25.08.2016 Views

B&W Company Profile

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COMPANY<br />

PROFILE


2<br />

COMPANY PROFILE<br />

CONTENTS<br />

3 WHO WE ARE<br />

4 WHAT WE OFFER<br />

5 OUR UNIQUE BUSINESS MODEL<br />

NAVIGATING<br />

THIS DOCUMENT<br />

You can navigate to a section<br />

by clicking on the title in the<br />

contents list below. To return<br />

to this contents page click the<br />

green title box at the top of any<br />

section page.<br />

B&W’S ETHOS<br />

IS SIMPLE:<br />

QUICK DELIVERY<br />

OF PREMIUM MEP<br />

SERVICES BY<br />

EXPERIENCED<br />

& TALENTED<br />

ENGINEERS.<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

13<br />

15<br />

16<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

INDUSTRY RECOGNITION - LEADERS IN OUR FIELD<br />

RANGE OF SERVICES<br />

ACHIEVING SUSTAINABILITY THROUGH DESIGN<br />

BUILDING INFORMATION MODELLING (BIM)<br />

DESIGN TOOLS WE USE<br />

KEY PROJECTS: HOTELS<br />

KEY PROJECTS: HIGH RISE<br />

KEY PROJECTS: FIT-OUTS<br />

KEY PROJECTS: RETAIL<br />

KEY PROJECTS: TECHNOLOGY<br />

KEY PROJECTS: COMMERCIAL<br />

KEY PROJECTS: HEALTHCARE<br />

KEY PROJECTS: AIRPORT FACILITIES<br />

KEY PROJECTS: INFRASTRUCTURE & MASTERPLANNING<br />

KEY PROJECTS: LEISURE<br />

CONTACT US


3<br />

COMPANY PROFILE<br />

WHO WE ARE<br />

BLACK & WHITE<br />

ENGINEERING (B&W)<br />

IS A MULTI-AWARD<br />

WINNING GLOBAL MEP<br />

DESIGN CONSULTANCY<br />

We have been providing comprehensive Mechanical,<br />

Electrical and Plumbing (MEP) engineering<br />

consultancy services since 2007. We re-branded as<br />

Black & White in 2014 in recognition of our growth and<br />

maturity.<br />

B&W has a global presence that allows us internally<br />

to draw upon a widespread resource base and react<br />

to project demands with ownership retained by the<br />

designated delivery team. Our approach to projects is<br />

to develop accurate concept designs that determine<br />

the course of subsequent stages for efficient design<br />

management.<br />

B&W’s engineering expertise reaches across all<br />

sectors of the construction industry, providing<br />

pragmatic and practical design solutions to ensure our<br />

projects are spatially and operationally efficient.<br />

Our team of highly qualified engineers have a wealth<br />

of knowledge and experience that has been acclaimed<br />

by peers within the industry on numerous occasions.<br />

B&W are the go-to consultancy of choice for many<br />

leading developers, contractors and operators who<br />

require the reassurance of a second opinion on the<br />

design solutions of others, a clear testament of faith in<br />

our ability that is second to none.<br />

B&W are frequently called in by clients to resolve<br />

operational issues related to their businesses, caused<br />

through the actions of others, that may result in<br />

commercial and reputational losses. We understand<br />

our clients businesses and engineer our designs to<br />

meet operational needs.


4<br />

COMPANY PROFILE<br />

WHAT WE OFFER<br />

The B&W commitment to provide an<br />

unrivalled level of engineering and service<br />

excellence is supported by our capability<br />

across a wide range of sectors and is<br />

demonstrated by the excellence and<br />

innovation of our client-focused design.<br />

WE PROVIDE SMART DESIGN<br />

SOLUTIONS FOR:<br />

HVAC<br />

Plumbing<br />

Drainage<br />

Fire protection systems<br />

Power distribution<br />

Lighting and lighting control<br />

Audio visual systems<br />

Information and communication<br />

technology systems<br />

Vertical transport<br />

Intelligent buildings<br />

Infrastructure<br />

THE B&W ADVANTAGE<br />

Structured design approach<br />

Early load analysis, system definitions<br />

and MEP space planning<br />

Focus on non-complex solutions<br />

Coordinated design<br />

BIM expertise.<br />

Fast response<br />

Flexible approach<br />

Global locations and resource<br />

Experience in specialist sectors across<br />

the globe<br />

Global understanding of local<br />

requirements<br />

Adaptability to different rules and<br />

regulations<br />

Willingness to travel<br />

Clear, concise, checked documentation<br />

OUR DESIGNS<br />

We deliver fresh and innovative<br />

designs which are:<br />

Practical<br />

Buildable<br />

Commissionable<br />

Operable<br />

Maintainable<br />

Sustainable<br />

OUR KEY SECTORS<br />

Hospitality<br />

Retail<br />

Commercial<br />

Technology<br />

Healthcare<br />

Airports<br />

Fit-out<br />

Infrastructure<br />

INTERNATIONAL PROJECTS<br />

We have a large international<br />

presence, from UK to Australia and<br />

international project experience in:<br />

UAE<br />

Azerbaijan<br />

Ethiopia<br />

Sudan<br />

KSA<br />

Qatar<br />

Oman<br />

Bahrain<br />

India<br />

Lebanon<br />

Syria<br />

CLIENTS<br />

RECEIVE<br />

A LEVEL OF<br />

ENGINEERING<br />

AND SERVICE<br />

EXCELLENCE<br />

UNSURPASSED<br />

IN THE<br />

INDUSTRY.


5<br />

COMPANY PROFILE<br />

OUR UNIQUE BUSINESS MODEL<br />

MAKING THE MOST OF<br />

OUR EXPERTISE<br />

THE BENEFITS OF<br />

BEING ONE TEAM<br />

Sector experts brings sector-specific<br />

insights and best solutions to projects.<br />

Best skills on all design decisions.<br />

Co-ordinated project set up for greater<br />

efficiency.<br />

NEWCASTLE<br />

LONDON<br />

(Opening soon)<br />

Our business model is designed<br />

to commit all our available<br />

engineering expertise to client<br />

projects. This includes our<br />

directors who are able to devote<br />

their time to the needs of clients,<br />

away from the shackles of general<br />

management. It also allows our<br />

senior engineers to do what they<br />

do best: produce distinctive and<br />

innovative designs that maintain<br />

B&W as an industry leader.<br />

OF TIME DEVOTED<br />

TO PROJECTS<br />

ALL DIRECTORS<br />

AND SENIOR<br />

MANAGEMENT<br />

DEVOTE MOST<br />

OF THEIR TIME<br />

TO CLIENTS/<br />

PROJECTS.<br />

Workshops allow engineers with greatest<br />

experience in project type to input their<br />

knowledge prior to commencement.<br />

THE BENEFITS OF<br />

BEING GLOBAL<br />

Collaborative global working.<br />

B&W is based in the United Kingdom,<br />

the Middle East, Asia and Australia. This<br />

allows regional offices to draw on global<br />

strategies and international personnel.<br />

BAKU<br />

UK & EUROPE<br />

MIDDLE EAST<br />

ASIA PACIFIC<br />

EXPERT<br />

PERSONNEL<br />

ONLY SENIOR<br />

PERSONNEL AND<br />

HIGH FLYING<br />

GRADUATES<br />

EMPLOYED AND<br />

NO CONTRACT<br />

STAFF.<br />

Undertakes client / project management<br />

and concept / scheme design.<br />

DUBAI<br />

MANILA<br />

Global Design Centre team undertakes<br />

production management and detail<br />

design/CAD with uninterrupted focus.<br />

Highly focused in-house team working<br />

together since 2003 enables effective<br />

teamwork.<br />

We have developed systems to plan and<br />

implement cross-border construction<br />

process.<br />

We take time to understand the key<br />

drivers of our partners and other<br />

members of the team on international<br />

projects.<br />

ABU DHABI<br />

AUSTRALIA<br />

PERTH<br />

WORKING DAY<br />

GLOBAL DESIGN<br />

OFFICE PROVIDES<br />

A LONGER<br />

WORKING DAY<br />

TO DELIVER<br />

PROJECTS MORE<br />

QUICKLY.


