Horizontal well completion
Fact-Sheet-Horisontal-Well-completion-Final
Fact-Sheet-Horisontal-Well-completion-Final
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
New Wells Technology Programme<br />
The Maersk-led development of the Al-<br />
Shaheen field in Qatar has been successfully<br />
managed through an active New Wells<br />
Technology Programme, a systematic<br />
approach to technology development based<br />
on a sequential, staged growth in capability.<br />
The programme develops and incorporates<br />
technology advancements in a logical<br />
progression.<br />
At Al-Shaheen, the New Wells Technology<br />
Programme has driven technology and<br />
deployment advances with horizontal<br />
<strong>completion</strong>s, culminating in the world’s first<br />
installation of a surface-controlled, flow<br />
control <strong>completion</strong> in a horizontal extended<br />
reach <strong>well</strong>.<br />
Manara<br />
Manara is Schlumberger’s surface-controlled,<br />
flow control <strong>completion</strong> that was first<br />
installed in <strong>well</strong> GD-12 at Maersk Oil’s Al-<br />
Shaheen field in July 2015.<br />
It is the most recent intelligent <strong>completion</strong><br />
system from Schlumberger that enables<br />
operators to monitor and control multiple<br />
zones continuously, simultaneously and in<br />
real time.<br />
It also represents the deepest extended<br />
reach <strong>well</strong> installation to date anywhere<br />
in the world and a new type of intelligent<br />
<strong>completion</strong> that is designed to help reduce<br />
<strong>well</strong> interventions during the entire production<br />
life of the <strong>well</strong>; something that will result in<br />
substantial OPEX cost savings and reduced<br />
safety risks for the life of the <strong>well</strong>.<br />
This type of intelligent <strong>completion</strong> is<br />
something Maersk Oil plans to implement in<br />
other feasible <strong>well</strong>s.<br />
Extended-reach <strong>well</strong><br />
Sand Screen<br />
Sand Screen<br />
Sand Screen<br />
Sand Screen<br />
Lower <strong>completion</strong><br />
Swnel<br />
Female Coupler<br />
Station<br />
Station<br />
Station<br />
Station<br />
One control Line<br />
Male Coupler<br />
Upper <strong>completion</strong>