong>on</strong>ducti<strong>on</strong><br />

date<br />

Grade<br />

(Secti<strong>on</strong>)<br />

# of<br />

Participants<br />

# of<br />

student<br />

given test<br />

1 Raju School 02 April VI - (A) 80 12<br />

2 Raju School 04 April VI - (B) 73 12<br />

3 Raju School 06 April VI - (C & D) 108 21<br />

4 Raju School 07 April VII - (A) 102 14<br />

5 Raju School 08 April VII - (B) 95 14<br />

6 Raju School 09 April VII - (C) 80 12<br />

7 Raju School 19 April VIII - (A) 71 12<br />

8 Raju School 20 April VIII - (B) 57 11<br />

9 Raju School 22 April VIII - (C) 40 08<br />

11 Fulkoli KG 23 April IV & V 22 04<br />

12 Medhashiri KG 06 May IV & V 19 04<br />

13 Mamdabad School 30 May IV 35 06<br />

14 Mamdabad School 10 May V 33 06<br />

15 Mach<strong>in</strong>eghar School 09 May V 55 10<br />

16 Mach<strong>in</strong>eghar School 14 May IV 54 08<br />

17 Kunderpara School 19 May IV 35 05<br />

18 Kunderpara School 19 May V 42 06<br />

19 Matrichhya KG 31 May IV & V 27 06<br />

Total 1028 171<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 63


Table- Annex B6: Status of CNG driver orientati<strong>on</strong><br />

Locati<strong>on</strong> Date Batch no<br />

Number of<br />

participants/batch<br />

Number of participants<br />

(Cumulative)<br />

12-May 1 11 11<br />

Nilkuthi<br />

11-Jun 2 10 21<br />

11-Jun 3 10 31<br />

14-Jun 4 10 41<br />

1 10 51<br />

Taluk K<str<strong>on</strong>g>and</str<strong>on</strong>g>i<br />

15-Jun<br />

2 11 62<br />

3 11 73<br />

1 10 83<br />

Baroicha<br />

16-Jun<br />

2 10 93<br />

3 10 103<br />

Narayanpur<br />

17-Jun<br />

1 10 113<br />

2 10 123<br />

Table- Annex B7: Status of safe crosser activit y<br />

Activities<br />

Number of safe crosser<br />

<strong>in</strong> Phase-I<br />

Number of safe crosser<br />

<strong>in</strong> phase-II<br />

Name of locati<strong>on</strong><br />

Nilkuthi Namapara Kunderpara<br />

2 0 0<br />

4 4 4<br />

Period of duty 01 Jun - 30 Nov 01 Jul - 30 Nov 01 Jul - 30 Nov<br />

Report <strong>on</strong> <str<strong>on</strong>g>Speed</str<strong>on</strong>g> <str<strong>on</strong>g>Management</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>Safe</str<strong>on</strong>g> <str<strong>on</strong>g>Cross<strong>in</strong>g</str<strong>on</strong>g> <strong>on</strong> <strong>Dhaka</strong>-<strong>Sylhet</strong> <strong>Highway</strong> (<strong>N2</strong>) <strong>in</strong> <strong>Bangladesh</strong> 64


“A pilot scheme <strong>in</strong>troduc<strong>in</strong>g speed bumps <str<strong>on</strong>g>and</str<strong>on</strong>g> other basic safety measures to the <strong>Dhaka</strong>-<br />

<strong>Sylhet</strong> <strong>N2</strong> highway has shown how simple <strong>in</strong>frastructure can save lives" theguardian<br />

Published <strong>on</strong> 23 September 2016”<br />

“This project is different from all the road safety work we have d<strong>on</strong>e before because<br />

we worked very actively with local communities who are affected by the <strong>N2</strong>”<br />

Prof. Dr. Md. Mazharul Hoque, BUET, Published <strong>on</strong> theguardian, UK <strong>on</strong> 23 September 2016<br />

“From tra<strong>in</strong><strong>in</strong>g, we have been taught how to cross safely <str<strong>on</strong>g>and</str<strong>on</strong>g> we are feel<strong>in</strong>g safer now than<br />

before” Faria Islam, Student, Class III, Kunderpara school<br />

r e s e a r c h c e n t r e<br />

Centre for Injury Preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research, <strong>Bangladesh</strong><br />

House- B/162, Lane- 23, New DOHS, Mohakhali, <strong>Dhaka</strong>-1206<br />

Ph<strong>on</strong>e: +880-2-58814988, Fax: +880-2-58814964<br />