Horizontal well completion
Fact-Sheet-Horisontal-Well-completion-Final
Fact-Sheet-Horisontal-Well-completion-Final
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
In the Al-Shaheen development in Qatar<br />
specialists from Subsurface, Wells and<br />
Production Operations teams are designing<br />
and constructing advanced <strong>well</strong>s with<br />
intelligent <strong>completion</strong>s, which so far have<br />
been deployed in <strong>well</strong> lengths to around<br />
18,000 ft (5,500 m). In particular for relatively<br />
shallow located reservoirs, this is <strong>well</strong> beyond<br />
the industry standard of approximately<br />
15,000 ft (4,500 m). With some of our Al-<br />
Shaheen <strong>well</strong>s reaching distances of over<br />
30,000 ft (9,000 m) our goal, via progressive<br />
technology development and staged trials, is<br />
to push intelligent <strong>completion</strong>s deployment<br />
to the full drilled length of these ultraextended<br />
reach <strong>well</strong>s distributions in 3D.<br />
Our specialists use multi-zone reservoir<br />
management techniques to improve<br />
production rates and total recovered oil<br />
volume, primarily in carbonate reservoirs<br />
like those in Qatar and Denmark. Reservoir<br />
management techniques such as<br />
surveillance, modelling and data collection<br />
provide a holistic approach to production<br />
optimisation.<br />
These techniques allow operators to monitor<br />
the pressure, temperature and movement of<br />
hydrocarbons in the <strong>well</strong>s and enable them<br />
to better control flow rates within each zone.<br />
The understanding gained through collecting<br />
and analysing data allows us to optimise the<br />
production over the entire life-cycle of the <strong>well</strong>.<br />
Multi-zone<br />
reservoir<br />
management<br />
techniques<br />
improves total<br />
recovered oil<br />
volume