6<br />

COMPANY PROFILE<br />

INDUSTRY RECOGNITION - LEADERS IN OUR FIELD<br />

Winner: Young Engineer of the Year;<br />

MEP Middle East Awards 2015<br />

Winner: Electrical Engineer of the Year;<br />

MEP Middle East Awards 2014<br />

Commendation: Mechanical<br />

Engineer of the Year;<br />

MEP Middle East Awards 2014<br />

Commendation: Mechanical<br />

Project of the Year;<br />

Dubai Marina Gate<br />

MEP Middle East Awards 2014<br />

Winner: MEP Innovation of the Year;<br />

Seawater Cooling Technology<br />

MEP Middle East Awards 2013<br />

Winner: Engineer of the Year<br />

MEP Middle East Awards 2013<br />

Winner: Specialist MEP<br />

Consultancy of the Year<br />

MEP Middle East Awards 2012<br />

Winner: Engineer of the Year<br />

MEP Middle East Awards 2011<br />

Winner: Innovation of the Year;<br />

Bioclimatic Design for Hotels<br />

MEP Middle East Awards 2011<br />

Winner: Innovation of the Year;<br />

Bladeroom Data Centre<br />

MEP Middle East Awards 2010<br />

Winner: Engineer of the Year<br />

MEP Middle East Awards 2010<br />

Winner: MEP Project of the Year;<br />

Yas Hotel<br />

MEP Middle East Awards 2009<br />

Finalist: Consultancy of the Year;<br />

Black & White Engineering<br />

MEP Middle East 2015<br />

Finalist: MEP Executive of the Year<br />

MEP Middle East 2015<br />

Finalist: Electrical Engineer of the Year<br />

MEP Middle East 2015<br />

Finalist: Mechanical Engineer of the Year<br />

MEP Middle East 2015<br />

Finalist: Plumbing Engineer of the Year<br />

MEP Middle East 2015<br />

Finalist: Project Manager of the Year<br />

MEP Middle East 2015<br />

Finalist: Mechanical Project of the Year;<br />

Residences at Marina Gate II,<br />

Dubai Marina (North Gate)<br />

MEP Middle East 2015<br />

Finalist: Retrofit Project of the Year;<br />

MEP Services for the expansion of<br />

Dubai Festival City<br />

MEP Middle East 2015<br />

Finalist: Sustainable Project of the Year;<br />

Seawater Heat Rejection for Coastal Retail<br />

Development<br />

MEP Middle East 2015<br />

Finalist: Engineer of the Year<br />

MEP Middle East 2013<br />

Finalist: Project Manager of the Year<br />

MEP Middle East 2013<br />

Finalist: Project Manager of the Year<br />

MEP Middle East 2013<br />

Finalist: Young Engineer of the Year<br />

MEP Middle East Awards 2013<br />

Finalist: Young Engineer of the Year<br />

MEP Middle East Awards 2013<br />

Finalist: Young Engineer of the Year<br />

MEP Middle East Awards 2012<br />

Finalist: Engineer of the Year<br />

MEP Middle East Awards 2012<br />

Finalist; Engineer of the Year<br />

MEP Middle East Awards 2012<br />

Finalist; Project Manager of the Year<br />

MEP Middle East Awards 2012<br />

Finalist: Project Manager of the Year<br />

MEP Middle East Awards 2012<br />

Finalist: Consultant of the Year<br />

MEP Middle East Awards 2013<br />

Finalist: Specialist MEP<br />

Consultant of the Year<br />

MEP Middle East 2013


7<br />

COMPANY PROFILE<br />

RANGE OF SERVICES<br />

OUR RANGE OF SERVICES<br />

Expert advice<br />

Asset surveys and condition reports<br />

Peer review / desktop studies<br />

Due diligence reports<br />

Trouble shooting surveys and<br />

Investigations<br />

Energy audits and EPC’s<br />

Employers’ agents/ technical<br />

representatives and monitoring duties<br />

Expert witness<br />

Technical author for employers<br />

requirements for corporate standards<br />

Feasibility studies<br />

Concept, scheme and detailed designs<br />

Post contract - monitoring standards of<br />

installation and site quality control<br />

Project close out, commissioning<br />

assistance and integrated system testing<br />

Sustainability reviews<br />

AS BUILT drawings<br />

Workshop drawings<br />

Testing and commissioning management<br />

SUSTAINABILITY<br />

The most sustainable design is the right<br />

design. B&W offer a wide capability for<br />

sustainability with expertise in achieving<br />

corporate strategy from concept design,<br />

through construction and in operations for all<br />

buildings and facilities. B&W’s low<br />

carbon consultants offer LEED and BREEAM<br />

compliant designs in addition to their<br />

accreditation with CIBSE, for all buildings in<br />

corporate portfolios. We are involved with a<br />

number of accreditation schemes, throughout<br />

the world, to define the energy performance<br />

of buildings.<br />

These standards include:<br />

BREEAM - Building Research<br />

Establishment Environmental<br />

Assessment Method (UK)<br />

LEED - Leadership in Energy and<br />

Environmental Design (US)<br />

Green Building Regulations (Dubai)<br />

Estidama - Sustainable design standards<br />

(Abu Dhabi)<br />

LCEA - Low Carbon Energy Assessors<br />

(Australia)<br />

DESIGN IS OUR<br />

SPECIALITY.<br />

OUR TEAM’S<br />

CREATIVE<br />

EXPERTISE<br />

CONSISTENTLY<br />

DELIVERS<br />

EXCITING AND<br />

INNOVATIVE<br />

SOLUTIONS.


8<br />

COMPANY PROFILE<br />

ACHIEVING SUSTAINABILITY THROUGH DESIGN<br />

At B&W our sustainable business model ensures sustainability<br />

is at the heart of our work which we believe will not only make<br />

our business stronger in the long run but also those of our<br />

clients. Sustainable business models promote and invariably<br />

produce tangible economic, environmental and social benefits.<br />

Through our in-house technical experts our analytical<br />

skills bring focus to strategies at the outset, answering<br />

the individual aims of a project, business or market<br />

sector.<br />

A number of our projects have left a sustainable legacy<br />

such as the Horizon Building in Delhi, India which<br />

achieved LEED Gold and the Urban Planning Council<br />

Headquarters in Abu Dhabi which achieved a LEED<br />

Platinum rating.<br />

We use thermal modelling software very early in the<br />

design process to establish accurate building<br />

loads that are within 5% of the final building loads. This<br />

also enables sustainable design decisions to be<br />

made with confidence when assessing options<br />

and informing strategies.<br />

We hold sustainable workshops on projects with our<br />

in-house technical experts to ensure the most<br />

appropriate strategies are proposed. These workshops<br />

include updates on latest technologies and design<br />

codes and lessons learned from previous projects.<br />

As part of our ISO Accreditation, all our staff are<br />

provided with industry-leading training which includes<br />

our CIBSE Low Carbon Consultants and Level 5<br />

Energy Assessors.<br />

Our diverse practical experience strengthens our ability<br />

to help clients with their sustainability goals and<br />

policies and achieve legislative compliance or planning<br />

permissions by addressing sustainability.<br />

COMMITTED TO<br />

Early IES Model for Al Jalila<br />

Research Building to correctly<br />

assess thermal loads /<br />

performance


9<br />

COMPANY PROFILE<br />

BUILDING INFORMATION MODELLING (BIM)<br />

THE BENEFITS<br />

OF BIM<br />

OUR BIM SYNERGY<br />

OUR BIM<br />

COMMITMENT<br />

OUR BIM<br />

CAPABILITY<br />

Earlier and more accurate<br />

visualisations of project<br />

fundamentals<br />

Enhanced collaboration and conflict<br />

mitigation for all design disciplines<br />

Efficient use, space planning and<br />

performance optioning<br />

Improved information delivery for<br />

key decisions<br />

Higher quality and accuracy of<br />

outputs for greater predictability<br />

Faster project delivery<br />

Integration between analysis/design<br />

and construction models<br />

Efficient construction phasing<br />

Improved programming and cost<br />

management (4D and 5D analysis)<br />

Risk reduction with increased<br />

confidence in design, construction<br />

and operational costs<br />

Improved facilities management<br />

The fundamental principles and<br />

objectives of BIM processes are<br />

synonymous with B&W’s core ethos.<br />

BIM is integrated into our design processes and<br />

management systems. Appropriately applying BIM on our<br />

projects enables us to realise our core values and facilitate:<br />

Earlier design collaboration to develop and test design<br />

alternatives<br />

More effort on design by our experienced and talented<br />

engineers with less effort on processing documentation<br />

Achieving precise co-ordination and clash avoidance<br />

early during the design phases, reducing risk of<br />

increased construction costs or a degraded installation<br />

High quality and highly informative digital deliverables<br />

Enhanced collaboration to ensure designs are<br />

right first time.<br />

B&W’s BIM affinity is<br />

recognised by our<br />

commitment to a long term<br />

structured implementation strategy.<br />

Our established BIM maturity has<br />

been advanced through robust<br />

and sustained investment, forming<br />

the building blocks of successful<br />

implementation.<br />

Key BIM building blocks implemented:<br />

A centre of excellence for talent<br />

Certified and accredited capability<br />

Robust IT infrastructure<br />

Collaborative working tools<br />

Our BIM pedigree in defined by the technical<br />

expertise and talent of our highly experienced<br />

team and the continuous development of our<br />

streamlined internal BIM systems. We demonstrate our<br />

expertise through recognised and accredited certification.<br />

BIM PRODUCTION<br />

Our technical capability to build<br />

advanced and complex MEP<br />

models is sustained through<br />

company-wide BIM standards<br />

and structured internal<br />

training.<br />

These standards and training<br />

are developed and enhanced<br />

through company BIM<br />

champions Karl Snowball and<br />

Karl (top) and Chris (below)<br />

Chris Nisbert. Both Karl and<br />

Chris are Autodesk® Revit®<br />

MEP:2015 Certified Professionals, a status achieved only by an<br />

elite community of MEP engineering professionals in the UK<br />

and globally.<br />

BIM DELIVERY<br />

Our internal management systems<br />

and procedures are certified to<br />

BIM Level 2, demonstrating our<br />

information management capability<br />

as defined within the standards<br />

PAS1192-2:2013 and PAS 91:2013<br />

section 4.2.<br />

The was achieved by fully<br />

integrating the requirements of BIM<br />

Level 2 into our business quality<br />

management (QSE) systems which<br />

have also achieved UKAS accredited certification to ISO 9001.<br />

BIM is now embedded in the way in which we operate.


10<br />

COMPANY PROFILE<br />

DESIGN TOOLS WE USE<br />

BUILDING SIMULATION<br />

IES VIRTUAL ENVIRONMENT -<br />

APACHE & SUNCAST<br />

Whether working on a new build or renovation project, our engineers apply a variety of innovative<br />

analysis techniques to meet the specific needs of each building. Applying a holistic approach<br />

ensures a fully integrated building performance is achieved. B&W’s sustainable design analysis<br />

considers different design options, identifies best practice solutions, compares low-carbon<br />

technologies, and draws conclusions on energy usage, CO2 emissions, occupant comfort, light<br />

levels, airflow, Part L, BREEAM and LEED.<br />

AMTECH PRODESIGN<br />

B&W contain global knowledge and expertise in Amtech<br />

modelling for all project electrical distribution calculations<br />

including cable sizing/selection, switch discrimination and<br />

fault protection studies, in accordance with BS 7671. B&W<br />

have multiple international licenses.<br />

Uses real weather data<br />

and occupancy profiles to<br />

accurately predict thermal<br />

loads, avoiding over-design.<br />

Sun-path/day-lighting analysis<br />

for determining effective<br />

shading strategies and<br />

minimising artificial lighting.<br />

Bulk airflow modelling for<br />

natural ventilation.<br />

Enhanced modelling for local<br />

energy code compliance.<br />

Solar shading analysis<br />

Sun-path image with building geomotery<br />

SYSTEM SIMULATION<br />

HEVACOMP<br />

0.00 0.44 0.87 1.31 1.74 2.18 2.62 3.05 3.49 3.92 4.36 4.79<br />

Velocity (m/s)<br />

B&W contain global knowledge and<br />

expertise with Hevacomp modelling<br />

for all projects mechanical distribution<br />

systems, including domestic hot and<br />

cold water pipework sizing<br />

(in accordance with BS EN 806-3),<br />

heating and chilled water pipework<br />

sizing, circulation pump duty head/<br />

flow rate, ductwork sizing, fan duty<br />

ESP/flow rate and gas pipework<br />

sizing. B&W have multiple international<br />

licenses.<br />

DIALUX AND RELUX<br />

B&W are fully proficient with a number of lighting design<br />

software package to maximise aesthetics and natural<br />

light studies whilst maintaining best practice light levels<br />

and throughout buildings and external landscapes.<br />

IES VIRTUAL ENVIRONMENT - MICROFLO<br />

Detailed element computational fluid dynamic (CFD) software<br />

for study of fluid velocity and temperatures in spaces.<br />

Very useful for predicting and avoiding overheating and<br />

stagnation/draughts in internal and external environments.<br />

Demand controlled ventilation strategies to reduce energy<br />

consumption<br />

CFD showing air velocity profile


11<br />

COMPANY PROFILE<br />

KEY PROJECTS: HOTELS<br />

Yas Viceroy Hotel<br />

YAS ISLAND, ABU DHABI<br />

DESCRIPTION: HOTEL<br />

CAPACITY:<br />

ARCHITECT:<br />

499 GUEST ROOMS & SUITES<br />

ASYMPTOTE<br />

SECTOR LEAD<br />

Brian Dryburgh<br />

DIRECTOR<br />

Having been in the industry since 1986, Brian<br />

has accumulated a wealth of professional<br />

experience, including multiple hotel projects in<br />

the UK, Middle East, Africa and the Asian subcontinent.<br />

His extensive experience includes learning and<br />

understanding a number of brand standards<br />

from 3 to 5 star properties. This exposure has<br />

led to Brian being involved in the development<br />

of brand standards for a variety of hotel<br />

operators as well as leading design teams in a<br />

number of hotel projects.<br />

Understanding and addressing the common<br />

complaints that occur in hotels, following Brand<br />

Standards and liaising with operators are key to<br />

the success of Black & White’s hotel designs.<br />

Brian’s ‘all-MEP disciplines’ background allows<br />

his input to all aspects of hotel design and<br />

has enabled Black & White commissions on<br />

projects with varying scopes - from AV/IT and<br />

Vertical Transport only to Electrical and full MEP<br />

services.<br />

bdryburgh@bw-engineering.com<br />

Full MEP design for this 1.8 billion AED, upscale<br />

hotel. CFD analysis was utilised in the design<br />

of the hotel rooms and the link bridge. B&W<br />

completed the MEP design in just 15 weeks,<br />

producing over 1,300 drawings. Appointed in<br />

May 2008, this posed a massive challenge as the<br />

structural design was complete and construction<br />

had commenced. B&W can deliver large projects.


12<br />

COMPANY PROFILE<br />

Boulevard Hotel<br />

BAKU, AZERBAIJAN<br />

DESCRIPTION: HOTEL<br />

CAPACITY:<br />

ARCHITECT:<br />

818 GUEST ROOMS AND SUITES<br />

REARDON SMITH<br />

Full MEP and specialist design services including AVIT,<br />

acoustics, fire and life safety and swimming pool and<br />

water features for The Boulevard Hotel overlooking the<br />

Caspian Sea. The hotel is part of Marriott International’s<br />

Autograph portfolio and consists of the following<br />

facilities:<br />

818 guest rooms and suites.<br />

Approximate GIA of 80,000 M 2<br />

Conference, meeting facilities, restaurants, spa<br />

and state of the art fitness centre<br />

Connection to on grade car park contained<br />

under the hotel<br />

Kempinski Hotel Marsa Malaz<br />

DOHA, QATAR<br />

DESCRIPTION: HOTEL<br />

CAPACITY:<br />

ARCHITECT:<br />

280 GUEST ROOMS AND SUITES<br />

AEB<br />

ELV design consultancy services - G+LG+G+5 floors,<br />

the hotel contains 280 keys of guest rooms and suites,<br />

three restaurants, beach bar facility, spa and wellness,<br />

four restaurants, a rooftop bar, six meeting rooms and<br />

an 800 person ballroom. B&W’s scope was to provide<br />

ELV design services including audio visual, IT and<br />

security to all of the areas listed above and all other<br />

public areas.


13<br />

COMPANY PROFILE<br />

KEY PROJECTS: HIGH RISE<br />

Burj Khalifa<br />

DUBAI, UAE<br />

ICC Towers<br />

MUMBAI, INDIA<br />

DESCRIPTION: MIXED USE<br />

DESCRIPTION: RESIDENTIAL<br />

HEIGHT:<br />

OVER 828 M<br />

TOTAL AREA:<br />

1 MILLION SQ M<br />

ARCHITECT:<br />

SKIDMORE, OWINGS<br />

& MERRILL LLP<br />

ARCHITECT:<br />

HAFEEZ CONTRACTOR<br />

SECTOR LEAD<br />

Steven Horn<br />

DIRECTOR<br />

Steven is a Director of B&W with responsibility<br />

for running the Newcastle office. Having spent<br />

four years in the Middle East, Steven has<br />

worked on a number of high rise projects in<br />

Dubai, Qatar and India.<br />

Specific areas of consideration on tall<br />

buildings include:<br />

Early conceptual thermal modelling<br />

and analysis to ensure appropriate<br />

diversities are applied, considering the<br />

different building uses and plant is not<br />

unnecessarily oversized.<br />

Detailed integration of MEP with the<br />

building structure.<br />

Logistics of high rise construction.<br />

Optimum MEP plant space requirements<br />

considering hydraulic requirements,<br />

maximising lettable areas.<br />

Plant, system and component pressure<br />

ratings including surge analysis in<br />

critical areas.<br />

Stack effect / reverse stack effect<br />

mitigation measures.<br />

Key understanding and design of all<br />

fire fighting and MEP life safety systems.<br />

Anchoring and movement of systems.<br />

shorn@bw-engineering.com<br />

Our Director’s previous experience<br />

includes involvement in the world’s<br />

tallest building. The Burj Khalifa<br />

presented a unique challenge which<br />

demanded an innovative, efficient<br />

and technologically advanced MEP<br />

system design.<br />

Black & White undertook construction<br />

supervision through full construction,<br />

commissioning and final handover.<br />

Marine Drive<br />

Cochin<br />

KOCHI, INDIA<br />

DESCRIPTION: MIXED USE<br />

TOTAL AREA: 120,773 M<br />

ARCHITECT: WOODS<br />

BAGOT<br />

The ever popular Marine Drive<br />

in Kochi is a picturesque and<br />

commercially thriving area<br />

facing the backwaters of the<br />

Arabian Sea.<br />

The project will consist<br />

of seven towers and will<br />

include a car park, podium<br />

levels (including retail), and<br />

residential zone.<br />

This luxury residential development is<br />

located in Island City Centre district in<br />

Mumbai, India. When fully developed<br />

ICC will have five residential towers, a<br />

commercial tower, hotel and serviced<br />

apartments development, shopping mall<br />

and high street.


14<br />

COMPANY PROFILE<br />

Worli Towers<br />

MUMBAI, INDIA<br />

DESCRIPTION: MIXED USE<br />

HEIGHT: APPROX. 298M<br />

ARCHITECT: KPF<br />

Nakheel No. 1 Park Harbour Avenue<br />

& DUBAI, Tower UAE<br />

DUBAI, UAE<br />

DESCRIPTION: MIXED USE<br />

HEIGHT: APPROX. 1500M<br />

ARCHITECT: WOODS BAGOT<br />

No. 1 Park<br />

Avenue<br />

Avenue<br />

DUBAI, UAE<br />

DUBAI, UAE<br />

DESCRIPTION: HOTEL<br />

HEIGHT: 381M<br />

ARCHITECT: BROADWAY<br />

MALYAN<br />

Aquum Towers<br />

DUBAI, UAE<br />

Tiara United Towers<br />

BUSINESS BAY, DUBAI, UAE<br />

DESCRIPTION: RESIDENTIAL<br />

DESCRIPTION: RESIDENTIAL<br />

HEIGHT:<br />

APPROX. 145M<br />

HEIGHT:<br />

APPROX. 225M<br />

ARCHITECT:<br />

PLAN QUADRANT<br />

ARCHITECT:<br />

ADPI<br />

The project comprises a mixed use<br />

tower, a residential tower, basement<br />

and a podium car park. The plot<br />

shall be developed with associated<br />

landscaped areas.<br />

Twin luxury residential towers which will<br />

have a height in excess of 145m. The project<br />

shall consist of: car park, podium including<br />

F&B and retail units, and a residential zone<br />

including gym and function rooms.<br />

B&W provided energy modelling for<br />

this 1km+ mixed use development<br />

comprising residential apartments,<br />

public spaces, and offices. B&W<br />

undertook a climatic study, sun-path<br />

analysis and produced a concept<br />

energy report within 6 months of<br />

being introduced to the project,<br />

realising significant energy savings<br />

as well as more efficient smaller<br />

plant/space requirements.<br />

The Tiara Tower project consists of two high rise<br />

comprising 48 levels made up of residential, leisure<br />

and MEP plant space. Resident’s car parking and<br />

core MEP plant is situated within the three levels of<br />

basement and within the podium link between both<br />

the east and west tower. The development will boast<br />

a range of luxury 1, 2 and 3 bedroom apartments<br />

and penthouse accommodation. Leisure facilities<br />

include pool and gym, located at the top level of the<br />

podium.<br />

Mixed use ultra high-rise<br />

development. This iconic building will<br />

contain a 90-room boutique hotel at<br />

levels 70-99, 32 floors of offices and<br />

serviced apartments. B&W created<br />

a detailed concept stage energy<br />

model.


15<br />

COMPANY PROFILE<br />

KEY PROJECTS: FIT-OUTS<br />

SECTOR LEAD<br />

Dominic Carrington<br />

DIRECTOR<br />

Dominic has a wealth of knowledge and<br />

experience in all disciplines after working in the<br />

engineering industry for over 35 years.<br />

With extensive technical experience at<br />

director level, Dominic has been responsible<br />

for managing and developing diverse<br />

multidisciplinary projects throughout the United<br />

Kingdom and internationally.<br />

His professional integrity has allowed him to<br />

plan and design complex jobs in aviation,<br />

commercial, industrial, retail, health and<br />

defence sectors. He specialises in technical<br />

building services design and has managed<br />

multidiscipline projects with an emphasis on low<br />

energy and sustainable solutions.<br />

The high calibre of Dominic’s expertise<br />

spanning a wide range of sectors which<br />

enhances our delivery of cutting edge,<br />

innovative and sustainable designs.<br />

The fast-paced and ever changing fit-out sector<br />

allows Dominic to make full use of his project<br />

management expertise to ensure projects run<br />

smoothly and are completed successfuly to the<br />

highest standards.<br />

dcarrington@bw-engineering.com<br />

Yas Viceroy Hotel<br />

ABU DHABI, UAE<br />

DESCRIPTION: RESTAURANTS<br />

ARCHITECT:<br />

ASYMPTOTE<br />

Design and fit-out of all restaurants in this<br />

iconic hotel. Restaurants include:<br />

Amici - Italian Restaurant<br />

A chic restaurant with a wood fired oven<br />

and elegant terrace outside overlooking<br />

the F1 Racing Circuit.<br />

Angar - Indian Restaurant<br />

A unique and modern restaurant features<br />

a circular open kitchen and the option of<br />

an outdoor terrace.<br />

Atayeb Arabic - Mediterranean<br />

Restaurant<br />

Ornate and beautifully furnished,<br />

serving Moroccan, Tunisian, Lebanese<br />

and Syrian old world tastes and with a<br />

modern flair.<br />

Kazu - Japanese Restaurant<br />

Featuring a sushi and sashimi bar,<br />

a tempura station and a terrace<br />

overlooking the F1 Racing Circuit.<br />

Noodle Box - Chinese Restaurant<br />

Contemporary South East Asian cuisine.<br />

Its external terrace gives the best views of<br />

the Yas Marina circuit.<br />

Nautilus - Seafood Restaurant<br />

A bright and modern dining experience<br />

with unique live fish tanks and amazing<br />

views of the marina.<br />

Origins - International Restaurant<br />

One of the best international buffets in<br />

Abu Dhabi. Patrons can dine indoors or<br />

on the spacious terrace overlooking Yas<br />

Marina Circuit.<br />

Hakkasan, Jumeirah Emirates Towers<br />

ABU DHABI, UAE<br />

DESCRIPTION: RESTAURANT<br />

ARCHITECT: WOODS BAGOT<br />

Restaurant MEP design and fit-out of one<br />

of the best Chinese restaurants in Dubai,<br />

situated within the Jumeirah Emirates<br />

Towers Hotel.<br />

This 1,500m 2 fit-out included one of the<br />

highest capacity kitchens we have come<br />

across and required a number of groundbreaking<br />

technologies to realise.<br />

Hakkasan Dubai is an award-winning<br />

independent restaurant where exquisite<br />

food and modern, authentic decor<br />

combine to create a unique dining<br />

experience. The 152 seat restaurant can<br />

accommodate an additional 88 guests<br />

on its stunning outside terrace. Private<br />

VIP areas and the Ling-Ling lounge cater<br />

for a more casual retreat.


16<br />

COMPANY PROFILE<br />

KEY PROJECTS: RETAIL<br />

SECTOR LEAD<br />

Stephen Clough<br />

TECHNICAL DIRECTOR<br />

Stephen is a technical director with over 25<br />

years of experience, 15 of those working<br />

internationally on projects in Europe, The Middle<br />

East and Australia.<br />

Stephen is a motivated, focused and<br />

enthusiastic leader committed to delivering<br />

multiple projects of significant size and<br />

complexity to a high degree of technical<br />

excellence. He possesses excellent problem<br />

solving abilities and interpersonal skills,<br />

ensuring that project goals are achieved.<br />

Stephen has a good understanding of<br />

professional and ethical responsibilities and is a<br />

great believer in an honest and open approach<br />

to teamwork.<br />

He has successfully delivered many AED<br />

600M+ projects within the Middle East and<br />

Europe, whilst building highly effective teams<br />

and company systems. A number of these have<br />

been worldwide iconic projects where he has<br />

utilised global expertise to deliver on time and to<br />

the client satisfaction, leading a multidisciplinary<br />

team.<br />

Stephen is the lead engineer various retail<br />

projects in Baku currently under construction<br />

and is providing engineering support to various<br />

mall projects in the Middle East.<br />

sclough@bw-engineering.com<br />

Dubai Festival City Mall<br />

DUBAI, UAE<br />

DESCRIPTION: MALL EXPANSION<br />

ARCHITECT:<br />

HOK<br />

SCALE: 44,593 M 2<br />

The expansion of Festival Square in the<br />

Dubai Festival City Mall adds 20 per cent<br />

more area and features new fashion,<br />

lifestyle and dining choices overlooking the<br />

Dubai Creek.<br />

The Phase 2B project involves the<br />

refurbishment of a large occupied and<br />

operational mall. The atrium will house<br />

several new retail and F&B units and will<br />

position the existing mall at the pinnacle of<br />

the Dubai retail market.<br />

One of the most challenging elements of<br />

the project was the phased opening of<br />

areas of the mall while unopened spaces<br />

were still being constructed.


17<br />

COMPANY PROFILE<br />

Baku White City Mall<br />

BAKU, AZERBAIJAN<br />

DESCRIPTION: RETAIL AND LEISURE<br />

ARCHITECT: CHAPMAN TAYLOR<br />

SCALE: 400,000 M 2<br />

Mall of India<br />

NOIDA, INDIA<br />

DESCRIPTION: RETAIL AND LEISURE<br />

ARCHITECT: BENOY<br />

SCALE: 185,806 M 2<br />

Barwa Mall<br />

STATE OF QATAR<br />

DESCRIPTION: MIXED USE COMPLEX<br />

ARCHITECT:<br />

WOODS BAGOT<br />

SCALE: 22,627 M 2<br />

B&W were appointed to provide full detailed MEP design for this<br />

285,000m 2 mall at Baku White City, Azerbaijan - the project will become<br />

the largest retail centre in the country. At concept stage the project<br />

consists of:<br />

Basement parking for over 3000 cars<br />

2 levels of retail<br />

Family entertainment centre<br />

10 screen cinema<br />

Food court<br />

Hypermarket<br />

B&W carried out an MEP peer review consultants for 185,806m 2 GLA<br />

retail project under construction at the moment in Noida. Located on<br />

the eastern side of New Delhi, the overall built up area is approximately<br />

232,257m 2 The entire MEP design including BOQ has been completed<br />

by local consultants based in Delhi. The structure is about 60 per cent<br />

complete and no MEP contracts have been awarded to date. B&W are<br />

providing technical reviews and advising on tenant delivery strategy and<br />

impact to the services design and commissionability.<br />

B&W provided full MEP and AV/IT design services on this project to<br />

convert an existing building to a multi-use building. Barwa Mall was<br />

created out of an existing building footprint that was already partly built.<br />

Our challenge was to evolve this building into a full multi-use complex<br />

including shopping mall, cinema, serviced apartments, medical centre,<br />

offices, food court, a children’s themed play area, bowling alley and a<br />

basement level car park.<br />

The primary challenge was to fit the services for the new building use<br />

into the already planned building shell. Over 1200 drawings were<br />

produced in the five-month design period which progressed as the


18<br />

COMPANY PROFILE<br />

KEY PROJECTS: TECHNOLOGY<br />

Barclays<br />

RIYADH, SAUDI ARABIA<br />

Etihad Airways<br />

RIYADH, SAUDI ARABIA<br />

New York University<br />

ABU DHABI, UAE<br />

SECTOR LEAD<br />

Critical comms room for regional<br />

banking headquarters office in<br />

Riyadh’s Faisaliah Tower. Comms<br />

room with full fire suppression, leak<br />

detection, UPS back-up, equivalent<br />

to Tier 2 classification.<br />

Review and study with report for<br />

condition survey of existing Etihad<br />

Airlines Data Centre Facility in their<br />

HQ building in Abu Dhabi.<br />

Peer review of the rack layouts for<br />

the data centre and redundant data<br />

centre in the NYU Abu Dhabi.<br />

Shaun O’Mahoney<br />

TECHNICAL DIRECTOR<br />

Shaun O’Mahoney has 20 years UK and<br />

international experience in technology, data<br />

centre design and build.<br />

His commitment to understanding latest<br />

developments in best PUE/DCIE practices,<br />

resilient/scalable distribution strategies and<br />

product/equipment innovation research means<br />

that clients can be confident that their data<br />

centre will exceed their planned return of<br />

investment whilst maintaining an adaptable<br />

platform to support business needs of<br />

tomorrow.<br />

somahoney@bw-engineering .com<br />

Khazna Data Centre<br />

DUBAI AND ABU DHABI, UAE<br />

DESCRIPTION:<br />

ARCHITECT:<br />

DATA CENTRE<br />

KHAZNA/<br />

EQUINIX<br />

AREA: 1000M 2<br />

POWER ALLOWANCE: 10MWe<br />

(PHASE 2)<br />

RESILIENCE: TIER 3<br />

The Khazna Data Centre projects<br />

consisted of two (nearly identical)<br />

double storey buildings; one located<br />

in Masdar (Abu Dhabi) and the other<br />

in Meydan (Dubai). Both data centres<br />

contained 2no. existing 1000m2<br />

PODs (White spaces) from a possible<br />

6no. PODs. B&W were employed<br />

to complete the MEP design for the<br />

POD 3 extension whilst maintaining<br />

the live data centre. The electrical<br />

distribution provides ‘N+1’ distributed<br />

redundancy. The project required<br />

careful negotiations and hand-holding<br />

with the UAE local authorities to<br />

obtain approval for data centre type<br />

allowances which did not fully align<br />

with approval authority guidelines.<br />

MBC Group<br />

DUBAI MEDIA CITY, UAE<br />

Numerous application for the MBC<br />

Group, including: New build data<br />

centres, mission critical chiller<br />

refurbishment and replacement,<br />

temp chiller solutions and<br />

emergency procedure planning.<br />

TDIC HQ<br />

ABU DHABI, UAE<br />

Critical comms room for major real<br />

estate developer’s headquarters<br />

building in Abu Dhabi. Comms<br />

room with full fire suppression,<br />

leak detection, generator and<br />

UPS back-up, equivalent to Tier 2<br />

classification.<br />

JP Morgan<br />

RIYADH, SAUDI ARABIA<br />

Critical comms room for regional<br />

banking headquarters office in<br />

Riyadh’s Faisaliah Tower. Comms<br />

room with full fire suppression,<br />

leak detection, generator and<br />

UPS back-up, equivalent to Tier 2<br />

classification.


19<br />

COMPANY PROFILE<br />

KEY PROJECTS: COMMERCIAL<br />

Urban Planning<br />

Council HQ<br />

ABU DHABI, UAE<br />

DESCRIPTION: OFFICE<br />

ARCHITECT:<br />

GENSLER<br />

SECTOR LEAD<br />

Philip Grant<br />

ASSOCIATE DIRECTOR<br />

Philip’s responsibilities include client & project<br />

team liaison, concept, scheme & detail<br />

development & full project delivery.<br />

He has been responsible for producing<br />

integrated designs for a variety of buildings<br />

across a diverse range of market sectors<br />

Having long been an advocate of<br />

multidisciplinary collaboration, Philip is a wellacquainted<br />

champion of Building Information<br />

Modelling (BIM) implementation within industry.<br />

His systematic and critical understanding<br />

of leading BIM processes have provided<br />

competencies that have been instrumental to<br />

ensuring appropriate & successful deployment<br />

of BIM on a number of large projects.<br />

pgrant@bw-engineering.com<br />

Linklaters HQ<br />

DUBAI, UAE<br />

DESCRIPTION: OFFICE<br />

ARCHITECT:<br />

WOODS BAGOT<br />

Linklaters relocated their UAE headquarters to a<br />

1,208m 2 site in the newly opened Currency House,<br />

part of the prestigious Dubai International Financial<br />

Centre (DIFC) district. Office fit-out consist of a mix<br />

of cellular, open plan office space, meeting rooms,<br />

utility rooms and a reception. The brief was for a<br />

high specification office utilizing low energy design<br />

through the use of high efficiency luminaires, daylight<br />

and occupancy sensors and variable air volume<br />

distribution systems.<br />

MEP and IT systems design and<br />

fit-out of three floors of a proposed<br />

office development which will<br />

comprise of cellular office space,<br />

meeting rooms, open plan admin<br />

space and conference rooms.<br />

The project saves energy through<br />

intelligent control solutions,<br />

lighting design with daylight<br />

sensors. Integration of time clocks,<br />

occupancy sensors, dimming ability<br />

and appropriate zoning has allowed<br />

comprehensive control over the<br />

space.<br />

Horizon Centre<br />

DELHI, INDIA<br />

DESCRIPTION: OFFICE AND RETAIL<br />

ARCHITECT:<br />

AHC<br />

Concept, schematic, detailed design and review for this<br />

23-storey iconic office tower which will include retail, car<br />

park and basement service levels as well as offices. The<br />

commercial offices shall have a floor plate in excess of<br />

297m 2 .


20<br />

COMPANY PROFILE<br />

KEY PROJECTS: HEALTHCARE<br />

Healthpoint Hospital<br />

ABU DHABI, UAE<br />

DESCRIPTION: HOSPITAL COMPLEX<br />

ARCHITECT: HDR<br />

SECTOR LEAD<br />

Jamie Darragh<br />

PRINCIPAL ENGINEER<br />

Jamie is a chartered engineer, based in the<br />

Dubai office, with over 12 years’ experience in<br />

the industry and a wealth of knowledge across<br />

all sectors.<br />

Specialising in healthcare, Jamie is an<br />

affiliate of The Institute of Healthcare<br />

Engineering and Estate Management. He<br />

has developed a wide range of experience<br />

from acute hospitals, mental health hospitals,<br />

inpatient to outpatient clinics and research<br />

facilities. Jamie is fully conversant with the<br />

requirement’s and challenges involved with<br />

the successful design of medical facilities<br />

including the key considerations of efficiency<br />

and cost effectiveness, flexibility, anti-ligature,<br />

expandability, environment, sanitation,<br />

accessibility, controlled circulation, aesthetics,<br />

security and sustainability.<br />

Medical facilities are one of the most complex of<br />

building types and each project comprises of a<br />

wide range of services and functional operations<br />

including diagnostic and treatment functions.<br />

These range from clinical laboratories, accident<br />

and emergency facilities, imaging and surgery,<br />

plus functionality services such as maintenance<br />

and food services, inpatient care and ward<br />

functionality. Such diversity has to be reflected<br />

in the design with reference to the wide range of<br />

regulations and codes.’<br />

The design of medical facilities is an evolving<br />

process and involves highly challenging design<br />

of MEP systems which requires the specialist<br />

knowledge and expertise which B&W offer.<br />

jdarragh@bw-engineering.com<br />

Al Jalila Research Building<br />

DUBAI HEALTHCARE CITY, DUBAI, UAE<br />

DESCRIPTION: UNIVERSITY HOSPITAL<br />

ARCHITECT:<br />

IBI NIGHTINGALE<br />

The Al Jalila Research Building is a<br />

prestigious first of its kind medical laboratory<br />

facility in Dubai Healthcare City. The 10<br />

storey building will form part of a major<br />

new academic health science centre and<br />

consists of medical research laboratories,<br />

clinic spaces, administration facilities<br />

and provision for other medical partner<br />

organisations. The project also features<br />

three levels of basement, containing car<br />

parking and MEP services.<br />

The structural design of the building was<br />

to remain the same because three levels<br />

of basement, including a portion of the<br />

ground floor and lift shafts were already<br />

constructed. The challenge was to fit a<br />

complex MEP system within the building’s<br />

existing foot print.<br />

B&W utilised BIM to deliver the project and<br />

ensure precise coordination of the MEP<br />

systems with the structural and architectural<br />

design, ensuring optimum use of space.<br />

The most forward thinking solutions were<br />

identified to ensure flexibility for the future<br />

installation of MEP systems for the partner<br />

organisation services.<br />

Dr Abdulkareem Sultan Al Olama, Al Jalila<br />

Foundation CEO, commented: “We are very<br />

pleased with the designs. It will be the UAE’s<br />

first independent multi-disciplinary medical<br />

research centre’’<br />

B&W carried out technical design review, post contract management<br />

and supervision of the MEP installations for this major hospital complex<br />

comprising operating theatres, treatment rooms and patient care facilities. The<br />

medical facility is a green field 20,700m 2 hospital and 9,000m 2 clinic interlinked<br />

and constructed over a 30,600m 2 two storey podium structure.<br />

Maliha Military<br />

Hospital<br />

SHARJAH, UAE<br />

DESCRIPTION: MILITARY<br />

HOSPITAL<br />

ARCHITECT: LEO A DALY<br />

Peer review of the Maliha Military Hospital located in Sharjah. This 220 bed<br />

hospital, consisting of two residential buildings for medical staff, a mosque,<br />

emergency helipad, air conditioned ambulance garage, an armoury, chemical<br />

storage facility and security gate house will be offering state of the art facilities<br />

in Sharjah. The hospital will cater for dignitaries by providing VIP medical suites.<br />

The hospital will function as a cutting edge medical education facility, with an<br />

entire floor consisting of three lecture theatres, a library and associated offices,<br />

offering the very latest research and excellence in medical education.


21<br />

COMPANY PROFILE<br />

KEY PROJECTS: AIRPORT FACILITIES<br />

SECTOR LEAD<br />

Alistair Davis<br />

ASSOCIATE DIRECTOR<br />

Alistair is a chartered mechanical engineer with<br />

10 years’ experience in the building services<br />

industry. Prior to joining the organisation, he<br />

lead the mechanical team of an international<br />

M&E firm.<br />

He spearheaded the MEP services delivery of<br />

major fit-out projects in Bahrain and Riyadh,<br />

managing high-level co-ordination between<br />

interdisciplinary project teams.<br />

Alistair’s expertise covers a broad spectrum of<br />

sectors - commercial offices, high rise, mixed<br />

use, residential, master plans and infrastructure<br />

design projects in the UK, India and across the<br />

Middle East.<br />

adavis@bw-engineering.com<br />

State Guest Reception Terminal<br />

ABU DHABI INTERNATIONAL AIRPORT, ABU DHABI, UAE<br />

DESCRIPTION: AIRPORT TERMINAL<br />

ARCHITECT: ADPI<br />

AREA: 20,000 M 2<br />

Full MEP services for a terminal building with a 1,000m 2 underground<br />

car park. This terminal is dedicated to welcoming VVIP dignitaries<br />

and heads of states arriving in Abu Dhabi. Located at the southwest<br />

end of the Abu Dhabi International Airport, it is close to the existing<br />

presidential flight facility.<br />

Specialist areas include:<br />

A 15m high welcome hall to accommodate a 260 piece band plus<br />

all ruling dignitaries (from which B&W used dynamic simulation<br />

software for thermal analysis that included macro flow air<br />

modelling).<br />

State of the art media centre<br />

Specialist air conditioned fully glazed airplane entrance portal,<br />

Central cooling plant upgrade and refurbishment whilst<br />

maintaining a fully operational existing presidential terminal.<br />

Royal Majlis with zero tolerance internal comfort criteria.<br />

A newly developed standardized approach to dynamic thermal<br />

modelling for typical building types enabled plant requirements to<br />

be obtained at an early stage in the design to enable design and<br />

development of MEP strategies that would complement the buildings<br />

type and form.<br />

Muscat International Airport MC2<br />

MUSCAT, OMAN<br />

DESCRIPTION: AIRPORT EXPANSION<br />

ARCHITECT:<br />

AREA: 130,000 M 2<br />

DRAKE & SCULL INTERNATIONAL LLC<br />

Airports in the Sultanate of Oman<br />

DUBAI, UAE<br />

DESCRIPTION: REGIONAL AIRPORTS DEVELOPMENT<br />

ARCHITECT: DRAKE & SCULL INTERNATIONAL LLC<br />

AREA: 12,000 M 2<br />

This project is part of the<br />

overall expansion of the<br />

Muscat International Airport<br />

(MIA) to cater for the expected<br />

increase in passenger and<br />

freight volumes. The project<br />

consists of ATC tower, data<br />

centre, crash fire rescue, air<br />

traffic & meteorology complex,<br />

contingency and training, guard<br />

house ATM complex, ATM<br />

complex utility yard and C&T<br />

centre utility yard.<br />

We undertook a Peer Review<br />

of the existing MEP design to<br />

define compliance with the ERs<br />

(as they stand), identify the<br />

missing/required employers<br />

requirements and produce a<br />

final detailed design for client<br />

sign-off.<br />

MEP design and specialist<br />

services for four airport sites in<br />

Oman. Buildings include cargo,<br />

ground support equipment,<br />

passenger terminal, aircraft<br />

rescue and fire fighting.<br />

Adam will have a capacity to<br />

handle 250,000 passengers<br />

annually. The Sohar Airport,<br />

which is in a major economic<br />

industrial city, Duqm, will be<br />

one of the cornerstones of<br />

this development and will be<br />

very important for boosting the<br />

economic zone in that area. On<br />

the other hand, the airport in<br />

Ras Al-Hadd is supporting<br />

tourism in the region.


22<br />

COMPANY PROFILE<br />

KEY PROJECTS: INFRASTRUCTURE & MASTERPLANNING<br />

Saadiyat Island District Cooling<br />

ABU DHABI, UAE<br />

DESCRIPTION: 9 PRIMARY PLANT ROOMS<br />

CLIENT: TDIC<br />

CAPACITY: 400,000 TR<br />

SECTOR LEAD<br />

Paul Allen<br />

TECHNICAL DIRECTOR<br />

Paul has accumulated a wealth of experience<br />

and has spent more than 25 years in the<br />

Middle East.<br />

His experience is evenly divided between<br />

contracting and consulting, giving him<br />

a balanced view of the industry and the ability<br />

to understand the practicalities of design<br />

solutions and the consequences of executing<br />

them.<br />

He has held senior design management<br />

responsibilities for a number of major<br />

prestigious projects across many sectors<br />

including district cooling.<br />

His extensive technical experience is invaluable<br />

in achieving project objectives and ensuring<br />

B&W’s designs are pragmatic, economical and<br />

sustainable.<br />

pallen@bw-engineering.com<br />

Sowwah Island District Cooling<br />

ABU DHABI, UAE<br />

DESCRIPTION: COOLING PLANT ROOMS<br />

CLIENT:<br />

CAPACITY:<br />

JOHN BUCK INTERNATIONAL / MUBADALA<br />

80,000 TR<br />

Peer review of the concept/scheme and detailed design proposals<br />

of a 80,000 TR district cooling plant incorporating an extensive<br />

chilled water thermal storage serving the new Abu Dhabi financial<br />

district. The district cooling plant has two independent distribution<br />

circuits one of which is an essential dedicated chilled water<br />

supply with full resiliency backed up with emergency generators.<br />

The total capacity of 80,000 TR consists of:<br />

System 1 - 15,000 TR;<br />

System 2 - 55,000 TR;<br />

Thermal storage – 10,000 TR or 54,000 TR<br />

Client representative services to Abu Dhabi’s leading<br />

developer for their largest development, Saadiyat Island.<br />

B&W provided strategic advice for the Capex/ Opex<br />

business plan for distributed district cooling. B&W also<br />

recommended load limits and design guidelines to<br />

sub-developers in order to preserve the viability of the<br />

business plan, setting low energy targets and diversity<br />

expectations for efficient operation of the district cooling<br />

plants which serve 130,000 residents.<br />

Najmat District Cooling<br />

ABU DHABI, UAE<br />

DESCRIPTION: COOLING PLANT ROOMS<br />

DEVELOPER: REEM DEVELOPMENTS<br />

CAPACITY: 115,000 TR<br />

Design and post-contract<br />

consultancy services for the<br />

district cooling plant rooms<br />

and reticulation associated<br />

with a district cooling network.<br />

B&W undertook developer<br />

cooling load assessment,<br />

generated a site-wide<br />

guideline for to rationalise and<br />

optimise their designs and<br />

implemented an NOC process<br />

to administer and manage the<br />

developer cooling loads to<br />

the benefit of all parties. B&W<br />

also provided advice on the<br />

business plan for construction<br />

and operation of the district<br />

cooling plant. Najmat<br />

occupies approximately 20%<br />

of Reem Island at 1,486,449<br />

m² and will be home to some<br />

80,000 residents.


23<br />

COMPANY PROFILE<br />

KEY PROJECTS: LEISURE<br />

SECTOR LEAD<br />

Jon Mitchell<br />

ASSOCIATE DIRECTOR<br />

Jonathan joined B&W in 2008, prior to which<br />

he had over 20 years’ experience in design and<br />

build contracting for MEP systems.<br />

Many of his most rewarding projects have been<br />

in the retail and leisure sector managing the<br />

design, installation and refurbishment for a wide<br />

range of projects including:<br />

Fitness First Leisure Centres - UK wide<br />

Caspian Waterfront mixed use complex -<br />

Baku, Azerbaijan<br />

Football stadium fit outs and refurbishments<br />

- Manchester, Glasgow and Abu Dhabi<br />

ESPA Spa – Yas Island, Dubai, UAE<br />

Hotel swimming pool & gym projects -<br />

Viceroy Dubai & Boulevard Baku<br />

Jonathan liaises closely with operators,<br />

architects and interior designers to ensure that<br />

careful coordination of MEP systems delivers<br />

the required environment to a wide range of<br />

varying spaces within each building.<br />

B&W directors maintain responsibility for a<br />

project from concept through to completion<br />

and Jonathan demonstrates this commitment<br />

to continuity to ensure design decisions are<br />

understood at site level and applied correctly.<br />

The ever changing and wide ranging challenges<br />

of the leisure sector allow Jonathan to make<br />

use of his design, co-ordination and contracting<br />

expertise and to focus on problem solving,<br />

which is where he specialises.<br />

jmitchell@bw-engineering.com<br />

Caspian Waterfront<br />

BAKU, AZERBAIJAN<br />

DESCRIPTION: LEISURE AND RETAIL<br />

ARCHITECT: BENOY<br />

This iconic development<br />

dramatically transforms the<br />

shoreline of the Caspian<br />

Sea. The architectural form<br />

is derived from the emblem<br />

of Azerbaijan and inspired by<br />

the Sydney Opera House.<br />

The mixed use building<br />

will contain leisure facilities<br />

including multi-screen<br />

cinema, play zones and<br />

international standard ice<br />

hockey rink together with<br />

retail and dining tenancies.<br />

The MEP systems consider<br />

the evolving use of the<br />

building, to allow flexibility<br />

of sub-let areas as tenants<br />

come on board. The lack of<br />

external spaces for plant also<br />

created major restrictions<br />

with seawater cooling one of<br />

the crucial design features<br />

employed to overcome these<br />

challenges.<br />

Vox Multi Screen<br />

Cinema Complex<br />

DUBAI, UAE<br />

DESCRIPTION: 10 SCREEN CINEMA<br />

ARCHITECT: WOODS BAGOT<br />

Hazza Bin Zayed Stadium<br />

AL AIN, ABU DHABI, UAE<br />

DESCRIPTION: MULTI-PURPOSE STADIUM<br />

ARCHITECT: GENSLER<br />

A four-level facility<br />

that includes 10<br />

screen cinema<br />

auditoria, café,<br />

box office,<br />

server, bio box<br />

projection rooms,<br />

concessions and<br />

staff areas.<br />

B&W provided<br />

lighting design<br />

and computer<br />

visualisations for<br />

the auditoria and<br />

other public spaces<br />

utilising bespoke<br />

down lights and<br />

other feature<br />

lighting concepts.<br />

MEP, acoustic and fire engineering consultancy services for<br />

the fit out of the VVIP and VIP areas within the new 25,000<br />

seat stadium. The fit-out of these areas within the west<br />

stand areas is of an exceptionally high standard, with MEP<br />

systems being critical to ensuring the highest level of comfort<br />

and security. For these areas Coordination of MEP systems<br />

with the complex interior design was critical in ensuring the<br />

success of the project.


CONTACT US<br />

DUBAI (Head Office)<br />

Black & White Engineering<br />

1801 Marina Plaza<br />

Marsa Street<br />

Dubai<br />

P O Box 27793<br />

+971 4 447 7281<br />

MANILA<br />

Black & White Middle East<br />

(Philippines) Inc.<br />

Unit 1, 22nd floor<br />

Zuellig Building<br />

Makati Avenue, Makati City<br />

Philippines<br />

+63 (2) 264 4450<br />

TALK TO US<br />

TODAY ABOUT<br />

YOUR MEP NEEDS,<br />

OUR TEAM HAS<br />

DECADES OF<br />

COMBINED<br />

EXPERIENCE TO<br />

SUCCESSFULLY<br />

DELIVER YOUR<br />

PROJECT.<br />

ABU DHABI<br />

Black & White Engineering<br />

Unit 3, Mezzanine Level<br />

Dolphin Tower<br />

PO Box 128981<br />

+971 2 443 9755<br />

NEWCASTLE<br />

Black & White Engineering Ltd<br />

Unit 2.8, First Floor<br />

Generator Studios,<br />

Trafalgar Street<br />

Newcastle upon Tyne NE1 2LA<br />

+44 (0) 191 230 0206<br />

BAKU<br />

Black & White<br />

Middle East-F.Z.E.<br />

3, Inshaatchilar Ave,<br />

Baku City, AZ1073<br />

Republic of Azerbaijan<br />

PERTH<br />

Black & White Engineering<br />

Pty Ltd<br />

507 Murray Street<br />

Perth, WA<br />

+61 8 6218 3120<br />

LONDON<br />

Office opening soon<br />

enquiries@bw-engineering.com<br />

www.bw-engineering.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!